合作协议(中英对照) (2)
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
合作协议书
Cooperation Agreement
合同编号:
Contract No.:
签订地点:
Signing place of contract:
于xxxxxxx合作事宜,达成如下协议:
Party A and Party B agree to sign the cooperation contract on xxxxxx, for
mutual benefits in conditions as follows:
1.合作内容
Cooperative Content
2.双方的责任、权利和义务
Responsibilities, Rights and Obligations
(1)甲方的责任、权利和义务
Party A's responsibility, rights and obligations:
(2)乙方的责任、权利和义务
Party B's responsibilities, rights and obligations:
3.费用与付款:
Commission
4.违约责任
Liability for Breach
如果一方不能按照本协议执行而给另一方造成了损失,受害方有权利要求对方给予相应的赔偿。
If any party is unable to perform this agreement and caused the loss of the other party, the victim has the right to ask for the corresponding compensation.
5.违约救济
Remedies for Breach of Contract
Except as other wise provided herein, if a Party (“breaching party”) fails to perform any of its material obligations under this Contact, then the other Party (“aggrieved party”) may at its option:
除本合同其他条款另有规定外,如果一方(“违约方”)未履行其在本合同项下某项主要义务,则对方(“受损害方”)除享有有关法律赋予的权利外,还可选择采取以下救济措施:
(a) give written notice to the breaching party describing the nature and scope of the breach and demand that the breaching party cure the breach at its cost within a reasonable time specified in the notice (“Cure Period”); and
向违约方发出书面通知,说明违约的性质以及范围,并且要求违约方在通知中规定的合理期限内自费予以补救;并且
(b) if the breaching party fails to cure the breach within the Cure period, then in addition to its other rights under Article .1(c)(i) (Termination) or Applicable Laws, the aggrieved party may claim direct and foreseeable damages arising from the breach.
如果违约方未在该书面通知中规定的补救期内予以补救,则受损害方可就违约引起的可以预见的直接损失提出索赔。
6. 不可抗力的后果
Consequences of Force Majeure
(1) “不可抗力”指超出本合同双方控制范围的、无法预见并且无法避免或无法克服的事件,该事件使得本合同一方部分或者完全不能履行本合同。这类事件包括但不限地地震、台风、洪水、火灾、战争、罢工、暴动、政府行为、法律规定或者其适用发生变化,或者其他任何无法预见、避免或者控制的事件,包括在国际商务初中中通常认定为不可抗力的事件。
(a)“Force Majeure” shall mean all eents which are beyond the control of the Parties to this Contract, and which are unforeseen, unavoidable or insurmountable, and which prevent total or partial performance by either of the Parties. Such events shall include earthquakes, typhoons, flood ,fire, war, strikes, riots, acts of governments, changes in law or the application thereof or any other instances which cannot be foreseens, prevented or controlled, including instances which are accepted as Force Majeure in general international commercial practice.
(2)如果发和不可抗力事件,一方在本合同项下受不可抗力影响的义务在不可抗力造成的延误期间自动中止,并且其履行期限应自动延长,延长期间为中止的期间,该方无须为此承担违约责任。
(b)if an event of Force Majeure occurs, a Party’s contractual obligations affected by such an event under this Contract shall be suspended during the period of delay caused by the Force Majeure and shall be automatically extended, without penalty, for a period equal to such suspension.
(3)提出受不可抗力影响的一方应及时书面通知对方,并且在随后的[十五(15)]日内向对方提供不可抗力发生以及持续期间的充分证据。提出受不可抗力影响的一方还应尽一切合理的努力排除不可抗力。