双导梁架桥机架桥施工工艺
双导梁架桥机架设t梁施工工艺流程
双导梁架桥机架设t梁施工工艺流程下载提示:该文档是本店铺精心编制而成的,希望大家下载后,能够帮助大家解决实际问题。
文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!本店铺为大家提供各种类型的实用资料,如教育随笔、日记赏析、句子摘抄、古诗大全、经典美文、话题作文、工作总结、词语解析、文案摘录、其他资料等等,想了解不同资料格式和写法,敬请关注!Download tips: This document is carefully compiled by this editor. I hope that after you download it, it can help you solve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you! In addition, this shop provides you with various types of practical materials, such as educational essays, diary appreciation, sentence excerpts, ancient poems, classic articles, topic composition, work summary, word parsing, copy excerpts, other materials and so on, want to know different data formats and writing methods, please pay attention!双导梁架桥机架设T梁施工工艺流程一、概述在桥梁施工中,双导梁架桥机被广泛应用于T梁的架设工作。
双导梁架桥机施工工艺流程
双导梁架桥机施工工艺流程
嘿,朋友们!今天咱就来唠唠双导梁架桥机施工工艺流程,这可真是个超级有趣又超级重要的事儿呢!
你看啊,就好比搭积木一样,双导梁架桥机要把那些大桥的构件一块一块地放到位。
首先呢,得做好准备工作,把场地清理得干干净净的,这就像是给建房子先打下坚实的地基!你说要是场地乱七八糟的,那还能好好施工吗?肯定不行啊!
然后呢,架桥机就闪亮登场啦!它就像一个大力士,稳稳地站在那里。
接着呀,要把梁片运输到指定的位置,就像送宝贝去它该去的地方。
运输的过程中可得小心翼翼的,不能有一点马虎,这可是关乎整个工程质量的关键一步呢!想想看,如果在运输的时候出了差错,那得多糟糕啊!
再之后,就是把梁片吊起啦,那场面,可壮观了!就像起重机在表演空中魔术一样。
哎呀呀,看着梁片被缓缓吊起,心里真的会很紧张又很期待呢,就盼着一切顺顺利利的。
把梁片准确地放到位置上后,还不算完呢,得仔细检查和调整,这就像是给一件艺术品做最后的修饰。
这时候的工人们就像一群细心的艺术家,精心雕琢着自己的作品,确保每一个细节都完美无缺。
最后,大功告成啦!一座漂亮的大桥就出现在眼前,那种成就感,简直无法用言语来形容!
我觉得啊,双导梁架桥机施工工艺流程真的太神奇了!它能让原本普通的材料变成雄伟的大桥,这是多么了不起的事情啊!每一个参与其中的人都值得骄傲,都为我们的生活带来了便利和美好。
这就是建筑的魅力,这就是工程的力量!让我们一起为这些伟大的工艺和辛勤的工人们点赞吧!。
(完整word版)35m小箱梁架设方案(双导梁架桥机)要点
35m小箱梁架设施工技术方案1、编制依照1.1 本标段合同文件;1.2 施工设计图纸及施工图设计技术交底报告;1.3 龙口至青岛高速公路莱西至城阳段项目工程建设管理手册;1.4 山东省高速公路施工标准化管理指南;1.5 《公路工程查验评定标准》(JTG F80/1 —2004);《公路桥涵施工技术规范》JTJ041-2011 ;1.7 《公路工程施工安全技术规程》JTJ076-95 ;1.8 本标段整体施工组织设计和整体施工进度计划;1.9 现场踏勘检查所获得的相关资料;1.10 我单位施工实力、架桥设施及长远从事公路工程所积累的丰富施工经验。
2、编制原则2.1 严格依照设计文件、技术规范和质量查收标准的原则。
能够正确指导施工,保证工程质量优异。
2.2 坚持脚扎实地的原则。
脚扎实地的确定工期、施工方案,保证按期、优异、安全、高效达成本工程建设任务。
2.3 依照我单位现有的施工技术水平,结合近似工程施工经验及施工机械设施配套能力。
3、工程大要我标段 K139+460分别立交,位于平曲线超高段,横向左高右低,桥面横坡 3%,纵向上坡,坡度,斜交 65°。
桥梁上部采用预应力混凝土箱梁简支转连续结构,全桥16孔,孔径均为 35m,分左右幅,一孔单幅 6片小箱梁,全桥共有 35m小箱梁 192片。
小箱梁在预制场集中预制,预制场设置在 K138+600~K139+080段路基上,距离待架桥位 0号台(架设起点)约 100m。
预制箱梁均为顶宽 2.4 米,底宽 1.0 米,梁高 1.8 米,纵桥向梁与梁之间设现浇湿接缝,箱梁中到中之间的距离为。
预制箱梁分边跨中梁、边跨边梁、中跨中梁、中跨边梁四各种类。
箱梁最大重量约120t 。
桥台顶采用 GYZF4300×76mm四氟滑板支座,桥墩顶采用 GYZ450× 84mm圆板橡胶支座。
