电力负荷计算表完整版
电力负荷计算表
、名称为各个设备组,其设备功率为额定功率乘以相对于的系数2、系数Kx,功率系数,计数系数可以参考相对于的电力设计数据3、负荷率=最后的视在功率/选型的变压器容量序需用系数计算系数号K X tgΦ1办公照明2400.30.622车间照明2800.40.623反应釜1320.30.624精馏塔1170.30.625槽型混合机930.30.626多层流化床600.30.627齐多夫定生产线600.70.628P-胸苷生产线450.70.6295-甲基尿苷生产线360.70.6212仓储系统1010.620.85100.8531.50.8525.20.85180.85420.8535.10.8527.90.851120.8539.60.8572名 称工作容量(KW )功率因数COSΦP (KW)13车间净化系统12010.6214天车27.50.30.6215气相色谱 5.250.80.6216离子色谱 6.250.30.6217标准实验箱0.50.30.6218分光光度计20.30.6219高纯度烘干箱 3.50.30.6220无尘分析室100.30.6221原子发射仪 1.20.30.6222组合空调1500.50.6223办公用电500.80.621449.2667.785同时系数KZ 0.85有功负荷系数a 0.75无功负荷系数PP^0.75~0.851449.20.831449.20.9313变压器负荷率800KVA 变压器(1台)无功补偿容量(KVar)总 计(补偿后)0.4车间干线KZ = 0.9〜1;低压母线KZ = 0.8〜0.9a-0.7 ~ 0.8 (平均负荷与计算负荷之比值)(平均负荷与计算负荷之比值)总 计(补偿前)0.660.85750.85400.8530.850.360.850.60.85 1.050.85 1.8750.850.150.858.250.85 4.20.8512084.71558备注6.211.819.537.115.629.611.221.226.049.421.841.317.332.869.4131.824.646.6S (KVA)44.684.7计算负荷P W)Q (Kvar)414.0267567.6173714527.9KH=81.6%压器(1台)121567.6227.00.8〜0.9值)567.6351.946.588.224.847.11.9 3.50.20.40.40.70.7 1.21.22.20.10.25.19.72.6 4.974.4141.2。
电力负荷计算公式与范例
常用电工计算口诀第一章按功率计算电流的口诀之一1.用途:这是根据用电设备的功率(千瓦或千伏安)算出电流(安)的口诀。
电流的大小直接与功率有关,也与电压,相别,力率(又称功率因数)等有关。
一般有公式可供计算,由于工厂常用的都是380/220 伏三相四线系统,因此,可以根据功率的大小直接算出电流。
2.口诀:低压380/220 伏系统每KW 的电流,安。
千瓦,电流,如何计算?电力加倍,电热加半。
单相千瓦,4 . 5 安。
单相380 ,电流两安半。
3. 说明:口诀是以380/220V 三相四线系统中的三相设备为准,计算每千瓦的安数。
对于某些单相或电压不同的单相设备,其每千瓦的安数.口诀中另外作了说明。
①这两句口诀中,电力专指电动机.在380V 三相时(力率左右),电动机每千瓦的电流约为2 安.即将“千瓦数加一倍”( 乘2)就是电流, 安。
这电流也称电动机的额定电流.【例1 】千瓦电动机按“电力加倍”算得电流为11 安。
【例2 】4 0 千瓦水泵电动机按“电力加倍”算得电流为8 0安。
电热是指用电阻加热的电阻炉等。
三相380 伏的电热设备,每千瓦的电流为安.即将“千瓦数加一半”(乘,就是电流,安。
【例1】3 千瓦电加热器按“电热加半”算得电流为安。
【例2】1 5 千瓦电阻炉按“电热加半”算得电流为2 3 安。
这口诀并不专指电热,对于照明也适用.虽然照明的灯泡是单相而不是三相,但对照明供电的三相四线干线仍属三相。
只要三相大体平衡也可以这样计算。
此外,以千伏安为单位的电器(如变压器或整流器)和以千乏为单位的移相电容器(提高力率用)也都适用。
即是说,这后半句虽然说的是电热,但包括所有以千伏安、千乏为单位的用电设备,以及以千瓦为单位的电热和照明设备。
【例1 】1 2 千瓦的三相( 平衡时) 照明干线按“电热加半”算得电流为1 8 安。
【例2】30 千伏安的整流器按“电热加半”算得电流为45 安。
(指380 伏三相交流侧)【例3 】3 2 0 千伏安的配电变压器按“电热加半”算得电流为480 安(指380/220 伏低压侧)。
电气计算EXCEL表格:电力负荷计算
784
0.5
0.80
Pjs(kW) 392
1176
0.5
0.80
588
70
0.8
0.80
56
234
0.7
0.80
164
200
0.7
0.80
140
120
0.7
0.80
84
0.80
1424
-600
0.95
1424
1424
选SBC10-1000变压器 2台变压器 负载率75%
Qjs(kvar)
294 441 42 123 105 63 1068 468 468
245 42
193
71 13 114 9 116 9 115 9 171 13 177 14 1312 423 423
以上负荷基数参考建设单位原有负荷估算表换算而成,原负荷表估算偏小。
Sjs(kVA)
490 735 70 205 175 105 1780 1499
343 59
270
100 19 160 12 163 12 161 13 240 19 247 19 1837 1353
备注
补偿33%
40+8套 48+3套 20+4套 20+4套 20+4套 30+6套 30+6套 补偿50%
1#、2#楼(6+1F)
7137
48
343
0.7
0.70
240
1#、2#楼地下室
2970
20
59
0.7
0.70
42
3#楼高层住宅 (18+1F)
6747
施工用电负荷计算
施工用电负荷计算2010-04-06 22:53:52| 分类:施工用电负荷计算第一节现场施工主要机械设备用电量统计表第二节用电项目的需要系数表用电设备组名称TST-20022JG2507 .5混凝土搅拌机及灰浆搅拌机、地泵施工外用电梯、振动机、钢筋机械、压缩机、木工机械、夯土机械第三节变压器需要容量计算1) 各用电设备组的负荷计算有功功率计算 PjS=kx Pe无功功率计算QjS=PjStgθ视在功率计算 SjS=式中Pjs—用电设备组的有功计算负荷kW;Qjs—用电设备组的无功计算负荷kVar;SjS—用电设备组的视在计算负荷kVA;Kx—用电设备组的需要系数。
1 .塔式起重机查表Kx=0.3;COSθ=0.7;tgθ=1.02,先将Jc=40%统一换算到Jc=25%的额定容量Pe1=2P1× =2×130× =174.2 kW计算负荷:Pjs1= Kx·Pe1=0.3×174.2=52.26 kWQjs11=Pjs1·tgθ=52.26 ×1.02=52.27 kvar2混凝土施工系统查表KX=0.7;COSθ=0.68;tgθ=1.08Pjs2=KX×Pe2=0.7×180=126(kW)Q js2=Pjs2×tgθ=126×1.08=136.8(kvar)3.电焊机及焊接设备组查表KX=0.45;COSθ=0.45;tgθ=1.98;先将Jc=50%统一换算到Jc=100%的额定容量;Pe3= ×Pn= ×144=101.84 (kw)计算负荷:Pjs3=KX×Pe3=0.45×101.84 =45.83 (kw)Q js3=Pjs3×tgθ=45.83×1.98=90.74(kvar) 4.施工外用电梯查表Kx=0.7;COSθ=0.7 tgθ=1.02;Pjs4= Kx·Pe4=0.7×44=30.8(kw)Qjs4=Pjs4·tgθ=30.8×1.02=31.46 (kvar)5.搅拌机组查表Kx=0.7;tgθ=1.08;Pjs5=Kx·Pe5=0.7×15=10.5 (kw)Qjs5=Pjs5·tgθ=10.5×1.08=11.3(kvar)6.钢筋调直机查表=0.7;COSθ=0.7;tgθ=1.02;Pjs6=Kx·Pe6=0.7×5.5×2=7.7 (kw)Qjs6=Pjs6·tgθ=7.7×1.02=7.85 (kvar)7.振动机组查表Kx=0.7;COSθ=0.7;tgθ=1.02Pjs7= Kx·Pe7=0.7×15=10.5 (kw)Qjs7=Pjs7·tgθ=10.5×1.02=10.71(kvar)8.打夯机组查表Kx=0. 7;COSθ=0.7;tgθ=1.02Pjs8= Kx·Pe8=0.7×4.5=3.15(kw)Qjs8=Pjs8·tgθ=3.15×1.02=3.21(kvar) 9.生产水泵:查表Kx=0.7;COSθ=0.7;tgθ=1.02Pjs9= Kx·Pe9=0.7×22.5=15.89 kWQjs9=Pjs9·tgθ=15.89×1.02=16.2 kvar对焊机查表查表KX=0.45;COSθ=0.45;tgθ=1.98; Jc=50%换算到Jc=100%Pe10= ×Pn= ×200=28.3 (kw)计算负荷:Pjs10= Kx·Pe10=0.45×141.44=63.64kWQjs10=Pjs10·tgθ=63.64×1.02=64.92 kva10.钢筋弯曲机查表=0.7;COSθ=0.7;tgθ=1.02;Pjs11=Kx·Pe11=0.7×3×2=4.2 (kw)Qjs11=Pjs11·tgθ=4.2×1.02=4.28 (kvar)11.钢筋切断机查表=0.7;COSθ=0.7;tgθ=1.02;Pjs6=Kx·Pe6=0.7×7.5×2=10.5 (kw)Qjs6=Pjs6·tgθ=10.5×1.02=10.71 (kvar)12.照明用电20KWa) 总的负荷计算式Pjz=kx∑Pjs (kw)Qjz=kxΣPjztgθ (kvar)Sjz= (kvA)在式中Pjz、Qjz 、Sjz—各用电设备组的有功、无功、视在计算负荷。
第二章 电力负荷计算
电力负荷的计算是正确选择供配电系统 中导线、电缆、开关电器、变压器等电气 设备基础,也是保障供配电系统安全可靠 运行必不可少的环节。本章是分析工厂供 配电系统和进行供电设计计算的基础。
本章主要学习以下几个内容:
电力负荷与负荷曲线 ✓电力负荷的基本概念; ✓电力负荷分级 ✓负荷曲线的基本概念、作用及分类 ✓ 与负荷曲线相关的几个物理量
计算负荷情况复杂,影响计算负荷的因素 很多,难以精确计算; ✓负荷是变化的; ✓与设备性能、生产组织、生产者的技能熟 练程度及能源供应的状况等多种因素有关。
计算负荷的方法很多:估算法、需要系数 法和二项式法和单相负荷等近似求解方法
本节主要介绍两种:需要系数法和 二项式法
(一)设备容量的计算 1.用电设备的额定容量
三级负荷对供电电源没有特殊要求,一般由 单回路电力线路供电。
三. 负荷曲线
1、负荷曲线(load curve) 是表征电力负荷随时间变动情况的一种图形,
绘在直角坐标纸上,纵坐标表示负荷(有功功 率或无功功率)值,横坐标表示对应的时间, 一般以小时(h)为单位。
某厂日有功负荷曲线
2、负荷曲线的作用 负荷曲线能够直观的反映出用户的用电特点和
额度负荷(安装容量);在工厂供配电系统设计时, 如果直接采用额定容量进行设计势必会造成浪费; 应首先计算出全部设备的实际负荷。 2 .负荷计算的主要内容 (1)求计算负荷(需要负荷,假想负荷):即正 常工作时的实际最大负荷。目的选择各级电压供电 网络、变压器容量、电气设备的型号等;保证使其 在通过正常最大工作电流时不至过热而损坏。(选 择设备)
(3)年持续负荷曲线意义 年持续负荷曲线与横轴所包围的面积代表
了用户全年消耗的总电能。
施工临时用电负荷计算方法
施工临时用电负荷计算方法施工手册Pjs1=KxXPeQjs1=Pjs×tgΦSjs=(P2+Q2)1/21塔式起重机组塔式起重机组为10台塔吊,其中QTZ5010型号9台,35KW/台;QTZ40型号1台,25KW/台,即Pe1=435KW0查表得Kx=O.3 C0SΦ=0.7tgΦ=1.02塔吊有功功率:Pjs1=KxXPe1=O.3×435=130.5KW塔吊无功功率:Qjs1=Pjs1×tgΦ=130.5×1.02=133.I1KVA2振捣组(插入式振动棒、平板式振动器)振捣组为插入式振动棒10根,每根1.1KW,平板振动器2根,每根1.5KW,共计10×1.1+2×1.5=14KW,即Pe2=14KWo查表得Kx=O.7COSΦ=O.7tgΦ=1.02振捣组有功功率:Pjs2=Kx×Pe2=0.7×14=9.8KW振捣组无功功率:Qjs2=Pjs2×tgΦ=9.8×1.02=9.996KVA3电焊机组电焊机组为6台BX3-500-2型号电焊机,每台38.6KW;2台钢结构专用电焊机,每台60KW。
共计6X38.6+2X60=351.6KW,即Pe3=351.6KW。
查表得Kx=O.45 tgΦ=1.98电焊机组有功功率:Pjs3=KxXPe3=0.45X351.6=158.22KW电焊机组无功功率:Qjs3=Pjs3XtgΦ=158.22X1.98=313.28KVA4蛙式夯机组蛙式夯机组为4台HW-60型号,每台3KW,共计4X3=12KMBPPe4=12KWo 查表得Kx=O.8COSΦ=0.8tgΦ=0.75蛙式夯机组有功功率:Pjs4=Kx×Pe4=0.8×12=9.6KW蛙式夯机组无功功率: Qjs4=Pjs4Xtg6=9.6X0.75=7.2KVA4电机组电机组(生产用水泵、预拌砂浆机、钢筋加工厂机械、消防水泵、混凝土地泵、电梯及工具)电机组为消防水泵2台,每台22KW;潜水泵5台,每台3KW;施工用水泵1台,每台IOKW;施工电梯19台,每台21KW;无齿锯10台,每台3K肌木工圆锯5台,每台3KW;直螺纹套丝机10台,每台3KW,钢筋弯曲机10台,每台3KW,钢筋切断机5台,每台3K肌钢筋调直机5台,每台14KW,混凝土地泵1台,每台22KW,手提电动工具30台,每台IKk共计2*22+5*3+1*22+19*21+10*3+5*3+10*3+10*3+5*3+5*14+1*22+30*1=722KW,即Pe5=156KW查表得KX=O.85 COSΦ=0.8tgΦ=0.75电机组有功功率:Pjs5=Kx×Pe5=0.85X722=631.7KW电机组无功功率:QjS5=Pjs5×tgΦ=631.7×0.75=460.275KVA5照明及办公照明及办公生活为:办公IOoK肌现场照明80KW,生活区150KW,共计330KW,即Pe6=270KWo照明及办公有功生活功率:Pjs6=Kx×Pe6=1×(100+80+4150)=330KW照明及办公无功生活功率:Qjs6=Pjs6×tgΦ=330XO=OKVA6总的负荷计算经过计算得出:塔吊有功功率: Pjs1=KxXPe1=O.3×435=130.5KW振捣组有功功率Pjs2=Kx×Pe2=0.7×14=9.8KW电焊机组有功功率:Pjs3=Kx×Pe3=0.45X351.6=158.22KW蛙式夯机组有功功率Pjs4=Kx×Pe4=0.8×12=9.6W电机组有功功率: Pjs5=K x×Pe5=0.85×722=631.7KW照明及办公有功功率:Pjs6=Kx×Pe6=1×(100+80+4150)=330KW总的有功功率:130.5+9.8+158.22+9.6+631.7+330=673.82KW,即∑Pjs=1269.82KWKx=O.85PjS=Kx∑Pjs=0.85X1269.82=1079.37KW经过计算得出:塔吊无功功率: QjS1=PjS1XtgΦ=130.5×1.02=133.I1KVA振捣组无功功率Qjs2=Pjs2×tgΦ=9.8×1.02=9.996KVA电焊机组无功功率Qjs3=Pjs3×tgΦ=158.22×1.98=313.28KVA蛙式夯机组无功功率Qjs4=Pjs4×tgΦ=9.6×0.75=7.2KVA电机组无功功率:Qjs5=Pjs5×tgΦ=631.7×0.75=460.275KVA照明及办公无功功率:Qjs6=Pjs6×tgΦ=330XO=OKVA总的无功功率为:133.11+9.996+313.28+7.2+460.275+0=923.86IKVA,即∑Qjs=5055KVA.Qjs=Kx∑Qjs=0.85X923.816=785.28KVA总的视在功率:Sjs=(P2+Q2)12=(1079.372+785.282),72=13380KVA 现场提供的变压器总容量为1400KVΛ,经计算变压器总容量可以满足施工用电的正常运行。
(完整版)住宅用电负荷需要系数选择表
住宅用电负荷需要系数选择表说明:1.表中通用值系目前采用的住宅需用系数值,推荐值是为计算方便而提出,仅供参考。
2.住宅的公用照明及公用电力负荷需要系数,一般可按0.8选取。
3.本表摘自《全国民用建筑工程设计技术措施·电气》(2003)。
规划单位建设用地负荷指标1.城市建设用地包括:居住用地、公共设施用地、工业用地、仓储用地、对外交通用地、道路广场用地、市政公用设施用地、绿化用地和特殊用地八大类。
不包括水域和其它用地。
2.超出表中三大类建设用地以外的其它各类建设用地的规划单位建设用地负荷指标的选取,可根据所在城市的具体情况确定。
3.ha——公顷。
规划单位建筑面积负荷指标注:超出表中三大类建筑以外的其它各类建筑的规划单位建筑面积负荷指标的选取,可结合当地实际情况和规划要求,因地制宜确定。
各类建筑物的用电指标注:表中所列用电指标的上限值是按空调采用电动压缩机制冷时的数值。
当空调冷水机组采用直燃机时,用电指标一般比采用电动压缩机制冷时的用电指标降低25—35V A/m2。
说明:1.“规划单位建设用电、建筑面积负荷指标”仅可用于规划设计阶段,该表摘自于《城市电力规划规范》GB50293—1999。
2.单体建筑物方案设计时,可采用本图集“各类建筑物的用电指标”表进行负荷估算。
该表摘自《全国民用建筑工程设计技术措施·电气》(2003)。
有线电视网的光节点,可以覆盖的用户数在800~2000,由于电视普及率大大高于电话普及率,光节点覆盖半径在1km范围,就可以拥有大量的用户。
同轴电缆每500m设置一级放大器,最多可以达4级,由于同轴电缆的每公里造价比铜缆贵,同轴电缆的长度也不宜太长。
对于光节点的覆盖户数,目前业界的一种倾向认为500户一个光节点为标准。
这实际上是国外的一种经验模式,而国内城市一般人口密度高、住宅密度大,如果按500户一个光节点规划设计,其费用投入将十分巨大。
我们认为在现阶段根据住宅片区地理情况及用户经济情况的不同,光节点之下三级放大器级联,覆盖半径0.8km左右、覆盖户数1000~2500户左右较为适宜。
电力负荷计算表
1617 1485
(400.0)
1165.4 519.7 1276
12.8 1178.1
63.8 583.5
1315
446.3 361.3 574
1.8 0.864
7.7
5.5
58.5 43.9
97.5 168.7
612
580
843
550.6 522.2 759
5.5
26.1
556.1 548.3 781
q=0.95
变压器损
耗:
合计
65
6
磨矿系统 变配电室
1)
磨矿系统 变配电室
44
2) 1#精矿库 43
3)
1#精矿库 除尘
6
177
2413 2331
160
2
1325.3 1325.3 1.5
19
626
413
132
14
149.1 132.1
30
35
2100 1870
132
35
2100 1870
132
57 693.99 674.99 220
84
1766 1565
188
84
1766 1565
188
544 11543 10600 220
560 21563 20620 2400
三
事故电源 部分:
22
19
855.4 659.9 132
力 负荷计算表
2009年4月30日
图号:
计算系数
计算负荷
计算电 流
备注
OUNT COEFFICILENT
COSφ
耗:
合计
电力负荷计算
0.5
1.73
0.569
0.984
小计 负荷总计 ( K 0.9 )
34
93
93.795
18.169
27.514
16.35
24.76
29.67
45.1
14
1.3 确定计算负荷的方法
二、按二项式系数法确定计算负荷
1.对同一工作制的单组用电设备
P30 c Px b Pe Q30 P30 tan 2 2 S 30 P30 Q30 I 30 S 30 3U N
电力工程基础
电力负荷计算
补充 电力负荷计算
1.1 1.2 1.3 1.4 1.5 1.6
用电设备工作制 计算负荷及有关系数 确定计算负荷的方法 尖峰电流的计算 企业计算负荷的确定 无功功率补偿
2
1.1 用电设备工作制
一、用电设备的工作制 (工作时间、温升)
1.连续运行工作制(长期工作制) 2.短时运行工作制(短时工作制)(负荷计算时不计) 3.断续周期工作制(反复短时工作制) 暂载率(负荷持续率):指设备工作时间与工作周期的百
(或Qc 、Sc 、 Ic )表示。
通常把根据半小时平均负荷所绘制的负荷曲线上的 “最
大负荷”称为计算负荷,并作为按发热条件选择电气设备的 依据,因此
Pc Pmax P 30
4
1.2 计算负荷与有关系数
二、确定计算负荷的系数
1.需要系数Kd:负荷曲线中的最大有功计算负荷Pmax与全部
用电设备额定功率 PN 之比值,即
19
1.5 企业计算负荷的确定
一、按逐级计算法确定企业的计算负荷
逐级计算法是指从企业的用电端开始,逐级上推,直至求
电力负荷计算表[最新]
