工程部经理年终工作总结1
工程部经理年终总结
工程部经理年终总结(经典版)编制人:__________________审核人:__________________审批人:__________________编制单位:__________________编制时间:____年____月____日序言下载提示:该文档是本店铺精心编制而成的,希望大家下载后,能够帮助大家解决实际问题。
文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!并且,本店铺为大家提供各种类型的经典范文,如工作总结、实习报告、活动方案、规章制度、心得体会、合同协议、条据文书、教学资料、作文大全、其他范文等等,想了解不同范文格式和写法,敬请关注!Download tips: This document is carefully compiled by this editor. I hope that after you download it, it can help you solve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!Moreover, our store provides various types of classic sample essays, such as work summaries, internship reports, activity plans, rules and regulations, personal experiences, contract agreements, documentary evidence, teaching materials, complete essays, and other sample essays. If you would like to learn about different sample formats and writing methods, please pay attention!工程部经理年终总结工程部经理年终总结4篇酒店应在广泛的市场调查的基础上,对整体市场进行科学有效的细分并从中选出一个或几个细分市场作为自己的目标市场。
工程部经理年终工作总结10篇大全
工程部经理年终工作总结10篇大全篇1 工程部经理年终工作总结光阴似箭,日月如梭。
一年的时间的确是很短暂的,不知不觉间20xx年已即将过去。
新的一年又将来临,值此新旧交替之际,总结一下过去,思索一下未来,取过去之长,补未来之短,对自己的工作进行一次总结,以便在新的一年当中更好的完成自己的本职工作。
我与20xx年进入公司工程部工作,主要负责暖通、给排水专业的技术、施工及造价的相关管理工作。
在工作过程中,遵守公司的各项规章制度,平时严格要求自己,廉洁自律。
工作中认真负责,能理论联系实际的开展工作,与工程部及各相关部门的同事配合,较好的完成了公司领导交办的的各项工作。
一、在技术管理方面1、能够耐心细致的做好图纸审查工作,配合主管领导及相关设计单位落实小区给排水、供热、燃气等管网的位置、走向,尽可能发现不合理的方案及设计,并提出自己的方案与设想,积极与设计人员沟通,完善方案及施工图纸的设计。
例如:中融国际项目地下构筑物较多,并且地下车库和地下人防均与各楼相连,这就导致将来小区排水管道无法排出。
因此向主管领导提出应在2#、3#、4#、5#楼与地下车库及地下人防之间留出一条通道,否则小区排水管网将无法铺设。
再如:设计院将连接体的采暖、给排水管线设计在汉口街一侧,而汉口街一侧又无位置铺设如此多的管线,向主管领导请示后,及时向设计单位提出了异议,经设计单位复核后,变更了设计。
2、外部协调:对于一个工程项目来说外部协调工作对于项的顺利开展有很大的帮助。
我的主要工作是在主管领导的指导下,配合各专业公司(自来水、供热、燃气)完成项目的管网配套设计工作。
在领导的正确领导及帮助下与各专业公司保持了良好的合作关系,各专业管网的配套设计正在如期进行,目前已完成给水、排水管网的设计工作,燃气、供热管网的设计正在进行中。
在工作当中能够从公司的利益和角度出发,积极配合各专业设计人员,完成各项任务。
二、在施工现场管理方面4月份进入施工现场伊始,即开始和领导研究施工现场用水方案,待方案落实后协助领导完成了相关手续办理及设计工作。
公司工程部经理年终工作总结3篇
公司工程部经理年终工作总结3篇(经典版)编制人:__________________审核人:__________________审批人:__________________编制单位:__________________编制时间:____年____月____日序言下载提示:该文档是本店铺精心编制而成的,希望大家下载后,能够帮助大家解决实际问题。
文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!并且,本店铺为大家提供各种类型的经典范文,如工作总结、工作计划、报告大全、心得体会、条据书信、合同协议、演讲稿、自我鉴定、其他范文等等,想了解不同范文格式和写法,敬请关注!Download tips: This document is carefully compiled by this editor.I hope that after you download it, it can help you solve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!In addition, this shop provides you with various types of classic sample essays, such as work summary, work plan, report book, experience and experience, letter of agreement, contract agreement, speech draft, self-assessment, other sample essays, etc. I would like to know the different format And how to write, stay tuned!公司工程部经理年终工作总结3篇总结就是对一个时期的学习、工作或其完成情况进行一次全面系统的回顾和分析的书面材料,通过它可以全面地、系统地了解以往的学习和工作情况。
