浅谈公路隧道防排水要点

摘要:公路隧道防排水问题是隧道工程中应当注意的重要问题,关于隧道防排水技术在近年来已有很大发展,公路隧道防排水问题已经得到较为有效的解决,通过对相关研究结果和工程实例的总结,本文针对防排水施工原则、注意事项以及防排水材料的选择做出了简要阐述,并提出了改进措施。

关键词:隧道;防排水;二次衬砌;防水层

abstract:highway tunnel waterproof and drainage problem is one of the important problems should be paid attention to in the tunnel engineering,the tunnel waterproof and drainage technology has great development in recent years, and the problem of highway tunnel waterproof and drainage has been relatively effective solution, based on the related research results and engineering example summary, the principle of waterproof and drainage construction, matters needing attention, and the choice of waterproof and drainage materials has made the brief elaboration, and the improvement measures are proposed .

key words:tunnel ;waterproof and drainage;secondary lining;waterproofer

中图分类号:u459.2文献标识码: a 文章编号:

1.前言

最新整理公路隧道施工技术规范防水和排水.doc

10 防水和排水 10.1 一般规定 10.1.1 隧道施工防排水设施应与营运防排水工程相结合。 10.1.2隧道施工防排水工作应按防、截、排、堵相结合的综合治理原则进行。 10.1.3 隧道施工前应根据工程地质、水文地质资料制定防排水方案。施工中应按现场施工方法、机具设备等情况,选择不妨碍施工的防排水措施。 10.1.4隧道进洞前应先做好洞顶、洞口、辅助坑道口的地面排水系统,防止地表水的下渗和冲刷。 10.1.5施工中应对洞内的出水部位、水量大小、涌水情况、变化规律、补给来源及水质成分等做好观测和记录,并不断改善防排水措施。 10.1.6 当防排水设计不符合实际情况,设计中有遗漏或施工中有增减时,施工单位应及时提请变更设计。 10.1.7隧道防排水工程施工质量应符合下列要求: 10.1.7.1 一般公路隧道 (1)拱部、边墙不滴水。 (2)路面不冒水、不积水,设备箱洞处不渗水。 (3)洞内排水系统不淤积、不堵塞,确保排水通畅。 (4)严寒地区隧道衬砌背后不积水,路面、排水沟不冻结。 10.1.7.2 汽车专用公路隧道 隧道拱部、墙部、路面、设备洞、车行横通道、人行横通道等均不渗水。 10.2 施工防排水 10.2.1隧道两端洞口及辅助坑道洞(井)口应按设计要求及时做好排水系统;覆盖较薄和渗透性强的地层,地表积水应及早处理,并符合以下要求: (1)勘探用的坑洼、探坑等应回填粘土,并分层夯实; (2)洞顶上方如有沟谷通过且沟谷底部岩层裂缝较多,地表水渗漏对隧道施工有较大影响时,应及时用浆砌片石铺砌沟底,或用水泥砂浆勾缝、抹面; (3)洞顶附近有井、泉、池沼、水田等,应妥善处理,不宜将水源截断、堵死; (4)清理洞附近杂草和树丛,开沟疏导封闭积水洼地,不得积水; (5)洞顶排水沟应与路基边沟顺接组成排水系统; (6)洞外路堑向隧道内为下坡时,路基边沟应做成反坡,向路堑外排水,并宜在洞口3~5m位置设置横向截水设施,拦截地表水流入洞内; (7)施工废水应通过管路及不透水的沟槽泄到隧道范围以外。 10.2.2洞内顺坡排水,其坡度应与线路坡度一致,并满足下列要求: (1)水沟断面应满足排除隧道中渗漏水和施工废水的需要; (2)水沟位置宜结合结构排水工程设在隧道两侧或中心,并避免妨碍施工; (3)经常清理排水设施,确保水路畅通。 10.2.3 洞内反坡排水,应采取下列措施: (1)必须采取机械抽水; (2)排水方式可根据距离、坡度、水量和设备等情况选用排水水沟或管路,或分段接