采用 XFQJ40/160(Ⅰ)桥式架桥机进行小箱梁架设。
双导梁架桥机施工方案
双导梁架桥机施工方案一、引言双导梁架桥机是一种常用的大型桥梁施工设备,它具备高承载能力、高效率和灵活性的特点。
本文档将详细介绍双导梁架桥机的施工方案,包括施工准备、施工步骤、安全措施等内容。
二、施工准备在进行双导梁架桥机施工前,需要进行一系列的准备工作,主要包括以下内容:2.1 确定施工方案根据桥梁设计图纸和实际施工情况,确定适合的双导梁架桥机施工方案。
该方案应包括施工步骤、梁段拼装顺序、工艺要求等。
2.2 选择合适的双导梁架桥机根据桥梁设计的参数和施工方案的要求,选择合适的双导梁架桥机。
考虑到桥梁的跨度、承载能力和施工环境等因素,确保选用的架桥机满足施工需求。
2.3 准备施工材料和设备根据施工方案,准备好所需的梁段、支撑设备、吊装工具等材料和设备。
同时,确保这些材料和设备符合安全规范,并进行必要的检测和验收。
2.4 制定施工计划和时间安排根据实际情况和施工方案,制定详细的施工计划和时间安排。
确保各施工步骤的顺序合理、时间充裕,并与相关部门和人员进行沟通和协调。
三、施工步骤双导梁架桥机施工的基本步骤包括梁段安装、吊装、定位和固定等。
具体的施工步骤如下:3.1 梁段安装依据施工方案和设计要求,将预制的各个梁段逐一安装在临时支承上。
在安装过程中,需要注意梁段的顺序、连接方式和精确度,确保梁段安装的准确性和稳定性。
3.2 吊装采用双导梁架桥机进行吊装作业。
根据施工方案的要求,合理安排吊装点和吊装顺序。
在吊装过程中,操作人员要严格按照操作规程进行操作,确保吊装安全和准确性。
3.3 定位将吊装好的梁段准确地定位到预先设置好的位置上。
通过调整和调节双导梁架桥机的位置和姿态,确保梁段的准确对接。
3.4 固定在梁段安装和定位完成后,对梁段进行固定。
主要采用螺栓和焊接两种方式进行固定。
在固定过程中,要确保固定的牢固性和稳定性,检测和修正任何不合格的固定。
四、安全措施在双导梁架桥机施工过程中,为确保工人和设备的安全,需要采取以下安全措施:4.1 执行施工安全规范施工人员必须熟悉并严格执行相关的施工安全规范和操作规程。
双导梁架桥机组装施工方案及安全防范措施
双导梁架桥机组装施工方案及安全防范措施
一、简介
双导梁架桥机是一种高效的施工设备,广泛应用于桥梁建设领域。
本文将重点
探讨双导梁架桥机的组装施工方案以及安全防范措施。
二、组装施工方案
1. 施工准备工作
在进行双导梁架桥机的组装施工前,需要做好以下准备工作: - 确保所有零部
件齐全,并对其进行检查确认; - 搭建临时搭建物,确保固定性和承重能力; - 制
定详细的施工计划,确定施工过程中的工序和时间节点。
2. 组装过程
步骤一:基础固定
首先需要将双导梁架桥机的底座固定在指定位置,确保底座稳固并符合设计要求。
步骤二:组装主体结构
根据工程图纸,将各个部件依次组装在底座之上,确保连接牢固,无松动现象。
步骤三:调试检验
完成组装后,对双导梁架桥机进行全面检验和调试,确保各功能正常,结构稳固。
三、安全防范措施
1. 人员培训
在施工前,对参与组装施工的人员进行专业培训,使其了解施工流程、操作要
点及安全规范。
2. 安全设施
在施工现场设置明确的安全标识,并配备必要的防护设施,如安全帽、安全绳等,确保施工人员的人身安全。
3. 定期检查
定期对双导梁架桥机进行检查和维护,确保设备处于良好状态,避免因设备故障导致意外发生。
4. 防火防爆
在施工现场严禁吸烟、明火及易燃易爆物品,确保施工现场的安全环境。
四、结论
通过本文对双导梁架桥机的组装施工方案及安全防范措施的探讨,可以有效指导工程施工过程中的相关操作,确保施工安全、高效进行。
希望相关工程施工人员在实际操作中能够严格按照规范要求,确保施工顺利进行,保障工程的质量和人员的安全。
步履式双导梁架桥机作业指导书
******工程步履式双导梁架桥机作业指导书***************公司二〇二〇年月目录1 目的及适用范围 (1)2 编制依据 (1)1、作业准备(内业准备、外业准备) (1)1.1、内业准备 (1)1.2、外业技术准备 (2)1.3、作业场地的规划与整备 (2)2、步履式双导梁架桥机设备概况 (3)2.1、主要性能参数 (3)2.2、架桥机结构组成 (4)2.3、架桥机的维护保养 (6)3、架梁施工工艺流程(含图) (7)4、架桥机施工工艺 (8)4.1、架桥机的运输、安装和拆解施工工艺 (8)4.2、试运转和自检 (11)4.3、架桥机过孔 (13)4.4、架桥机架梁 (16)4.5、吊梁、捆绑和运梁作业 (17)4.6、架桥机横移 (21)5、架桥机劳材机组织 (22)5.1、作业人员配备情况表 (22)5.2、人员分工与作业要求 (23)5.3、吊机设备 (23)5.4、吊机的运输及其要求 (24)5.5、安装需要工具配备: (24)6、质量控制措施 (25)6.1、质量保证措施 (25)7、安全(及环保)控制措施 (26)7.1、应急预案措施 (28)1 目的及适用范围1.1 适用于铁路、公路50m及以下的混凝土预制箱梁、T梁、板梁架设施工。
1.2 步履式双导梁架桥机适用于各种铁路、公路桥梁(直桥、斜桥、曲线桥)的架设,该机采用三角桁架作主要承载受力构件单元,单元间采用销轴联接,主导梁前端设置引导梁过孔安全可靠,且桥面荷载分布合理,安全可靠。