工程部经理年度总结7篇
工程部经理年度总结7篇(经典版)编制人:__________________审核人:__________________审批人:__________________编制单位:__________________编制时间:____年____月____日序言下载提示:该文档是本店铺精心编制而成的,希望大家下载后,能够帮助大家解决实际问题。
文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!并且,本店铺为大家提供各种类型的经典范文,如总结报告、心得体会、先进事迹、条据文书、合同协议、规章制度、应急预案、教学资料、作文大全、其他范文等等,想了解不同范文格式和写法,敬请关注!Download tips: This document is carefully compiled by this editor. I hope that after you download it, it can help you solve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!Moreover, our store provides various types of classic sample essays, such as summary reports, insights, advanced deeds, normative documents, contract agreements, rules and regulations, emergency plans, teaching materials, essay summaries, and other sample essays. If you would like to learn about different sample formats and writing methods, please pay attention!工程部经理年度总结7篇及时对自己的工作做好总结,大家可以写份年度总结,定期进行年度总结的书写是个非常好的习惯,可以让自己的能力提升,下面是本店铺为您分享的工程部经理年度总结7篇,感谢您的参阅。
2024年工程部经理年终工作总结参考(3篇)
2024年工程部经理年终工作总结参考____上半年,工程部在公司领导的正确带领下,以严谨认真的工作态度,努力营造良好的工作环境,在加速各在建工程项目的纵深推进的同时努力开展新工程。
在全体成员的积极协作、通力配合下,上半年我部门顺利开展了工程、工程、公司办公楼装饰装修工程等共计____个项目的施工改造工作,并中标房建项目、房建项目、市政基础设施及配套建设项目共计____个标段。
海外工程中完成移交,项目已正式开工,项目处于质保阶段。
现将上半年工作总结如下:一、____上半年主要工作的开展情况(一)国内工程1、改扩建工程:改扩建工程于____月开工,截至____月底已基本完工。
____月服务区、服务区的投入使用,标志着整个改造工程主施工阶段基本结束。
经初步测算,共完成工程量约____亿元。
其中:____上半年,完成工程量约计____万元,____平方米。
服务区完成工程量约计1100计万元,计____平方米。
对已完工的工程,我部积极配合推进工程的结算审计工作,并于____月将已完工程的结算书报业主单位。
截至目前,合同范围的工程已基本审计结束,审计认定结果约计____余万元。
2、公司办公楼装饰装修工程:本工程于____月开工,截至____月,已完成工程量人民币____万元整。
3、zzz装饰装修工程:本工程于____月开工,____月____日竣工,已完成工程量人民币____万元。
(二)海外工程:1、工程:____上半年是项目最为关键的时段,共完成产值____多万元。
在公司领导、现场技术组及国内管理组的共同努力下,项目管理人员及施工人员面临时间紧任务重,克服现场各种困难,使项目____月____日顺利通过内部验收,评定为合格工程。
2、项目:项目进入实施准备阶段,____月初技术组管理人员抵达现场,开始项目开工准备,____月份____名工人抵达现场,____月____日第一批材料物资抵达港,____月____日部批准了该项目的正式开工,项目正式拉开序幕。
工程经理年终工作总结8篇
工程经理年终工作总结8篇(经典版)编制人:__________________审核人:__________________审批人:__________________编制单位:__________________编制时间:____年____月____日序言下载提示:该文档是本店铺精心编制而成的,希望大家下载后,能够帮助大家解决实际问题。