高速铁路隧道防排水措施浅析

科技信息2011年第9期 SCIENCE&TECHNOLOGY INFORMATION 0引言 铁路隧道的防排水工程对隧道使用寿命、正常运营和安全起着举足轻重的作用,隧道防排水一般遵循“防、截、排、堵相结合,因地制宜,综合治理”的原则,达到防水可靠,经济合理,不留后患的目的,并对地表水、地下水作妥善处理,洞内外形成一个完整的防排水系统,同时衬砌结构无渗水,表面无湿渍。 1工程概况 渝利铁路周家坪隧道为设计时速200公里每小时的双线铁路隧道,全长3842米,施工区域处于低山地貌,洞口端为陡崖地貌,并且植被较发育,全隧地表覆土均薄,基岩多裸露,洞身段多辟为田地。隧道上覆第四系坡残积层,下伏侏罗系中统沙溪庙组泥岩夹砂岩及砂岩,地表水主要为当地龙河水,大部分由大气降雨补给。由于基岩节理裂隙较发育,地下水较发育,主要由大气降水及地表水补给,具有明显的季节性,雨后地下水明显增多。在隧道开挖过程中,裂隙发育会有滴水或渗水现象。 2隧道防排水 2.1洞外防排水措施 首先,在隧道进洞前对隧道影响范围内的地表水进行了解,分析补给方式、来源情况,做好地表防排水工作;对通过隧道洞顶且底部岩层裂缝较多的沟谷,用浆砌片石铺砌沟底,同时用水泥砂浆抹面;开沟疏导隧道附近封闭的积水洼地,达到无积水的要求;在隧道洞口上方按设计要求做好天沟,并用浆砌片石砌筑,将地表水排到隧道穿过的地表外侧,防止地表水的下渗和对洞口仰坡冲刷,并与路基边沟顺接成排水系统;洞顶开挖的仰坡、边坡坡面用喷射混凝土将其封闭,并对洞口上方及两侧挂网喷浆;在洞顶设置高压水池时,施做了防渗防溢设施,且水池设在远离隧道轴线处。 2.2洞内防排水措施 2.2.1初期支护防排水措施 根据开挖时围岩的实际情况,详细作好记录,并作相应的引、排措施。当渗漏水较集中时,喷锚前先用开缝磨擦锚杆进行导水,当渗水面积较大时,喷锚前设置树枝状软式透水管排水,当渗水严重时设置汇水孔,边排水边喷射。喷锚完成后,使开挖岩石面与喷射混凝土之间形成排水用的汇水孔,使围岩渗漏水通过设置的汇水孔等排水装置流向墙脚纵向软式透水管,再由引水管排到隧道中心排水沟内。初期支护通过引水导管的引导及喷射混凝土的堵截作用形成永久性地下水排水设施。经过这样的处理,使围岩的大部分地下水通过排水设施排出洞外,喷混凝土后混凝土表面渗水现象很少,真正起到了防水作用。2.2.2防水卷材防排水措施 二次衬砌施做前,先对初期支护喷锚混凝土表面的锚杆头和钢筋网断头及凹凸不平的部位进行修凿、喷补,使混凝土表面平顺,符合铺挂柔性防水材料的要求。然后按设计要求在拱部和边墙环向及纵向挂设软式透水管。喷混凝土表面有渗漏水时,根据渗漏水的多少采用透水管引导,或再增加环向软式排水管,并用塑料锚固螺栓绑牢。 土工布、防水板铺设前,应先检查其质量,检查背面排水管安装是否符合设计要求。安装防水板时,应先根据防水板的尺寸,布置好塑料锚固螺栓的位置,用电钻钻孔安装塑料锚固螺栓,用螺钉和垫圈环向整体铺挂防水板,用专用塑料焊接机及时焊接,保证焊接宽度和焊缝宽度,根据喷射混凝土面的平顺程度在每两个加固点都留有一定的富余量,衬砌时才能使防水板与喷射混凝土面密贴。 2.2.3施工缝防排水措施 混凝土施工缝是衬砌防水混凝土间隙灌注施工造成的,对于施工缝的防排水处理,在复合式衬砌中,采用中埋式橡胶止水带及外贴式橡胶止水带,纵向施工缝采用中埋式橡胶止水带及混凝土界面剂进行防水处理。 1)在浇筑二次衬砌混凝土前,将上层混凝土刷毛,或在衬砌混凝土浇筑完后4h-12h内,用高压水将混凝土表面冲洗干净,并检查止水带接头是否完好,止水带在混凝土浇筑过程中是否刺破,止水带是否发生偏移,如发现有割伤、破裂、接头松动及偏移现象,应及时修补和处理,以保证止水带防水功能。 2)检查有止水带是否发生偏移,止水带接头宽度是否符合要求,止水带是否割伤破裂,止水带是否有卡环固定并伸入两端混凝土内等项目,做好详细检查记录,如存在问题时,应立即进行修补。 2.3.4沉降缝防排水措施 隧道沉降缝设置中埋式钢边橡胶止水带、外贴式橡胶止水带及嵌缝材料进行防水。止水带的长度应根据施工需要事先向生产厂家定制,尽量避免接头。如确需接头,应采取搭接、复合连接、对接形式。 沿衬砌轴线每隔0.5-1.0m钻一φ12的钢筋孔。将制成的钢筋卡穿过挡头模板,内侧卡紧止水带一半,另一半止水带平靠在挡头板上,待混凝土凝固后拆除挡头板,将止水带拉直,然后弯钢筋卡紧止水带。2.3.5衬砌混凝土防排水措施 混凝土自防水对隧道防排水是很重要的,是隧道防排水的最后一道防线。必须进行混凝土自防水性能的检测,混凝土的抗渗要求不低于P8。混凝土施工前,必须在试验室进行配合比设计、调整,经充分讨论、检测了混凝土的抗渗要求能达到验收标准的规定,方可进行混凝土施工。现场施工必须按照混凝土作业指导书进行,提高混凝土的抗渗性,对隧道防水起到本身的作用。在浇筑砼过程中,应保护好防水板,必要时在混凝土输送泵出口处设置防护板,防止混凝土直接冲击防水板。 3结语 随着高速铁路的快速发展,铁路防水等级逐步提高,防排水工程的规格愈加严格,从而对隧道施工过程中的每一道工序需要严加控制。 通过对渝利铁路隧道防排水施工实例分析,得高速铁路防排水应从以下几个方面着手:(1)洞外防排水消除地表水影响。(2)洞内防排水:通过初期支护防排水、防水卷材防排水、施工缝和沉降缝防排水及防水衬砌混凝土防排水等,达到防排水工程规范要求,消除施工中的任何一点缺失可能造成渗漏水隐患,保证隧道的使用寿命及列车运行安全。 【参考文献】 [1]建筑施工手册[M].北京:中国建筑工业出版社,1999. [2]交通部第一公路工程总公司.桥涵:下册[M].北京:人民交通出版社,2000. 作者简介:李应平(1980—),男,甘肃天水人,本科,助理工程师,现从事工程技术管理工作。 [责任编辑:张慧] 高速铁路隧道防排水措施浅析 李应平 (中铁隧道集团杭州分公司浙江杭州310030) 【摘要】防排水工程对隧道结构和设备的正常运行以及行车安全起到至关重要的作用,结合渝利铁路隧道防排水施工实例,提出高速铁路隧道防排水方法应实行洞内外防排水结合手段,达到防排水工程规范要求,消除施工中的任何一点缺失可能造成渗漏水隐患,保证隧道的使用寿命及列车运行安全。 【关键词】隧道水害;防排水工程;隧道;施工方法;沉降缝;耐久性 科 ● ○建筑与工程○ 619