该机采用铺设全断面横移轨道达到一次架梁到位,边梁可通过倒换一次吊钩进行安装,整机具备机械全断面一次到位横移功能,高效快捷,且易于拆装、运输。
2 编制依据《通用门式起重机》 GB/T14406-2011;《起重机械用钢丝绳检验和报废实用规范》 GB/T5972-2006《重要用途钢丝绳》 GB8918-2006《起重机械安全规程》 GB/T6067-2010《起重设备安装工程施工及验收规范》 GB50278-2010《机械设备安装工程施工及验收通用规范》 GB50231-2009《起重机械试验规范和程序》 GB5905-2011《起重机电气装置施工及验收规程》 GB50256-1996《桥式和门式起重机制造及轨道公差》 GB10183-2005《步履式双导梁架桥机使用说明书》《桥梁运输车使用保养说明书》《特种设备安全监察条例》《起重机械基础知识》1、作业准备(内业准备、外业准备)1.1、内业准备1、认真阅读、审核设计文件,熟悉规范和技术标准。
双导梁架桥机作业步序
2021年4月14日
架桥机 过孔
1、前后支腿油缸同时顶升,前小车开到中托位置把中托部分吊起, 前小车吊起中托向前纵移到前支位置。
2、前支腿油缸顶升使前支横梁脱离盖梁准备过孔。
3. 架桥机主梁靠前反托轮组和后液压支腿横梁下的轮组共同驱动, 向前自行20米。
4.并用起重小车上的吊具吊接好配重梁,让钢丝绳有一定预紧力, 主梁前移完成桥机过孔。
预制箱梁的横移
横移第一片梁
横ห้องสมุดไป่ตู้第二片梁
架桥机架设箱梁
1.前小车吊起预制梁使梁和运梁车分离。 2.前小车提梁和后运梁车同时前进。 3.后运梁车走到前运梁车位置时,前小车和后运梁车同时停止。
4、后小车启动卷扬机把预制梁后端吊起。 5、前后小车同时前进,到达预制梁安装位置时前后小车同时停止前进。 6、两小车卷扬机同时下降,使预制梁底面距支座100mm时停止下降。 7、启动两小车横移动力组,使预制梁横移到位后,落梁。
某特大桥-步履式双导梁架桥机施工作业指导书
步履式双导梁架桥机施工作业指导书(作者:王亚军目录1.适用范围2.编制依据3.作业准备4.设备概况5.架桥机的运输、安装和拆解施工工艺6架桥机施工工艺7架桥机施工所需劳、材、机具8 技术措施1.适用范围适用于步履式双导梁公路架桥机对公路、高速公路50m及以下的混凝土预制箱梁、T梁、板梁架设施工。
步履式双导梁架桥机适用于各种公路桥梁(直桥、斜桥、曲线桥)的架设,该机采用三角桁架作主要承载受力构件单元,单元间采用销轴联接,主导梁前端设置引导梁过孔安全可靠,且桥面荷载分布合理,安全可靠。
该机采用铺设全断面横移轨道达到架梁一次到位,可通过倒换一次吊钩安装边梁,整机可实现机械全断面一次到位横移功能,高效快捷,且易于拆装、运输,便于转移,经济实用。
2.编制依据《步履式双导梁架桥机使用说明书》《桥梁运输车使用保养说明书》《特种设备安全监察条例》《起重机械基础知识》3.作业准备3.1内业技术准备在开工前,应编制作业指导书,并组织技术、施工人员认真学习实施性施工组织设计、阅读、审核施工图纸、澄清有关技术问题,熟悉规范和技术标准。
制定施工安全保证措施、质量保证措施和提出应急预案。
对施工人员进行技术交底,对参加施工人员进行岗前技术培训,考试合格后持证上岗。
3.2外业技术准备准备施工作业中涉及的设备、机具、材料和劳动保护用品;修建生活房屋,配齐生活、办公设施,满足主要管理、技术、施工人员进场生活、办公需要。
3.3作业场地的规划与整备架桥机的拼装、拆解场地要符合设备操作使用说明书要求,并进行必要的修整,场地基础要有足够的承载力,满足架桥机安装的要求,具体要求如下:3.3.1组装架桥机应选择在桥头路基上进行,直线有效长度200t-50m架桥机不小于86m×20m,160t-40m架桥机不小于68m×20m,组装场地平整、夯实,不得有局部路基松软。
3.3.2组装场地横向、纵向坡度均应小于4%,拼装还应注意汽车吊摆放空间、零部件摆放位置、吊装和拼装空间。
双导梁架桥机安装与架设板梁的施工控制
双导梁架桥机安装与架设板梁的施工控制作者:孙秀华来源:《砖瓦世界·下半月》2020年第02期摘要:双导梁架桥机科学化安装和板梁合理施工,对于整体上保证工程项目满足施工需求,按照施工方案落实一切操作等方面起着非常重要的作用。
在实际双导梁架桥机安装工作进行中,能够针对桥机安装和板梁施工存在问题分析,提出相对应的改进策略,具有非常必要的现实意义。
关键词:双导梁架桥机;板梁施工;安装控制在当前工程工程项目施工建设工作进行中,对于某些跨度较大的、较为复杂的桥梁,在实际施工中,切实需要双导梁架桥机安装操作,这样才能够保证桥机施工操作按照工程操作需求落实,保证工艺操作顺序,提升整体的施工进度。
而在实际双导梁架桥机安装与板梁架设工作进行中,由于双导梁架桥机安装存在的特殊性,无论是桥机安装还是板梁架设都是比较复杂的。
如果工程人员未能及时管控,那么将会在一定程度上导致双刀梁架桥机应用水平未能达到相应的管控要求,损害双导梁架桥机安装操作水平,未能给工程项目实现高效建设发挥有效的促进作用。
一、双导梁架桥机安装操作工艺分析在双导梁架桥机安装操作中,前期准备工作能够到位,工程人员能够针对需要安装的的架桥机的各个部件实现有效的核查。
在各个部件切实到位基础上,按照架设要求进行科学化的组装。