文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!并且,本店铺为大家提供各种类型的经典范文,如汇报材料、工作计划、心得体会、条据文书、发言致辞、合同协议、规章制度、教学资料、作文大全、其他范文等等,想了解不同范文格式和写法,敬请关注!Download tips: This document is carefully compiled by this editor. I hope that after you download it, it can help you solve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!Moreover, our store provides various types of classic sample essays for everyone, such as report materials, work plans, experiences, documents, speeches, contract agreements, rules and regulations, teaching materials, complete essays, and other sample essays. If you want to learn about different sample formats and writing methods, please pay attention!工程经理年终工作总结8篇工作期间尽自己应尽的职责,那么在工作完成后是时候来写一份工作总结了,工作总结帮助我们认识到自己的成长和进步,增强自信心,下面是本店铺为您分享的工程经理年终工作总结8篇,感谢您的参阅。
工程部经理年终述职报告7篇
工程部经理年终述职报告7篇下面是本店铺分享的工程部经理年终述职报告7篇,以供借鉴。
工程部经理年终述职报告1时间如梭、岁月如歌,转眼间已经在忙碌中度过,回首旧年,在领导的关心和同事的帮助下,在自己的不断努力下,顺利完成领导安排的各项工作。
展望新岁,在新的一年里,我将总结经验、吸取教训,完善不足,付出更大的努力,以更加奋发有为的精神状态和扎扎实实的工作作风投入到工作中去。
加强与各职能部门的协调配合,营造良好的工作氛围。
在施工过程中,统一步调,形成合力,对在项目实施过程中遇到的问题和情况,主动和领导汇报,作到沟通、协调,从而保证了项目建设顺利实施。
一、工作任务及重点控制1、文明施工控制:XX库开工面积大、施工场地狭小,一次性进场材料多,现场安全文明施工、材料进场码放是我们工作的一个必控点,为使现场有序有秩我们密切监控现场材料、机具使用情况,加强周转料具的使用码放、机械的协调管理,保证现场杂而有序、错而不乱。
2、进度控制:我们合理组织人员、科学安排施工工序,加强现场管理力度,做好施工过程中的检查,完成过程质量预控,减少因为返工整改所延误的时间,确保一次成型、一次验收通过,为加快施工进度打下坚实的基础,配合安全组做好施工现场的安全管理工作。
力争做到质量无隐患、安全无事故。
3、质量控制:坚决实行公司推行样板先行制度,各分部分项工程大面积施工前,必须通过项目部组织的样板验收才能全面展开。
对重点难点部位,现场旁站,加强施工过程控制。
4、安全控制:加大巡查密度,提高巡查力度,及时纠正、制止安全生产违法违规现象,严格危险源(点)监控,配合安全组人员将安全隐患扼杀在萌芽之中。
二、不足与改进建设工程具有时效性的特点,各种规范不断的更新和发展,我不仅需要自己不断学习,更应该主动、互相交流、互相学习、取长补短,不断增强自身业务知识和技术水平。
今后我们要切实提高自身综合素质,树立自觉的学习意识,循序渐进,温故知新,持之以恒,坚持不懈,扎扎实实地学习,才能学到真才实学,才能把学到的知识融会贯通到我们的具体工作中去。
工程经理年终总结5篇
工程经理年终总结5篇(经典版)编制人:__________________审核人:__________________审批人:__________________编制单位:__________________编制时间:____年____月____日序言下载提示:该文档是本店铺精心编制而成的,希望大家下载后,能够帮助大家解决实际问题。
文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!并且,本店铺为大家提供各种类型的经典范文,如工作汇报、工作报告、工作总结、工作计划、合同协议、条据书信、规章制度、教学资料、作文大全、其他范文等等,想了解不同范文格式和写法,敬请关注!Download tips: This document is carefully compiled by this editor. I hope that after you download it, it can help you solve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!Moreover, our store provides various types of classic sample essays, such as work reports, work reports, work summaries, work plans, contract agreements, policy letters, rules and regulations, teaching materials, complete essays, and other sample essays. If you would like to learn about different sample formats and writing methods, please pay attention!工程经理年终总结5篇写好年终总结能让自己在工作中有更多发展的机会,我们在写年终总结时一定要保证我们的思路是清晰的,下面是本店铺为您分享的工程经理年终总结5篇,感谢您的参阅。
工程部经理工作总结6篇
工程部经理工作总结6篇写工作总结一定要抓住这一年来的工作重点和几个突出的成绩、亮点进行阐述,不能让领导产生“事情做了不少,但都印象不深”之感。
工程部经理工作总结篇1尊敬的各位领导、同志们:您好!充实而忙碌的上半年年即将过去了,回首过去的一年虽然没有轰轰烈烈的战果,但也经历了一段不平凡的考验和磨砺。
非常感谢各位领导给我这个成长的平台,令我在工作中不断学习、进步,慢慢的提升自身的素质与才能,同时也非常感谢同事们这两年多来对我的支持与关爱,正是有你们的协助才使我在工作中更加得心应手,较好的完成各项工作任务。
在此我向大家表示衷心的感谢!在这辞旧迎新之际,我对这一年来工程部的工作做简要汇报:一、工程建设方面2022年上半年是紧张而忙碌的,跃进港新增大中小型工程建设项目十几项,其中有南大门工程、大堤支护工程、7#泊位码头及码头后方堆场工程、备用煤堆场硬化及港区一些生产、生活辅助设施建设等工程。