电力负荷计算表[最新]电力负荷计算表台数装机工作需要功率计算负荷序安工备功率容量容量系数因数 Pjs Qjs Sjs 设备名称号 cos装作用 (KW) (KW) (KW) Kx (KW) (KVar) (KVA) Ф1 22.00 22.00 0.85 0.80 18.70 14.03 23.38 中速潜水搅拌机 4 4 0 5.52 3.80 3.80 0.80 0.85 3.04 1.88 3.58 桁车式刮泥机 2 2 0 1.93 水解池污泥回流泵4 4 0 11 44.00 44.00 0.80 0.88 35.20 19.00 40.004 8.80 8.80 0.75 0.85 6.60 4.09 7.76 初沉池排泥泵 4 4 0 2.25 8.80 8.80 0.85 0.80 7.48 5.61 9.35 高速潜水搅拌机 4 4 0 2.26 中速潜水搅拌机 4 4 0 5.5 22.00 22.00 0.85 0.80 18.70 14.03 23.387 中速潜水搅拌机8 8 0 7.5 60.00 60.00 0.85 0.80 51.00 38.25 63.75 8 内回流泵 2 2 0 7.5 15.00 15.00 0.85 0.88 12.75 6.88 14.49 9 污泥回流泵 3 2 1 22 66.00 44.00 0.85 0.88 37.40 20.19 42.50 10 剩余污泥泵 2 1 1 3 6.00 3.00 0.75 0.85 2.25 1.39 2.65 11 电动葫芦 1 1 0 3.4 3.40 3.40 0.20 0.50 0.68 1.18 1.36 12 周边传动吸泥机 2 2 0 1.5 3.00 3.00 0.80 0.85 2.40 1.49 2.82 13 铸铁镶铜闸门 1 1 0 2.2 2.20 2.20 0.20 0.80 0.44 0.33 0.55 140.75 0.75 0.20 0.80 0.15 0.11 0.19 铸铁镶铜闸门 1 1 0 0.7515 单级立式离心泵 3 2 1 22 66.00 44.00 0.50 0.85 22.00 13.63 25.8816 罗茨鼓风机 2 1 1 75 150.00 75.00 0.50 0.85 37.50 23.24 44.12 17 单级双吸卧式离心泵 4 3 1 30 120.00 90.00 0.85 0.85 76.50 47.41 90.00 18 5.50 5.50 0.80 0.85 4.40 2.73 5.18 真空泵 1 1 0 5.519 0.75 0.75 0.85 0.85 0.64 0.40 0.75 立式潜污泵 1 1 0 0.75电动单梁悬挂桥式起重20 3.80 3.80 0.20 0.50 0.76 1.32 1.52 机 1 1 0 3.821 480.00 320.00 0.90 0.88 288.00 155.45 327.27 离心鼓风机 3 2 1 16022 8.30 8.30 0.20 0.50 1.66 2.88 3.32 电动单梁悬挂起重机 1 1 0 8.323 2.20 1.10 0.80 0.88 0.88 0.47 1.00 冷却水循环泵 2 1 1 1.124 1.50 6.00 6.00 0.20 0.80 1.20 0.90 1.50 铸铁闸门 4 4 025 1.50 7.50 7.50 0.20 0.80 1.50 1.13 1.88 铸铁闸门 5 5 026 1.50 6.00 6.00 0.20 0.80 1.20 0.90 1.50 铸铁闸门 4 4 027 1.50 3.00 3.00 0.60 0.75 1.80 1.59 2.40 回转式格栅 2 2 028 2.20 6.60 6.60 0.60 0.75 3.96 3.49 5.28 无轴输送器 3 3 029 污水排污泵 2 2 0 75.00 150.00 150.00 0.88 0.85 132.00 81.81155.29 30 1.50 3.00 3.00 0.60 0.75 1.80 1.59 2.40 转鼓细格栅 2 2 031 0.25 0.50 0.50 0.65 0.75 0.33 0.29 0.43 砂水分离器 2 2 032 风机 2 2 0 5.50 11.00 11.00 0.50 0.85 5.50 3.41 6.47 33 潜水搅拌器 2 2 0 2.00 4.00 4.00 0.85 0.80 3.40 2.55 4.25 34 周边传动吸泥机 2 2 0 1.50 3.00 3.00 0.80 0.85 2.40 1.49 2.8235 潜水排污泵 2 2 0 5.50 11.00 11.00 0.85 0.85 9.35 5.79 11.00 36 潜水排污泵 3 2 1 18.50 55.50 37.00 0.85 0.85 31.45 19.49 37.00 37 3.006.00 3.00 0.80 0.50 2.40 4.16 4.80 二氧化氯发生器 2 1 138 卸酸泵 1 1 0 3.00 3.00 3.00 0.80 0.80 2.40 1.80 3.00 39 动力水泵2 1 1 7.50 15.00 7.50 0.70 0.85 5.25 3.25 6.18 40 3.00 3.00 3.00 0.70 0.80 2.10 1.58 2.63 除磷加药装置 1 1 041 剩余污泥泵 2 1 1 1.50 3.00 1.50 0.75 0.85 1.13 0.70 1.32 42 回流污泥泵 3 2 1 15.00 45.00 30.00 0.85 0.88 25.50 13.76 28.98 43 1.50 3.00 3.00 0.85 0.80 2.55 1.91 3.19 潜水搅拌器 2 2 044 二氧化氯发生器 2 1 1 3.00 6.00 3.00 0.80 0.50 2.40 4.16 4.80 45 卸酸泵 1 1 0 3.00 3.00 3.00 0.80 0.80 2.40 1.80 3.00 46 7.50 15.00 7.50 0.70 0.85 5.25 3.25 6.18 动力水泵 2 1 147 聚合铝加药装置 1 1 0 3.00 3.00 3.00 0.80 0.80 2.40 1.80 3.00 48 除磷加药装置 1 1 0 3.00 3.00 3.00 0.70 0.80 2.10 1.58 2.63 补偿前合计 1477.40 1108.30 0.85 880.89 540.13 1033.30乘同时系数K?p=0.9和K?q=0.95后合计 0.85 836.84 513.13 981.63补偿后功率因数 0.95无功补偿容量 238.07补偿后合计 0.95 836.84 275.06 880.89ΔPT=0.01Sjs 8.81 变压器损耗ΔQT=0.05Sjs 44.04变压器高压侧合计 0.93 845.65 319.10 903.85。
工业企业电力负荷及其计算
2.1、工业企业电力负荷和负荷曲线
• 2.1.1工业企业电力负荷的分级
1、电力负荷:
用电设备所消耗的功率或者线路中流过的电流或者功率; —— (反映数值 KA/KVA)
耗用电能的用电设备和用户。——(反映性质)
2、按照电力负荷对其供电可靠性及中断供电在政治上、经济上所造 成的损失或者影响的程度,将工业企业的电力负荷分成三级:
则:
P30 KpP30,i ; Q30 KqQ30,i
P30 KpP30,i ; Q30 KqQ30,i ;
S30 I30
P302 Q302 ; S30 . 3U N
注意:视在计算负荷和电流的计算不能用各组的视在负荷或 计算电流直接相加而得。
2.3.2二项式系数法
略(P38)
计算每台用电设备的计算负荷p301按工作制相似的用电设备分组求出计算负荷p302低压母线上所有低压配电线路计算负荷之和再乘以一个同时系数求出计算负荷p303车间变电所低压侧计算负荷p303加上车间变压器的功率损耗求出车间变电所高压侧计算负荷p304304加上高压供电线路损耗求出总降压变压所各出线的计算负荷汇总总降压变电所各出线的计算负荷乘以一个同时系数得到变电所低压母线上的计算负荷p306总降压变电所低压母线上的计算负荷加上总降压变电所变压器耗损求得企业总计算负荷p307252按需要系数法确定企业计算负荷首先将企业用电设备容量p就得到了用功计算负荷p3030视在计算负荷s30计算电流i30253按估算法确定企业计算负荷wa为企业全年电能需求量
C、单相设备分别接线电压和相电压: 所有设备统一换算成相电压下的设备容量分相计算各相的设备容量和计算负荷取最 大相的3倍
A相:
Pe1,ph Pe1,mph,A Pe2,mph,A
电力负荷计算表完整版
单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvar KVA利用小数时(MWn)一铅锡合金电解1熔铅锅223060600.80.750.754533.752阳极锅113030300.80.750.7522.516.883阳极板铸型1133.233.233.20.80.750.6521.616.194残极洗涮机113330.80.750.65 1.95 1.465光棒机11 5.5 5.5 5.50.80.750.65 3.58 2.686阴极锅113030300.80.750.7522.516.887真空蒸馏炉4330012009000.80.750.87205408始极片锅113030300.80.750.7522.516.889铅始极片制造机组1131.5531.5531.550.80.750.6520.5115.3810电铅锅熔体搅拌机111515150.80.750.710.57.881150t锅搅拌机111515150.80.750.710.57.8812铅泵22 5.511110.80.750.758.25 6.1913吊钩桥式起重机11232.8232.8232.80.5 1.730.1534.9260.4814熔铅锅熔体搅拌机221530300.80.750.72115.7515阳极锅搅拌机111515150.80.750.710.57.8816其他115005005000.80.750.7350262.517离心风机115555550.80.750.7541.2530.9418螺旋卸灰机33 5.516.516.50.71.020.6510.7310.94电力负荷计算表受电设备名称序号备注计算负荷Kctg¢COS¢数量(台)19离心风机223774740.80.750.7555.541.6320离心风机117575750.80.750.7556.2542.1921玻璃钢净化塔循环泵112222220.80.750.7516.512.3822空调器66 3.923.423.40.80.750.7517.5513.1623空调器55 5.5527.7527.750.80.750.7520.8115.6124照明50500.80.750.84030小计25862285.71584.371225.5乘同时系数:Ky=0.9 Kw=0.95无功补偿-480补偿后1425.93684.21581.62X1250变压器损耗15.8279.0810KV侧负荷0.81441.75763.271631.360008650.49动力变压器单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)二铅电解直流负荷1电解直流负荷114754754750.90.480.8380184.04422.22变压器损耗 4.2221.1110KV侧负荷0.88384.22205.1560002305.33整流变压器4754751X475S11-M-1250/10 .10/0.4 2台计算负荷电力负荷计算表序号受电设备名称数量(台)COS¢tg¢Kc备注1164.21425.93单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)三烟化炉风机房离心鼓风机(10KV)单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)四收尘变电所(一)分银炉收尘1布袋除尘器控制柜22510100.80.750.757.5 5.6变频2卸灰阀1212336360.7 1.020.621.622.043电动蝶阀220.090.180.180.7 1.020.60.110.114电动蝶阀440.27 1.080.180.7 1.020.60.320.335风机221322642640.80.750.75198148.56埋刮板输送机225.511110.71.020.657.27.331528022560序号受电设备名称2310.33绕线电机5605500 电力负荷计算表4200.75计算负荷备注数量(台)COS¢tg¢Kc数量(台)COS¢tg¢Kc0.750.8计算负荷备注电力负荷计算表序号受电设备名称7照明及其他115550.80.750.843小计327.3327.26239.01187.23(二)铋转炉收尘1布袋除尘器控制柜115550.80.750.75 3.8 2.8变频2卸灰阀66318180.7 1.020.610.811.2 3电动蝶阀110.180.180.180.7 1.020.60.110.11 4电动蝶阀220.270.540.540.7 1.020.60.320.33 5风机111321321320.80.750.759974.25 6埋刮板输送机22 5.511110.7 1.020.657.27.3 7电动葫芦11 4.5 4.5 4.50.5 1.730.150.68 1.17 8照明及其他115550.80.750.843小计176.2176.22125.8199.99(三)贵铅炉收尘1布袋除尘器控制柜115550.80.750.75 3.8 2.8变频2卸灰阀88324240.7 1.020.614.414.69 3电动蝶阀110.090.090.090.7 1.020.60.050.06 4电动蝶阀220.270.540.540.7 1.020.60.320.33 5风机111321321320.7 1.020.759974.25 6埋刮板输送机117.57.57.50.7 1.020.65 4.95 7照明及其他115550.80.750.843小计174.1174.13126.4100.11(四)锑熔练反射炉收尘1布袋除尘器控制柜115550.80.750.75 3.8 2.8变频2卸灰阀88324240.7 1.020.614.414.69 3电动蝶阀110.180.180.180.7 1.020.60.110.11 4电动蝶阀220.270.540.540.7 1.020.60.320.33 5风机111321321320.7 1.020.759974.25 6埋刮板输送机117.57.57.50.7 1.020.65 4.95 7照明及其他115550.80.750.843小计174.2174.22126.46100.17(五)精练炉收尘1布袋除尘器控制柜115550.80.750.75 3.8 2.8变频2卸灰阀66318180.7 1.020.610.811.023电动蝶阀110.180.180.180.7 1.020.60.110.114电动蝶阀220.270.540.540.7 1.020.60.320.335风机111321321320.7 1.020.759974.256埋刮板输送机22 5.511110.7 1.020.657.27.37照明及其他111051051050.80.750.88463小计249.6249.63188.58146.39(六)(一)-(五)合计11011101.5806.25633.88乘同时系数Ky=0.9 Kw=0.95无功补偿-2402X630补偿后725.63362.18810.99变压器损耗8.1140.5510KV侧负荷0.88733.74402.7383760004402.42动力变压器S11-M-630/10 .10/0.4 2台725.63602.18单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)五贵金属熔炼变电所(一)阳极泥库及配料1阳极泥搅拌槽114440.80.750.7 2.8 2.12矿浆二次压滤泵112222220.80.750.7516.512.383二次箱式压滤机11 3.7 3.7 3.70.80.750.7 2.59 1.944滤液输送泵111515150.80.750.7511.258.445洗液输送泵117.57.57.50.7 1.020.6511.258.446圆盘给料机227.515150.7 1.020.659.759.957定量给料皮带机113330.7 1.020.65 1.95 1.998电动单梁起重机11 6.5 6.5 6.50.5 1.730.150.98 1.699抓斗挢式起重机1162.762.762.70.5 1.730.318.8132.5810定量给料皮带机99 2.219.819.80.7 1.020.6512.8713.1311惯性振动给料机220.55 1.1 1.10.7 1.020.650.720.7312鄂式破碎机222244440.80.750.753324.7513离心风机117575750.80.750.7556.2542.1914螺旋卸灰机11 5.5 5.5 5.50.7 1.020.65 3.58 3.6515轴流风机44 1.5660.80.750.75 4.5 3.3816空调器551.658.258.250.80.750.75 6.19 4.6417照明及其他50500.80.750.84030小计393.3393.3259.76222.05序号受电设备名称计算负荷备注数量(台)COS¢tg¢Kc电力负荷计算表(二贵金属熔练)1双钩桥式起重机11126.4126.4126.40.5 1.730.1518.9632.842贵铅炉111515150.80.750.7511.258.443电动平板车11 3.7 3.7 3.77 1.020.65 2.41 2.454分银炉111515150.80.750.7511.258.445银阳极板浇铸车440.37 1.48 1.480.7 1.020.650.960.986电动平板车44 2.28.88.80.7 1.020.65 5.72 5.847铋转炉111111110.80.750.77.7 5.788胶带输送机33 2.2 6.6 6.60.7 1.020.65 4.29 4.389胶带输送机112222220.7 1.020.6514.314.5910电动单梁起重机119.99.99.90.5 1.020.15 1.49 2.5711铋精炼锅651006005000.80.750.75375281.2512电动葫芦12 4.9 4.9 4.90.5 1.730.150.74 1.2713精炼炉113330.80.750.75 2.25 1.6914抽铋机55 1.57.57.50.80.750.7 5.25 3.9415颜氏喷火机22 3.77.47.40.80.750.75 5.55 4.1616颜氏喷火机33 1.5 4.5 4.50.80.750.75 3.38 2.5317离心风机119090900.80.750.7567.550.6318喷淋塔循环泵117.57.57.50.80.750.75 5.63 4.2219螺旋卸灰机11 5.5 5.5 5.50.7 1.020.65 3.58 3.6520轴流风机113330.80.750.75 2.25 1.6921池氯报警及吸收装置1118.518.518.50.80.750.7513.8810.4122照明及其他1001000.80.750.88060小计1072971.68643.31511.72(三(一)-(二)合计14651365903.03733.77)乘同时系数:812.76697.09Ky=0.9 Kw=0.95无功补偿-360补偿后812.76337.09879.892X800变压器损耗8.843.9910KV侧负荷0.91821.56381.08905.6460004929.37动力变压器单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)六金属砷回收1电动单梁桥式起重机44 6.927.627.60.5 1.730.15 4.147.172除尘器44520200.80.730.71410.53除尘器附离心风机22 5.511110.80.750.758.256.194螺旋给料机22 2.2 4.4 4.40.7 1.020.65 2.86 2.925砷蒸馏电阻炉404035140014000.80.750.811208406卸灰阀22 1.1 2.2 2.20.7 1.020.6 1.32 1.357埋刮板输送机22 5.511110.7 1.020.657.157.298碱液制备槽224880.80.750.7 5.6 4.29碱液循环泵221122220.80.750.7516.512.3810污水输送泵221122220.80.750.7516.512.3811离心风机221122220.80.750.7516.512.3812照明及其他1501500.80.750.812090小计17001700.21332.821006.74乘同时系数:Ky=0.9 Kw=0.95无功补偿-4001199.54956.4tg¢Kc电力负荷计算表数量(台)COS¢备注计算负荷S11-M-800/10 .10/0.4 2台序号受电设备名称补偿后1199.54556.41322.32X1000变压器损耗13.2266.1210KV侧负荷0.891212.76622.521363.260007276.57动力变压器单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)七金银电解变电所(一)金银电解1银电解槽1112.612.612.60.80.750.810.087.562金电解槽110.40.40.40.80.750.80.320.243出. 刮银粉机220.75 1.5 1.50.80.750.7 1.050.794手动单工位清洗机112525250.80.750.717.513.135离心式过滤机11 1.5 1.5 1.50.80.750.7 1.050.796通风罩11 1.1 1.1 1.10.80.750.70.770.587恒温干燥箱113330.80.750.8 2.4 1.88高频坩埚锅炉114440.80.750.8 3.2 2.49热水泵110.750.750.750.80.750.750.560.4210电解液循环泵114440.80.750.753 2.2511输送泵66424240.80.750.751813.512干燥机114440.80.750.8 3.2 2.413液下泵113330.80.750.75 2.25 1.6914电动葫芦1110.610.610.60.51.730.151.592.75备注Kc计算负荷数量(台)COS¢tg¢电力负荷计算表S11-M-1000/10. 