公司各部门定岗定编表
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
公司各部门定岗定编表序号部门部门总人数(人) 岗位配岗人数(人)
总经理 1 1 总经理室 2
副总经理 1
部长 1
主管会计 1 2 财务室 6 成本会计 1
出纳 1
仓管 2
部长 1
采购员 2 3 采购部 5
外协采购 1
司机兼采购 1 4 销管部 3 销售内勤 3
总工/部长 1
机械工程师 5 5 研发部 9 液压工程师 1
电气工程师 2
图纸管理员 1
部长 1 6 技术部 4
技术员 3
部长 1 7 内贸部 16
业务员 15
部长 1 8 外贸部 6 业务员 4
业务助理 1
部长 1 9 人资部 17
薪资绩效专干 1
installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before
招聘培训专干 1 网络管理员 1 档案管理员 1 企划专干 1 行政专干 1 司机
1 主厨 1 厨师 1 帮厨
2 保安队长 1 保安
3 保洁 1 部长 1 质量工程师 2
10 质量部 16 质量组长 1 机加质检 2 质检员 10 部长 1 副部长 1 班长 7 质量成本专干 1
11 生产部 135 生产文员 1 生产计划员 1 维修主管 1 维修员 4 普工 118
部长 1
12 制造部 49 生产调度 1 工艺工程师 2
installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are
particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before
生产文员 1
下料 3
焊工 12
剪板 1
装配钳工 12
电气装配 4
车工 4
钻铣工 3
镗工 2
勤杂工 1
油漆工 2
部长 1 13 售后服务部 9 售后组长 1
售后服务员 7 总计 278
installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models,