现工程建设已全部完成并投入使用,有力的保障了港区生产、业务、生活的顺利进行。
在工程招标过程中坚持低价中标的原则,严格控制预算造价限度的节约公司投资。
其中一些工程我们多次请到相关专家反复论证反复比较,比如大堤支护工程在工程建设前期我们做了大量的工作,前期方案的制定:有内河水工专家的方案、有着丰富海港工程施工的专家、还有一些水利工程的专家,当然方案都是不同的、意见也是不一致的,最终我们选定的方案比较一些专家方案节约资金100多万元,现在工程已经竣工得到了大多数专家的认可及好评。
同样其他所有工程招标项目始终坚持把公司利益放在第一位,只有做到公正廉洁自律才能做好本职工作,才能给领导提供正确的决策依据。
二、团队建设方面工程部是一个年轻的团队,平均年龄只有28岁,个个充满活力,干劲十足,但因为工作经验少,不可避免的出现临机处理问题能力不足,现场动态管理不到位等问题。
对此,我在工作上严格要求自己的同时,学习上时时督促,利用自己的经验和技能进行“传、帮、带”;并且敢于给他们压担子,鼓励他们放手工作的同时,倡导公司管理格言的激励理念,激发员工的工作激情,做到工作着眼于细、事事求精细。
工程部经理年终工作总结范文(4篇)
工程部经理年终工作总结范文时光过得飞快,在不知不觉之中,充满希望的一年就要伴随着洁白祥瑞的雪花到来了。
在过去的一年里,我们有硕果累累的喜悦,也有与同事协同攻关的艰辛;我们有观望惆怅的疑惑,也有坚信前途光明的时刻……就是这样,我们一步一步坚实地走过了____年的春秋夏冬。
可以说,____年是公司推进改革,拓展市场,持续发展的关键一年,也是我们公司向集团公司迈出最坚实一步的一年。
回顾过去的一年,感慨很多,收获颇丰,信念更加坚定,思路格外清晰。
现将____年工程部的工作总结以及明年的工作思路和计划向公司做以回报。
一、一年来的工作:1、努力工作,圆满完成自身任务。
1)本年伊始,工程部在公司各位领导的关心帮助下,对丽水金沙温泉会所的后期安装、精装修工程展开全面的施工。
由于我公司以前以土建为主,管理人员对装饰工程还不尽精通,但是,我们不气馁,不自卑,虚心学习,多方请教,克服重重困难,经过近八个月的不懈努力,终于在十一前,使温泉会所隆重开业。
完成装饰面积近____平方,其中吊顶____平方,木地板____平方,壁纸____平方以及相应的给排水、电气、中央空调的安装调试工作。
同时,温泉会所的第二阶段的改造、装饰工作正在有序进行。
2)____年____号交工后,由于多种原因人防车库工程没有彻底完工。
今年年初,工程部立即组织人力物力对其剩余工程抓紧施工,经过一个月的努力,完成地坪____平方,十个集水坑,四个截水沟以及两个坡道的面层工程。
同时对____一期____号、____号楼,二期____号楼、人防车库的结算资料进行搜集整理。
3)总建筑面积____平方的____街住宅小区工程,今年是关键的一年,在缺少技术员的情况向下,工程部及时派出____工程师配合吴经理的工作,每日坚持骑自行车往返两个工地之间。
精心组织施工,工作细致认真。
完成了水、电、暖以及木质防火门、防火卷闸门的安装工程,完成了上料提升机的拆除和上料洞口的封堵工作。
工程经理年终工作总结(四篇)
工程经理年终工作总结转眼间,____年已经过去,现从以下几个方面将一年来工程部的工作情况做一总结汇报。
一、进度控制按照年初公司制定的工程进度要求,主体工程应在____月底完成,实际截止到年底,主体工程全部完成,砌体工程完成____%,比原预定工期平均延误____个月,工期延误的主要原因在以下三个方面:1、我们事先对该工程的难度估计不足,合同工期过于紧张。
本工程定额工期应该在____天,但我们把工期压缩到了____天,这个工期只有在理想化的情况下才有可能按计划完成,但该工程由于难度较大,任何一个事先未预料到的情况出现都有可能造成工期的延误并有可能产生连锁反应。
2、我们事先对施工单位的实际实力(包括资金实力和管理实力)估计不足。
两家施工单位都属于承包责任制,施工单位收取承包人的管理费用,工程的资金投入和管理人员的配置由承包人负责,施工单位不给承包人任何资金支持和人员支持,同时也缺乏必要的管理方面的支持,存在以包代管现象。
制约工期的主要原因在于施工单位的资金和管理方面。
资金实力的不足导致材料、设备经常供应不上,工地经常出现停工待料现象,停工待料又经常造成施工人员的流失,劳动力的严重缺乏造成了工程进度严重拖延。
在管理方面,一方面管理人员责任心和素质达不到应有要求,另一方面由于劳务层分包层次过多,工班分组过细,无法形成流水作业,导致项目经理在人员调配上存在困难,同时由于劳务层层分包,管理层次过多,上层管理人员尤其是项目经理的管理意图无法在班组得到及时有效的贯彻执行。
另一方面现在的民工也是非常地不好管理,经常因为一些小问题和管理人员对着干。
这是导致工期拖延的最主要原因。
针对以上问题的出现,我们工程部全体人员在总经办的大力支持和帮助下,在资金上和其他各方面采取了一系列措施,也取得了很好的效果,在后半年的施工过程中,不仅遏制住了工期进一步拖延的势头,而且延误的工期也在一步步减少。
二、质量控制从开工以来,工程部始终坚持质量第一的原则,严把质量关,到目前为止,施工质量还是比较令人满意的,虽然曾经出现过一些质量滑坡现象也都及时得到了解决,保持了高质量工程的总体势头,为创____杯打下了坚实的基矗目前经过市质检站和省站的多次检查,虽然提出了一些问题,但对我们的总体工程质量还是给予了肯定的。
工程公司经理年终总结10篇
工程公司经理年终总结10篇(经典版)编制人:__________________审核人:__________________审批人:__________________编制单位:__________________编制时间:____年____月____日序言下载提示:该文档是本店铺精心编制而成的,希望大家下载后,能够帮助大家解决实际问题。