10/0.4 2序号受电设备名称15造液槽11 1.5 1.5 1.50.80.750.7 1.050.7916废电解液处理槽11 1.5 1.5 1.50.80.750.7 1.050.7917烘烤电阻炉111010100.80.750.88618中频感应电炉221002002000.80.750.816012019银阳极浇铸车110.370.370.370.7 1.020.650.240.2520银铸锭车110.370.370.370.7 1.020.650.240.2521台钻110.370.370.370.7 1.020.650.240.2522真空泵110.370.370.370.80.750.750.280.2123电动单梁起重机11 6.9 6.9 6.90.5 1.730.15 1.04 1.7924离心风机117.57.57.50.80.750.75 5.63 4.2225轴流风机220.040.080.080.80.750.750.060.0526轴流风机440.120.480.480.80.750.750.360.2727轴流风机220.060.120.120.80.750.750.090.0728玻璃钢净化塔1120.520.520.50.80.750.7515.3811.5329空调器11 2.32.3 2.30.80.750.75 1.73 1.2930照明及其他10100.80.750.886小计357.8357.81268.34204.03(二)综合维修站11127.68127.7127.680.7 1.020.563.8465013(三)化验及环监站11115.64115.6115.640.7 1.020.557.8258.99(四)综合仓库,贵金属产品库1126.526.526.50.71.020.513.2513.25(五)(一)-(二)合计627.6627.63403.25341.66乘同时系数:Ky=0.9 Kw=0.95无功补偿-150补偿后369.93174.58402.731X630变压器损耗 4.0320.1410KV侧负荷0.88366.95194.72415.4260002201.72动力变压器362.93324.58S11-M-630/10 .10/0.4 1台单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)八余热电站(一)余热电站1余热发电站170900.80.750.7567.550.632化水站75450.80.750.7533.7525.31小计245135101.2575.94(二)富氧侧吹熔炼炉收尘1电收尘器5514.9574.7574.750.7 1.020.644.8545.762阴阳极振打机17170.37 6.29 6.290.7 1.020.5 3.1 3.23电加热器1515690900.80.750.872544布袋除尘器控制柜115550.80.750.75 3.82.8变频5卸灰阀1111333330.7 1.020.619.820.26埋刮板输送机22 5.511110.7 1.020.657027.37照明及其他112525250.80.750.82015小计245245.04170.7148.27(三)富氧侧吹还原炉收尘1布袋除尘器控制柜115550.80.750.75 3.8 2.8变频2卸灰阀113330.71.020.61.81.84计算负荷备注序号受电设备名称数量(台)COS¢tg¢Kc电力负荷计算表3电动蝶阀110.180.180.180.7 1.020.60.110.114风机112222220.80.750.7516.512.385电动葫芦11 4.5 4.5 4.50.5 1.730.150.68 1.176照明及其他112525250.80.750.82015小计59.6859.6842.8333.3(四)烟化炉收尘1袋除尘器控制柜115550.80.750.75 3.8 2.8变频2卸灰阀55315150.7 1.020.699.183电动蝶阀110.270.270.270.7 1.020.60.160.174风机111101101100.80.750.7582.561.885埋刮板输送机11 5.5 5.5 5.50.7 1.020.65 3.6 3.66照明及其他112525250.80.750.82015小计160.8160.77118.9992.68(五)铜浮渣反射炉收尘1布袋除尘器控制柜115550.80.750.75 3.8 2.8变频2卸灰阀113330.7 1.020.6 1.8 1.843电动蝶阀110.180.180.180.7 1.020.60.110.114风机1145454580.750.7533.7525.315照明及其他112525250.80.750.82015小计78.1878.1859.4145.07(六)(一)-(五)合计788.7678.67493.13395.27乘同时系数:Ky=0.9 Kw=0.95无功补偿-180补偿后443.86195.54852X500变压器损耗 4.8524.2510KV侧负荷0.9448.71219.75499.6360002692.23443.86375.5动力变压器单台功率设备功率(KW)最大负荷年耗电量总的工作的(KW) 总的工作的KW kvar KVA利用小数时(MWn)九制酸(一)制酸系统变电所净化工段1电除雾器22661321320.7 1.020.679.280.8 2压滤机213630.80.750.65 1.95 1.46 3一级循环泵2118.53718.50.80.750.7513.8810.41 4填料塔循环泵212244220.80.750.7516.512.38 5二级循环泵2118.53718.50.80.750.7513.8810.41 6清洗泵2118.53718.50.80.750.7513.8810.41 7清液泵217.5157.50.80.750.75 5.63 4.22 8污酸泵1118.518.518.50.80.750.7513.8810.41 9起重机11 6.9 6.9 6.90.5 1.730.15 1.04 1.79 10照明及其他20200.80.750.81612小计353.4265.4175.81154.27干吸工段1干燥塔循环泵113030300.80.750.7522.516.88 2一级塔循环泵113030300.80.750.7522.516.88 3二级塔循环泵113030300.80.750.7522.516.88 4地下槽泵111515150.80.750.7511.258.44 5干吸酸冷器441440.80.750.753 2.25备注电力负荷计算表序号受电设备名称数量(台)COS¢tg¢Kc计算负荷S11-M-500/10 .10/0.4 2台6电动葫芦33 6.318.918.90.5 1.730.15 2.84 4.91 7照明及其他20200.80.750.81612小计147.9147.9100.5978.22转化工段1起重机1112.712.712.70.5 1.730.15 1.91 3.3 2电动葫芦22 6.312.612.60.5 1.730.15 1.89 3.27 3照明及其他10100.80.750.886小计35.335.311.812.57尾吸工段1洗涤器循环泵212244220.80.750.7516.512.38 2洗涤塔循环泵212244220.80.750.7516.512.38 3氨水泵21 5.511 5.50.80.750.75 4.13 3.09 4硫胺泵217.5157.50.80.750.75 5.63 4.22 5引风机111111110.80.750.758.25 6.19 6电动葫芦11 2.6 2.6 2.60.5 1.730.150.390.68 7照明及其他10100.80.750.886小计137.6137.659.3944.93成品工序1地下槽泵111515150.80.750.7511.258.44 2电动葫芦11 2.6 2.6 2.60.5 1.730.150.390.68 3电动蝶阀3030130300.7 1.020.61818.36 4电动蝶阀44 2.28.88.80.7 1.020.6 5.28 5.39 5照明及其他10100.80.750.886小计66.466.442.9238.86综合楼1排风机220.190.380.380.80.750.750.290.21 2空调器99 2.219.819.80.80.750.7514.8511.14 3照明及其他10100.80.750.886小计30.1830.1823.1417.35硫酸循环水260.2148.160.80.750.7103.7177.78生产污水处理449.4345.170.80.750.7241.62181.21(1)-(8)合计1480111.91758.97605.21乘同时系数:Ky=0.9 Kw=0.95无功补偿-240补偿后683.07334.95760.771X1250变压器损耗7.6138.0410KV侧负荷0.88690.68372.99784.9560004144.06动力变压器单台功率设备功率(KW)最大负荷年耗电量总的工作的(KW) 总的工作的KW kvar KVA利用小数时(MWn)(二)1#开工电炉115405405400.90.481540261.536001X630变压器损耗63010KV侧负荷0.88546291.5618.96400218.4动力变压器单台功率设备功率(KW)最大负荷年耗电量备注tg¢Kc计算负荷数量(台)COS¢tg¢计算负荷备注电力负荷计算表序号受电设备名称数量(台)COS¢Kc电力负荷计算表序号574.95 683.07受电设备名称S11-M-1250/10 .10/0.4 1 S11-M-630/10. 10/0.4 1台总的工作的(KW) 总的工作的KWkvar KVA利用小数时(MWn)(三)2#开工电炉112702702700.90.481270130.773001X315变压器损耗31510KV侧负荷动力变压器0.88273145.8309.48400109.2(四)硫酸风机(10KV)114504504500.80.750.75337.5253.1355001856.25变频(五)(一)-(四)合计27402379.11847.181063.416327.91单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)(十)熔炼变电所(一)熔炼13#胶带输送机112222220.7 1.020.6514.314.592圆筒混合制粒机113737370.80.750.6524.0518.043氧化炉移动带式输送机114440.7 1.020.65 2.6 2.6544#胶带输送机1118.518.518.50.7 1.020.6512.0312.275还原炉移动式输送机114440.7 1.020.65 2.6 2.6561#定量给料机11 2.2 2.2 2.20.7 1.020.65 1.43 1.467斗式提升机117.57.57.50.71.020.654.884.97COS¢tg¢备注Kc电力负荷计算表序号受电设备名称数量(台)COS¢tg¢Kc计算负荷备注序号受电设备名称S11-M-315/10. 10/0.4 1台8单机袋式收尘器11 6.25 6.25 6.250.80.750.75 4.69 3.52 93#埋刮板输送机11 4.2 4.2 4.20.7 1.020.65 2.73 2.79 10粗铅铸锭机11 5.5 5.5 5.50.80.750.7 3.85 2.89 11离心通风机2218.537370.80.750.7527.7520.81 12电动葫芦11 4.5 4.5 4.50.5 1.730.150.68 1.17 13吊钩桥式起重机1127.527.527.50.5 1.730.15 4.137.14 14抓斗挢式起重机1133.233.233.20.5 1.730.15 4.988.65 15螺旋给料机4241680.7 1.020.65 5.2 5.31 16防爆轴流风机660.8 4.8 4.80.80.750.75 3.6 2.7 17给煤机4241680.7 1.020.65 5.2 5.31 18脉冲袋式收尘器110.430.430.430.80.750.75 3.20.24 19防爆离心通风机4231260.80.750.75 4.5 3.38 20冲渣循环泵49.427.40.80.750.7520.5515.41 21电动葫芦118.38.38.30.5 1.730.15 1.25 2.16 22电炉112002002000.80.750.8160120 23照明及其他20200.80.750.81612小计540.3496.28327.3270.07(二)烟化炉风机房1高压鼓风辅助设备221530300.80.750.824182电动单梁起重机1110.610.610.60.5 1.730.15 1.59 2.753自洁式空气过滤器111501501500.80.750.710578.754电动阀22 2.2 4.4 4.40.7 1.020.6 2.64 2.69 5电动阀44312120.7 1.020.67.27.35 6照明10100.80.750.886小计217217148.43115.54(三)余热锅炉房1侧吹还原炉给水泵2190180900.80.750.7567.550.632侧吹熔原炉给水泵119090900.80.750.7567.550.633烟化炉锅炉给水泵2190180900.80.750.7567.550.634贵铅炉锅炉给水泵1118.518.518.50.80.750.7513.8810.415铜浮渣反射炉锅炉给水泵1118.518.518.50.80.750.7513.8810.416氧化锑还原炉熔炼精炼反射炉锅炉给水泵7清水离子泵212244220.80.750.7516.512.388埋刮板出渣机66 5.533330.7 1.020.6521.4521.889爆破清灰装置33515150.7 1.020.57.57.710高效弹性振打电机65650.5535.7533.750.7 1.020.517.918.211组合加药装置 1.95 1.650.80.750.75 1.240.9312乙炔瓶排风机22 1.5330.80.750.75 2.25 1.6913电动阀661.5990.7 1.020.6 5.4 5.5114照明10100.80.750.886小计657.2454.9324.34257.36(四)成品库1电动单梁起重机119.99.99.90.5 1.730.3 2.97 5.142扒渣机114545450.80.750.6529.2521.943振动筛11 2.2 2.2 2.20.7 1.020.65 1.43 1.464电磁振荡动给料机110.650.650.650.7 1.020.650.420.435液下泵111.11.11.10.80.750.750.830.621113.8810.4118.518.518.50.750.750.86电动平板车11 2.2 2.2 2.20.7 1.020.65 1.43 1.467电动葫芦118.38.38.30.5 1.730.15 1.25 2.168照明及其他550.80.750.843小计74.3574.3541.5736.21(五粉煤制备)1电动蝶阀110.50.50.50.7 1.020.60.30.312钢球磨煤机112752752750.80.750.82201653圆盘给料机11 5.5 5.5 5.50.7 1.020.65 3.58 3.654排粉风机117575750.80.750.7556.2542.195布袋除尘器113330.80.750.7 2.1 1.586脉冲阀30300.020.540.540.7 1.020.60.320.337排风机1118.518.518.50.80.750.7513.8810.418气动输送泵113030300.80.750.7522.516.8895#胶带输送机11 1.1 1.1 1.10.80.750.750.830.6210电磁除铁器111110.7 1.020.70.70.7111电动葫芦113030300.5 1.730.15 4.57.7912轴流风机11 1.1 1.1 1.10.80.750.750.830.6213防爆风机330.250.750.750.80.750.750.560.4214除尘器11 5.3 5.3 5.30.80.750.7 3.71 2.7815空调器11 3.63 3.63 3.630.80.750.75 2.72 2.0416照明及其他10100.80.750.886小计467.3467.32344.82265.67(六(一)-(五)合计19561709.91186.45944.86)乘同时系数:1067.81897.61Ky=0.9 Kw=0.95无功补偿-450补偿后1067.8447.611157.82X1000变压器损耗11.758.4910KV侧负荷0.91079.51536.11205.360006477.04动力变压器单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)十一精矿仓及配料变电所(一)精矿仓及配料1抓斗挢式起重机11188.1188.1188.10.5 1.730.356.4397.742定量给料皮带机1111333330.7 1.020.6521.4521.88变频31#胶带输送机117.57.57.50.7 1.020.65 4.88 4.9742#胶带输送机11 5.5 5.5 5.50.7 1.020.65 3.58 3.655惯性振动给机220.55 1.1 1.10.7 1.020.650.720.736编织袋破碎清洗机1129.529.529.50.80.750.720.6515.497压滤机1118.518.518.50.80.750.712.959.718循环泵117.57.57.50.80.750.7 5.25 3.949箱式压滤机11 3.7 3.7 3.70.80.750.7 2.59 1.9410离心风机113737370.80.750.7527.7520.8111除尘器螺旋卸灰机22 5.511110.7 1.020.657.157.2912离心风机112222220.80.750.7516.512.3813除尘器机组117.57.57.50.80.750.7 5.25 3.9414空调器223.97.87.80.80.750.75 5.85 4.3915照明及其他10100.80.750.886小计389.7389.7198.99214.86数量(台)COS¢tg¢S11-M-1000/10. 10/0.4 2电力负荷计算表序号受电设备名称Kc计算负荷备注(二)煤气站465.7268.720.80.750.75201.54151.16(三)(一)-(二)合计855.4658.42400.53366.02乘同时系数:Ky=0.9 Kw=0.95无功补偿-180补偿后360.47167.71397.58变压器损耗 3.9819.8810KV侧负荷0.89364.45187.59409.8960002186.69动力变压器单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)十二制氧站(一)氧气站高压用电设备1罗茨鼓风机(10KV)117107107100.80.750.75532.5399.382罗茨真空泵(10KV)22800160016000.80.750.7512009003氧压机(10KV0213807603800.80.750.75285213.754小计307026902017.51513.13600012105(二)低压用电设备1氧气站低压用电设备52520.80.750.753929.252螺杆式空压机322507505000.80.750.75375281.253再生干燥机323090600.80.750.754533.75计算负荷备注序号受电设备名称数量(台)COS¢tg¢Kc电力负荷计算表360.47347.71S11-M-500/10. 