June 2: The first cuts in the dirt for the north array.

June 2: Almost done with the hole for the first pier.

June 2: Second pier had a huge rock in it...

June 2: But the littel Bobcat got it out! That was most of the hole

第1页,共53页

June 3: After bending all the steel we started tying it together.

June 3: Almost got the first cage done. Lots of little things to do. 第2页,共53页

June 3: Getting it wrapped up. Dave (right) could tie steel fater

June 6: Steel in, conduit in, bolts in. Ready for mud. than anyone I've ever seen.

第3页,共53页

June 6: Mud coming! June 6: First mud in the hole!

第4页,共53页

June 6: About halfway full of mud. June 6: Dave starting to smooth off the concrete.

第5页,共53页

June 6: Sean and Dave working the top of the north pier. June 6: Mud going in the south pier.

第6页,共53页

June 6: Finishing off the top. June 6: A view of both piers looking back to the house.

第7页,共53页

PV Installation Photos 2

Taken June 14 & 16, July 12 & 13, 2005

第8页,共53页

Notes: Trench for the electrical wiring was done on the 14th and I started wiring then. Most wiring was done the 14th and 16th and the inspection was the 17th. Posts were delivered July 12 and much work was accomplished the 12th and 13th.

June 14: Starting the trench for the electrial.

June 14: Working on the trench for the south array.

第9页,共53页

June 14: Working on the long trench up to the house from the north June 16: Laying conduit and wire down the long run.

第10页,共53页

array.

June 16: Another look at the long trench to the north array.June 16: Details of the custom wire-pulling rig.

第11页,共53页

June 22: Just a detail of the finished pad with wire and the trenches filled in. June 28: Electrical box mounting plates and boxes for the poles. Note the big U-bolts for the post.

第12页,共53页

July 12: Delivery of the posts. July 12: South post installed.

第13页,共53页

July 12: Detail of the base of the post. July 13: The first motor arrives by padded wheelbarrow at the

第14页,共53页

south tower.

July 13: Finally a good idea --use the bobcat to lift the 180

July 13: Getting the motor in place over the tower. lb motor!

第15页,共53页

July 13: North-South actuator installed on the south array. July 13: Motors are in, now the horizontal torque tubes go on,

and are tightened in.

第16页,共53页

July 13: Finishing the installation of the actuator. July 13: Detail of the horzontal torque tube on the north array.

These next few photos are mostly for Michael at Array

Technologies. :-)

第17页,共53页