市政道路排水施工方案

通州区川姜镇华欣路联邦路志浩村路工程 技 术 标 编制单位: 编制人: 审核人: 日期: 2014年11月18日

一、施工组织总体设计,方案针对性及施工段划分 第一节施工组织总体设计 通州区川姜镇华欣路联邦路志浩村路工程位于通州区川姜镇,道路包括华欣路、联邦路和志浩村路这三条道路,施工内容包括道路及排水. 1。1管道部分 雨水:雨水考虑道路范围及用地红线两侧共200米范围,主管管径为D600—800mm,预留支管管径为D600mm.管材采用承插式钢筋混凝土排水管(II级管),雨水管位于道路南侧人行道下,距离道路中心线8.5m.钢筋混凝土基础,在人行道下采用120°混凝土基础,在车行道下采用180°混凝土基础。PVC—U加筋管基础采用砂石基础。 污水:污水主管根据业主要求,主管管径为D600mm,预留支管管径为D400mm。管材采用承插式钢筋混凝土排水管(II级管),污水管位于道路北侧人行道下,距离道路中心线8.5m。钢筋混凝土基础,在人行道下采用120°混凝土基础,在车行道下采用180°混凝土基础.PVC-U加筋管基础采用砂石基础. 1.2道路部分 通州区川姜镇华欣路联邦路志浩村路工程道路宽度为18 米,道路采用单幅路横断面形式,道路横断面布置为: 2m人行道+ 14m行车道+2m 人行道=18m 1。2.1机动车道路面结构层 华欣路拓宽及新建部分行车道路面结构层为:5cm 中粒式沥青砼(AC—16)+沥青下封层+20cm水泥稳定碎石+36 cm 12%石灰土(分两层施工)=61cm;远期可根据道路使用情况加铺4cm细粒式沥青砼(AC—13)。人行道部分路面结构层为:6cm 水泥砖+3cm 1:2水泥砂浆+6cm C15 砼+15cm 12%石灰土=30cm. 联邦路行车道路面结构层为:5cm 中粒式沥青砼(AC-16)+沥

隧道防排水方案

XXX隧道防排水施工专项方案 1.工程概况 1.1 编制依据 ⑴新建XXX隧道实施性施工组织设计; ⑵XXX隧道设计施工图、双线隧道防排水及辅助工程措施参考图; ⑶《铁路隧道设计规范》(TB10003-2005) ⑷《高速铁路隧道设计规范(试行)》(TB10621-2009); ⑸《铁路隧道防排水施工技术指南》(TZ331-2009); ⑹《铁路隧道防排水技术规范》(TB10005-2009); ⑺《混凝土结构耐久设计规范》(GB/T50476-2008) ⑻《高速铁路隧道工程施工技术指南》(铁建设{2010}241号); ⑼《铁路隧道工程施工安全技术规程》(TB10304-2009); ⑽《铁路隧道防水材料技术条件(科技基【2008】21号)》; ⑾《铁路隧道防水板铺设工艺技术规定》(建技【2010】13号) ⑿其它铁路工程技术规范及国家行业标准、规则、规程。 1.2工程概况 XXX隧道工程,进口里程0,出口里程5,线路长度0m,隧道埋深3.12~85m,排水采用保温侧沟和深埋中心沟。隧道均位于直线上,隧道内纵坡为6.0‰的单面下坡。进出口结构相同,均为18m喇叭口式洞门,以及19m路堑对称式明洞。 1.3地质概况 隧道范围穿越地层较单一,进出口为第四系全新统残坡积(Q4el+dl)粗角砾土,粉质粘土,粉土;洞身范围为太古界(Ar)片岩。另外山涧沟谷底部多有第四系全新统坡洪积层(Q4dl+pl)堆积。根据物探显示DK561+460~DK561+900段洞深波速4.6km/s,DK561+950~DK562+370段洞深波速4.8km/s。 隧道区地下水类型主要为基岩裂隙水,分布较广,以浅部为主,含干基岩风化带、风化裂隙及构造节理裂隙中,水位和水量受季节降雨量影响明显。其中DK561+330~DK562+545段地下水具氯盐侵蚀性。据渗透入渗法隧道分段正

公路隧道防排水措施_secret

公路隧道防排水措施 一、隧道防排水的重要性 隧道防排水质量和效果的好坏,直接影响隧道整体工程质量和运营使用。鉴于已建成隧道存在不同程度的渗漏通病,所以目前对公路隧道特别是高速公路隧道的防排水尤为重视,质量要求也特别高。 高速公路隧道渗漏水的危害性较大,在冻融地区的隧道渗漏水危害更大。如果隧道出现渗漏或路面溢水,会造成路面湿滑,不利于行车安全;在严寒地区由于反复冻融,会造成衬砌开裂、变形乃至破坏;冬季在隧道内渗漏水会形成冰柱及冰湖,常会诱发交通事故。同时长期的渗漏水,还会对隧道内的机电设备、消防系统和通讯线路构成威胁。因此,规范要求隧道内不得有渗漏水。新的《公路工程质量检验评定标准》已将隧道防排水要求提升到显要位置,以突出其重要性。为的是要切实保证防排水质量,防止病害的产生。所以对隧道防排水这一系统工程及其施工技术的探讨,就显得非常必要且具有重要的现实意义。 二、隧道防排水的要求和措施 隧道防排水应遵循“以排为主,防排结合,因地制宜,综合治理”的原则。其基本要求是保证运营期隧道防水可靠,排水畅通,不渗不漏。具体来讲,要求隧道拱部、墙部、设备箱洞处及车(人)行通道均无渗漏水;路面干燥无水;洞内排水系统不淤积,不堵塞,确保排水畅通;隧道衬砌背后不积水,排水沟不冻结。 隧道防排水的主要措施包括:喷射混凝土防水、衬砌混凝土防水、钻孔排水、注浆堵水和综合防排水。 1、喷射混凝土防水:喷射混凝土的主要功能是快速封闭岩层,约束围岩变形,并与围岩共同作用,防止围岩失稳。同时也具有一定的防水功能和抗渗能力,使其在内水