10/0.4 2台4离心式空压机211322641320.80.750.759974.25小计1156744558418.5697.5乘同时系数:Ky=0.9 Kw=0.95无功补偿-180补偿后502.2217.58变压器损耗 5.4727.3710KV侧负荷0.9507.67244.94563.6760003046.04(三)以上小计422634342525.171758.073076.915151动力变压器单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)十三锌净化变电所(一)锌电积1新液转槽泵电机221530300.80.750.7522.516.882冷风机电机2218.537370.80.750.7527.7520.813循环泵电机331545450.80.750.7533.7525.314废液泵电机111515150.80.750.7511.258.445转槽泵电机1118.518.518.50.80.750.7513.8810.416阳极泥泵电机1118.518.518.50.80.750.7513.8810.417小循环泵电机1118.518.518.50.80.750.7513.8810.418循环泵电机114545450.80.750.7533.7525.31tg¢Kc计算负荷备注电力负荷计算表COS¢S11-M-630/10 .10/0.4 2台502.2397.58受电设备名称数量(台)序号9液下泵电机22 2.2 4.4 4.40.80.750.75 3.3 2.48 10液下泵电机22 5.511110.80.750.758.25 6.19 11硫酸泵电机113330.80.750.75 2.25 1.69 12增压泵电机33 5.516.516.50.80.750.7512.389.28 13废水泵电机111111110.80.750.758.25 6.19 14配制等泵电机557.537.537.50.80.750.7528.521.5 15刷板机电机113330.80.750.7 2.1 1.58 16绝缘行车电机111111110.5 1.730.3 3.3 5.7222 5.511110.5 1.730.3 3.3 5.7211 2.2 2.2 2.20.5 1.730.30.66 1.1417真空泵电机114545450.80.750.7533.7525.31 18轴流风机14140.18 2.52 2.520.80.750.75 1.89 1.42 19照明及其它1001000.80.750.88060小计485.6485.62358.18275.76(二)锌净化及镉回收1一次净化槽222244440.80.750.730.823.1 2一次净化压滤泵212244220.80.750.715.411.55 3一次净化压滤机22 3.77.47.40.80.750.7 5.18 3.89 4二次净化槽2222440.80.750.730.823.1 5二次净化压滤泵212244220.80.750.715.411.55 6二次净化压滤机22 3.77.47.40.80.750.7 5.18 3.897二次净化液冷却塔111515150.80.750.710.57.888三次净化槽222244440.80.750.730.823.1 9三次净化压滤泵212244220.80.750.715.411.55 10二次净化压滤机22 3.77.47.40.80.750.7 5.18 3.89 11吊挂锌粉圆661660.80.750.7 4.2 3.15 12溶液输送泵551575750.80.750.752.539.38 13浆化槽224880.80.750.7 5.6 4.2 14矿浆输送泵221530300.80.750.72115.7515电动单梁悬挂起重机1111.411.411.40.80.750.72115.75 16洗滤布机11 2.2 2.2 2.20.80.750.7 1.54 1.16 17铜镉渣浸出槽227.515150.80.750.710.57.88 18铜镉渣浸出液压滤泵111111110.80.750.77.7 5.78 19铜镉渣浸出液压滤机11 1.1 1.1 1.10.80.750.70.770.58 20镉置换槽117.57.57.50.80.750.7 5.25 3.94 21镉置换槽压滤泵111111110.80.750.77.7 5.78 22镉置换槽压滤机11 1.1 1.1 1.10.80.750.70.770.58 23镉棉溶解槽113330.80.750.7 2.1 1.5824镉棉溶解液压滤泵111111110.80.750.77.7 5.7825镉棉溶解液压滤机11 1.1 1.1 1.10.80.750.70.770.5826净化除铜槽113330.80.750.7 2.1 1.5827净化除铜液压滤泵111111110.80.750.77.7 5.7828净化除铜压滤机11 1.1 1.1 1.10.80.750.70.770.58 29熔铸电炉116060600.80.750.74231.5 30溶液输送泵66 5.533330.80.750.723.117.33 31污水泵22 5.511110.80.750.77.7 5.78 32镉电解114545450.80.750.731.525.233玻璃钢酸雾净化塔113333330.80.750.7524.7518.5634照明及其它1001000.80.750.88060小计792.7726.7520.34391.83(三)铟回收1萃取反萃机电机44312120.80.750.78.4 6.3 2离心风机电机44312120.80.750.759 6.75 3电动葫芦电机113330.5 1.730.150.450.78 4轴流风机电机22 2.2 4.4 4.40.80.750.75 3.3 2.485中和压滤泵电机11 5.5 5.5 5.50.80.750.75 4.13 3.09 6搅拌机电机11 2.2 2.2 2.20.80.750.7 1.54 1.16 7压滤机电机113330.80.750.7 2.1 1.58 8压团机电机11 1.5 1.5 1.50.80.750.7 1.050.79 9液下泵电机11 5.5 5.5 5.50.80.750.75 4.13 3.09 10搅拌机电机11 1.1 1.1 1.10.80.750.70.770.58 11盐酸泵电机11 1.5 1.5 1.50.80.750.75 1.130.84 12萃取反萃机电机44 5.522220.80.750.715.411.55 13搅拌机电机223660.80.750.7 4.2 3.15 14压滤泵电机223660.80.750.7 4.2 3.15 15压滤机电机11 1.5 1.5 1.50.80.750.7 1.050.79 16洗油机电机11 1.1 1.1 1.10.80.750.70.770.58 17液下泵电机11 5.5 5.5 5.50.80.750.75 4.13 3.09 18离心风机电机224880.80.750.756 4.519玻璃钢酸雾净化塔1116.516.516.50.80.750.7512.389.2820照明及其它50500.80.750.84030小计168.3168.3124.1193.52(四)锌熔铸1锌直线铸定机11 5.5 5.5 5.50.80.750.7 3.85 2.89 2电炉辅助设备66 2.213.213.20.80.750.759.97.43 3离心风机电机117.57.57.50.80.750.75 5.63 4.22 4吊钩桥式起重机2219.939.839.80.5 1.730.27.9613.79 5离心风机电机113737370.80.750.7527.7520.81 6照明及其它12312371.0961.13小计15701503.61073.71822.24(五)(一)-(四)合计15701503.61073.71822.24乘同时系数:Ky=0.9 Kw=0.95966.33781.13无功补偿-360补偿后966.33421.131054.12X800变压器损耗10.552.7110KV侧负荷0.9976.88473.38108660005861.25电力变压器单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)十四锌浸出变电所(一)浓密1酸洗浓密机11 4.5 4.5 4.50.80.750.7 3.15 2.362高浸浓密机11 4.5 4.5 4.50.80.750.7 3.15 2.363沉矾浓密机22 3.5770.80.750.7 4.9 3.684低浸浓密机11 3.5 3.5 3.50.80.750.7 2.45 1.845中浸浓密机11 3.5 3.5 3.50.80.750.7 2.45 1.846备用浓密机11 3.5 3.5 3.50.80.750.7 2.45 1.847浓密机底流泵77151051050.80.750.773.555.138熔液输送泵1010151501500.80.750.710578.759污水泵225.511110.80.750.77.7 5.7810照明及其后50500.80.750.84030小计342.5342.5244.75183.36(二)氧化锌球磨碱洗1QZ型抓斗桥式起重机1162.762.762.70.51.730.159.4116.29Kc计算负荷备注电力负荷计算表序号受电设备名称数量(台)COS¢tg¢S11-M-800/10KV 2台2螺旋输送机11 4.5 4.5 4.50.7 1.020.65 2.93 2.98 3湿式球磨机117575750.80.750.86045 4矿浆泵227.515150.80.750.7511.258.44 5碱洗槽222244440.80.750.730.823.1 6碱洗压滤泵222244440.80.750.753324.75 7厢式压滤机44 4.9519.819.80.80.750.713.8610.4 8滤液输送泵111515150.80.750.7511.258.44 9洗液输送泵117.57.57.50.80.750.75 5.63 4.22 10浆化槽224880.80.750.7 5.6 4.2 11矿浆输送泵111515150.80.750.7511.258.44 12浆化液输送泵111515150.80.750.7511.258.44 13LD型电动单梁起重机11 6.5 6.5 6.50.5 1.730.150.98 1.69 14洗滤布机11 2.2 2.2 2.20.80.750.7 1.54 1.16 15污水泵11 5.5 5.5 5.50.80.750.75 4.13 3.09 16离心风机112222220.80.750.7516.512.3817除尘器螺旋卸灰机11 5.5 5.5 5.50.7 1.020.65 3.58 3.6518轴流风机220.090.180.180.80.750.750.140.1 19小计417.4417.38273.07216.75(三)锌浸出1中浸反应槽332266660.80.750.746.234.65 2中浸矿浆泵211530300.80.750.7511.258.44 3低酸浸出槽332266660.80.750.746.234.65 4低浸矿浆泵211530150.80.750.7511.258.44 5沉矾槽442288880.80.750.761.646.2 6沉矾矿浆泵421560300.80.750.7522.516.88 7螺旋电子秤441440.80.750.7 2.8 2.1 8高酸浸出槽222244440.80.750.730.823.1 9高浸矿浆泵211530150.80.750.7511.258.44 10酸洗槽112222220.80.750.715.411.5511酸洗矿浆泵111515150.80.750.7511.258.44 12备用反应槽112222220.80.750.715.411.55 13矿浆泵111515150.80.750.7511.258.44 14硫酸泵117.57.57.50.80.750.75 5.63 4.22 15矿浆搅拌中间槽33 5.516.516.50.80.750.711.558.66 16矿浆压滤泵332266660.80.750.7549.537.13 17厢式压滤机66 3.722.222.20.80.750.715.5411.66 18滤液输送泵331545450.80.750.7533.7525.31 19矿浆输送泵111515150.80.750.7511.258.44 20浆化槽224880.80.750.7 5.6 4.2 21洗滤布机11 2.2 2.2 2.20.80.750.7 1.54 1.16 22电动单梁悬挂起重机11 5.7 5.7 5.70.15 6.590.150.86 5.64 23污水泵22 5.511110.80.750.88.8 6.624玻璃钢酸雾净化塔113333330.80.750.7524.7518.5625旋流板塔1116.516.516.50.80.750.7512.389.2826照明及其后50500.80.750.84030小计790.6715.6518.29393.71(四)(一)-(三)合计15501475.51036.1794乘同时系数:Ky=0.9 Kw=0.95无功补偿-300补偿后932.49454.321037.32X800变压器损耗10.3751.8610KV侧负荷0.88942.86506.18107060005657.2电力变压器S11-M-800/10KV 2台932.49754.32电力负荷计算表单台功率设备功率(KW)最大负荷年耗电量总的工作的(KW) 总的工作的KW kvar KVA利用小数时(MWn)十五熔锌感应电炉1熔锌感应电炉113003003000.90.481300145.3333.331X400变压器损耗 3.3316.6710KV侧负荷0.88303.33161.96343.8750001516.7电力变压器单台功率设备功率(KW)最大负荷年耗电量总的工作的(KW) 总的工作的KW kvar KVA利用小数时(MWn)十六生活设施1水处理设备47.627.10.80.750.7520.3315.242办公生活设施4004000.80.750.75300225小计447.6427.1320.33240.24乘同时系数:Ky=0.9 Kw=0.95无功补偿-120补偿后288.29108.23307.94变压器损耗 3.0815.410KV侧负荷0.92291.31123.65316.5160001748.23备注电力负荷计算表序号受电设备名称数量(台)COS¢tg¢Kc计算负荷备注序号受电设备名称数量(台)COS¢tg¢Kc计算负荷S11-M-400/10KV288.29228.23动力变压器S11-M-630/10.10/0.41台单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)十七循环水1循环水1524963.580.80.750.75722.69542.01乘同时系数:Ky=0.9 Kw=0.95无功补偿-240补偿后650.42274.91706.13变压器损耗7.0635.3110KV侧负荷0.9657.48310.22726.9960003944.87电力负荷计算表序号受电设备名称数量(台)COS¢tg¢Kc计算负荷备注650.42514.91动力变压器S11-M-1000/10.10/0.42台单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)十八(一)-(十九)合计244732164514817.98225.2383639乘同时系数:Ky=0.95 Kw=0.97无功补偿-3600补偿后140774378.48147422X10000变压器损耗147.42737.1110KV侧负荷9414224.45115.615116 电力负荷计算表电力负荷计算表序号受电设备名称数量(台)COS¢tg¢Kc计算负荷备注0.87140777978.516181单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvar KVA利用小数时(MWn)二十余热发电机组112000200020000.8-0.7512000-150013460二十一计及余热发电的负荷0.8812224.46615.61390070179无功补偿-3600补偿后12224.43015.612591变压器损耗125.9629.546500818.435KV侧负荷0.9612350.33645.131287770997.4单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)二十二锌电积1锌电积直流负荷117540754075400.90.480.860322921.436702.2无功补偿-1500补偿后60321421.436197.21X8000变压器损耗67.02335.1135KV侧负荷0.966099.021756.546346.9485029580.3电力负荷计算表序号受电设备名称数量(台)COS¢tg¢Kc计算负荷备注序号受电设备名称数量(台)COS¢tg¢Kc计算负荷备注。
电力负荷计算
这种曲线的负荷从大到小依次排列
年每日最大负荷曲线, 反映了全年当中不同 时段的电能消耗水平, 是按全年每日的最大 半小时平均负荷来绘 制的。
专用来确定经济运行方式用的
年负荷曲线
图2-2 年负荷持续时间曲线的绘制 a) 夏日负荷曲线 b) 冬日负荷曲线 c) 年负荷持续时间曲线
绘制方法:从夏季日负荷曲线和冬季日负荷曲线中的最大功率开始, 以功率递减的顺序,依次绘制到年持续负荷曲线坐标系中(注意横坐 标最大值为8760h)
电热设备的工作特点是:
➢(1)工作方式为长期连续工作方式。
➢(2)电力装置一般属二级或三级负荷。
➢(3)功率因数都较高,小型的电热设备 可达到1。
照明设备
常用照明设备 ➢白炽灯、卤钨灯、荧光灯、高压汞灯、高压钠灯、钨卤 化物灯和单灯混光灯等。
照明设备的工作特点: ➢(1)工作方式属长期连续工作方式。 ➢(2)除白炽灯、卤钨灯的功率因数为1外,其它类型的 灯具功率因数均较低。 ➢(3)照明负荷为单相负荷,单个照明设备容量较小。
Wa=a·A
有功计算负荷为:
P30
Wa Tmax
2. 车间生产面积负荷密度法
已知车间生产面积S(m2)和负荷密度指标ρ(kW/m2)时, 车间平均负荷为:
Pav=ρ·S 负荷密度指标查表,S表示车间面积。
二、按需要系数法确定计算负荷
需要系数法
需要系数是按照车间以上的负荷情况来 确定的,适用于变、配电所的负荷计算。
(2)求尖峰电流:目的用于计算电压波动、电压损失,选择熔断 器和保护元件等。(校验设备)
(3)求平均负荷:目的计算全厂的电能需要量、电能损耗以及选择 无功补偿容量等。(节能措施)
4. 电力负荷的类型
用电负荷计算方法
一、用电负荷计算:现场用电设备:1、卷扬机3台(7.5KW)22.5KW2、砂浆机3台(3KW)9KW3、加压泵1台(5.5KW) 5.5KW4、介木机4台(3KW)12KW5、振动器3台(1.1KW) 3.3KW6、电焊机1台(25.5KW)25.5KW7、镝灯4支(3.5KW)14KW8、碘钨灯10支(1KW)10KW9、其他用电10(KW)10KW10、生活用电10(KW)10KW 施工现场用电设备的kx、cos、tg1、卷扬机kx=0.3 cosφ=0.7 tgφ=1.022、砂浆机kx=0.7 cosφ=0.68 tgφ=0.623、加压泵kx=0.5 cosφ=0.8 tgφ=0.754、介木机kx=0.7 cosφ=0.75 tgφ=0.885、振动器kx=0.65 cosφ=0.65 tgφ=1.176、电焊机kx=0.45 cosφ=0.87 tgφ=0.577、镝灯kx=18、碘钨灯kx=19、其他用电kx=110、生活用电kx=1有功荷载计算:1、卷扬机Pj1=Pj×kx=22.5kw×0.3=6.75kw2、砂浆机Pj2=Pj×kx=9kw×0.7=6.3kw3、加压泵Pj3=Pj×kx=5.5kw×0.5=2.75kw4、介木机Pj4=Pj×kx=12kw×0.7=8.4kw5、振动器Pj5=Pj×kx=3.3kw×0.65=2.15kw6、电焊机Pj6=Pj×kx=25.5kw×0.45=11.48kw7、镝灯Pj7=Pj×kx=14kw×1=14kw8、碘钨灯Pj8=Pj×kx=10kw×1=10kw9、其他用电Pj9=Pj×kx=10kw×1=10kw10、生活用电Pj10=Pj×kx=10kw×1=10kw无功荷载计算:1、卷扬机Qj1=Pj1×tgφ=6.75kw×1.02=6.89 KVAR2、砂浆机Qj2=Pj2×tgφ=6.3kw×0.62=3.91 KVAR3、加压泵Qj3=Pj3×tgφ=2.75kw×0.75=2.06 KVAR4、介木机Qj4=Pj4×tgφ=8.4kw×0.88=7.39 KVAR5、振动器Qj5=Pj5×tgφ=2.15kw×1.17=2.51 KVAR6、电焊机Qj6=Pj6×tgφ=11.48kw×0.57=6.54 KVAR7、镝灯Qj7=Pj7×tgφ=14kw×1.52=21.28 KVAR总有功计算,取同期系数kp=0.8P总=kp×(6.75+6.3+2.75+8.4+2.15+11.48+14+10+10+10) ×0.8=65.46KW总无功计算,取同期系数kp=0.8P总=kQ×(6.89+3.91+2.06+7.39+2.51+6.54+21.28) ×0.8=40.46KW现在功率:Sj= P总2+ P总2=65.462+40.462=76.95KVA工地临时供电包括动力用电和照明用电两种,在计算时,应考虑:(1)全工地所使用的机械动力用电和各种电气工具及照明用电的数量;(2):施工进度计划中施工高峰阶段同时用电的机械设备最高数量;(3)总用电量计算公式:P=1.05-1.10(K1∑P1/cosδ+K2∑P2+K3∑P3+K4∑P4)P_供电设备总需要容量(KVA);P1_电动机额定功率(KW);P2_电焊机额定容量(KVA);P3_室内照明容量(KW);P4_室外照明容量(KW);cosδ_电动机的平均功率因素(一般取0.65~0.75,最高为0.75~0.78);K1_需要系数,其中K3、K4分别为0.8、1.0;K1随电动机数量而变,3~10台取0.7;11~30台取0.6;30台以上取0.5;K2随电焊机数量而变,3~10台取0.6;10台以上取0.5。
电力负荷的计算方法
五. 电能损耗计算
企业年电能消耗量用年平均负荷和年实际工作小时数计算.当已知企业的计算有功 功率Pis及计算无功功率Qjs后,企业的年有功及无功电能消耗量可按下式计算: Wn = α n Pjs Tn Qn = β n Qjs Tn 上式中:
kWh kvarh
α n,β n --- 年平均有功,无功负荷系数,α n值一般取0.7 ~ 0.75,β n值取
2 2
视在功率: Sis =
视在功率: Sis = 计算电流: Iis =
以上式中: 有功功率: Pe Kx tgφ K p, K q Uj
--- 用电设备组的设备功率, kW ; --- 需要系数,见表. --- 用电设备功率因数角的正切值,见表. --- 有功功率,无功功率通时系数,分别取0.8~0.9和0.93~0.97 ; --- 用电设备额定电压,kV.