而针对双导梁架桥机安装操作中零部件需要运输操作的现象,要严格控制运输操作过程,避免过渡颠簸对零部件产生不良损害现象。
一旦在运输和装卸的过程中,出现变形的不良现象,要及时检查,重新替换,保证每个零部件应用符合实际管理水平。
在零部件运输到位之后,要针对架桥机进行专门化的铺设。
在实际架桥机运行轨道铺设工作进行中,能够首先采用纵向运行的方式进行,一般采用两根重型钢轨,控制相邻的钢轨之间的距离,并且保证钢轨铺设的平整度。
在钢轨接头处选择使用专门的鱼尾板进行固定操作,保证轨道切实固定到位。
此外,而真谛钢轨在安装中,需要分别保证钢轨的四周在鱼尾板上坚固到位,这样才能够实现力度的有效均匀,提升钢轨安装的牢固性。
双导梁架桥机架梁施工
双导梁架桥机架梁施工T形简支梁采用架桥机进行架设。
梁体用龙门吊吊至运梁小车上,输送至架桥机。
运梁时必须对梁支护牢固,支点正确。
安装前检测吊装和拖拉等设备的能力,检测支座的中心位置是否正确,找平的水泥砂浆必须干燥, T梁梁体安放时必须仔细,使梁体就位准确,与支座密贴。
如支座与梁体不密贴,缝隙小时采用干性砂浆垫平,缝隙较大时采用经过防腐处理的薄钢板结合干性砂浆垫平支座。
支座、伸缩缝的安装,应在厂家指导下进行,必须安装平整。
若不符合有关规范要求时,应起吊重新放置。
架桥机架梁施工步骤图附后。
1、架梁施工工艺见表5《施工工艺框图》中的架桥机架梁施工工艺流程图2、架设T梁施工要点a.架桥机试吊。
架桥机组装后,在拼装场地做吊梁试验。
吊梁试验前,主机先空载行走与制动,检查机械电气设备及仪表是否正常,对吊梁台车的起吊、横移及制动、前支腿升降等做全面检查和试运行,测定空载时悬臂部分挠度值,然后按上述程序,重载试吊,检查重载时前、后、中支点最大工作反力。
符合设计要求后,方可架梁。
b. 脱空前支架架桥机运行前,运行轨道下的梁隔板、翼板必须焊接完毕,并在前轮停车位置设限位器,以防止架桥机因惯性或其他原因溜车造成危险。
吊梁台车移至架桥机后端并可靠制动后脱空前支架,架桥机悬臂前行至安装孔位,在轨面上作停止位置标记并派专人安放止轮器。
c.顶升前支腿,架桥机呈吊梁状态在墩帽支承面上用橡胶板垫平,顶升支架呈铅垂状态,然后加双定位销,用5t倒链在支架两侧收紧。
d.架梁架桥机就位后,将事先准备好的喂梁轨道平车及T梁,通过架桥机前端安放的5t卷扬机牵引运梁平车,使梁片进入架桥机腹巷至预定位置(或运至桥墩下方),吊梁台车移至大梁上方,挂好前后吊点的吊杆和底梁,检查无误后启动2台卷扬机组将梁吊起横移对中,前行到位后再横移到预定位置,两吊点卷扬机组动作一致、均衡使梁片落至距横移设备20~30cm时,再调整一次梁片纵横向位置,确保连续缝或伸缩缝达到构造要求,而后继续落梁至设计位置。
预制梁的架设施工
预制梁的架设施工1、工序标准化(双导梁架桥机架梁)工序注解:对于预制梁架设的施工工艺流程,有以下几点需在现场严格控制:(1)架桥机拼装过程中一定要充分利用枕木垛的临时支撑作用,并将枕木垛搭设稳固,确保导梁的稳定。
(2)横梁平移平车的走行轮转换方向前,切记先在横梁附近用枕木垛将导梁稳定支撑,避免导梁侧翻。
(3)架桥机移跨时,4个人负责尾部平车的行走过程,注意在行走过程中轮子不能有啃轨现象,4个人负责中部平车的行走,因此时整个架桥机的重量大部分都在中部平车上,所以中部平车的行走很重要,一边行走一边要用尺子量轨距,使轨距要始终保持在固定规矩上。
2、安全文明施工标准化2.1为保证架梁的质量和安全,工作人员应挂牌作业,持证上岗。
2.2架梁现场应有明显标志,与该工作无关的人员严禁入内。
2.3现场的枕木随时堆成垛,即保证使用方便,又使架桥范围内整齐干净,规范。
2.4滑轮运转不正常情况下,应立即停止,进行检查。
2.5使用钢轨的,钢轨的两侧必须设置限位装置,并经常检查限位装置的完好性。
2.6钢丝绳必须每天检查,发现断丝的必须更换。
2.7作为架梁时工作人员行走的“天桥”,必须设置严格规范的防护栏杆,确保施工安全。
2.8架梁的全过程必须专人指挥,统一信号,确保所有人员协调一致,一切行动听指挥。
2.9运梁车必须限速行驶,并保证道路平整通畅,无急弯。
2.10运梁时,梁体与运梁车要绑扎稳固,支撑牢靠,避免倾覆或侧翻。
3、施工前提条件标准化:3.1桥梁墩台已经施工完成,并达到承载强度。
3.2对于所用的工人必须进场,对于进场的工人应进行适当的培训,应有起重工、电工、架子工、电焊工、测工,所有的工种必须持有上岗证,各工种工人人员分布情况见下表:设备等机械设备材料均已进场。
3.4T梁生产已经满足架设需要并达到设计要求。
4、施工技术标准化:4.1支承垫石:(1)支承垫石的混凝土强度应符合设计要求,顶面标高准确,表面平整,在平坡情况下同一片梁两端支承垫石水平面应尽量处于同一平面内,其相对误差不得超过3mm,避免支承垫石发生偏歪、不均匀受力或脱空现象。
六四军用梁组装双导梁架桥机架梁的应用技术
六四军用梁组装双导梁架桥机架梁的应用技术摘要:六四军用梁由于具备有设计规范、构造简单、运输及拼装方便、性能可靠等优点,被广泛应用工程建设领域。
文中结合施工实例,探讨了六四军用梁在自拼式双导梁架桥机中的应用技术,介绍了六四军用梁双导梁架桥机的结构组成及受力计算分析内容,以期对其它工程的架梁提供借鉴。
