转自: 专筑网 Anting Culture and Sports Activity Centre / Atelier Z+

安亭镇文体活动中心/Atelier Z+

Courtesy of Atelier Z+

Architects: Atelier Z+

Location: Anting, Jiading, Shanghai

Architects: Zhang Bin, Zhou Wei

Design Team: Wang Jiaqi, Lu Jun, Li Ying, Li Qin, Zhuang Sheng, Guo Yue

Area: 16,171 sqm

Year: 2010

Photographs: Courtesy of Atelier Z+

建筑师:Atelier Z+

位置:上海,嘉定,安亭

建筑师:张斌,周伟

设计团队:王家琪,陆军,李莹,李琴,庄胜,郭跃

面积:16171平方米

年份:2010

摄影:Courtesy of Atelier Z+

Courtesy of Atelier Z+

Courtesy of Atelier Z+

Courtesy of Atelier Z+

Collaborating Architect: Architectural Design and Research Institute of Tongji University Contractor: Shanghai Xinchang Construction Co., Ltd.

合作建筑师:同济大学的建筑设计研究院

承包商:上海新昌建筑有限公司

This project is sited in the north of Anting Town, in a triangular plot by a river that is completely surrounded by industrial buildings (factories and warehouses) with the exception of one supermarket. The program’s complexity required a negation between the exterior and interior, resulting a tight interior spaces.

该项目选址在安亭镇北部的一个三角区域内,靠近一条完全被工业建筑(厂房和仓库)及一家超市包围的河流。该方案的复杂性要求外部和内部之间的一种否定,造成了一个紧张的内部空间。

Courtesy of Atelier Z+

Since a lot of spaces are required for outdoor activities, spaces available for construction are slightly tight. With the intent of keeping the relative independence for different internal use, simplifying space complexity and reducing external dimensions, the whole building is divided into four independent volumes. These four volumes of natatorium, gym, culture center and cinema are of different sizes, height and scales, and are arranged along the road by the side of the site from northeast to southwest in a saw tooth pattern. A semi-enclosed entrance plaza for pedestrian faces the main road on the west. Since majority of the main spaces are located on the second floor, all four volumes are linked by an elevated compact public platform. This platform can be accessed freely via wide ramps on the west and north. Underneath the platform are supporting facilities such as bistros, café, shops, fitness rooms and parking lots.

由于户外活动需要很多空间,建筑的可用空间略显紧张。带着保持不同的内部使用相对独立这样的目的,从而化简了空间的复杂性,并减少了外部尺寸,整个建筑被分为四个独立的建筑。游泳馆,健身房,文化中心和电影院这四个建筑有着不同的尺寸,高度和规模,在一个锯齿图案中由东北向西南沿着建筑一边的道路安排开来。一个为行人提供的半封闭的入口广场面对这西侧的主干道。由于大部分主要空间位于二楼,所有这四个建筑被一个高架的紧凑的公共平台连接着。人们可以经由西侧和北侧的宽阔坡道自由地进入到平台。平台的下方是一些配套设施,例如小酒馆,咖啡厅,商店,健身室和停车场。

Courtesy of Atelier Z+

The four independent volumes have very strict functional and space requirements of their own, demonstrating themselves in a way strongly restraining the expressiveness. All external characteristics are merely direct representation of internal uses, making each volume tending towards an abstract autonomy, eliminating the respective unnecessary complicated expression, and presenting to the city a subtle yet interesting linkage created by their respective locations and mutual relationships. In the natatorium, the swimming pool and locker rooms are located in two parallel volumes from south to north, and are connected by a series of glass bridges through a narrow courtyard. Above the swimming pool is a movable roof with skylights. This roof can be opened and closed as a whole. Between the pedestal as fitness center at the bottom and the roof on the top, extending eastward over the public platform is the gym.

这四个独立的建筑有着非常严格的功能和它们自己的空间要求,用一种强烈抑制表达的方式展示着自己。所有的外部特征仅仅是内部使用的直接表达,使每一个建筑都趋向一种抽象的自主权,消除了各自不必要的复杂表达,向城市展现了一种由它们各自的位置及相互关系而创造出来的微妙而有趣的连接。在游泳馆,游泳池和更衣室位于从南到北的两个平行区域中,由一系列穿过狭窄庭院的玻璃桥连接着。游泳池上方是一个带天窗的可移动屋顶。这种屋顶可以作为一个整体而被打开或关闭。在底部健身中心的基座与顶部的屋顶之间,向东延伸于公共平台之上的,是健身房。