10kV高压侧
计 算 负 荷 选择变压器 有功功率 无功功率 视在功率 台数 x 容量 n x kVA (kW) (kvar) (kVA) 0.20 0.5/1.73 240 415 0.80 0.8/0.75 200 150 0.25 0.6/1.33 200 266 0.15 0.5/1.73 22 38 0.6 0.7/1.02 180 184 0.553 0.27/0.97 228 221 1070 1274 910 1210 -810 (2x405) 0.3 0.92/0.43 910 400 994 1 x 1250 10 50 0.31 0.9/0.48 920 450 1024 cosφ tgφ 第 5 页
四. 功率损ቤተ መጻሕፍቲ ባይዱ计算
1. 三相线路中有功及无功损耗 有功损耗: 无功损耗: 式中: Pj = 3 Ijs R x 10 Qj = 3 Ijs X x 10
电力负荷计算表完整版.xls
单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvar KVA利用小数时(MWn)一铅锡合金电解1熔铅锅223060600.80.750.754533.752阳极锅113030300.80.750.7522.516.883阳极板铸型1133.233.233.20.80.750.6521.616.194残极洗涮机113330.80.750.65 1.95 1.465光棒机11 5.5 5.5 5.50.80.750.65 3.58 2.686阴极锅113030300.80.750.7522.516.887真空蒸馏炉4330012009000.80.750.87205408始极片锅113030300.80.750.7522.516.889铅始极片制造机组1131.5531.5531.550.80.750.6520.5115.3810电铅锅熔体搅拌机111515150.80.750.710.57.881150t锅搅拌机111515150.80.750.710.57.8812铅泵22 5.511110.80.750.758.25 6.1913吊钩桥式起重机11232.8232.8232.80.5 1.730.1534.9260.4814熔铅锅熔体搅拌机221530300.80.750.72115.7515阳极锅搅拌机111515150.80.750.710.57.8816其他115005005000.80.750.7350262.517离心风机115555550.80.750.7541.2530.9418螺旋卸灰机33 5.516.516.50.71.020.6510.7310.94备注tg¢COS¢受电设备名称序号电力负荷计算表数量(台)计算负荷Kc19离心风机223774740.80.750.7555.541.6320离心风机117575750.80.750.7556.2542.1921玻璃钢净化塔循环泵112222220.80.750.7516.512.3822空调器66 3.923.423.40.80.750.7517.5513.1623空调器55 5.5527.7527.750.80.750.7520.8115.6124照明50500.80.750.84030小计25862285.71584.371225.5乘同时系数:Ky=0.9 Kw=0.95无功补偿-480补偿后1425.93684.21581.62X1250变压器损耗15.8279.0810KV侧负荷0.81441.75763.271631.360008650.49动力变压器单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)二铅电解直流负荷1电解直流负荷114754754750.90.480.8380184.04422.22变压器损耗 4.2221.1110KV侧负荷0.88384.22205.1560002305.33整流变压器4754751X475备注1164.21425.93tg¢COS¢受电设备名称序号数量(台)计算负荷KcS11-M-1250/10 .10/0.4 2台 电力负荷计算表单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)三烟化炉风机房离心鼓风机(10KV)单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)四收尘变电所(一)分银炉收尘1布袋除尘器控制柜22510100.80.750.757.5 5.6变频2卸灰阀1212336360.7 1.020.621.622.043电动蝶阀220.090.180.180.7 1.020.60.110.114电动蝶阀440.27 1.080.180.7 1.020.60.320.335风机221322642640.80.750.75198148.56埋刮板输送机225.511110.71.020.657.27.3备注绕线电机备注2310.3355003154200.75Kctg¢0.75tg¢COS¢0.8COS¢56056028022受电设备名称受电设备名称序号序号电力负荷计算表数量(台)计算负荷电力负荷计算表数量(台)计算负荷Kc7照明及其他115550.80.750.843小计327.3327.26239.01187.23(二)铋转炉收尘1布袋除尘器控制柜115550.80.750.75 3.8 2.8变频2卸灰阀66318180.7 1.020.610.811.2 3电动蝶阀110.180.180.180.7 1.020.60.110.11 4电动蝶阀220.270.540.540.7 1.020.60.320.33 5风机111321321320.80.750.759974.25 6埋刮板输送机22 5.511110.7 1.020.657.27.3 7电动葫芦11 4.5 4.5 4.50.5 1.730.150.68 1.17 8照明及其他115550.80.750.843小计176.2176.22125.8199.99(三)贵铅炉收尘1布袋除尘器控制柜115550.80.750.75 3.8 2.8变频2卸灰阀88324240.7 1.020.614.414.69 3电动蝶阀110.090.090.090.7 1.020.60.050.06 4电动蝶阀220.270.540.540.7 1.020.60.320.33 5风机111321321320.7 1.020.759974.25 6埋刮板输送机117.57.57.50.7 1.020.65 4.95 7照明及其他115550.80.750.843小计174.1174.13126.4100.11(四)锑熔练反射炉收尘1布袋除尘器控制柜115550.80.750.75 3.8 2.8变频2卸灰阀88324240.7 1.020.614.414.693电动蝶阀110.180.180.180.7 1.020.60.110.114电动蝶阀220.270.540.540.7 1.020.60.320.335风机111321321320.7 1.020.759974.256埋刮板输送机117.57.57.50.7 1.020.65 4.957照明及其他115550.80.750.843小计174.2174.22126.46100.17(五)精练炉收尘1布袋除尘器控制柜115550.80.750.75 3.8 2.8变频2卸灰阀66318180.7 1.020.610.811.023电动蝶阀110.180.180.180.7 1.020.60.110.114电动蝶阀220.270.540.540.7 1.020.60.320.335风机111321321320.7 1.020.759974.256埋刮板输送机22 5.511110.7 1.020.657.27.37照明及其他111051051050.80.750.88463小计249.6249.63188.58146.39(六)(一)-(五)合计11011101.5806.25633.88乘同时系数Ky=0.9 Kw=0.95无功补偿-2402X630补偿后725.63362.18810.99变压器损耗8.1140.5510KV侧负荷0.88733.74402.7383760004402.42动力变压器602.18725.63S11-M-630/10 .10/0.4 2台单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)五贵金属熔炼变电所(一)阳极泥库及配料1阳极泥搅拌槽114440.80.750.7 2.8 2.12矿浆二次压滤泵112222220.80.750.7516.512.383二次箱式压滤机11 3.7 3.7 3.70.80.750.7 2.59 1.944滤液输送泵111515150.80.750.7511.258.445洗液输送泵117.57.57.50.7 1.020.6511.258.446圆盘给料机227.515150.7 1.020.659.759.957定量给料皮带机113330.7 1.020.65 1.95 1.998电动单梁起重机11 6.5 6.5 6.50.5 1.730.150.98 1.699抓斗挢式起重机1162.762.762.70.5 1.730.318.8132.5810定量给料皮带机99 2.219.819.80.7 1.020.6512.8713.1311惯性振动给料机220.55 1.1 1.10.7 1.020.650.720.7312鄂式破碎机222244440.80.750.753324.7513离心风机117575750.80.750.7556.2542.1914螺旋卸灰机11 5.5 5.5 5.50.7 1.020.65 3.58 3.6515轴流风机44 1.5660.80.750.75 4.5 3.3816空调器551.658.258.250.80.750.75 6.19 4.6417照明及其他50500.80.750.84030小计393.3393.3259.76222.05备注Kctg¢COS¢受电设备名称数量(台)计算负荷序号电力负荷计算表(二)贵金属熔练1双钩桥式起重机11126.4126.4126.40.5 1.730.1518.9632.842贵铅炉111515150.80.750.7511.258.443电动平板车11 3.7 3.7 3.77 1.020.65 2.41 2.454分银炉111515150.80.750.7511.258.445银阳极板浇铸车440.37 1.48 1.480.7 1.020.650.960.986电动平板车44 2.28.88.80.7 1.020.65 5.72 5.847铋转炉111111110.80.750.77.7 5.788胶带输送机33 2.2 6.6 6.60.7 1.020.65 4.29 4.389胶带输送机112222220.7 1.020.6514.314.5910电动单梁起重机119.99.99.90.5 1.020.15 1.49 2.5711铋精炼锅651006005000.80.750.75375281.2512电动葫芦12 4.9 4.9 4.90.5 1.730.150.74 1.2713精炼炉113330.80.750.75 2.25 1.6914抽铋机55 1.57.57.50.80.750.7 5.25 3.9415颜氏喷火机22 3.77.47.40.80.750.75 5.55 4.1616颜氏喷火机33 1.5 4.5 4.50.80.750.75 3.38 2.5317离心风机119090900.80.750.7567.550.6318喷淋塔循环泵117.57.57.50.80.750.75 5.63 4.2219螺旋卸灰机11 5.5 5.5 5.50.7 1.020.65 3.58 3.6520轴流风机113330.80.750.75 2.25 1.6921池氯报警及吸收装置1118.518.518.50.80.750.7513.8810.4122照明及其他1001000.80.750.88060小计1072971.68643.31511.72(三)(一)-(二)合计14651365903.03733.77乘同时系数:Ky=0.9 Kw=0.95无功补偿-360补偿后812.76337.09879.892X800697.09812.76变压器损耗8.843.9910KV侧负荷0.91821.56381.08905.6460004929.37动力变压器单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)六金属砷回收1电动单梁桥式起重机44 6.927.627.60.5 1.730.15 4.147.172除尘器44520200.80.730.71410.53除尘器附离心风机22 5.511110.80.750.758.256.194螺旋给料机22 2.2 4.4 4.40.7 1.020.65 2.86 2.925砷蒸馏电阻炉404035140014000.80.750.811208406卸灰阀22 1.1 2.2 2.20.7 1.020.6 1.32 1.357埋刮板输送机22 5.511110.7 1.020.657.157.298碱液制备槽224880.80.750.7 5.6 4.29碱液循环泵221122220.80.750.7516.512.3810污水输送泵221122220.80.750.7516.512.3811离心风机221122220.80.750.7516.512.3812照明及其他1501500.80.750.812090小计17001700.21332.821006.74乘同时系数:Ky=0.9 Kw=0.95无功补偿-400备注956.41199.54Kctg¢COS¢受电设备名称S11-M-800/10 .10/0.4 2台电力负荷计算表数量(台)计算负荷序号补偿后1199.54556.41322.32X1000变压器损耗13.2266.1210KV侧负荷0.891212.76622.521363.260007276.57动力变压器单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)七金银电解变电所(一)金银电解1银电解槽1112.612.612.60.80.750.810.087.562金电解槽110.40.40.40.80.750.80.320.243出. 刮银粉机220.75 1.5 1.50.80.750.7 1.050.794手动单工位清洗机112525250.80.750.717.513.135离心式过滤机11 1.5 1.5 1.50.80.750.7 1.050.796通风罩11 1.1 1.1 1.10.80.750.70.770.587恒温干燥箱113330.80.750.8 2.4 1.88高频坩埚锅炉114440.80.750.8 3.2 2.49热水泵110.750.750.750.80.750.750.560.4210电解液循环泵114440.80.750.753 2.2511输送泵66424240.80.750.751813.512干燥机114440.80.750.8 3.2 2.413液下泵113330.80.750.75 2.25 1.6914电动葫芦1110.610.610.60.51.730.151.592.75备注Kctg¢COS¢受电设备名称序号S11-M-1000/10. 10/0.4 2电力负荷计算表数量(台)计算负荷15造液槽11 1.5 1.5 1.50.80.750.7 1.050.7916废电解液处理槽11 1.5 1.5 1.50.80.750.7 1.050.7917烘烤电阻炉111010100.80.750.88618中频感应电炉221002002000.80.750.816012019银阳极浇铸车110.370.370.370.7 1.020.650.240.2520银铸锭车110.370.370.370.7 1.020.650.240.2521台钻110.370.370.370.7 1.020.650.240.2522真空泵110.370.370.370.80.750.750.280.2123电动单梁起重机11 6.9 6.9 6.90.5 1.730.15 1.04 1.7924离心风机117.57.57.50.80.750.75 5.63 4.2225轴流风机220.040.080.080.80.750.750.060.0526轴流风机440.120.480.480.80.750.750.360.2727轴流风机220.060.120.120.80.750.750.090.0728玻璃钢净化塔1120.520.520.50.80.750.7515.3811.5329空调器11 2.32.3 2.30.80.750.75 1.73 1.2930照明及其他10100.80.750.886小计357.8357.81268.34204.03(二)综合维修站11127.68127.7127.680.7 1.020.563.8465013(三)化验及环监站11115.64115.6115.640.7 1.020.557.8258.99(四)综合仓库,贵金属产品库1126.526.526.50.71.020.513.2513.25(五)(一)-(二)合计627.6627.63403.25341.66乘同时系数:Ky=0.9 Kw=0.95无功补偿-150补偿后369.93174.58402.731X630变压器损耗 4.0320.1410KV侧负荷0.88366.95194.72415.4260002201.72动力变压器324.58362.93S11-M-630/10 .10/0.4 1台单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)八余热电站(一)余热电站1余热发电站170900.80.750.7567.550.632化水站75450.80.750.7533.7525.31小计245135101.2575.94(二)富氧侧吹熔炼炉收尘1电收尘器5514.9574.7574.750.7 1.020.644.8545.762阴阳极振打机17170.37 6.29 6.290.7 1.020.5 3.1 3.23电加热器1515690900.80.750.872544布袋除尘器控制柜115550.80.750.75 3.82.8变频5卸灰阀1111333330.7 1.020.619.820.26埋刮板输送机22 5.511110.7 1.020.657027.37照明及其他112525250.80.750.82015小计245245.04170.7148.27(三)富氧侧吹还原炉收尘1布袋除尘器控制柜115550.80.750.75 3.8 2.8变频2卸灰阀113330.71.020.61.81.84Kctg¢受电设备名称序号电力负荷计算表数量(台)计算负荷COS¢备注3电动蝶阀110.180.180.180.7 1.020.60.110.114风机112222220.80.750.7516.512.385电动葫芦11 4.5 4.5 4.50.5 1.730.150.68 1.176照明及其他112525250.80.750.82015小计59.6859.6842.8333.3(四)烟化炉收尘1袋除尘器控制柜115550.80.750.75 3.8 2.8变频2卸灰阀55315150.7 1.020.699.183电动蝶阀110.270.270.270.7 1.020.60.160.174风机111101101100.80.750.7582.561.885埋刮板输送机11 5.5 5.5 5.50.7 1.020.65 3.6 3.66照明及其他112525250.80.750.82015小计160.8160.77118.9992.68(五)铜浮渣反射炉收尘1布袋除尘器控制柜115550.80.750.75 3.8 2.8变频2卸灰阀113330.7 1.020.6 1.8 1.843电动蝶阀110.180.180.180.7 1.020.60.110.114风机1145454580.750.7533.7525.315照明及其他112525250.80.750.82015小计78.1878.1859.4145.07(六)(一)-(五)合计788.7678.67493.13395.27乘同时系数:Ky=0.9 Kw=0.95无功补偿-180补偿后443.86195.54852X500变压器损耗 4.8524.2510KV侧负荷0.9448.71219.75499.6360002692.23375.5443.86动力变压器单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)九制酸(一)制酸系统变电所净化工段1电除雾器22661321320.7 1.020.679.280.82压滤机213630.80.750.65 1.95 1.463一级循环泵2118.53718.50.80.750.7513.8810.414填料塔循环泵212244220.80.750.7516.512.385二级循环泵2118.53718.50.80.750.7513.8810.416清洗泵2118.53718.50.80.750.7513.8810.417清液泵217.5157.50.80.750.75 5.63 4.228污酸泵1118.518.518.50.80.750.7513.8810.419起重机116.96.9 6.90.5 1.730.15 1.04 1.7910照明及其他20200.80.750.81612小计353.4265.4175.81154.27干吸工段1干燥塔循环泵113030300.80.750.7522.516.882一级塔循环泵113030300.80.750.7522.516.883二级塔循环泵113030300.80.750.7522.516.884地下槽泵111515150.80.750.7511.258.445干吸酸冷器441440.80.750.7532.25备注Kctg¢受电设备名称序号电力负荷计算表数量(台)计算负荷COS¢S11-M-500/10 .10/0.4 2台6电动葫芦33 6.318.918.90.5 1.730.15 2.84 4.91 7照明及其他20200.80.750.81612小计147.9147.9100.5978.22转化工段1起重机1112.712.712.70.5 1.730.15 1.91 3.3 2电动葫芦22 6.312.612.60.5 1.730.15 1.89 3.27 3照明及其他10100.80.750.886小计35.335.311.812.57尾吸工段1洗涤器循环泵212244220.80.750.7516.512.38 2洗涤塔循环泵212244220.80.750.7516.512.38 3氨水泵21 5.511 5.50.80.750.75 4.13 3.09 4硫胺泵217.5157.50.80.750.75 5.63 4.22 5引风机111111110.80.750.758.25 6.19 6电动葫芦11 2.6 2.6 2.60.5 1.730.150.390.68 7照明及其他10100.80.750.886小计137.6137.659.3944.93成品工序1地下槽泵111515150.80.750.7511.258.44 2电动葫芦11 2.6 2.6 2.60.5 1.730.150.390.68 3电动蝶阀3030130300.7 1.020.61818.36 4电动蝶阀44 2.28.88.80.7 1.020.6 5.28 5.39 5照明及其他10100.80.750.886小计66.466.442.9238.86综合楼1排风机220.190.380.380.80.750.750.290.21 2空调器99 2.219.819.80.80.750.7514.8511.14 3照明及其他10100.80.750.886小计30.1830.1823.1417.35硫酸循环水260.2148.160.80.750.7103.7177.78生产污水处理449.4345.170.80.750.7241.62181.21(1)-(8)合计1480111.91758.97605.21乘同时系数:Ky=0.9 Kw=0.95无功补偿-240补偿后683.07334.95760.771X1250变压器损耗7.6138.0410KV侧负荷0.88690.68372.99784.9560004144.06动力变压器单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvar KVA利用小数时(MWn)(二)1#开工电炉115405405400.90.481540261.536001X630变压器损耗63010KV侧负荷0.88546291.5618.96400218.4动力变压器单台功率设备功率(KW )最大负荷年耗电量备注备注574.95683.07KcKctg¢tg¢COS¢受电设备名称受电设备名称数量(台)计算负荷S11-M-630/10. 10/0.4 1台电力负荷计算表数量(台)计算负荷序号序号COS¢S11-M-1250/10 .10/0.4 1 电力负荷计算表总的工作的(KW) 总的工作的KWkvar KVA利用小数时(MWn)(三)2#开工电炉112702702700.90.481270130.773001X315变压器损耗31510KV侧负荷动力变压器0.88273145.8309.48400109.2(四)硫酸风机(10KV)114504504500.80.750.75337.5253.1355001856.25变频(五)(一)-(四)合计27402379.11847.181063.416327.91单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)(十)熔炼变电所(一)熔炼13#胶带输送机112222220.7 1.020.6514.314.592圆筒混合制粒机113737370.80.750.6524.0518.043氧化炉移动带式输送机114440.7 1.020.65 2.6 2.6544#胶带输送机1118.518.518.50.7 1.020.6512.0312.275还原炉移动式输送机114440.7 1.020.65 2.6 2.6561#定量给料机11 2.2 2.2 2.20.7 1.020.65 1.43 1.467斗式提升机117.57.57.50.71.020.654.884.97备注备注KcKctg¢tg¢COS¢COS¢受电设备名称S11-M-315/10. 