关键词:六四军用梁双导梁架桥机30m简支T梁架设计算分析Abstract:due to the tiananmen incident military beam with design specification, simple structure, convenient transportation and assembly, reliable performance and other advantages, is widely used in the field of construction engineering. This paper based on the construction example, discusses the military since the tiananmen incident beam in spelling type double guide beam bridge the application technique, introduces the tiananmen incident military beam bridge double guide beam structure and force calculation analysis content, aiming to frame beams of other projects for reference.Key words: the tiananmen incident military beam double guide beam bridge simply supported beam 30 m T set up calculation中图分类号:TU74文献标识码:A 文章编号:1 工程概况兴业海螺水泥铁路专用线小坝江中桥中心里程为DK7+815,全桥长71.26m,桥梁位于直线上,为铁路单线桥,上跨河流小坝江,上部结构设置2×32m 简支T梁,桥面纵坡为0.15%。
双导梁架桥机桥梁-PPT
简支梁架设施工工艺流程图
1、架桥机架前准备工作 ①架桥机部件运至施工现场前期,认真检查核实所有部件。运输车辆装车时应绑扎牢固,装卸过程要按顺序进行,以免造成部件损坏变形,影响组拼安装。 ②架桥机运行轨道铺设 架桥机的纵向运行轨道及预制混凝土梁运输轨道均分别采用两根43Kg/m钢轨,纵向轨间距为5m,运输轨道间距为1.5m,两侧轨道要求对应水平,严格控制轨道间距。钢轨接头用鱼尾板紧固,并以轨道固定在枕木上。轨道铺设可根据空心板梁安装陆续向前延伸,即拆除后再安装重复使用。 前、中、后支腿均要在横向轨道上运行,前支腿轨道为两根43Kg/m钢轨组合,间距0.5m。中支腿轨道为两根43Kg/m钢轨。间距1.25m。后支腿轨道为一根43Kg/m钢轨。钢轨接头要求接头平顺,轨距准确,支垫平稳牢固。四条横向轨道间(前、中、后支腿)距离尺寸严格控制平行。 ③架桥机组拼安装 组拼程序为: 测量定位→铺设纵向轨道→安装中支腿→平衡对称拼装前后导梁(同时加临时支承)→前、后支腿,中、后顶高腿→前后横向连接框架→起吊平车,液压转换挂钩,操作台,接通电三处,保证规定的预拱度。
架桥机纵向运行结束后,进行一次全面安全试运行检查。螺栓、销子连接是否牢固;电气线是否正确;电线有否破损和挤压;液压系统是否正常;以及轨道接头是否平顺;支垫是否平稳和轨距尺寸是否正确等。架桥机要进行空载试运行检验,特别是横向运行前检查铺轨情况。架桥机运转正常后,才能进行空心板梁的安装。 3、架桥机施工注意事项 ⑴架桥机组拼时要按设计要求控制预拱度。架桥机纵向运行轨道两侧轨顶高度要求对应水平,保持平衡。前、中、后支腿各横向运行轨道要求水平,并严格控制间距,四条轨道必须平行。 ⑵前支腿横移轨道与平车轨道交叉处设一2m长轨道,平车喂梁时,将该段横移轨道拆除,喂梁后再安装上。 ⑶架桥机纵向位移要做好一切准备工作,要示一次到位,不允许中途停顿。 ⑷架桥机起吊天车携带空心板梁纵向运行时,前支腿部位要求用手拉葫芦(5t)与横移轨道接紧固定,加强稳定性。 ⑸由于该桥有纵向坡度,架桥机纵向移位时要采用三角垫木在轮子前后作防,特别是中支腿离梁端较近,移位时必须注意控制。 ⑹架桥机组拼后一定要进行吊重运行,也可用混凝土梁试吊后,架桥机再运行到位开始安装作业。 ⑺架桥机安装作业时,要经常注意安全检查,每安装一孔必须进行一次全面安全检查,发现问题要停止工作并及时处理后才能继续作业。不允许机械及电气带病工作。
双导梁架桥机架设公路桥梁40m箱梁施工工法
双导梁架桥机架设公路桥梁40m箱梁施工工法双导梁架桥机架设公路桥梁40m箱梁施工工法一、前言公路桥梁是连接交通运输的重要组成部分,桥梁施工工法的选择和应用对于保证工程质量和施工效率至关重要。
本文将介绍一种常用的双导梁架桥机架设公路桥梁40m箱梁施工工法,它具有特定的工法特点和施工过程,适用于一定长度的箱梁施工,能够保证施工质量和安全。
二、工法特点双导梁架桥机架设工法是一种常用的公路桥梁施工方法,其特点如下:1. 采用双导梁,可以实现两榀箱梁同时架设,提高施工效率;2. 简化了临时支撑结构,减少对桥梁正常通行的影响;3. 具备较强的适应性,适用于各种类型的公路桥梁;4. 施工过程控制严密,能够保证施工质量和安全。
三、适应范围双导梁架桥机架设公路桥梁40m箱梁施工工法适用于40m长的箱梁施工,可以用于各种类型的公路桥梁,包括高速公路、普通公路等。