文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!并且,本店铺为大家提供各种类型的经典范文,如讲话致辞、报告体会、合同协议、策划方案、职业规划、规章制度、应急预案、教学资料、作文大全、其他范文等等,想了解不同范文格式和写法,敬请关注!Download tips: This document is carefully compiled by this editor. I hope that after you download it, it can help you solve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!Moreover, our store provides various types of classic sample essays for everyone, such as speeches, report experiences, contract agreements, planning plans, career planning, rules and regulations, emergency plans, teaching materials, complete essays, and other sample essays. If you want to learn about different sample formats and writing methods, please pay attention!工程公司经理年终总结10篇下面是本店铺收集的工程公司经理年终总结10篇,以供借鉴。
工程部经理终总结3篇
工程部经理终总结3篇工程部经理终总结1尊敬的公司领导:感谢公司领导的信任,由本人担任公司工程部副经理一职,主持工程部日常工作。
在任职期间,基本上能按公司要求完成工作任务,但也存在一些问题和不足。
现报告如下:一、工作完成情况:1、掌握工地在建工程情况,各工地总包、各分包单位的人事架构、工程进度、质量控制、遗留问题等进行分析和初步判断,制订各阶段的处理措施。
2、熟悉公司人事架构、工作方法;3、熟悉工程部人员配置,与各个专业工程师单独沟通,以迅速掌握工作现状;4、处理解决在建工程历史遗留问题,如:___楼工地遗留签证单五份、___楼工地遗留签证单十一份;5、召开各工地工程例会,制定新的工作例会方法,将过去拖拉疲沓的工作例会改变为能处理解决工地实际问题的工作例会;如:主持___项目、___项目的第一次工程例会,会上以各单位达成今后对项目管理的基本要求;6、明确工程部各专业工程师职责,改变过去无目标、胡子眉毛一把抓的现象,制定周工作计划,提高工作效率;明确各个工地具体责任人,由本人任总责任;7、落实上周的工地存在的问题,明确责任人和监督人,有效的解决问题;8、敦促各工地总包、分包单位提供施工组织设计九份、进度计划九份,对不合格的发回重做;如:___工地施工进度计划达不到我公司确定的工期,已发回令其重做;9、对各个工地关键工程工序实时跟进验收,发现问题的,即时与施工单位和监理单位沟通,以求用最快的速度解决。
如:验收___楼15层钢筋绑扎时,发现17个问题(及时处理),在验收16层钢筋时只发现4个问题(及时处理),已有较大改观,相信17层钢筋验收时基本无问题,从而确保工程质量和结构安全。
二、遵守公司规章制度,着重执行力1、适应了公司考勤打卡的工作制度,改变了过去从不打卡的习惯,至今为全勤。
2、遵照刘总的指示,开展工程部各项工作,建立总包单位和分包单位平行管理体系,严格按照公司对工程质量、安全、进度管理各项目。
工程部经理年终工作总结(7篇)
工程部经理年终工作总结紧张而又忙碌的____已经过去,新的一年已经开始,在这个岁末年初的时刻,总结并梳理了____工作,借此机会向各位领导及同事汇报一下工程部____工作总结及____的工作思路。
一、____度工作总结(一)安全方面1、编制完善了安全资料内所需要的制度,完善了公司级各项安全技术交底工作;2、检查督促完成了技校实训楼、裕升国际花园8#楼项目的省级文明工地验收;3、组织完成企业三类人员安全证书的延期考核,完成企业特殊作业人员证件的年审;4、组织对各项目进行安全日检、周检及月度检查,对所查出的问题下发隐患通知并监督整改落实;5、按照公司计划对安全员、项目经理进行安全培训18班次,极大地提高了管理人员的安全意冬季施工进行交底、监控及检查,提出问题并监督落实整改;9、对新建项目的施工组织设计、专项方案组织审批,组织各项目木工班组去培训基地学习;10、学习并传达了市组织的建筑安全生产法规宣贯会议,并在公司范围推广实施;11、对____、____两项目立体交叉施工安全交底并监督落实;12、落实推进安全生产标准化施工,并顺利通过省市领导检查。
(二)质量方面1、组织QC质量小组课题研发,取得了一二三等奖各一名的好成绩,促进了广大员工们参与QC质量活动的积极性,提高了工程实际质量;2、定期与不定期的对公司在建工程进行了质量检查及监控,主要通过日检、周检等手段。
组织了在建工程的主体分部等各项验收,真正做到了所有工程报验质监站前,均经过工程部验收,工程部全过程参与验收活动,积累了验收经验;3、编写公司级“质量、安全奖惩处理办法暂行规定”,并在工程实施过程中加以完善,使公司的质量安全生产有法可依,奖罚分明,极大地促进了工程质量的提高,施工安全得到了保障;4、编制公司级技术交底并下发到各项目部,使每一分项工程均做到了事前交底、事中控制、事后总结的“三控”;5、编制出台了公司级施工组织设计编制指南,使公司各在识;6、组织对各项目的塔吊等施工机具进行专项检查,提出整改意见并组织落实整改;7、参加市建委组织的安全月宣传活动、市安监站组织的安康杯安全演讲比赛,并取得个人三等奖的好成绩,参加全市安全拉网大检查;8、对各项目夏季防台防汛专项安全大检查,组织对各项目建工程的施工组织设计编制有据可依;6、积极响应公司培训计划,组织各项目部相关人员参加质量技术相关技术培训____班次,提高了各级管理人员专业技能,为公司日后发展储备了技术力量;7、积极组织了公司级月度大检查,对检查中发现的问题、隐患及时跟进,监督各项目部整改;8、组织并落实人员参加市建委组织的技术比武,取得瓦工第____、镶贴工第____,总分第____的好成绩,受到了建委主管部门的表扬;9、对技校食堂等项目资料收集并整理,并顺利完成备案事宜;10、积极参加标准化协会组织的冬季施工相关培训,____培训学习,提高了公司专业部门的执业水平;11、及时对工程售后维修进行跟踪服务。