10/0.4 1台电力负荷计算表数量(台)计算负荷序号受电设备名称序号8单机袋式收尘器11 6.25 6.25 6.250.80.750.75 4.69 3.52 93#埋刮板输送机11 4.2 4.2 4.20.7 1.020.65 2.73 2.79 10粗铅铸锭机11 5.5 5.5 5.50.80.750.7 3.85 2.89 11离心通风机2218.537370.80.750.7527.7520.81 12电动葫芦11 4.5 4.5 4.50.5 1.730.150.68 1.17 13吊钩桥式起重机1127.527.527.50.5 1.730.15 4.137.14 14抓斗挢式起重机1133.233.233.20.5 1.730.15 4.988.65 15螺旋给料机4241680.7 1.020.65 5.2 5.31 16防爆轴流风机660.8 4.8 4.80.80.750.75 3.6 2.7 17给煤机4241680.7 1.020.65 5.2 5.31 18脉冲袋式收尘器110.430.430.430.80.750.75 3.20.24 19防爆离心通风机4231260.80.750.75 4.5 3.38 20冲渣循环泵49.427.40.80.750.7520.5515.41 21电动葫芦118.38.38.30.5 1.730.15 1.25 2.16 22电炉112002002000.80.750.8160120 23照明及其他20200.80.750.81612小计540.3496.28327.3270.07(二)烟化炉风机房1高压鼓风辅助设备221530300.80.750.824182电动单梁起重机1110.610.610.60.5 1.730.15 1.59 2.753自洁式空气过滤器111501501500.80.750.710578.754电动阀22 2.2 4.4 4.40.7 1.020.6 2.64 2.69 5电动阀44312120.7 1.020.67.27.35 6照明10100.80.750.886小计217217148.43115.54(三)余热锅炉房1侧吹还原炉给水泵2190180900.80.750.7567.550.632侧吹熔原炉给水泵119090900.80.750.7567.550.633烟化炉锅炉给水泵2190180900.80.750.7567.550.634贵铅炉锅炉给水泵1118.518.518.50.80.750.7513.8810.415铜浮渣反射炉锅炉给水泵1118.518.518.50.80.750.7513.8810.416氧化锑还原炉熔炼精炼反射炉锅炉给水泵7清水离子泵212244220.80.750.7516.512.388埋刮板出渣机66 5.533330.7 1.020.6521.4521.889爆破清灰装置33515150.7 1.020.57.57.710高效弹性振打电机65650.5535.7533.750.7 1.020.517.918.211组合加药装置 1.95 1.650.80.750.75 1.240.9312乙炔瓶排风机22 1.5330.80.750.75 2.25 1.6913电动阀661.5990.7 1.020.6 5.4 5.5114照明10100.80.750.886小计657.2454.9324.34257.36(四)成品库1电动单梁起重机119.99.99.90.5 1.730.3 2.97 5.142扒渣机114545450.80.750.6529.2521.943振动筛11 2.2 2.2 2.20.7 1.020.65 1.43 1.464电磁振荡动给料机110.650.650.650.7 1.020.650.420.435液下泵111.11.11.10.80.750.750.830.6210.4113.880.750.750.818.518.518.5116电动平板车11 2.2 2.2 2.20.7 1.020.65 1.43 1.467电动葫芦118.38.38.30.5 1.730.15 1.252.168照明及其他550.80.750.843小计74.3574.3541.5736.21(五)粉煤制备1电动蝶阀110.50.50.50.7 1.020.60.30.312钢球磨煤机112752752750.80.750.82201653圆盘给料机11 5.5 5.5 5.50.7 1.020.65 3.58 3.654排粉风机117575750.80.750.7556.2542.195布袋除尘器113330.80.750.7 2.1 1.586脉冲阀30300.020.540.540.7 1.020.60.320.337排风机1118.518.518.50.80.750.7513.8810.418气动输送泵113030300.80.750.7522.516.8895#胶带输送机11 1.1 1.1 1.10.80.750.750.830.6210电磁除铁器111110.7 1.020.70.70.7111电动葫芦113030300.5 1.730.15 4.57.7912轴流风机11 1.1 1.1 1.10.80.750.750.830.6213防爆风机330.250.750.750.80.750.750.560.4214除尘器11 5.3 5.3 5.30.80.750.7 3.71 2.7815空调器113.633.63 3.630.80.750.75 2.72 2.0416照明及其他10100.80.750.886小计467.3467.32344.82265.67(六)(一)-(五)合计19561709.91186.45944.86乘同时系数:Ky=0.9 Kw=0.95无功补偿-450补偿后1067.8447.611157.82X1000变压器损耗11.758.4910KV侧负荷0.91079.51536.11205.360006477.04897.611067.81动力变压器单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)十一精矿仓及配料变电所(一)精矿仓及配料1抓斗挢式起重机11188.1188.1188.10.5 1.730.356.4397.742定量给料皮带机1111333330.7 1.020.6521.4521.88变频31#胶带输送机117.57.57.50.7 1.020.65 4.88 4.9742#胶带输送机11 5.5 5.5 5.50.7 1.020.65 3.58 3.655惯性振动给机220.55 1.1 1.10.7 1.020.650.720.736编织袋破碎清洗机1129.529.529.50.80.750.720.6515.497压滤机1118.518.518.50.80.750.712.959.718循环泵117.57.57.50.80.750.7 5.25 3.949箱式压滤机11 3.7 3.7 3.70.80.750.7 2.59 1.9410离心风机113737370.80.750.7527.7520.8111除尘器螺旋卸灰机22 5.511110.7 1.020.657.157.2912离心风机112222220.80.750.7516.512.3813除尘器机组117.57.57.50.80.750.7 5.25 3.9414空调器223.97.87.80.80.750.75 5.85 4.3915照明及其他10100.80.750.886小计389.7389.7198.99214.86备注Kctg¢COS¢ 电力负荷计算表数量(台)计算负荷序号受电设备名称S11-M-1000/10. 10/0.4 2(二)煤气站465.7268.720.80.750.75201.54151.16(三)(一)-(二)合计855.4658.42400.53366.02乘同时系数:Ky=0.9 Kw=0.95无功补偿-180补偿后360.47167.71397.58变压器损耗 3.9819.8810KV侧负荷0.89364.45187.59409.8960002186.69动力变压器单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)十二制氧站(一)氧气站高压用电设备1罗茨鼓风机(10KV)117107107100.80.750.75532.5399.382罗茨真空泵(10KV)22800160016000.80.750.7512009003氧压机(10KV0213807603800.80.750.75285213.754小计307026902017.51513.13600012105(二)低压用电设备1氧气站低压用电设备52520.80.750.753929.252螺杆式空压机322507505000.80.750.75375281.253再生干燥机323090600.80.750.754533.75备注347.71360.47Kctg¢COS¢受电设备名称电力负荷计算表数量(台)计算负荷序号S11-M-500/10. 10/0.4 2台4离心式空压机211322641320.80.750.759974.25小计1156744558418.5697.5乘同时系数:Ky=0.9 Kw=0.95无功补偿-180补偿后502.2217.58变压器损耗 5.4727.3710KV侧负荷0.9507.67244.94563.6760003046.04(三)以上小计422634342525.171758.073076.915151动力变压器单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)十三锌净化变电所(一)锌电积1新液转槽泵电机221530300.80.750.7522.516.882冷风机电机2218.537370.80.750.7527.7520.813循环泵电机331545450.80.750.7533.7525.314废液泵电机111515150.80.750.7511.258.445转槽泵电机1118.518.518.50.80.750.7513.8810.416阳极泥泵电机1118.518.518.50.80.750.7513.8810.417小循环泵电机1118.518.518.50.80.750.7513.8810.418循环泵电机114545450.80.750.7533.7525.31备注397.58502.2Kctg¢COS¢受电设备名称S11-M-630/10 .10/0.4 2台电力负荷计算表数量(台)计算负荷序号9液下泵电机22 2.2 4.4 4.40.80.750.75 3.3 2.48 10液下泵电机22 5.511110.80.750.758.25 6.19 11硫酸泵电机113330.80.750.75 2.25 1.69 12增压泵电机33 5.516.516.50.80.750.7512.389.28 13废水泵电机111111110.80.750.758.25 6.19 14配制等泵电机557.537.537.50.80.750.7528.521.5 15刷板机电机113330.80.750.7 2.1 1.58 16绝缘行车电机111111110.5 1.730.3 3.3 5.7222 5.511110.5 1.730.3 3.3 5.7211 2.2 2.2 2.20.5 1.730.30.66 1.1417真空泵电机114545450.80.750.7533.7525.31 18轴流风机14140.18 2.52 2.520.80.750.75 1.89 1.42 19照明及其它1001000.80.750.88060小计485.6485.62358.18275.76(二)锌净化及镉回收1一次净化槽222244440.80.750.730.823.1 2一次净化压滤泵212244220.80.750.715.411.55 3一次净化压滤机22 3.77.47.40.80.750.7 5.18 3.89 4二次净化槽2222440.80.750.730.823.1 5二次净化压滤泵212244220.80.750.715.411.55 6二次净化压滤机22 3.77.47.40.80.750.7 5.18 3.897二次净化液冷却塔111515150.80.750.710.57.888三次净化槽222244440.80.750.730.823.1 9三次净化压滤泵212244220.80.750.715.411.55 10二次净化压滤机22 3.77.47.40.80.750.7 5.18 3.89 11吊挂锌粉圆661660.80.750.7 4.2 3.15 12溶液输送泵551575750.80.750.752.539.38 13浆化槽224880.80.750.7 5.6 4.2 14矿浆输送泵221530300.80.750.72115.7515电动单梁悬挂起重机1111.411.411.40.80.750.72115.75 16洗滤布机11 2.2 2.2 2.20.80.750.7 1.54 1.16 17铜镉渣浸出槽227.515150.80.750.710.57.88 18铜镉渣浸出液压滤泵111111110.80.750.77.7 5.78 19铜镉渣浸出液压滤机11 1.1 1.1 1.10.80.750.70.770.58 20镉置换槽117.57.57.50.80.750.7 5.25 3.94 21镉置换槽压滤泵111111110.80.750.77.7 5.78 22镉置换槽压滤机11 1.1 1.1 1.10.80.750.70.770.58 23镉棉溶解槽113330.80.750.7 2.1 1.5824镉棉溶解液压滤泵111111110.80.750.77.7 5.7825镉棉溶解液压滤机11 1.1 1.1 1.10.80.750.70.770.5826净化除铜槽113330.80.750.7 2.1 1.5827净化除铜液压滤泵111111110.80.750.77.7 5.7828净化除铜压滤机11 1.1 1.1 1.10.80.750.70.770.58 29熔铸电炉116060600.80.750.74231.5 30溶液输送泵66 5.533330.80.750.723.117.33 31污水泵22 5.511110.80.750.77.7 5.78 32镉电解114545450.80.750.731.525.233玻璃钢酸雾净化塔113333330.80.750.7524.7518.5634照明及其它1001000.80.750.88060小计792.7726.7520.34391.83(三)铟回收1萃取反萃机电机44312120.80.750.78.4 6.3 2离心风机电机44312120.80.750.759 6.75 3电动葫芦电机113330.5 1.730.150.450.78 4轴流风机电机22 2.2 4.4 4.40.80.750.75 3.3 2.485中和压滤泵电机11 5.5 5.5 5.50.80.750.75 4.13 3.09 6搅拌机电机11 2.2 2.2 2.20.80.750.7 1.54 1.16 7压滤机电机113330.80.750.7 2.1 1.58 8压团机电机11 1.5 1.5 1.50.80.750.7 1.050.79 9液下泵电机11 5.5 5.5 5.50.80.750.75 4.13 3.09 10搅拌机电机11 1.1 1.1 1.10.80.750.70.770.58 11盐酸泵电机11 1.5 1.5 1.50.80.750.75 1.130.84 12萃取反萃机电机44 5.522220.80.750.715.411.55 13搅拌机电机223660.80.750.7 4.2 3.15 14压滤泵电机223660.80.750.7 4.2 3.15 15压滤机电机11 1.5 1.5 1.50.80.750.7 1.050.79 16洗油机电机11 1.1 1.1 1.10.80.750.70.770.58 17液下泵电机11 5.5 5.5 5.50.80.750.75 4.13 3.09 18离心风机电机224880.80.750.756 4.519玻璃钢酸雾净化塔1116.516.516.50.80.750.7512.389.2820照明及其它50500.80.750.84030小计168.3168.3124.1193.52(四)锌熔铸1锌直线铸定机11 5.5 5.5 5.50.80.750.7 3.85 2.89 2电炉辅助设备66 2.213.213.20.80.750.759.97.43 3离心风机电机117.57.57.50.80.750.75 5.63 4.22 4吊钩桥式起重机2219.939.839.80.5 1.730.27.9613.79 5离心风机电机113737370.80.750.7527.7520.81 6照明及其它12312371.0961.13小计15701503.61073.71822.24(五)(一)-(四)合计15701503.61073.71822.24乘同时系数:Ky=0.9 Kw=0.95781.13 966.33无功补偿-360补偿后966.33421.131054.12X800变压器损耗10.552.7110KV侧负荷0.9976.88473.38108660005861.25电力变压器单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)十四锌浸出变电所(一)浓密1酸洗浓密机11 4.5 4.5 4.50.80.750.7 3.15 2.362高浸浓密机11 4.5 4.5 4.50.80.750.7 3.15 2.363沉矾浓密机22 3.5770.80.750.7 4.9 3.684低浸浓密机11 3.5 3.5 3.50.80.750.7 2.45 1.845中浸浓密机11 3.5 3.5 3.50.80.750.7 2.45 1.846备用浓密机11 3.5 3.5 3.50.80.750.7 2.45 1.847浓密机底流泵77151051050.80.750.773.555.138熔液输送泵1010151501500.80.750.710578.759污水泵225.511110.80.750.77.7 5.7810照明及其后50500.80.750.84030小计342.5342.5244.75183.36(二)氧化锌球磨碱洗1QZ型抓斗桥式起重机1162.762.762.70.51.730.159.4116.29tg¢COS¢受电设备名称序号S11-M-800/10KV 2台电力负荷计算表数量(台)计算负荷Kc备注2螺旋输送机11 4.5 4.5 4.50.7 1.020.65 2.93 2.98 3湿式球磨机117575750.80.750.86045 4矿浆泵227.515150.80.750.7511.258.44 5碱洗槽222244440.80.750.730.823.1 6碱洗压滤泵222244440.80.750.753324.75 7厢式压滤机44 4.9519.819.80.80.750.713.8610.4 8滤液输送泵111515150.80.750.7511.258.44 9洗液输送泵117.57.57.50.80.750.75 5.63 4.22 10浆化槽224880.80.750.7 5.6 4.2 11矿浆输送泵111515150.80.750.7511.258.44 12浆化液输送泵111515150.80.750.7511.258.44 13LD型电动单梁起重机11 6.5 6.5 6.50.5 1.730.150.98 1.69 14洗滤布机11 2.2 2.2 2.20.80.750.7 1.54 1.16 15污水泵11 5.5 5.5 5.50.80.750.75 4.13 3.09 16离心风机112222220.80.750.7516.512.3817除尘器螺旋卸灰机11 5.5 5.5 5.50.7 1.020.65 3.58 3.6518轴流风机220.090.180.180.80.750.750.140.1 19小计417.4417.38273.07216.75(三)锌浸出1中浸反应槽332266660.80.750.746.234.65 2中浸矿浆泵211530300.80.750.7511.258.44 3低酸浸出槽332266660.80.750.746.234.65 4低浸矿浆泵211530150.80.750.7511.258.44 5沉矾槽442288880.80.750.761.646.2 6沉矾矿浆泵421560300.80.750.7522.516.88 7螺旋电子秤441440.80.750.7 2.8 2.1 8高酸浸出槽222244440.80.750.730.823.1 9高浸矿浆泵211530150.80.750.7511.258.44 10酸洗槽112222220.80.750.715.411.5511酸洗矿浆泵111515150.80.750.7511.258.4412备用反应槽112222220.80.750.715.411.5513矿浆泵111515150.80.750.7511.258.4414硫酸泵117.57.57.50.80.750.75 5.63 4.2215矿浆搅拌中间槽33 5.516.516.50.80.750.711.558.6616矿浆压滤泵332266660.80.750.7549.537.1317厢式压滤机66 3.722.222.20.80.750.715.5411.6618滤液输送泵331545450.80.750.7533.7525.3119矿浆输送泵111515150.80.750.7511.258.4420浆化槽224880.80.750.7 5.6 4.221洗滤布机11 2.2 2.2 2.20.80.750.7 1.54 1.1622电动单梁悬挂起重机11 5.7 5.7 5.70.15 6.590.150.86 5.6423污水泵22 5.511110.80.750.88.8 6.624玻璃钢酸雾净化塔113333330.80.750.7524.7518.5625旋流板塔1116.516.516.50.80.750.7512.389.2826照明及其后50500.80.750.84030小计790.6715.6518.29393.71(四)(一)-(三)合计15501475.51036.1794乘同时系数:Ky=0.9 Kw=0.95无功补偿-300补偿后932.49454.321037.32X800变压器损耗10.3751.8610KV侧负荷0.88942.86506.18107060005657.2电力变压器932.49 电力负荷计算表S11-M-800/10KV 2台754.32单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)十五熔锌感应电炉1熔锌感应电炉113003003000.90.481300145.3333.331X400变压器损耗 3.3316.6710KV侧负荷0.88303.33161.96343.8750001516.7电力变压器单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)十六生活设施1水处理设备47.627.10.80.750.7520.3315.242办公生活设施4004000.80.750.75300225小计447.6427.1320.33240.24乘同时系数:Ky=0.9 Kw=0.95无功补偿-120补偿后288.29108.23307.94变压器损耗 3.0815.410KV侧负荷0.92291.31123.65316.5160001748.23备注备注228.23288.29Kctg¢tg¢COS¢受电设备名称受电设备名称序号序号数量(台)计算负荷数量(台)计算负荷S11-M-400/10KV电力负荷计算表COS¢Kc动力变压器S11-M-630/10.10/0.41台单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)十七循环水1循环水1524963.580.80.750.75722.69542.01乘同时系数:Ky=0.9 Kw=0.95无功补偿-240补偿后650.42274.91706.13变压器损耗7.0635.3110KV侧负荷0.9657.48310.22726.9960003944.87备注514.91650.42Kctg¢COS¢受电设备名称电力负荷计算表数量(台)计算负荷序号动力变压器S11-M-1000/10.10/0.42台单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)十八(一)-(十九)合计244732164514817.98225.2383639乘同时系数:Ky=0.95 Kw=0.97无功补偿-3600补偿后140774378.48147422X10000变压器损耗147.42737.1110KV侧负荷9414224.45115.615116备注161817978.514077Kctg¢COS¢0.87序号电力负荷计算表数量(台)计算负荷电力负荷计算表受电设备名称单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvar KVA利用小数时(MWn)二十余热发电机组112000200020000.8-0.7512000-150013460二十一计及余热发电的负荷0.8812224.46615.61390070179无功补偿-3600补偿后12224.43015.612591变压器损耗125.9629.546500818.435KV侧负荷0.9612350.33645.131287770997.4单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)二十二锌电积1锌电积直流负荷117540754075400.90.480.860322921.436702.2无功补偿-1500补偿后60321421.436197.21X8000变压器损耗67.02335.1135KV侧负荷0.966099.021756.546346.9485029580.3备注备注KcKctg¢tg¢COS¢受电设备名称序号序号电力负荷计算表数量(台)计算负荷数量(台)计算负荷受电设备名称COS¢。
工厂电力负荷及其计算
07:36
2
(3)采用二项式系数法确定多组用电设备的总计算负荷时, 要考虑各组用电设备的最大负荷不同时出现的因素。在各组 用电设备中取其中一组最大的附加负荷 (cPx )m ax ,再加上各 组平均负荷 bPe ,求出设备组的总计算负荷。
总的有功计算负荷为: P30
总的无功计算负荷为: Q30
07:36
8
例2-4 一机修车间的380V线路上,接有金属切削机床电动机20台共50kW, 其中较大容量电动机有7.5kW2台,4kW2台,2.2kW8台;另接通风机2台共 2.4kW;电阻炉1台2kW。试用二项式法来确定计算负荷(设同时系数K∑p、 K∑q均为0.9)。 解 求出各组的平均功率bPe和附加负荷cPx ( 1) 金属切削机床电动机组 查附录表1,取b1=0.14,c1=0.4,cosφ1=0.5,tgφ1=1.73, x1=5,则 (bPe)1=0.14×50=7kW (cPx)1=0.4(7.5×2+4×2+2.2×1)=10.08kW (2) 通风机组 查附录表1,取b2=0.65,c2=0.25,cosφ2=0.8,tgφ2=0.75,x2=1,则 (bPe)2=0.65×2.4=1.56kW (cPx)2=0.25×1.2=0.3kW (3) 电阻炉 (bPe)3=2kW (cPx)3=0
Q 30(1) 1.73 28.4 49.1kvar
56.8 86.3A 3 0.38
S30(1) 28.42 49.12 56.8kVA I30(1)
07:36
4
例2-3续
(2)电焊机组的计算负荷
查表1 取需要系数和功率因数为:
K d 0.35, cos 0.35, tan 2.68
电力负荷分析计算
目录1、电力系统中电力负荷的分析2、系统的供电负荷的计算3、系统的发电负荷的计算4、系统的备用容量分析5、有功、无功平衡的计算2 电力负荷分析2.1 系统供电负荷和发电负荷计算2.1.1 系统的供电负荷系统的供电负荷,就是用电负荷加上为输送该负荷而产生的功率损耗,这种损耗通常成为网络损耗,简称网损。
网损包括线路损耗和升、降压变压器损耗。
在规划设计时,网损是用网损率计算的,一般取5%~10%。
这样,系统的供电负荷g P 为:式(2.1) 式中:2K ——网损率,取6%;y P ——系统的用电负荷。
式(2.2) 式中:1K ——负荷的同时率,取1。