压力作用下不致产生危及围岩稳定的大量渗水。在高水流、水压情况下,喷射混凝土封闭水是无效的,应事先对岩石排水或注浆,以降低水流和水压。 2、衬砌混凝土防水:衬砌防水混凝土(C25)具有较强的防水能力。其防渗等级一般应达到58,在施工过程中只要振捣密实,比较容易达到这一结构本身的要求。采用防水混凝土,并在其中添加抗裂防水混凝土膨胀剂,以提高混凝土防裂渗的能力。 3、钻孔排水:钻孔排水是较为有效的排水方法,特别适用于有严重渗漏的隧道区域。而各种类型的排水管就被广泛地用作岩石的排水中。施工中有大面积渗漏时,可采用钻孔疏导排水,将水集中汇入排水沟。在地下水发育的岩层中,为防止高压涌水的袭击,可在开挖面上布置超前钻孔,还可用钻孔机钻穿入透水层进行预探和排水。在大量涌水或钻孔不能满足排水需要时,可开挖迂回侧洞和泄水洞截流排水。 4、注浆堵水:在衬砌内,特别是渗漏水地段,压注水泥砂浆或水泥一水玻璃浆液可起到良好的防水作用。拱部以堵为主,墙部的水可引至排水沟。在软弱围岩区域施工时,可采用管棚超前注浆,以固结岩层,达到防水、堵水的效果。在涌水量很大或渗水严重致使地表水位下降,危及地面结构物安全和自然环境受到破坏的情况下,可采用深孔注浆(≥4m)。但由于注浆堵水后水压升高,势必要加大支护参数从而提高了成本。 5、综合防排水:是以排水为主、防排结合、综合治理,采用防、截、堵、排相结合,以形成完整的防排水体系。也是多年实践经验总结出来较为有效的一种防排水措施。排水管是把隧道渗水强引到隧道外的通道,管路畅通,隧道周边就不会有太大的水压,渗水的可能性就越小;防水板和止水带可防、截、堵水,把分散的水引到纵间排水管,防止水渗透到衬砌混凝土中。 三、平安至阿岱高速公路xx隧道的防排水措施 xx隧道除了具有和兼用了以上1~4种防排水措施外,主要采用了综合防排水施工技术。它由排水系统(主要是排水管)和防水系统(主要是防水板)组成。 1、施工方法:排水系统是在隧道开挖初期支护时进行,先按一定间距挂设φ100㎜排水半圆管和弹簧软式透水管(渗水地段加密设置),将水引到隧道两侧墙脚通长埋

隧道防排水施工技术方案样本

连霍高速公路洛阳至三门峡(豫陕界)段改扩建工程T J-10合同段 ( RK80+100~RK86+900) 隧道防排水工程施工技术方案 [标段里程: RK85+842~RK86+722; DK85+845~DK86+715] 中铁十五局集团第一工程有限公司 连霍洛三灵段改扩建工程TJ-10合同段 二○一二年二月十一日

目录 1.编制依据.............................. 错误!未定义书签。 2.工程概况.............................. 错误!未定义书签。 3.质量目标.............................. 错误!未定义书签。 4.安全目标.............................. 错误!未定义书签。 5.组织管理.............................. 错误!未定义书签。 6.施工准备.............................. 错误!未定义书签。 7. 隧道防排水工程施工方案............... 错误!未定义书签。 7.1 测量放样............................ 错误!未定义书签。 7.2纵横向排水管施工工艺 ................ 错误!未定义书签。 7.3环向排水管或排水板施工工艺........... 错误!未定义书签。 7.4防水层铺设.......................... 错误!未定义书签。 7.5施工缝处止水带施工 .................. 错误!未定义书签。 7.6 隧道边水沟及中央排水沟施工.......... 错误!未定义书签。 7.7洞身防排水施工保证措施 .............. 错误!未定义书签。 8. 工程质量保证措施..................... 错误!未定义书签。 9. 安全生产............................. 错误!未定义书签。 10. 文明施工............................ 错误!未定义书签。 11. 环境保护............................ 错误!未定义书签。

市政道路、排水工程施工组织设计方案

市政道路、排水工程施工组织设计方案 编制依据、范围及原则 1.1.1编制依据 一、某国家高新区工业园I 期市政工程施工图。 二、建设部颁发的现行设计规范、施工规范、验收标准及有关文件。 三、从现场调查、采集、咨询所获取的资料。 四、集团公司积累的成熟技术、科技成果、施工方法以及多年来从事同类工程的工法和施工经验。 五、集团公司可供调用到该工程的各类资源。 1.2.1编制范围 编制范围为某国家高新区工业园I 期市政道路工程**大道,主要包括**大道的涵洞、路基、路面基层、面层、附属构筑物(侧石、人行道、收水井)以及原有道路结构层的拆除等工程。 1.3.1编制原则 一、安全第一的原则 在施工组织设计的编制中始终按照技术可靠、措施得力、确保安全的原则确定施工方案。本工程是永两公路与桂柳高速连接的主干道,亦是工业园市政的主干道,目前受道路行车干扰大,必须把安全措施落实到位、确保

万无一失的前提下组织施工。 二、优质高效的原则 加强领导,强化管理,优质高效。根据我们在施工组织设计中明确承诺的质量目标,贯彻执行ISO9001 质量体系标准,积极推广和使用“四新”技术,确保创优规划和质量目标的实现。施工中强化标准管理,加强内部核算管理,降低工程成本,提高经济效益。 三、方案优化的原则 科学组织,合理安排,优化施工方案是工程施工管理的行动指南,在施工方案的编制中,对路基土方填筑、路床及基层碾压、沥青砼面层施工等关键工序进行多种施工方案的综合比选。 四、确保工期的原则 根据建设单位对本工程的工期要求,编制科学的、合理的、周密的施工方案,合理安排进度,实行网络控制,搞好工序衔接,实施进度监控,特别要抓住重点控制工程,确保实现工期目标,满足业主要求。 五、科学配置的原则 根据本工程的工程量大小及各项管理目标的要求,在施工组织上,施工要素实行科学配置,选派有施工经验的管理人员,组织专业化施工队伍,投入高效先进的施工设备,确保建设资金的周转使用,选用优质材料,确保人、财、物设备的科学合理配置。 六、合理布局的原则 从合理利用临时占地、便于施工、搞好环保、实施文明施工等多角度出发,合理安排二灰碎石、水泥稳定层拌和站及沥青拌和站布局。