四、工艺原理双导梁架桥机架设公路桥梁40m箱梁施工工法基于以下工艺原理:1. 技术措施:通过双导梁架设机构,将箱梁从临时架设位置平移到预定位置,实现箱梁的准确定位;2. 施工工法与实际工程的联系:根据桥梁设计和施工要求,采取相应的技术措施,确保施工进度和质量控制,保证施工过程的安全和顺利进行。
五、施工工艺1. 施工准备:包括现场勘测、材料准备、设备安装等;2. 临时支撑搭设:根据设计要求,搭设临时支撑结构,保证施工过程的安全和稳定;3. 双导梁安装:将双导梁安装在桥墩上,保证双导梁的水平和垂直度;4. 箱梁架设:使用双导梁架设机架将箱梁从临时架设位置平移到预定位置,保证箱梁的准确定位;5. 箱梁连接:对箱梁进行连接和预应力张拉,使之形成整体结构;6. 临时支撑拆除:在箱梁架设完成后,拆除临时支撑结构,完成施工。
六、劳动组织施工过程中需要组织人员进行现场管理、机具操作等工作,确保施工按照规定进行。
七、机具设备1. 双导梁架设机架:用于将箱梁从临时架设位置平移到预定位置,具备一定的承载能力和定位精度;2. 箱梁吊装机具:用于搬运和吊装箱梁,在施工过程中起到关键的作用;3. 其他常规机具:如起重机、挖掘机等,用于施工过程中的辅助作业。
双导梁架桥机架设预制梁施工方案
双导梁架桥机架梁施工工艺一、工程概况本施工工艺适用于桥梁工程跨径不大于40m、预制T梁自重不大于150t的预制T梁架设,采用双导梁架桥机架设预制T梁。
二、施工准备1.1材料要求1架桥机轨道铺设所用原材料(石渣、枕木、钢轨等)其规格、数量等应符合施工组织设计或专项方案规定。
2预制梁吊装前必须验收合格;混凝土预制梁的几何尺寸、混凝土强度应符合规范要求。
3预制梁应按专项方案规定的吊装顺序编号。
4预制梁张拉验收合格后方可进行吊装作业。
1.2机械设备1运梁车辆:轴线车、拖车、炮车、DCY150轮胎式平板运输车等。
运梁车辆应根据预制梁长度、重量及几何尺寸以及运输线路现况条件选用,其载重能力及技术性能必须满足运输梁板的要求。
2吊装设备:双导梁架桥机,其起#重量及技术性能必须满足吊装预制梁段的要求。
3工具:钢尺、皮尺、水平卡尺、全站仪、水准仪、千斤顶、大锤、经纬仪、撬杠、扳手、线坠等。
2.3技术规范1认真熟悉图纸,确定施工方案并报监理审批。
2对操作人员进行培训,向班组进行交底。
3组织施工测量放线,对每个支座的高程及轴线偏差进行复核,并放出支座中心十字线。
2.4施工条件1预制梁制造完成,并对预制梁的强度、规格、尺寸、质量验收符合设计要求。
2支座安装完并验收合格。
3双导梁架桥机拼装场地的准备工作已完成,拼装场地平整坚实有足够承载力,能够满足架桥机安装及试运行荷载的要求。
4架梁前对架桥机各项主零件进行检查,各项指标合格后可架设梁板。
三、操作工艺.3.1工艺流程运梁线路调查f架桥机组装准备一轨道铺设f架桥机组装、试运行f架桥机行走就位、安前支腿f运梁车辆到场f喂梁、试吊f纵向移动f带梁横移f落梁及固定f重复其余各孔架梁。
3.2运梁线路调查运梁线路调查注意事项包括:路面纵坡、路面横坡、交通状况、运梁距离、对周边环境的影响程度等。
山区线路还应考虑周边山体可能对通道产生的影响以及解决措施。
3.3架桥机组装准备1检查架梁桥头路基填筑质量,应符合规定要求。
双导梁架桥机架设公路梁施工工艺简述
双导梁架桥机架设公路梁施工工艺简述摘要:在公路桥涵施工过程中,经常需跨河或跨线架设安装预制梁,为了减少对下部河道或既有线路的通行影响,往往采用架桥机架设,本文结合在深圳市南坪快速路(二期)A段工程施工中的应用,简要介绍双导梁架桥机安装公路梁的施工工艺。
关键词:架桥机架设箱梁工艺1.工程概述深圳市南坪快速路(二期)A段工程第三合同段位于深圳市南山区西丽镇,其中龙井路、龙珠大道跨线桥第十联至第十三联为先简支后连续小箱梁,桥梁分左右幅设置,半幅桥横向布置5片,有30m、30.4m、30.5m、31.9m四种跨径,箱梁安装最大重量130T,共需架设箱梁114片。
2.总体架设方案本工程箱梁采用预制场预制,运梁台车运送,架桥机逐孔向前架设法施工。
由于左右幅桥下部结构不能同步完成,架梁顺序为先左幅后右幅,两幅桥均由大里程向小里程方向进行,架桥机在左幅桥台后方路基上拼装,先进行左幅桥架设,左幅桥架设完成后,架桥机退回至桥台后方路基上,横移至右线再进行右幅桥架设。
3.架桥机基本情况箱梁架设选用wjq50m-150t型架桥机,该架桥机为步履式过孔双导梁架桥机,能适应山区或平原区大坡度、小半径弯桥、斜桥等预制梁架设。
结构上分为主梁、吊梁天车、行走轨道、前中后支腿、液压和电气系统等几部分。
主梁为架桥机的主要承重结构,为三角桁架式梁,平行2列,每列长50m,两列主梁通过横梁联系在一起。
主梁上部设两台吊梁天车,吊梁天车在上部运行及进行吊装作业,每台天车设计吊重75T。
主梁下部设前中后(0—2#)共3对6个支腿,支腿下安装走行箱,架桥机行走轨道采用钢轨,根据箱梁安装位置及架桥机移动进行布置。
4. 主要施工方法及工艺4.1施工准备(1)修筑运输便道,本工程利用路基作为运输道路,满足架桥机和箱梁运输要求。
(2)检查架桥机合格证等质量证明文件,根据架桥机安装图纸,事先将架桥机拼装位置场地进行平整、碾压。
4.2临时支座临时支座采用砂箱与砼垫块组合结构,每端各两个,钢箍内径为22cm,壁厚5mm,内装干燥的中粗砂(用以调节支座顶标高及方便临时支座卸落),其上安放C55砼预制圆柱垫块,直径20cm。