()max 1max 11max 2max 3max max 11(60605030)200ny A i P K P K P P P P MW MW MW MW MW===+++=⨯+++=∑()min 1min 11min 2min 3min min 11(35403015)120n y A i P K P K P P P P MW MW MW MW MW ===+++=⨯+++=∑则: max 211200212.77110.06g y P P MW MW K ==⨯=-- min min 211120127.66110.06g y P P MW MW K ==⨯=-- 2.1.2 系统的发电负荷系统的发电负荷是指满足系统供电负荷,以及发电机电压直配负荷的需要,发电机(厂)所必须发出的功率,它等于系统供电负荷、直配负荷,即系统的发电负荷f P 为: ()311f g z P P P K =+- 式(2.4) 1max 1n y i P k P ==∑211g y P P K =-式中:g P ——系统的供电负荷;z P ——发电机电压直配负荷,取0;3K ——厂用电率,取10%。
因此:min 311()127.66141.84110.1f g z P P P MW MW K =+=⨯=--2.2 系统备用容量2.2.1 负荷备用容量负荷备用容量是指接于母线上能立即带负荷的旋转备用容量,以备用平衡负荷瞬间波动与发电机负荷曲线的差值。
电力负荷计算公式与范例
资料范本本资料为word版本,可以直接编辑和打印,感谢您的下载电力负荷计算公式与范例地点:__________________时间:__________________说明:本资料适用于约定双方经过谈判,协商而共同承认,共同遵守的责任与义务,仅供参考,文档可直接下载或修改,不需要的部分可直接删除,使用时请详细阅读内容常用电工计算口诀第一章按功率计算电流的口诀之一1.用途:这是根据用电设备的功率(千瓦或千伏安)算出电流(安)的口诀。
电流的大小直接与功率有关,也与电压,相别,力率(又称功率因数)等有关。
一般有公式可供计算,由于工厂常用的都是380/220 伏三相四线系统,因此,可以根据功率的大小直接算出电流。
2.口诀:低压380/220 伏系统每KW 的电流,安。
千瓦,电流,如何计算?电力加倍,电热加半。
单相千瓦,4 . 5 安。
单相380 ,电流两安半。
3. 说明:口诀是以380/220V 三相四线系统中的三相设备为准,计算每千瓦的安数。
对于某些单相或电压不同的单相设备,其每千瓦的安数.口诀中另外作了说明。
①这两句口诀中,电力专指电动机.在380V 三相时(力率0.8 左右),电动机每千瓦的电流约为2 安.即将“千瓦数加一倍”( 乘2)就是电流, 安。
这电流也称电动机的额定电流.【例1 】5.5 千瓦电动机按“电力加倍”算得电流为11 安。
【例2 】4 0 千瓦水泵电动机按“电力加倍”算得电流为8 0安。
电热是指用电阻加热的电阻炉等。
三相380 伏的电热设备,每千瓦的电流为1.5安.即将“千瓦数加一半”(乘1.5),就是电流,安。
【例1】3 千瓦电加热器按“电热加半”算得电流为4.5 安。
【例2】1 5 千瓦电阻炉按“电热加半”算得电流为2 3 安。
这口诀并不专指电热,对于照明也适用.虽然照明的灯泡是单相而不是三相,但对照明供电的三相四线干线仍属三相。
只要三相大体平衡也可以这样计算。
此外,以千伏安为单位的电器(如变压器或整流器)和以千乏为单位的移相电容器(提高力率用)也都适用。
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvar KVA利用小数时(MWn)一铅锡合金电解1熔铅锅223060600.80.750.754533.752阳极锅113030300.80.750.7522.516.883阳极板铸型1133.233.233.20.80.750.6521.616.194残极洗涮机113330.80.750.65 1.95 1.465光棒机11 5.5 5.5 5.50.80.750.65 3.58 2.686阴极锅113030300.80.750.7522.516.887真空蒸馏炉4330012009000.80.750.87205408始极片锅113030300.80.750.7522.516.889铅始极片制造机组1131.5531.5531.550.80.750.6520.5115.3810电铅锅熔体搅拌机111515150.80.750.710.57.881150t锅搅拌机111515150.80.750.710.57.8812铅泵22 5.511110.80.750.758.25 6.1913吊钩桥式起重机11232.8232.8232.80.5 1.730.1534.9260.4814熔铅锅熔体搅拌机221530300.80.750.72115.7515阳极锅搅拌机111515150.80.750.710.57.8816其他115005005000.80.750.7350262.517离心风机115555550.80.750.7541.2530.9418螺旋卸灰机33 5.516.516.50.71.020.6510.7310.94电力负荷计算表受电设备名称序号备注计算负荷Kctg¢COS¢数量(台)19离心风机223774740.80.750.7555.541.6320离心风机117575750.80.750.7556.2542.1921玻璃钢净化塔循环泵112222220.80.750.7516.512.3822空调器66 3.923.423.40.80.750.7517.5513.1623空调器55 5.5527.7527.750.80.750.7520.8115.6124照明50500.80.750.84030小计25862285.71584.371225.5乘同时系数:Ky=0.9 Kw=0.95无功补偿-480补偿后1425.93684.21581.62X1250变压器损耗15.8279.0810KV侧负荷0.81441.75763.271631.360008650.49动力变压器单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)二铅电解直流负荷1电解直流负荷114754754750.90.480.8380184.04422.22变压器损耗 4.2221.1110KV侧负荷0.88384.22205.1560002305.33整流变压器4754751X475S11-M-1250/10 .10/0.4 2台计算负荷电力负荷计算表序号受电设备名称数量(台)COS¢tg¢Kc备注1164.21425.93单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)三烟化炉风机房离心鼓风机(10KV)单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)四收尘变电所(一)分银炉收尘1布袋除尘器控制柜22510100.80.750.757.5 5.6变频2卸灰阀1212336360.7 1.020.621.622.043电动蝶阀220.090.180.180.7 1.020.60.110.114电动蝶阀440.27 1.080.180.7 1.020.60.320.335风机221322642640.80.750.75198148.56埋刮板输送机225.511110.71.020.657.27.331528022560序号受电设备名称2310.33绕线电机5605500 电力负荷计算表4200.75计算负荷备注数量(台)COS¢tg¢Kc数量(台)COS¢tg¢Kc0.750.8计算负荷备注电力负荷计算表序号受电设备名称7照明及其他115550.80.750.843小计327.3327.26239.01187.23(二)铋转炉收尘1布袋除尘器控制柜115550.80.750.75 3.8 2.8变频2卸灰阀66318180.7 1.020.610.811.2 3电动蝶阀110.180.180.180.7 1.020.60.110.11 4电动蝶阀220.270.540.540.7 1.020.60.320.33 5风机111321321320.80.750.759974.25 6埋刮板输送机22 5.511110.7 1.020.657.27.3 7电动葫芦11 4.5 4.5 4.50.5 1.730.150.68 1.17 8照明及其他115550.80.750.843小计176.2176.22125.8199.99(三)贵铅炉收尘1布袋除尘器控制柜115550.80.750.75 3.8 2.8变频2卸灰阀88324240.7 1.020.614.414.69 3电动蝶阀110.090.090.090.7 1.020.60.050.06 4电动蝶阀220.270.540.540.7 1.020.60.320.33 5风机111321321320.7 1.020.759974.25 6埋刮板输送机117.57.57.50.7 1.020.65 4.95 7照明及其他115550.80.750.843小计174.1174.13126.4100.11(四)锑熔练反射炉收尘1布袋除尘器控制柜115550.80.750.75 3.8 2.8变频2卸灰阀88324240.7 1.020.614.414.69 3电动蝶阀110.180.180.180.7 1.020.60.110.11 4电动蝶阀220.270.540.540.7 1.020.60.320.33 5风机111321321320.7 1.020.759974.25 6埋刮板输送机117.57.57.50.7 1.020.65 4.95 7照明及其他115550.80.750.843小计174.2174.22126.46100.17(五)精练炉收尘1布袋除尘器控制柜115550.80.750.75 3.8 2.8变频2卸灰阀66318180.7 1.020.610.811.023电动蝶阀110.180.180.180.7 1.020.60.110.114电动蝶阀220.270.540.540.7 1.020.60.320.335风机111321321320.7 1.020.759974.256埋刮板输送机22 5.511110.7 1.020.657.27.37照明及其他111051051050.80.750.88463小计249.6249.63188.58146.39(六)(一)-(五)合计11011101.5806.25633.88乘同时系数Ky=0.9 Kw=0.95无功补偿-2402X630补偿后725.63362.18810.99变压器损耗8.1140.5510KV侧负荷0.88733.74402.7383760004402.42动力变压器S11-M-630/10 .10/0.4 2台725.63602.18单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)五贵金属熔炼变电所(一)阳极泥库及配料1阳极泥搅拌槽114440.80.750.7 2.8 2.12矿浆二次压滤泵112222220.80.750.7516.512.383二次箱式压滤机11 3.7 3.7 3.70.80.750.7 2.59 1.944滤液输送泵111515150.80.750.7511.258.445洗液输送泵117.57.57.50.7 1.020.6511.258.446圆盘给料机227.515150.7 1.020.659.759.957定量给料皮带机113330.7 1.020.65 1.95 1.998电动单梁起重机11 6.5 6.5 6.50.5 1.730.150.98 1.699抓斗挢式起重机1162.762.762.70.5 1.730.318.8132.5810定量给料皮带机99 2.219.819.80.7 1.020.6512.8713.1311惯性振动给料机220.55 1.1 1.10.7 1.020.650.720.7312鄂式破碎机222244440.80.750.753324.7513离心风机117575750.80.750.7556.2542.1914螺旋卸灰机11 5.5 5.5 5.50.7 1.020.65 3.58 3.6515轴流风机44 1.5660.80.750.75 4.5 3.3816空调器551.658.258.250.80.750.75 6.19 4.6417照明及其他50500.80.750.84030小计393.3393.3259.76222.05序号受电设备名称计算负荷备注数量(台)COS¢tg¢Kc电力负荷计算表(二贵金属熔练)1双钩桥式起重机11126.4126.4126.40.5 1.730.1518.9632.842贵铅炉111515150.80.750.7511.258.443电动平板车11 3.7 3.7 3.77 1.020.65 2.41 2.454分银炉111515150.80.750.7511.258.445银阳极板浇铸车440.37 1.48 1.480.7 1.020.650.960.986电动平板车44 2.28.88.80.7 1.020.65 5.72 5.847铋转炉111111110.80.750.77.7 5.788胶带输送机33 2.2 6.6 6.60.7 1.020.65 4.29 4.389胶带输送机112222220.7 1.020.6514.314.5910电动单梁起重机119.99.99.90.5 1.020.15 1.49 2.5711铋精炼锅651006005000.80.750.75375281.2512电动葫芦12 4.9 4.9 4.90.5 1.730.150.74 1.2713精炼炉113330.80.750.75 2.25 1.6914抽铋机55 1.57.57.50.80.750.7 5.25 3.9415颜氏喷火机22 3.77.47.40.80.750.75 5.55 4.1616颜氏喷火机33 1.5 4.5 4.50.80.750.75 3.38 2.5317离心风机119090900.80.750.7567.550.6318喷淋塔循环泵117.57.57.50.80.750.75 5.63 4.2219螺旋卸灰机11 5.5 5.5 5.50.7 1.020.65 3.58 3.6520轴流风机113330.80.750.75 2.25 1.6921池氯报警及吸收装置1118.518.518.50.80.750.7513.8810.4122照明及其他1001000.80.750.88060小计1072971.68643.31511.72(三(一)-(二)合计14651365903.03733.77)乘同时系数:812.76697.09Ky=0.9 Kw=0.95无功补偿-360补偿后812.76337.09879.892X800变压器损耗8.843.9910KV侧负荷0.91821.56381.08905.6460004929.37动力变压器单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)六金属砷回收1电动单梁桥式起重机44 6.927.627.60.5 1.730.15 4.147.172除尘器44520200.80.730.71410.53除尘器附离心风机22 5.511110.80.750.758.256.194螺旋给料机22 2.2 4.4 4.40.7 1.020.65 2.86 2.925砷蒸馏电阻炉404035140014000.80.750.811208406卸灰阀22 1.1 2.2 2.20.7 1.020.6 1.32 1.357埋刮板输送机22 5.511110.7 1.020.657.157.298碱液制备槽224880.80.750.7 5.6 4.29碱液循环泵221122220.80.750.7516.512.3810污水输送泵221122220.80.750.7516.512.3811离心风机221122220.80.750.7516.512.3812照明及其他1501500.80.750.812090小计17001700.21332.821006.74乘同时系数:Ky=0.9 Kw=0.95无功补偿-4001199.54956.4tg¢Kc电力负荷计算表数量(台)COS¢备注计算负荷S11-M-800/10 .10/0.4 2台序号受电设备名称补偿后1199.54556.41322.32X1000变压器损耗13.2266.1210KV侧负荷0.891212.76622.521363.260007276.57动力变压器单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)七金银电解变电所(一)金银电解1银电解槽1112.612.612.60.80.750.810.087.562金电解槽110.40.40.40.80.750.80.320.243出. 刮银粉机220.75 1.5 1.50.80.750.7 1.050.794手动单工位清洗机112525250.80.750.717.513.135离心式过滤机11 1.5 1.5 1.50.80.750.7 1.050.796通风罩11 1.1 1.1 1.10.80.750.70.770.587恒温干燥箱113330.80.750.8 2.4 1.88高频坩埚锅炉114440.80.750.8 3.2 2.49热水泵110.750.750.750.80.750.750.560.4210电解液循环泵114440.80.750.753 2.2511输送泵66424240.80.750.751813.512干燥机114440.80.750.8 3.2 2.413液下泵113330.80.750.75 2.25 1.6914电动葫芦1110.610.610.60.51.730.151.592.75备注Kc计算负荷数量(台)COS¢tg¢电力负荷计算表S11-M-1000/10. 10/0.4 2序号受电设备名称15造液槽11 1.5 1.5 1.50.80.750.7 1.050.7916废电解液处理槽11 1.5 1.5 1.50.80.750.7 1.050.7917烘烤电阻炉111010100.80.750.88618中频感应电炉221002002000.80.750.816012019银阳极浇铸车110.370.370.370.7 1.020.650.240.2520银铸锭车110.370.370.370.7 1.020.650.240.2521台钻110.370.370.370.7 1.020.650.240.2522真空泵110.370.370.370.80.750.750.280.2123电动单梁起重机11 6.9 6.9 6.90.5 1.730.15 1.04 1.7924离心风机117.57.57.50.80.750.75 5.63 4.2225轴流风机220.040.080.080.80.750.750.060.0526轴流风机440.120.480.480.80.750.750.360.2727轴流风机220.060.120.120.80.750.750.090.0728玻璃钢净化塔1120.520.520.50.80.750.7515.3811.5329空调器11 2.32.3 2.30.80.750.75 1.73 1.2930照明及其他10100.80.750.886小计357.8357.81268.34204.03(二)综合维修站11127.68127.7127.680.7 1.020.563.8465013(三)化验及环监站11115.64115.6115.640.7 1.020.557.8258.99(四)综合仓库,贵金属产品库1126.526.526.50.71.020.513.2513.25(五)(一)-(二)合计627.6627.63403.25341.66乘同时系数:Ky=0.9 Kw=0.95无功补偿-150补偿后369.93174.58402.731X630变压器损耗 4.0320.1410KV侧负荷0.88366.95194.72415.4260002201.72动力变压器362.93324.58S11-M-630/10 .10/0.4 1台单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)八余热电站(一)余热电站1余热发电站170900.80.750.7567.550.632化水站75450.80.750.7533.7525.31小计245135101.2575.94(二)富氧侧吹熔炼炉收尘1电收尘器5514.9574.7574.750.7 1.020.644.8545.762阴阳极振打机17170.37 6.29 6.290.7 1.020.5 3.1 3.23电加热器1515690900.80.750.872544布袋除尘器控制柜115550.80.750.75 3.82.8变频5卸灰阀1111333330.7 1.020.619.820.26埋刮板输送机22 5.511110.7 1.020.657027.37照明及其他112525250.80.750.82015小计245245.04170.7148.27(三)富氧侧吹还原炉收尘1布袋除尘器控制柜115550.80.750.75 3.8 2.8变频2卸灰阀113330.71.020.61.81.84计算负荷备注序号受电设备名称数量(台)COS¢tg¢Kc电力负荷计算表3电动蝶阀110.180.180.180.7 1.020.60.110.114风机112222220.80.750.7516.512.385电动葫芦11 4.5 4.5 4.50.5 1.730.150.68 1.176照明及其他112525250.80.750.82015小计59.6859.6842.8333.3(四)烟化炉收尘1袋除尘器控制柜115550.80.750.75 3.8 2.8变频2卸灰阀55315150.7 1.020.699.183电动蝶阀110.270.270.270.7 1.020.60.160.174风机111101101100.80.750.7582.561.885埋刮板输送机11 5.5 5.5 5.50.7 1.020.65 3.6 3.66照明及其他112525250.80.750.82015小计160.8160.77118.9992.68(五)铜浮渣反射炉收尘1布袋除尘器控制柜115550.80.750.75 3.8 2.8变频2卸灰阀113330.7 1.020.6 1.8 1.843电动蝶阀110.180.180.180.7 1.020.60.110.114风机1145454580.750.7533.7525.315照明及其他112525250.80.750.82015小计78.1878.1859.4145.07(六)(一)-(五)合计788.7678.67493.13395.27乘同时系数:Ky=0.9 Kw=0.95无功补偿-180补偿后443.86195.54852X500变压器损耗 4.8524.2510KV侧负荷0.9448.71219.75499.6360002692.23443.86375.5动力变压器单台功率设备功率(KW)最大负荷年耗电量总的工作的(KW) 总的工作的KW kvar KVA利用小数时(MWn)九制酸(一)制酸系统变电所净化工段1电除雾器22661321320.7 1.020.679.280.8 2压滤机213630.80.750.65 1.95 1.46 3一级循环泵2118.53718.50.80.750.7513.8810.41 4填料塔循环泵212244220.80.750.7516.512.38 5二级循环泵2118.53718.50.80.750.7513.8810.41 6清洗泵2118.53718.50.80.750.7513.8810.41 7清液泵217.5157.50.80.750.75 5.63 4.22 8污酸泵1118.518.518.50.80.750.7513.8810.41 9起重机11 6.9 6.9 6.90.5 1.730.15 1.04 1.79 10照明及其他20200.80.750.81612小计353.4265.4175.81154.27干吸工段1干燥塔循环泵113030300.80.750.7522.516.88 2一级塔循环泵113030300.80.750.7522.516.88 3二级塔循环泵113030300.80.750.7522.516.88 4地下槽泵111515150.80.750.7511.258.44 5干吸酸冷器441440.80.750.753 2.25备注电力负荷计算表序号受电设备名称数量(台)COS¢tg¢Kc计算负荷S11-M-500/10 .10/0.4 2台6电动葫芦33 6.318.918.90.5 1.730.15 2.84 4.91 7照明及其他20200.80.750.81612小计147.9147.9100.5978.22转化工段1起重机1112.712.712.70.5 1.730.15 1.91 3.3 2电动葫芦22 6.312.612.60.5 1.730.15 1.89 3.27 3照明及其他10100.80.750.886小计35.335.311.812.57尾吸工段1洗涤器循环泵212244220.80.750.7516.512.38 2洗涤塔循环泵212244220.80.750.7516.512.38 3氨水泵21 5.511 5.50.80.750.75 4.13 3.09 4硫胺泵217.5157.50.80.750.75 5.63 4.22 5引风机111111110.80.750.758.25 6.19 6电动葫芦11 2.6 2.6 2.60.5 1.730.150.390.68 7照明及其他10100.80.750.886小计137.6137.659.3944.93成品工序1地下槽泵111515150.80.750.7511.258.44 2电动葫芦11 2.6 2.6 2.60.5 1.730.150.390.68 3电动蝶阀3030130300.7 1.020.61818.36 4电动蝶阀44 2.28.88.80.7 1.020.6 5.28 5.39 5照明及其他10100.80.750.886小计66.466.442.9238.86综合楼1排风机220.190.380.380.80.750.750.290.21 2空调器99 2.219.819.80.80.750.7514.8511.14 3照明及其他10100.80.750.886小计30.1830.1823.1417.35硫酸循环水260.2148.160.80.750.7103.7177.78生产污水处理449.4345.170.80.750.7241.62181.21(1)-(8)合计1480111.91758.97605.21乘同时系数:Ky=0.9 Kw=0.95无功补偿-240补偿后683.07334.95760.771X1250变压器损耗7.6138.0410KV侧负荷0.88690.68372.99784.9560004144.06动力变压器单台功率设备功率(KW)最大负荷年耗电量总的工作的(KW) 总的工作的KW kvar KVA利用小数时(MWn)(二)1#开工电炉115405405400.90.481540261.536001X630变压器损耗63010KV侧负荷0.88546291.5618.96400218.4动力变压器单台功率设备功率(KW)最大负荷年耗电量备注tg¢Kc计算负荷数量(台)COS¢tg¢计算负荷备注电力负荷计算表序号受电设备名称数量(台)COS¢Kc电力负荷计算表序号574.95 683.07受电设备名称S11-M-1250/10 .10/0.4 1 S11-M-630/10. 