公路隧道防排水设计简述

公路隧道防排水设计简述 摘要:公路隧道应进行专门的防排水设计,洞内、洞口及洞外应形成完整的防排水系统。防排水方案亦应方便施工和便于维护维修,保证防排水系统长期有效。本文从阐述隧道防排水的基本原则出发,分析了隧道产生水害的原因及影响,系统地介绍了隧道洞身衬砌防排水、洞口排水及其施工注意事项,对公路隧道防排水设计及施工具有重要的指导意义。 关键词:公路隧道防排水渗漏施工工艺防水材料三缝 Abstract: highway tunnel should specialized waterproof and drainage design, hole, the mouth of the cave and within the hole should be formed complete waterproof and drainage system. Waterproof and drainage scheme should also be convenient for construction and easy to maintenance, ensure the long-term effective drainage system. This paper has discussed the basic principle of waterproof and drainage, we analyzed the reasons and water hazards tunnel produce effect, the system was introduced in the tunnel lining waterproof and drainage hole body, the hole drainage and matters needing attention of construction of highway tunnel waterproof and drainage design and construction has important guiding significance. Keywords: highway tunnel waterproof and drainage leakage construction technology waterproof material three seam 0 前言 近十多年来,随着我国公路交通事业的飞速发展,公路隧道的建设规模越来越大,其对降低交通事故发生率、缩短行车距离、提高车速、保护环境诸方面发挥了积极作用,取得了良好的社会经济效益。鉴于已建成隧道存在不同程度的渗漏通病,部分病害对隧道主体结构破坏严重,影响安全运营,所以目前对公路隧道特别是高速公路隧道的防排水尤为重视,质量要求也特别高。 1 公路隧道防排水原则隧道防排水应遵循“防、排、截、堵相结合,因地制宜,综合治理”的原则,保证隧道结构物和营运设备的正常使用和行车安全。隧道防排水设计应对地表水、地下水妥善处理,并确立混凝土结构自防水体系,洞内外应形成一个完整通畅的防排水系统,使隧道建成后达到洞内基本干燥的要求。 2 公路隧道水害原因及影响 目前,国内绝大部分山岭隧道运用新奥法原理进行设计和施工。大量的工程实践表明,地下水是很多隧道病害的诱因所在,主要原因如下:

市政道路排水施工方案样本

第一章工程概况 第一节编制依据、设计规范与施工标准 1、【鼎湖区帝豪花园北侧12米道路工程】, 道路、排水工程施工设计文件和施工设计图以及有关设计文件。 2、现场实际踏勘所了解的情况。 3、交通、市政、建筑安装有关道路、排水、管渠、人行道等的施工规范, 施工工艺及操作规程和质量验收评定标准。 4、本设计中采用规范依据: ( 1) 《城市道路设计规范》CJJ37-90 ( 2) 《城镇道路工程施工与质量验收规范》 ( 3) 《城市道路设计手册》( 上、下册) ( 4) 《公路水泥砼路面设计规范》G85768-86 ( 5) 《城市道路设计规范》CJJ37-90 ( 6) 设计委托任务书、工程设计合同书。 ( 7) 由鼎湖区建设项目办提供的规划道路红线、现状道路断面测量资料。 5、施工标准 ( 1) 肇庆市鼎湖区城镇建设规划设计室提供的图纸及有关资料( 2) 设计图纸中指定使用的标准图 ( 3) 《城市道路设计规范》( CJJ37-90) ( 4) 《混凝土结构工程施工及验收规范》( GB50204-92)

( 5) 《市政道路工程质量检验评定标准》( CJJ1-90) ( 6) 《给排水管道工程施工及验收规范》( GB50268- ) ( 7) 《预制混凝土构件质量检验评定标准》( GBJ302-90) 6、工程位置 【鼎湖区帝豪花园北侧12米道路工程】位于【鼎湖区帝豪花园北侧】, 该道路属小区道路。我司承担的【鼎湖区帝豪花园北侧12米道路工程】道路红线为12m, 砼路面宽度为7m。工程包括道路、排水工程。 第二节设计概况 1、设计标准 ( 1) 、道路等级: 城市支路。 ( 2) 、设计车速: 20km/h。 ( 3) 、设计标准轴线: BZZ—100KN级。 ( 4) 、设计使用年限( 临界状态) : 20年。 ( 5) 、路面类型: 刚性路面( 水泥混凝土路面) 。 ( 6) 、交通等级: 少量交通。 2、路线平面设计: 道路线形是按照规划部门提供的坐标进行设计的, 坐标系为肇庆市独立坐标系。 3、纵断面设计 由于该道路两头相交的道路已建, 故新建道路接顺两端车道的

隧道防排水施工技术交底

隧道防排水施工技 术交底

隧道防排水施工技术交底书 一、防水板施工 (一)示意图 效果图 土工布铺设示意图防水板铺设示意图 防水板焊接示意图

断面示意图 土工布防水板平面展示图

明暗洞变形缝防水板搭接 (二)、施工技术要求 1、防水板、土工复合材料的材质、性能和规格必须符合设计要求。 检验数量:施工单位按进场批次每10000m2检验一次,不足10000m2也按一次计。 检验方法:施工单位检查产品合格证、质量证明文件,并对防水板的厚度、密度、抗拉强度、断裂延伸率和土工复合材料单位面积的重量等性能指标进行试验。 2、防水板搭接长度不得小于15cm,防水板必须按设计要求进行双焊缝焊接,焊接应牢固,不得有渗漏,每一单焊缝的宽度不应小于15mm。 检验数量:施工单位、监理单位每一浇筑段环向检查1条焊缝、纵向检查2条焊缝。 检验方法:焊缝宽度施工单位采用尺量,焊缝质量施工单位采用双焊缝间充气检查。 3、防水板铺设范围及铺挂方式应符合设计要求。铺设时防水板应留有一定的余量,挂吊点设置的数量应合理。环向铺设时先拱后墙,下部防水板应压住上部防水板。 检验数量:施工单位全部检查。 检验方法:观察。 4、铺设防水板的基层应平整、无尖锐物体。基层平整度应符合D/L≤1/6的规定。 检验数量:施工单位沿隧道长度每10m检查10处。检验方法:施工单位尺量,监理单位见证检查。 注:D——初期支护基层相邻两凸面凹进去的深度。 L——初期支护基层相邻两凸面之间的距离。 5、防水板焊缝无漏焊、假焊、焊焦、焊穿等现象: 检验数量:施工单位全部检查。 检验方法:观察。 6、铺设防水板的基面应坚实、平整、圆顺,无漏水现象;阴阳角处应做成圆弧形。 检验数量:施工单位全部检查。 检验方法:观察。 7、防水板的铺设应与基层固定牢固,不得有绷紧和破损现象。 检验数量:施工单位全部检查。