工程部经理年终工作总结
工程部经理年终工作总结工程部经理年终工作总结6篇总结是把一定阶段内的有关情况分析研究,做出有指导性的经验方法以及结论的书面材料,它可以帮助我们有寻找学习和工作中的规律,不妨坐下来好好写写总结吧。
那么总结要注意有什么内容呢?下面是店铺收集整理的工程部经理年终工作总结,供大家参考借鉴,希望可以帮助到有需要的朋友。
工程部经理年终工作总结1随着时间的流逝,20xx年的新年钟声即将响起,在这辞旧迎新之际,xx项目部一部在xx公司的正确指导下,在xx房地产开发公司的正确领导下,xx小区一期开发abc个标段总建筑面积xx平方米,本部负责xx花园小区a标段共10幢住宅其中:小高层4幢分别是:7#12层、(10#、14#、15#)、11层,高层六幢分别是:(3#、4#、8#、12#)30层、16#20层、11#18层、小高层含车库图示建筑面积:xx,高层图示建筑面积:xxm2。
商铺1#、2#,面积xxm2,有xxm2的工程指挥部。
项目部在全体员工的共同努力下,经施工单位广大干部、工人的辛勤劳动,目前小高层已经完成主体结构验收,进入装饰阶段,高层建筑11#、16#楼主体结构已封顶,3#楼结构完成26层,4#楼结构已完成22层,8#结构楼已完成13层,12#结构楼已完成18层,本着回顾过去,总结经验,找出不足,丰富自己,使企业具有长足发展的后劲,特对过去的工作总结如下:一、定目标,遵章守纪,抓好组织建设。
1、工程项目部成立后,根据本项目工程的特点和规模,公司决定由朱总经理担任项目部项目工程总指挥,主抓项目部的全面工作。
在项目经理的直接领导下,从组织结构上入手,做好组织建设工作。
项目部的组织结构形式,采用直线式组织结构形式,即:根据工程特点和平面分布,划分了三个区域,成立了三个项目部,负责本区域所辖范围内的工程建设管理工作。
2、项目部一部在蒋经理的领导下,负责制定工作目标,其中:安全目标是:零死亡。
进度目标是:小高层20xx年4月31工程竣工,高层20xx年11月30日工程竣工,交付使用。
工程部经理年底工作总结(3篇)
第1篇尊敬的领导,亲爱的同事们:随着岁月的流转,转眼间又到了年底,回顾过去的一年,工程部在公司的正确领导下,全体员工的共同努力下,圆满完成了各项工作任务。
在此,我代表工程部全体员工,向公司领导表示衷心的感谢,向同事们致以崇高的敬意!一、回顾过去,总结经验1. 工程项目进度控制过去的一年,我部共承担了XX个工程项目,其中新建项目XX个,改造项目XX个。
在项目进度控制方面,我们采取了以下措施:(1)严格执行项目计划,确保项目按期完成。
(2)加强项目沟通,及时解决项目过程中出现的问题。
(3)优化资源配置,提高施工效率。
(4)加强质量监控,确保工程质量。
经过全体员工的共同努力,XX个工程项目均按期完成,得到了业主和公司的一致好评。
2. 工程项目质量管理在工程项目质量管理方面,我们始终坚持“质量第一,用户至上”的原则,采取了以下措施:(1)加强质量意识教育,提高员工质量意识。
(2)严格执行质量管理体系,确保工程质量。
(3)加强质量检查,及时发现和纠正质量问题。
(4)加强施工过程控制,确保工程质量。
经过一年的努力,我部承揽的工程项目质量合格率达到100%,优良率达到XX%,得到了业主和公司的高度认可。
3. 工程项目成本控制在工程项目成本控制方面,我们采取了以下措施:(1)加强成本意识教育,提高员工成本意识。
(2)优化施工方案,降低施工成本。
(3)加强材料管理,降低材料损耗。
(4)加强合同管理,降低合同风险。
通过一系列措施的实施,我部承揽的工程项目成本控制在预算范围内,为公司创造了良好的经济效益。
4. 团队建设与人才培养在过去的一年里,我们注重团队建设与人才培养,采取了以下措施:(1)加强团队凝聚力建设,提高团队执行力。
(2)开展员工培训,提高员工技能水平。
(3)建立人才激励机制,激发员工工作积极性。
(4)关心员工生活,提高员工满意度。
通过以上措施,我部团队凝聚力、执行力显著提升,员工技能水平不断提高,为公司发展提供了有力的人才保障。
工程经理年终工作总结范本(5篇)
工程经理年终工作总结范本在公司领导及各部门各同事的帮助下,工程部完成了本年度的工作。
从____年____月初担任工程部经理以来。
由于专业技能的局限性以及管理经验的欠缺,从任职以来,对工作一直不敢怠慢,坚持小心谨慎、脚踏实地、认真务实、高效求新的工作态度与工作方式。
在工作中不断的深入和学习,得出一些项目管理方面的思路。
这些项目管理方面的思考,有的已经在实施和实践。
但由于有些思考不成熟、不系统,也就没有及时与公司领导汇报沟通,现对其进行相对系统的整理。
总结共分2部分,第一部分:工程情况,第二部分:分析和建议。
第一部分:工程情况1、地下室平整、垫层、防水、底板混凝土,暖气管道拆除、安装,仓库砌砖抹灰;一楼五金区装修;二楼红木家具区装修;四楼董事长办公室装修;五楼厨房、餐厅、活动室装修;A区工程检查,对发现的问题逐条登记、算量、计价,检查外墙平整度、垂直度、真石漆开裂脱落,内墙平整度、垂直度,刮白的平整度、垂直度,塑钢窗的平整度、垂直度等质量问题,现已查出问题不少;门窗修整、屋面漏水维修、B区仓库围墙修整,商场里水电维护维修;挖供热管道,污水管道修整,做花坛路侧石、排水沟,南侧浇水泥路、做消防检查井,换热站、B区开工;资料、预算、合同起草、联系相关部门、核对工程量、技术交底、现场巡查、成本控制、编写施工日志;2、按董事长指示:地下室供热管道修改,陈工、金工带人做节约____万左右、做____楼供暖节约____万左右、地下室每年都能节约供暖费____万左右、A区能使公司节约开支____万左右B区能使公司少受损失____万左右;去年防水合同谈好____万,经今年比较董事长确定____万,节约____万;第二部分:分析和建议通过一年工作的总结,我认为在今后的工作中有以下几方面的问题需要引起我们的重视:1、在以后项目的施工单位选择上,我们该如何更加准确的评估施工单位的真正实力,如何从根本上杜绝各种形式的挂靠、转包等问题,是我们需要专门研究的问题。