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
双导梁架桥机架桥施工工艺TLJ850型双导梁架桥机是结合了单梁架桥机和下导梁式架桥机的优点而形成的一种较优方案的架桥机。
主要由主梁、前导梁、下导梁、前支腿、支腿、吊梁行车和辅助行车等主要部分组成。
由前吊梁行车起吊桥梁前端,前吊梁行车和运梁车上的推进台车共同作用使梁前移至梁后端到中腿后方,后吊梁行车将梁的后端吊起,前后两行车共同吊梁前进到位,落梁就位。
1、双导梁架桥机的特点1.1 工序简捷下导梁仅支跨一跨跨径,主机仅跨一跨架设桥梁,巧妙的利用上下导梁、吊梁行车和辅助行车实现架桥机的过跨,工序简捷、高效,整机结构简单、自重轻、安全实用。
运架分体,运梁与架梁平行作业,作业效率高1.2 无辅助工作量不需采取墩顶及桥面预埋锚固件等特殊设施,即可完成第一跨和最后一跨桥梁的架设,作业程序简单。
1.3 移机时间较短双导梁架桥机的前支腿,因与主梁直接固接,没有向后回移的动作,架桥机自行过跨时,是由辅助支腿骑跨在下导梁上运动,前支腿支立于墩顶后,再由铺助天车将下导梁拎前,只有两次梁长的纵向运动。
1.4 转场方便该方案对配套的运梁车不受车长和车宽的限制,采用轮胎式,选配范围广,机动灵活,可整机驮运架桥机实现桥间转场。
1.5 操作简单双导梁架桥机操作采用线控和遥控变频调速技术,起落梁安全平稳,使得操作更方便。
2、架桥机主要性能序号项目名称参数1 额定起重能力 850t2 架设梁跨≤32m3 梁体起落速度 0.8m/min梁体横向微调速度 1.5m/min 微调距离:±200mm吊梁纵移速度 0~5m/min(重载)、0~10m/min(空载)外形尺寸 70×16×13.5m整机功率 300kW机重 450t3、结构组成TLJ850型高速铁路架桥机主要由前后2台吊梁行车、起重系统、箱型主梁2根及横梁、前支腿 l套、后支腿1套、后支腿台车及顶升装置、辅助支腿、悬臂梁、下导梁、下导梁天车、轨道、电气控制系统、液压系统和动力系统等组成。
3.1 吊梁行车吊梁行车共两台,前后布置。
吊梁行车在走行系统驱动下于主梁上前后运行,吊梁行车纵移为双轨式,轨道设置于两主梁腹板正上方,走形系统采用三合一变频动力电机驱动,走行平稳、停位准确,非常有利于落梁就位。
吊梁行车上设置定滑轮纲组,与吊具上动滑轮组上形成起升系统。
吊梁行行车上设置液压横移装置,可以同步横移,满足梁体微调和曲线架梁需要,确保落梁准确就位。
吊梁行年设计为倒马鞍形,充分利用两主梁之间的空间,非常有效的降低了整机的高度。
3.2 起重系统四台卷扬机设置于架桥机主梁尾端,通过钢丝绳导绕系统分别通向两台吊梁行车,通过行车的定滑轮组与吊具动滑轮相穿绕,形成起重系统。
前吊梁行车的两台卷扬机钢丝绳相连通,使吊具的两吊点相平衡,从而实现四点吊梁,三点起吊的作用。
卷扬机均设有首级和末级双级制动,首级制动采用锥行电机本身制动,末级制动采用钳盘式制动器在卷简处制动。
卷筒处设置有自动排绳器,可以确保排绳的规则和起升的安全。
3.3 主梁主梁为箱型结构,基本节长度为12m,采用拼接板栓接,便于装拆和运输,主梁前端段设有横梁及变跨接头,横联设置于两主梁上部,将两主联接为一个整体,同时,横联也是悬臂梁的安装基础。
变跨按头设置于两主梁下部,与辅助支腿直接相联,满足32m-24m间变跨施工需要。
主梁是架桥机直按承受荷载的主要构件,为使吊梁行车运行平稳,科学的设置预拱度,采用了SAP 2000和ANSYS等大型程序进行计算,在保证强度和刚度的条件下尽可能减轻其自重。
3.4 前支腿前支腿为主梁前支撑点,设有固定节、折叠节和调整节,以满足桥梁纵坡、变跨作业和最后一孔桥梁架设需要。
前支腿固定节上部设有移位滚轮,可以沿主梁下盖板纵向移位,满足变跨需要;架梁状态移位滚轮与主梁脱离,前支腿与土梁铰接,保证架桥机为简支架梁,使受力明确。
前支腿下部为折叠节,在架设最后一孔梁时向两侧折起,使前支腿可以支立在桥台上,实现最后一孔梁架设。
调整节用于在变跨作业时调整由于梁高不同而要求前支腿长度不同的需要。
3.5 后支腿后支腿为闭式O型结构,满足喂梁净高、净宽需要,上部和主梁固接,下部和走行台车联结,架梁时由传用装置受力,设置液压干斤顶,实现受力装置与走走行台车的转换。
后支腿台车运行为单轨方式,轨道采用起重机轨,采取特殊处理措施加大与梁面按触面积,走行轨距按箱梁腹板中心设置,使箱梁合理受力。
走行轨道利用设置于后支腿的卷扬机和设于前支腿的导绕滑轮进行拖抗,极大程度方便施工。
专用受力装置设于走行轮间,扩大面积后与桥面可靠接触。
3.6 悬臂梁悬臂梁为板梁式桁架结构,固接于主梁的横联上,设置一定的上翘,使下导梁天车运行平稳。
悬臂梁采用多种方法优化设计,具有刚度大、重量轻的特点。
满足下导梁天车前移下导梁需要。
3.7 下导梁天车下导梁天车采用双轨自力运行,走行系统采用变频调速,有利于下导梁对位。
起升系统采用双卷扬起落装置。
3.8 下导梁下导梁为箱式结构,上部设有双轨,满足辅支腿台车运行需要,下部设八字形箱式结构支腿,设有可调支撑,满足下导梁调平需要。
4、主要工艺作业流程4.1 架桥机的安装架桥机可在桥台后路基土安装,采用过孔的方式移位到第一跨上,也可在较宽阔的地方或预制场拼装,然后利用运梁车驮运到桥头再过孔到第一跨桥位的方法。