隧道防排水施工技术交底

技术交底书 共 28 页 工程名称西成客专XCZQ-5标段编号 交底项目隧道防排水施工技术交底交底日期 1 工程概况 新建西成铁路西安至江油段(陕西境内)站前工程XCZQ-5标段,正线全长31.81Km,桩号为DgK152+500~DgK184+312.32。其中隧道工程30.47km:得利隧道我标段施工范围DK152+500~DK158+830.5共计6330.5m;福仁山隧道DK159+625.95~DK172+725.5全长13101.55m、1#斜井位于DK163+000处长度为1783.04m、出口横洞位于DK172+050处长度为373.2m、出口平导位于DK172+063-DK166+348处长度为5715m;罗曲隧道 DK172+977~DK182+261全长9284m、1#斜井位于DK175+650处长度为1217.33m、2#斜井位于DK179+300处长度为612.88m;范家咀隧道DK182+556~DK184+312.32全长1756.32m。 2 交底范围 得利隧道、福仁山隧道、罗曲隧道、范家咀隧道二次衬砌防排水作业,包括防水板、纵环向排水盲管及止水带和止水条的安装作业等。 3 目的 明确隧道防排水作业工艺流程、操作要点和相应的工艺标准,指导、规范隧道防排水作业施工,减少和杜绝隧道结构渗漏水的发生,满足隧道防排水设计和规范要求。 4 作业准备 1、内业技术准备 作业指导书编制后,应在开工前组织技术人员认真学习,阅读审核施工图纸,澄清有关技术问题,熟悉技术规范和技术标准,制定施工安全保证措施,提出应急预案,对施工人员进行技术交底,对参加施工人员进行岗前技术培训,考核合格后持证上岗。 2、外业技术准备

隧道防排水施工技术交底

隧道防排水施工技术交底 1.技术要求 1.1 隧道防排水采用“防、截、排、堵相结合,因地制宜,综合治理”的原则,达到防水可靠,经济合理,不留后患的目的。 1.2 隧道防水等级必须达到国家标准《地下工程防水技术规范》(GB50108)规定的一级防水等级标准,衬砌结构不允许渗水,表面无湿渍。 1.3 隧道结构防水一般由喷射混凝土、全封闭柔性卷材防水层和二次衬砌结构自防水等组成。其抗渗等级符合设计要求,防水混凝土防渗等级不低于P8,两端洞口各500m范围、地下水发育地段、地下水有侵蚀性地段衬砌抗身等级不低于P10。 2.施工工艺及要求 2.1基面 铺设防水层之前,对外漏的突出物及表面凸凹不平处进行检查处理,基面应平整、无空鼓、裂缝、松酥,清洁干燥,无尖锐物。基层平整度应该符合下列要求: D/L≤1/10 D:初期支护基层相邻两凸面间凹进去的深度; L:初期支护基层相邻两凸面间的距离; 2.2盲管 初期支护与防水板间设置纵向、环向盲管,环向盲管采用Ф50HDPE单壁打孔波纹管(外裹无纺布),纵向盲管暗洞采用Ф80(明洞Ф100)HDPE单壁打孔波纹管(外裹无纺布)。纵、环向盲管直接

弯入侧沟,出水口高于侧沟沟底25cm。 按铁路总公司监督总站及青藏铁路公司监督站《铁路建设工程质量安全监督通知书》(铁质安监督青藏站【2016】16 号)要求,对纵、环向盲管环设计进行调整:采用每板二衬独立排水,纵向盲管于环向施工缝附近弯入侧沟(弯出点距环向施工缝30cm),环向盲管设置于每板衬砌中部位置,紧贴纵向盲管于纵向盲管上部弯入侧沟。 2.3无纺布 无纺布铺设,首先用作业台车将单幅无纺布固定到预定位置,然后用专用射钉将无纺布固定在喷射混凝土上。专用热熔垫圈及射钉梅花形布置,拱部0.5m—0.8m,边墙0.8m—1m,底部1m—1.5m,并左右上下成行固定,基面凸凹较大处应增加固定点,使无纺布与基面密贴。无纺布与喷射混凝土表面密贴,铺设平顺、无隆起、无褶皱,无纺布搭接宽度不不小于5cm。 2.4防水板

隧道防排水施工工艺(论文)

铁路隧道复合式衬砌防排水施工工艺 摘要目前铁路隧道设计采取“防、排、截、堵相结合,因地制宜,综合治理”的原则,以达到隧道防水质量可靠的目的;隧道结构防排水设施措施由环向排水管、纵向排水管、在复合式衬砌之间设置土工布加防水板和隧道两侧的排水沟组成完善的排水系统;本文结合山西中南部铁路通道工程实例,浅析了隧道复合式衬砌防排水机理,并就隧道防排水材料,特别是EV A防水板和施工缝与变形缝施工工艺重点进行了概述,以供读者参考。 关键词铁路隧道防排水施工工艺 1、衬砌背后排水系统 1.1盲管及泄水管的设置和材料要求 (1)拱墙初期支护与二衬之间环向设¢50mm透水软管,间距宜为5~10m,当水量较大时,可在水量较大处增设1~2道,集中出水部位应设独立盲管引排,其管径应根据围岩渗水量的大小确定;边墙墙角处纵向设¢80mm透水软管纵向附膜盲沟,纵向盲管应设在衬砌边墙脚处防水层外,纵向坡度不得小于2‰,一般与线路纵向设计坡度一致;环向盲管在边墙底部通过纵向软管式盲沟与隧道洞内侧沟相连;盲管应具有一定的弹性,透水性好,能承受0.5Mpa的压力,并不易锈蚀。 (2)在边墙底部纵向盲沟处设横向泄水管,泄水管的管径为¢80mm,沿线路纵向间距为8m;电力电缆槽及通信、信号电缆槽底部