10/0.4 1台总的工作的(KW) 总的工作的KWkvar KVA利用小数时(MWn)(三)2#开工电炉112702702700.90.481270130.773001X315变压器损耗31510KV侧负荷动力变压器0.88273145.8309.48400109.2(四)硫酸风机(10KV)114504504500.80.750.75337.5253.1355001856.25变频(五)(一)-(四)合计27402379.11847.181063.416327.91单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)(十)熔炼变电所(一)熔炼13#胶带输送机112222220.7 1.020.6514.314.592圆筒混合制粒机113737370.80.750.6524.0518.043氧化炉移动带式输送机114440.7 1.020.65 2.6 2.6544#胶带输送机1118.518.518.50.7 1.020.6512.0312.275还原炉移动式输送机114440.7 1.020.65 2.6 2.6561#定量给料机11 2.2 2.2 2.20.7 1.020.65 1.43 1.467斗式提升机117.57.57.50.71.020.654.884.97COS¢tg¢备注Kc电力负荷计算表序号受电设备名称数量(台)COS¢tg¢Kc计算负荷备注序号受电设备名称S11-M-315/10. 10/0.4 1台8单机袋式收尘器11 6.25 6.25 6.250.80.750.75 4.69 3.52 93#埋刮板输送机11 4.2 4.2 4.20.7 1.020.65 2.73 2.79 10粗铅铸锭机11 5.5 5.5 5.50.80.750.7 3.85 2.89 11离心通风机2218.537370.80.750.7527.7520.81 12电动葫芦11 4.5 4.5 4.50.5 1.730.150.68 1.17 13吊钩桥式起重机1127.527.527.50.5 1.730.15 4.137.14 14抓斗挢式起重机1133.233.233.20.5 1.730.15 4.988.65 15螺旋给料机4241680.7 1.020.65 5.2 5.31 16防爆轴流风机660.8 4.8 4.80.80.750.75 3.6 2.7 17给煤机4241680.7 1.020.65 5.2 5.31 18脉冲袋式收尘器110.430.430.430.80.750.75 3.20.24 19防爆离心通风机4231260.80.750.75 4.5 3.38 20冲渣循环泵49.427.40.80.750.7520.5515.41 21电动葫芦118.38.38.30.5 1.730.15 1.25 2.16 22电炉112002002000.80.750.8160120 23照明及其他20200.80.750.81612小计540.3496.28327.3270.07(二)烟化炉风机房1高压鼓风辅助设备221530300.80.750.824182电动单梁起重机1110.610.610.60.5 1.730.15 1.59 2.753自洁式空气过滤器111501501500.80.750.710578.754电动阀22 2.2 4.4 4.40.7 1.020.6 2.64 2.69 5电动阀44312120.7 1.020.67.27.35 6照明10100.80.750.886小计217217148.43115.54(三)余热锅炉房1侧吹还原炉给水泵2190180900.80.750.7567.550.632侧吹熔原炉给水泵119090900.80.750.7567.550.633烟化炉锅炉给水泵2190180900.80.750.7567.550.634贵铅炉锅炉给水泵1118.518.518.50.80.750.7513.8810.415铜浮渣反射炉锅炉给水泵1118.518.518.50.80.750.7513.8810.416氧化锑还原炉熔炼精炼反射炉锅炉给水泵7清水离子泵212244220.80.750.7516.512.388埋刮板出渣机66 5.533330.7 1.020.6521.4521.889爆破清灰装置33515150.7 1.020.57.57.710高效弹性振打电机65650.5535.7533.750.7 1.020.517.918.211组合加药装置 1.95 1.650.80.750.75 1.240.9312乙炔瓶排风机22 1.5330.80.750.75 2.25 1.6913电动阀661.5990.7 1.020.6 5.4 5.5114照明10100.80.750.886小计657.2454.9324.34257.36(四)成品库1电动单梁起重机119.99.99.90.5 1.730.3 2.97 5.142扒渣机114545450.80.750.6529.2521.943振动筛11 2.2 2.2 2.20.7 1.020.65 1.43 1.464电磁振荡动给料机110.650.650.650.7 1.020.650.420.435液下泵111.11.11.10.80.750.750.830.621113.8810.4118.518.518.50.750.750.86电动平板车11 2.2 2.2 2.20.7 1.020.65 1.43 1.467电动葫芦118.38.38.30.5 1.730.15 1.25 2.168照明及其他550.80.750.843小计74.3574.3541.5736.21(五粉煤制备)1电动蝶阀110.50.50.50.7 1.020.60.30.312钢球磨煤机112752752750.80.750.82201653圆盘给料机11 5.5 5.5 5.50.7 1.020.65 3.58 3.654排粉风机117575750.80.750.7556.2542.195布袋除尘器113330.80.750.7 2.1 1.586脉冲阀30300.020.540.540.7 1.020.60.320.337排风机1118.518.518.50.80.750.7513.8810.418气动输送泵113030300.80.750.7522.516.8895#胶带输送机11 1.1 1.1 1.10.80.750.750.830.6210电磁除铁器111110.7 1.020.70.70.7111电动葫芦113030300.5 1.730.15 4.57.7912轴流风机11 1.1 1.1 1.10.80.750.750.830.6213防爆风机330.250.750.750.80.750.750.560.4214除尘器11 5.3 5.3 5.30.80.750.7 3.71 2.7815空调器11 3.63 3.63 3.630.80.750.75 2.72 2.0416照明及其他10100.80.750.886小计467.3467.32344.82265.67(六(一)-(五)合计19561709.91186.45944.86)乘同时系数:1067.81897.61Ky=0.9 Kw=0.95无功补偿-450补偿后1067.8447.611157.82X1000变压器损耗11.758.4910KV侧负荷0.91079.51536.11205.360006477.04动力变压器单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)十一精矿仓及配料变电所(一)精矿仓及配料1抓斗挢式起重机11188.1188.1188.10.5 1.730.356.4397.742定量给料皮带机1111333330.7 1.020.6521.4521.88变频31#胶带输送机117.57.57.50.7 1.020.65 4.88 4.9742#胶带输送机11 5.5 5.5 5.50.7 1.020.65 3.58 3.655惯性振动给机220.55 1.1 1.10.7 1.020.650.720.736编织袋破碎清洗机1129.529.529.50.80.750.720.6515.497压滤机1118.518.518.50.80.750.712.959.718循环泵117.57.57.50.80.750.7 5.25 3.949箱式压滤机11 3.7 3.7 3.70.80.750.7 2.59 1.9410离心风机113737370.80.750.7527.7520.8111除尘器螺旋卸灰机22 5.511110.7 1.020.657.157.2912离心风机112222220.80.750.7516.512.3813除尘器机组117.57.57.50.80.750.7 5.25 3.9414空调器223.97.87.80.80.750.75 5.85 4.3915照明及其他10100.80.750.886小计389.7389.7198.99214.86数量(台)COS¢tg¢S11-M-1000/10. 10/0.4 2电力负荷计算表序号受电设备名称Kc计算负荷备注(二)煤气站465.7268.720.80.750.75201.54151.16(三)(一)-(二)合计855.4658.42400.53366.02乘同时系数:Ky=0.9 Kw=0.95无功补偿-180补偿后360.47167.71397.58变压器损耗 3.9819.8810KV侧负荷0.89364.45187.59409.8960002186.69动力变压器单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)十二制氧站(一)氧气站高压用电设备1罗茨鼓风机(10KV)117107107100.80.750.75532.5399.382罗茨真空泵(10KV)22800160016000.80.750.7512009003氧压机(10KV0213807603800.80.750.75285213.754小计307026902017.51513.13600012105(二)低压用电设备1氧气站低压用电设备52520.80.750.753929.252螺杆式空压机322507505000.80.750.75375281.253再生干燥机323090600.80.750.754533.75计算负荷备注序号受电设备名称数量(台)COS¢tg¢Kc电力负荷计算表360.47347.71S11-M-500/10. 10/0.4 2台4离心式空压机211322641320.80.750.759974.25小计1156744558418.5697.5乘同时系数:Ky=0.9 Kw=0.95无功补偿-180补偿后502.2217.58变压器损耗 5.4727.3710KV侧负荷0.9507.67244.94563.6760003046.04(三)以上小计422634342525.171758.073076.915151动力变压器单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)十三锌净化变电所(一)锌电积1新液转槽泵电机221530300.80.750.7522.516.882冷风机电机2218.537370.80.750.7527.7520.813循环泵电机331545450.80.750.7533.7525.314废液泵电机111515150.80.750.7511.258.445转槽泵电机1118.518.518.50.80.750.7513.8810.416阳极泥泵电机1118.518.518.50.80.750.7513.8810.417小循环泵电机1118.518.518.50.80.750.7513.8810.418循环泵电机114545450.80.750.7533.7525.31tg¢Kc计算负荷备注电力负荷计算表COS¢S11-M-630/10 .10/0.4 2台502.2397.58受电设备名称数量(台)序号9液下泵电机22 2.2 4.4 4.40.80.750.75 3.3 2.48 10液下泵电机22 5.511110.80.750.758.25 6.19 11硫酸泵电机113330.80.750.75 2.25 1.69 12增压泵电机33 5.516.516.50.80.750.7512.389.28 13废水泵电机111111110.80.750.758.25 6.19 14配制等泵电机557.537.537.50.80.750.7528.521.5 15刷板机电机113330.80.750.7 2.1 1.58 16绝缘行车电机111111110.5 1.730.3 3.3 5.7222 5.511110.5 1.730.3 3.3 5.7211 2.2 2.2 2.20.5 1.730.30.66 1.1417真空泵电机114545450.80.750.7533.7525.31 18轴流风机14140.18 2.52 2.520.80.750.75 1.89 1.42 19照明及其它1001000.80.750.88060小计485.6485.62358.18275.76(二)锌净化及镉回收1一次净化槽222244440.80.750.730.823.1 2一次净化压滤泵212244220.80.750.715.411.55 3一次净化压滤机22 3.77.47.40.80.750.7 5.18 3.89 4二次净化槽2222440.80.750.730.823.1 5二次净化压滤泵212244220.80.750.715.411.55 6二次净化压滤机22 3.77.47.40.80.750.7 5.18 3.897二次净化液冷却塔111515150.80.750.710.57.888三次净化槽222244440.80.750.730.823.1 9三次净化压滤泵212244220.80.750.715.411.55 10二次净化压滤机22 3.77.47.40.80.750.7 5.18 3.89 11吊挂锌粉圆661660.80.750.7 4.2 3.15 12溶液输送泵551575750.80.750.752.539.38 13浆化槽224880.80.750.7 5.6 4.2 14矿浆输送泵221530300.80.750.72115.7515电动单梁悬挂起重机1111.411.411.40.80.750.72115.75 16洗滤布机11 2.2 2.2 2.20.80.750.7 1.54 1.16 17铜镉渣浸出槽227.515150.80.750.710.57.88 18铜镉渣浸出液压滤泵111111110.80.750.77.7 5.78 19铜镉渣浸出液压滤机11 1.1 1.1 1.10.80.750.70.770.58 20镉置换槽117.57.57.50.80.750.7 5.25 3.94 21镉置换槽压滤泵111111110.80.750.77.7 5.78 22镉置换槽压滤机11 1.1 1.1 1.10.80.750.70.770.58 23镉棉溶解槽113330.80.750.7 2.1 1.5824镉棉溶解液压滤泵111111110.80.750.77.7 5.7825镉棉溶解液压滤机11 1.1 1.1 1.10.80.750.70.770.5826净化除铜槽113330.80.750.7 2.1 1.5827净化除铜液压滤泵111111110.80.750.77.7 5.7828净化除铜压滤机11 1.1 1.1 1.10.80.750.70.770.58 29熔铸电炉116060600.80.750.74231.5 30溶液输送泵66 5.533330.80.750.723.117.33 31污水泵22 5.511110.80.750.77.7 5.78 32镉电解114545450.80.750.731.525.233玻璃钢酸雾净化塔113333330.80.750.7524.7518.5634照明及其它1001000.80.750.88060小计792.7726.7520.34391.83(三)铟回收1萃取反萃机电机44312120.80.750.78.4 6.3 2离心风机电机44312120.80.750.759 6.75 3电动葫芦电机113330.5 1.730.150.450.78 4轴流风机电机22 2.2 4.4 4.40.80.750.75 3.3 2.485中和压滤泵电机11 5.5 5.5 5.50.80.750.75 4.13 3.09 6搅拌机电机11 2.2 2.2 2.20.80.750.7 1.54 1.16 7压滤机电机113330.80.750.7 2.1 1.58 8压团机电机11 1.5 1.5 1.50.80.750.7 1.050.79 9液下泵电机11 5.5 5.5 5.50.80.750.75 4.13 3.09 10搅拌机电机11 1.1 1.1 1.10.80.750.70.770.58 11盐酸泵电机11 1.5 1.5 1.50.80.750.75 1.130.84 12萃取反萃机电机44 5.522220.80.750.715.411.55 13搅拌机电机223660.80.750.7 4.2 3.15 14压滤泵电机223660.80.750.7 4.2 3.15 15压滤机电机11 1.5 1.5 1.50.80.750.7 1.050.79 16洗油机电机11 1.1 1.1 1.10.80.750.70.770.58 17液下泵电机11 5.5 5.5 5.50.80.750.75 4.13 3.09 18离心风机电机224880.80.750.756 4.519玻璃钢酸雾净化塔1116.516.516.50.80.750.7512.389.2820照明及其它50500.80.750.84030小计168.3168.3124.1193.52(四)锌熔铸1锌直线铸定机11 5.5 5.5 5.50.80.750.7 3.85 2.89 2电炉辅助设备66 2.213.213.20.80.750.759.97.43 3离心风机电机117.57.57.50.80.750.75 5.63 4.22 4吊钩桥式起重机2219.939.839.80.5 1.730.27.9613.79 5离心风机电机113737370.80.750.7527.7520.81 6照明及其它12312371.0961.13小计15701503.61073.71822.24(五)(一)-(四)合计15701503.61073.71822.24乘同时系数:Ky=0.9 Kw=0.95966.33781.13无功补偿-360补偿后966.33421.131054.12X800变压器损耗10.552.7110KV侧负荷0.9976.88473.38108660005861.25电力变压器单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)十四锌浸出变电所(一)浓密1酸洗浓密机11 4.5 4.5 4.50.80.750.7 3.15 2.362高浸浓密机11 4.5 4.5 4.50.80.750.7 3.15 2.363沉矾浓密机22 3.5770.80.750.7 4.9 3.684低浸浓密机11 3.5 3.5 3.50.80.750.7 2.45 1.845中浸浓密机11 3.5 3.5 3.50.80.750.7 2.45 1.846备用浓密机11 3.5 3.5 3.50.80.750.7 2.45 1.847浓密机底流泵77151051050.80.750.773.555.138熔液输送泵1010151501500.80.750.710578.759污水泵225.511110.80.750.77.7 5.7810照明及其后50500.80.750.84030小计342.5342.5244.75183.36(二)氧化锌球磨碱洗1QZ型抓斗桥式起重机1162.762.762.70.51.730.159.4116.29Kc计算负荷备注电力负荷计算表序号受电设备名称数量(台)COS¢tg¢S11-M-800/10KV 2台2螺旋输送机11 4.5 4.5 4.50.7 1.020.65 2.93 2.98 3湿式球磨机117575750.80.750.86045 4矿浆泵227.515150.80.750.7511.258.44 5碱洗槽222244440.80.750.730.823.1 6碱洗压滤泵222244440.80.750.753324.75 7厢式压滤机44 4.9519.819.80.80.750.713.8610.4 8滤液输送泵111515150.80.750.7511.258.44 9洗液输送泵117.57.57.50.80.750.75 5.63 4.22 10浆化槽224880.80.750.7 5.6 4.2 11矿浆输送泵111515150.80.750.7511.258.44 12浆化液输送泵111515150.80.750.7511.258.44 13LD型电动单梁起重机11 6.5 6.5 6.50.5 1.730.150.98 1.69 14洗滤布机11 2.2 2.2 2.20.80.750.7 1.54 1.16 15污水泵11 5.5 5.5 5.50.80.750.75 4.13 3.09 16离心风机112222220.80.750.7516.512.3817除尘器螺旋卸灰机11 5.5 5.5 5.50.7 1.020.65 3.58 3.6518轴流风机220.090.180.180.80.750.750.140.1 19小计417.4417.38273.07216.75(三)锌浸出1中浸反应槽332266660.80.750.746.234.65 2中浸矿浆泵211530300.80.750.7511.258.44 3低酸浸出槽332266660.80.750.746.234.65 4低浸矿浆泵211530150.80.750.7511.258.44 5沉矾槽442288880.80.750.761.646.2 6沉矾矿浆泵421560300.80.750.7522.516.88 7螺旋电子秤441440.80.750.7 2.8 2.1 8高酸浸出槽222244440.80.750.730.823.1 9高浸矿浆泵211530150.80.750.7511.258.44 10酸洗槽112222220.80.750.715.411.5511酸洗矿浆泵111515150.80.750.7511.258.44 12备用反应槽112222220.80.750.715.411.55 13矿浆泵111515150.80.750.7511.258.44 14硫酸泵117.57.57.50.80.750.75 5.63 4.22 15矿浆搅拌中间槽33 5.516.516.50.80.750.711.558.66 16矿浆压滤泵332266660.80.750.7549.537.13 17厢式压滤机66 3.722.222.20.80.750.715.5411.66 18滤液输送泵331545450.80.750.7533.7525.31 19矿浆输送泵111515150.80.750.7511.258.44 20浆化槽224880.80.750.7 5.6 4.2 21洗滤布机11 2.2 2.2 2.20.80.750.7 1.54 1.16 22电动单梁悬挂起重机11 5.7 5.7 5.70.15 6.590.150.86 5.64 23污水泵22 5.511110.80.750.88.8 6.624玻璃钢酸雾净化塔113333330.80.750.7524.7518.5625旋流板塔1116.516.516.50.80.750.7512.389.2826照明及其后50500.80.750.84030小计790.6715.6518.29393.71(四)(一)-(三)合计15501475.51036.1794乘同时系数:Ky=0.9 Kw=0.95无功补偿-300补偿后932.49454.321037.32X800变压器损耗10.3751.8610KV侧负荷0.88942.86506.18107060005657.2电力变压器S11-M-800/10KV 2台932.49754.32电力负荷计算表单台功率设备功率(KW)最大负荷年耗电量总的工作的(KW) 总的工作的KW kvar KVA利用小数时(MWn)十五熔锌感应电炉1熔锌感应电炉113003003000.90.481300145.3333.331X400变压器损耗 3.3316.6710KV侧负荷0.88303.33161.96343.8750001516.7电力变压器单台功率设备功率(KW)最大负荷年耗电量总的工作的(KW) 总的工作的KW kvar KVA利用小数时(MWn)十六生活设施1水处理设备47.627.10.80.750.7520.3315.242办公生活设施4004000.80.750.75300225小计447.6427.1320.33240.24乘同时系数:Ky=0.9 Kw=0.95无功补偿-120补偿后288.29108.23307.94变压器损耗 3.0815.410KV侧负荷0.92291.31123.65316.5160001748.23备注电力负荷计算表序号受电设备名称数量(台)COS¢tg¢Kc计算负荷备注序号受电设备名称数量(台)COS¢tg¢Kc计算负荷S11-M-400/10KV288.29228.23动力变压器S11-M-630/10.10/0.41台单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)十七循环水1循环水1524963.580.80.750.75722.69542.01乘同时系数:Ky=0.9 Kw=0.95无功补偿-240补偿后650.42274.91706.13变压器损耗7.0635.3110KV侧负荷0.9657.48310.22726.9960003944.87电力负荷计算表序号受电设备名称数量(台)COS¢tg¢Kc计算负荷备注650.42514.91动力变压器S11-M-1000/10.10/0.42台单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)十八(一)-(十九)合计244732164514817.98225.2383639乘同时系数:Ky=0.95 Kw=0.97无功补偿-3600补偿后140774378.48147422X10000变压器损耗147.42737.1110KV侧负荷9414224.45115.615116 电力负荷计算表电力负荷计算表序号受电设备名称数量(台)COS¢tg¢Kc计算负荷备注0.87140777978.516181单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvar KVA利用小数时(MWn)二十余热发电机组112000200020000.8-0.7512000-150013460二十一计及余热发电的负荷0.8812224.46615.61390070179无功补偿-3600补偿后12224.43015.612591变压器损耗125.9629.546500818.435KV侧负荷0.9612350.33645.131287770997.4单台功率设备功率(KW )最大负荷年耗电量总的工作的(KW) 总的工作的KWkvarKVA利用小数时(MWn)二十二锌电积1锌电积直流负荷117540754075400.90.480.860322921.436702.2无功补偿-1500补偿后60321421.436197.21X8000变压器损耗67.02335.1135KV侧负荷0.966099.021756.546346.9485029580.3电力负荷计算表序号受电设备名称数量(台)COS¢tg¢Kc计算负荷备注序号受电设备名称数量(台)COS¢tg¢Kc计算负荷备注。