工程部经理年终总结(10篇)
工程部经理年终总结(10篇)工程部经理年终总结(10篇)工程部经理年终总结1 尊敬的公司领导、同事们大家好:20xx年转瞬即逝,20xx年已在眼前。
工程部在公司领导的关心帮助下,在同级部门的协同下,在部门全体同事的努力付出下,获得些许成绩,留下些许遗憾,在此我代表工程部做如下工作汇报:一、各工程完成情况汇总及下一年度工作方案XXXX自20xx年初确定了XXX改办公楼,面对大量的设计变更、系统调整和设备选型变化,工程部针对图纸审核、方案论证、总控方案、设备进场方案等做了很多工作。
办公楼B座于20xx年12月24日主体封顶,屋面构造20xx年1月3日完成,办公楼A座6月11日主体封顶,屋面构造6月20日完成。
7月16日完成建立局平安评定,8月15日主体构造验收。
9月25日完成办公楼B座优质构造验收。
截至20xx年底,建筑装饰装修分部工程核心筒、楼梯间等部位抹灰完成,外窗副框完成,幕墙吊篮开始组装。
建筑屋面分部工程除屋面地砖外全部完成,建筑给排水分部工程地下压力排水管道根本完成,地下室消防水完成,办公楼B座给水立管、消防立管完成,虹吸雨水全部完成,建筑电气分部工程变配电室安装完成,室外接线海尔路段土建施工完成,电缆桥架管井内安装完成,通风与空调分部工程空调给水管敷设已入户内施工,办公楼B座5-12层风管安装完成,电梯分部工程已采购根据总方案要求节后安装。
规划变更手续自9月开始办理,10月22日提交变更面积审核,11月19日正式提交建管处报件,目前市规划局长会通过。
20xx年2月20日崂山建立局建筑行业表彰大会召开,公司获得20xx年度崂山区建筑工程质量工作先进单位。
12月6日XXXX工程喜获中国房地产名盘荣誉。
20xx年是XXXX工程最为辛苦繁忙一年,所有设备将全面进场安装,各专业衔接和调试将全面展开,新技术的成功应用势必是工程人艰辛付出的结果。
装饰装修及设备安装等分部分项工程、综合管线和景观绿化将全面展开施工,方案20xx年11月30日完工交付。
工程部经理年终工作总结6篇
工程部经理年终工作总结6篇(经典版)编制人:__________________审核人:__________________审批人:__________________编制单位:__________________编制时间:____年____月____日序言下载提示:该文档是本店铺精心编制而成的,希望大家下载后,能够帮助大家解决实际问题。
文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!并且,本店铺为大家提供各种类型的经典范文,如工作报告、演讲致辞、条据文书、合同协议、心得体会、自我鉴定、规章制度、教学资料、作文大全、其他范文等等,想了解不同范文格式和写法,敬请关注!Download tips: This document is carefully compiled by this editor. I hope that after you download it, it can help you solve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!Moreover, our store provides various types of classic sample essays, such as work reports, speeches, written documents, contract agreements, insights, self-evaluation, rules and regulations, teaching materials, complete essays, and other sample essays. If you want to learn about different sample formats and writing methods, please pay attention!工程部经理年终工作总结6篇优秀的工作总结可以帮助大家得到更大的发展和进步,工作总结是对自己工作表现的客观评价和反思,下面是本店铺为您分享的工程部经理年终工作总结6篇,感谢您的参阅。
工程部经理个人年度总结(3篇)
工程部经理个人年度总结工程部经理个人年度总结(3篇)工程部经理个人年度总结120xx年度工程部在公司领导的关怀指导下,在各部门的密切配合下,全力以赴地投入到一期工程建设工作中,完成建设投资约九千余万元;基本完成年初制定的施工控制计划,为明年一期工程整体竣工带给了保障。
作为公司工程建设管理的核心职能部门,我们从项目的技术特点着手,定目标、定策略、统一思想,充分发挥工程部在工程管理上的核心作用,使工程部构成一个专业配套齐全,岗位职责分明、团结奋进,有很强战斗力的群众。
本着回顾过去,总结经验,找出不足,提高公司管理水平的原则,我们就工程部20xx年的工作状况进行回顾和总结。
1、完成的主要工作:(一)一期工程1、编制项目年度施工进度计划。
2、组织项目施工、完成了设计交底及图纸会审、办理项目施工中出现的设计变更、技术核定等手续。
3、20xx年3月15日组织市规划测量队对现场三个测量控制点及标高控制点进行复核,为工程准确放线带给了技术保障。
4、在2#公寓楼整体南移,cfg桩的施工准备中,我们根据现场土质较软的实际状况,及时制定了采用建筑垃圾及粗石粉加固基础表层的技术方案,保证了cfg桩的施工能够顺利进行。
5、委托山西春晖岩土工程科技有限公司从今年3月份开始对一期工程基坑进行位移观测,确保土方开挖期间基坑安全。