设置¢40mm的泄水管,间距为3~5m。横向泄水管采用PVC管。 1.2盲管的安装 1、基面处理 对于洞内涌水或地下水位较高的地段,可采用超前钻孔排水、辅助坑道排水、超前小导管预注浆堵水、超前围岩预注浆堵水、井点降水及深井降水等辅助施工方法。当涌水较集中时,喷锚前可用打孔或开缝的摩擦锚杆进行排水;当涌水面积较大时,喷锚前可在围堰表面设置树枝状软式透水管,对涌水进行引排,然后再喷射混凝土;当涌水严重时,可在围岩表面设置汇水孔,边排水边喷射。在喷射混凝土完成后,用引水管连接汇水孔等排水装置将涌水引入排水沟内。 在隧道施工过程中,存在隧道涌水情况,导致隧道轴线范围内的地下水位下降,情况严重时可能影响附近居民的生活用水。对于此种情况,处理涌水就不能一味地通过引排水来解决隧道渗漏水问题,一般可采用超前小导管预注浆堵水、超前围岩预注浆堵水等辅助施工方法。注浆前进行反复注浆试验,根据注浆效果,确定注浆能力及工作参数等,减少工作的盲目性。 2、排水盲管施工工艺 环向、纵向排水盲管施工工艺主要为:钻孔定位、安装锚栓、铺设盲管、捆绑盲管、盲管纵向环向连接。 施工步骤与方法施作: (1)按规定画线,画线时注意盲管尽可能走基面的低凹处和有出水点的地方,以使盲管位置准确合理。

市政道路、排水工程施工方案

规划四、五支路道路及排水工程施工招标 投标文件 (技术部分) 招标备案编号:122224120090904 项目名称:规划四、五支路道路及排水工程 投标人:(盖公章) 法定代表人或 其委托代理人:(签字或盖章) 日期: 2009年10月10日

目录 第一部分:施工组织设计 (01) 第一章:综合说明 (02) 第二章:施工现场平面布置 (05) 第三章:劳动力计划表 (09) 第四章:机械设备投入情况 (10) 第五章:施工进度计划 (12) 第六章:施工进度、施工工期保证措施 (13) 第七章:施工方案或方法 (15) 第八章:施工质量保证措施 (40) 第九章:地下管线、地上设施、周围建筑物保护措施 (49) 第十章:各工序的协调措施 (50) 第十一章:季节性施工措施 (52) 第十二章:施工安全保证措施 (54) 第十三章:现场文明施工的费用投入和措施 (59) 第十四章:施工现场环保费用投入和措施 (61) 第十五章:施工现场维护措施 (63) 第十六章:与各协作单位配合服务承诺 (66) 第十七章:工程交验后服务措施 (67) 第二部分:辅助资料 (68) 1.1项目经理简历 (69) 1.2主要施工管理人员情况一览表 (70) 1.3主要施工机械设备一览表 (71) 1.4 项目拟分包情况表 (73) 1.5 劳动力计划表 (74)

第一部分:施工组织设计

第一章:综合说明 1.1修建意义: 该工程为武清区汊沽港镇中华自行车王国产业园区新建规划四、五支路道路及排水工程。本工程位于武清区汊沽港镇境内。新规划四、五支路道路及排水工程。规化四、五支路道路宽度为12米,长度分别为347.829米、373.73米;规划四、五支路排水管道全长为721.559米,其中DN1650约为243米、DN1500约为153米、DN1350约为190米、DN1200约为157米、DN400约为96米、DN300约为591米。为该配套工程的修建将大大提高产业园区的配套环境,同时对城市基础设施建设起着十分重要的推动作用。 1.2 施工工期: 根据招标文件的要求,该工程2009年10月17日计划开工,2010年5月1日计划竣工,总工期198天(日历天)(包含冬季停工时间)。工程质量达到国家验收规范合格标准。 1.3 施工现场情况: 经我方现场勘察,规划四、五支路工程红线范围沿线地势平坦,大部分为旱田、果园。。 1.4工程概况: 1.4.1 四、五支路道路横断面: 该道路规划为城市支路,设计行车速度为20Km/h。

隧道防排水监理实施细则

目录 一、监理依据 (1) 二、工程概况 (1) (一)地形、形貌、地质、水文、气候情况 (1) (二)建设目标 (2) 三、技术标准 (3) 四、监理工作范围 (3) 五、监理工作流程 (4) (一)隧道工程监理工作流程 (4) (二)初期支护表面处理 (5) (三)环、纵向盲管安装 (6) (四)防水板安装 (6) (五)止水条(带)安装 (6) 六、监理工作控制要点和目标及手段 (6) (一)监理工作目标 (6) (二)监理控制要点及手段 (7) 七、监理工作方法与措施 (13) (一)监理工作方法 (13) (二)主要控制措施 (14) 八、具体旁站部位和工序 (16)