4.2 架梁4.2.1 架桥机就位4.2.2 运梁车运梁到位,前吊梁行车起吊箱梁前端4.2.3 前吊梁行车吊梁前行(运梁车同时推送梁后端)4.2.4 后吊梁行车起吊梁后端4.2.5 吊梁前行到位,落梁,调梁,落梁就位4.3 过孔4.3.1 铺设临时自行轨道,收缩前支腿,使其脱离桥墩4.3.2 架桥机前行到位,支立前支腿,回缩辅助支腿,将下导梁提起4.3.3 前吊梁行车吊下导梁后端前行至近1/2 时,辅助天车吊下导梁4.3.4 下导梁就位,架桥机完成过孔4.4 变跨4.4.1 32m 跨变24m4.4.1.1 完成最后一孔32m 梁架设,回缩前支腿使其脱离桥墩顶4.4.1.2 架桥机前行8m4.4.1.3 解除前支腿与主粮联接,前支腿后行8m 与主梁重新联接4.4.1.4 前支腿支立于桥墩,辅助前支腿后行8m 与主梁重新联接4.4.1.5 架桥机前行到位4.4.1.6 下导梁前移到位支立,架设24m 梁4.4.2 24m 跨变32m 跨4.4.2.1 完成最后一孔24m 梁架设4.4.2.2 解除辅助前支腿与主梁联接,前行8m 与主梁重新联接4.4.2.3 解除前支腿与主梁联接并固定,架桥机后退8m,前支腿与主梁重新联接4.4.2.4 架桥机前行到位4.4.2.5 下导梁前移到位到位并支立,架设32m 箱梁4.5 架设最后一孔箱梁4.6 架桥机驮运架桥机架完一座桥的最后一跨后,架桥机自行到路基上。
辅助支腿支承,后支腿曲腿部分底部支承于路基上;前支腿上节伸缩部分完全缩回。
后天车将后支腿下横梁拆除并提升;运梁车先下降到最低高度,然后进入巷内驮运位置;后天车安放后支腿下横梁在运梁车上的驮运支架上,作为架桥机驮运时的后端支点;前支腿与运梁车支承作为驮运时的前支点。
运梁车升高托起架桥机;各部位检查安全可靠后,运梁车驮运架桥机转场。
5、TLY850 型运梁车TLY850运梁车是为满足850t 箱形梁运输,与架桥机配套使用。
并可驮运架桥机,帮助架桥机转场作业,发动机废气排放标准不低于欧I标准的环保要求。
设计时考虑了两个三点支承(预制箱梁与车架之间为三点支承,车架与液压悬挂系统之间为三点支承)保证混凝土箱梁及车架在运输过程中不受扭。
在载运箱梁时,支座表面装有防滑的硬橡胶垫。
运梁车顶的移梁小车可以满足不同跨度的箱梁沿运梁车顶的轨道纵同时配合架桥机完成喂梁工作。
5.1 运梁车主要性能序号项目名称参数1 运载能力 850t2 整机质量 230t3 车速 O~6km/h(重载)O~12km/h(空载)O~O.15km/h(稳定车速)4 适宜坡度 3‰5 发动机功率 400kW×26 外形尺寸 32×7×3.7m5.2 结构组成TLY850型运梁平车由车架、悬挂支撑、轮轴、箱梁支撑、驱动系统、转向系统、制动系统、梁体台车移动系统、柴油机、电器系统、激光导向系统等组成。
5.2.1 行走系统轮距约等于箱梁腹板中心距(5m),液压悬挂;轮胎为23.50-R25或18.00—R25、21.00—R25单胎布置;驱动轴约为总轴数的1/3。
车架设伸缩支腿,供喂梁时使用。
5.2.2 转向系统全轮连杆转向,油缸驱动,最大车轮偏摆角可为35°5.2.3 制动系统从动轮设置行走制动和驻车制动两套制动系统;钳盘式或鼓式制动器。
5.2.4 承梁系统枕梁支点巾心距梁端小于3m;保证预制梁始终处于三点支承。
前枕梁为固定式,后枕梁为小车式(4轴线,16个车轮,电机驱动)5.2.5 控制系统采用总线式控制,两端设置驾驶室。
6、提梁机提梁机是为满足京沪高速铁路的施工要求,将预制好的箱型砼梁吊装到运梁车上,并承担TLY850 型箱梁架桥机梁场组装及拆卸任务的大型起重设备。
两台提梁机同时作业时额定起重量为900吨。
6.1 单台提梁机主要性能序号项目名称参数1 额定起重量 450t2 跨度 30m3 起升高度 16m4 起升速度主起升机构:0.3m/min、副起升机构:7m/min5 走行速度大车走行0~7.75m/min小车走行1.8m/min(重载)3.6m/min(轻载)6 电机功率主起升机构37kW、副起升机构13 kW大车走行机构4×5.5kW、小车走行机构11 kW7 单机重量 280t6.2 结构组成本设备由两台TLJ450/30型提梁机组成,两台单机同时工作,协同完成提梁任务。
每台TLJ450/30型提梁机即为一台单梁龙门起重机。
每台TLJ450/30型提梁机主要由金属结构、吊梁小车总成、大车走行总成、电气系统总成等组成。
6.2.1 金属结构金属结构主要由主梁、支腿、下横梁等组成。
支腿与主梁的连接方式采用一个刚性支腿与一个柔性支腿,刚性支腿与主梁采用螺栓连接,柔性支腿与主梁采用铰接。
支腿与横梁均采用铰接。
考虑到公路、铁路运输的需要,主梁共分成五段,相互之间用高庋螺栓连接。
6.2.2 吊梁小车总成吊梁小车总成由起升机构、走行机构、小车架及吊具等组成。
吊梁小车的起升机构采用安装在主梁一侧的卷扬机通过滑轮组提升吊具的形式,由吊具起吊箱梁。
6.2.3 大车走行总成大车走行总成由电机、减速机、车架、走行轮等组成。
车架与下横梁铰接。
大车走行总成还设有夹轨器、缓冲器、防撞止动器等安全保护装置。
6.2.4 电气系统总成为了安全可靠的完成提梁机的各项工作,电气系统采用了变频调速技术,对小车走行机构,大车走行机构进行调速,可大大减小对电网的冲击,提高提梁机运行时的平衡性。