6、配合预算部招标活动,参与一期工程施工总承包合同文件编审,经过与施工总承包单位多轮洽谈,20xx年5月16日签订一期施工承包合同。
7、组织高新区质监站对一期工程cfg桩进行验收,对地基验槽进行了现场监督检查。
8、完成了基坑支护及土方开挖工程。
9、完成1#公寓楼基础工程及地下二层至二十六层的主体结构施工。
10、完成2#公寓楼基础工程及地下二层至十层的主体结构施工。
11、完成科研楼基础工程及主体结构施工。
12、完成车库部分基础工程及主体工程施工。
13、完成别克4s店、凯迪拉克4s店钢结构主体工程施工。
14、完成凯迪拉克展厅及办公区装修工程施工。
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
报告总结参考范本
工程部经理年终工作总结1
$
20xx年已经过去,我们将迎来新的一年,回首20xx,有成绩也有不足,我将总结过去一年工作中的不足,戒骄戒躁、脚踏实地一步一个脚印的走下去,努力做得更好,以自己的实际行动来证明。
在新一年我会带领工程部,精诚团结,恪尽职守,努力完成全年的工作任务、工作目标。
下面我将20xx 年的工作情况做以下汇报。
(一)20xx年工作内容:
20xx年6月份以来,由我负责xx社区生活保障房工程项目,总建筑面积xx 平方米,结构采用框架——核心简结构体系,工程地下一层和二层为地下停车场和人防设施,一至五层裙楼为大型商业群体,本项目东西各一座塔式办公楼和南向两座板式公寓组成,该工程为公司重点工程项目,20xx 年6 月18 日开工以来。
完成了地质勘擦、监理单位、土石方、基坑降水支护以及桩基工程的招标工作。
合同签订及组织施工工作,施工图纸设计、人防图纸设计、消防图纸设计审查手续,目前基坑降水支护工程已接近尾声,土方开挖也已过半。
(二)20xx 年主要工作完成情况:
( 1) 施工图纸设计及图纸审查通过。
( 2) 人防图纸设计及图纸审查通过。
( 3) 消防图纸设计及图纸报审查。
( 4) 工程招标代理及招标控制价计算。
( 5) 山体爆破办理相关手续。
(三)工程招标工作:
完成了xx 社区生活保障房工程监理单位、土石方、基坑降水支护、桩
基施工及招标代理公司的招标工作。
严格对投标队伍进行考察,争取选用综合实力强的施工单位,保障总体工程的顺利进行。
(四)工程总体的控制目标;
(1)工程质量完成情况:
XX社区生活保障房工程是公司20XX年重点建设项目,我作为项目总工,开始了项目部的组建工作。
首先根据xx 社区生活保障房工程的工作要求,建立了质量管理体系、项目管理目标和管理人员岗位责任制。
xx社区生活保障房工程的质量目标为创建无质量通病工程,为此制定了许多预防措施和实施办法。
为保证整个目标的实现,我组织项目部管理人员根据自己的实践经验,结合工程的特点,编制了项目部质量预防措施。
工程开工以后,我们严格控制施工质量,在施工过程中,我要求坚决落实公司预防措施内容,并且坚持进行样板引路,同时组织管理人员对其他在建工程进行参观学习,作到扬长避短,提高了项目部人员的质量争先意识。
(2)工程生产及进度控制:
XX社区生活保障房工程开工以后,我按照公司要求工期,组织制定了施工进度网络计划以及劳动力计划。
并且根据施工进度要求,与各个施工班组签订了质量、进度、安全控制协议书。
对其具体进度、生产内容提出了具体要求。
在生产过程中,我根据实际情况,通过制定月计划和周计划,对整个工程生产进行了控制管理。
施工初期,因降水支护施工单位因组织不周密,劳动力出现不足,工程进度缓慢。
对此,项目部多方召集人员,经过努力,基本上保证了施工的要求。
(3)安全、设备管理:施工进场的准备期间,根据项目工程特点,制定了设备需用计划,并组织了布置和安装。
施工中,我坚持将安全管理作为日常
管理的重点,将确保职工的生命安全作为自己的第一要务。
框架工程,支撑体系和临边防护是安全管理的重点,为此,我从以下几个方面加强了管理工作:
①加强安全技术交底工作。
通过进场时的三级安全教育、上岗时的专项安全交底来加强职工的安全意识。
②加强安全检查和巡视,及时发现问题,及时整改,杜绝安全隐
患。
加强建筑物临边的安全防护。
同时,对现场的全部设备实行了专人专机管理。
设备进场时项目部统一进行检查,合格后进行接受。
施工中,定期进行设备的维修、保养和检查,及时发现安全隐患,及时进行修理更换。
(五)工作存在的不足:
①工程质量:在基坑降水支护工程施工中,由于前期地质勘探不完善,基坑降水支护施工单位,由于思想上有所放松,监理单位监管不严,造成施工质量不理想。
这对我来说是一个教训,提醒自己对后期的工程管理需要进一步加强。
②施工进度:因基坑降水支护施工单位的人员与机具组织不利,工期严重拖延,严重影响土方开挖进度,对我们的整体施工进度造成影响。
还需要自己进一步加强进度管理、总结不足,加强人力组织,弥补前期施工的不足。
(六)20xx 年工作计划:在新的一年中,我将从以下几点作出努力、作好工作。
做好整体施工管理工作:
① 继续抓好xx 社区生活保障房工程项目管理工作:在20xx 年的主要工作为基础及主体施工,时间紧、任务重。
考虑到项目总工期要求我将继续抓好施工生产进度控制,积极组织好人力投入,确保工程按照预期要求全部完成。
②加强业务知识学习,继续提高管理水平:随着时代的前进、新技术的运用,必须进行专业技术知识的再教育。
所以,在新的一年中,我打算首先加
强学习专业知识。
另一方面,积极学习他人的先进之处,作到扬长避短,进一步提高思想认识,开拓视野。
③进一步作好施工管理工作:20xx 年的工作中,我负责的工程尽管有一定的成绩,但是仍然存在很多不足,需要继续总结和完善。
只有很好的总结过去,才能更好的服务未来。
新的一年中,我要进一步重点作好3 个方面的管理:一是人的管理。
人是管理的组织者和执行者,项目管理人员不能松懈,只有全体管理人员密切配合,各负其责,才能作到施工各个环节环环相扣,整体工作才能井然有序。
二是物的管理。
也就是材料的管理。
20xx 年,我将继续在项目管理中作好限额领料制度,并且进一步细化,定期与工程预算量进行对比分析,找出不足,制定对策。