隧道防排水监理实施细则 一、监理依据 1、《高速铁路隧道工程施工质量验收标准》(TB10753-2010); 2、《铁路建设工程监理规范》(TB10402-2007); 3关于印发《铁路隧道防水板铺设工艺技术规定》的通知(建技【2010】13号) 4、《铁路隧道防排水施工技术指南》(ZT331-2009) 5、与本工程相关的标准、设计文件和技术资料及业主管理文件; 6、四川铁科赤峰至喀左客运专线CFJL-1标监理站经批准的监理规划。 二、工程概况 (一)地形、形貌、地质、水文、气候情况 1、地形、地貌 本监理标段线路自京沈客专喀左站北京端外包京沈正线引出,途径喀左、建平两县。线路所经地形地貌主要以低中山区为主,地势较高,地形变化大,沟谷发育,多为“U”型谷,局部为山间洼地及小型山间平原,植被覆盖较好,山间洼地及沟谷为耕地,地势较高处多为林地。 2、地质条件 沿线地层为华北地层,基岩主要以陆相碎屑岩类为主,岩浆岩类种类较少的特点,其中元古界、泥盆系、石炭系、二叠系、三叠系缺失,沿线第四系地层分布广泛,成因多样,岩性众多。 线路位于I级构造单元华北地台(中朝准地台)的北部和内蒙兴安华力西地槽褶皱带南端。华北地台以赤峰-开源大断裂为界与北部的内蒙兴安华力西地槽褶皱带相邻。拟建铁路从南至北依次穿行于以下构造单元:华北地台二级构造单元燕山台褶带东端的辽西台陷、华北地台二级构造单元内蒙古地轴的东端建平台拱、内蒙兴安华力西地槽褶皱带二级构造单元内蒙华力西晚期褶皱带的敖汉复向斜。。 3、水文地质特征 沿线水系属辽河流域,本标段所处位置无较大河流,地下水分布主要有第四系孔隙水、基岩裂隙水。经取样化验,地下水对铁路混凝土结构一般不具侵蚀性。地下水位埋深一般不大于30-40m。

市政道路排水工程施工方案

第七章:施工方案及方法 排水工程施工 7.1施工部署 7、1、1 总体部署: 施工准备工作 排水管道基槽开挖 排水管道铺设 检查井工程 管道沟槽回填 7、1、2 分项工程工艺流程安排: 排水工程工艺流程:施工前准备工作→施工测量放线→基槽开挖→管道基槽处理→管道安装→砌筑(浇筑)各类检查井→闭水试验→管道沟槽回填。 7.2施工现场的准备工作 7、2、1 现场准备: 我单位技术人员与机械设备随时待命,保证按规定时间进场。接到中标通知书后,与业主进行合同签订的同时,开始施工准备工作,首先做好以下几项工作:复查与了解现场、确定工程的范围、清除现场障碍、办妥有关手续、做好现场规划。 同时我单位将按照施工总平面布置图搭建现场办公及生活房屋、仓库等;安装供水管线、架设供电与通讯线路、设置料场、混

合料拌合场、修建临时道路与临时排水设施等。 7、2、2 人员、机械设备与材料进场计划: 7、2、2、1 人员: 我方将从公司内挑选精干人员担任本项目经理人选及项目班子人员,并让她们提前作好充分思想准备,收到中标通知书后,人员立即到位。 本工程施工需要大量的劳动力,而且时间相对集中,因此,开工前落实劳动力来源,按计划适时组织进退场,就是顺利开展施工、按期完成任务、避免停工或窝工浪费的重要条件之一。 本工程组织施工人员做好以下工作: a、注重素质。施工人员素质直接影响工程质量,施工队伍素质审查要严把“四关”,及政治素质、道德纪律、身体条件与技术水平四个方面。 b、注重教育。要把工程建设的意义、任务情况、质量要求、效益情况交待给大家,使大家心中有数。从而安下心来,积极热情地投入施工。 c、签订好施工合同。合同内容应包含人员数量、工程数量、取费标准、质量标准、施工进度、安全施工等方面。 7、2、2、2机械设备: 本工程施工需要大量的机械设备与运输车辆,其中大、中型机械设备与运输车辆为施工的主力。我方将根据现有设备的数量、质量情况与周密的计划,分期分批地组织进场。需要维修、租赁与购置的,按计划落实,并要适当留有备份,以保证施工的需要。

公路隧道防排水施工要点

公路隧道防排水施工要点 摘要:隧道长期受地下水的影响,如果防排水措施设计不合理、施工不完善,可能引起隧道渗漏,不但会影响隧道工程的使用,而且可能会使砼主体结构产生腐蚀、钢筋锈蚀、地基下沉、危及工程安全,在运营期间将造成洞内通信、供电、照明等设备处于潮湿环境中而发生锈蚀,甚至使路面积水结冰,造成打滑危及行车安全。因此隧道防排水就显得尤为重要。本文首先分析了公路隧道防排水的重要意义,然后说明了防排水施工应遵循的原则,最后从六大方面详细探讨了公路隧道防排水的施工技术要点。 关键词:公路隧道;防排水;防水板;止水带;混凝土 一、公路隧道防排水的意义 公路隧道防排水质量和效果的好坏,直接影响隧道整体工程质量和运营使用。鉴于已建成隧道存在不同程度的渗漏通病,所以目前对公路隧道特别是高速公路隧道的防排水尤为重视,质量要求也特别高。 如果公路隧道出现渗漏或路面溢水,会造成路面湿滑,不利于行车安全;在严寒地区由于反复冻融,会造成衬砌开裂、变形乃至破坏同时长期的渗漏水,还会对隧道内的机电设备、消防系统和通讯线路造成威胁。因此,规范要求隧道内不得有渗漏水。 二、公路隧道防排水施工应遵循的原则 隧道结构防排水遵循“以排为主,防、排、截、堵相结合,因地制宜,综合治理”的原则施工,特别要做好结构自身防水,对可能的渗水的位置进行引排和封堵,以达到建成后“洞内无渗漏水,安装孔眼不漏水,洞内路面不冒水、不积水”的标准。 三、公路隧道防排水施工技术要点 (一)基面检查处理施工 所谓基面处理就是通过对初期支护表面渗透水和外露突出物及其表面的不平处进行处理。 1、处理基面的渗漏水,采用回填注浆进行堵水,以保持基面无明显漏水现象。 2、对于初期支护混凝土表面突出的锚杆头、钢筋等尖头硬物割除,主要要点如下: