EAc3_update-Beijing Jin Maofu elementary schoolMechanical commissioning contract
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
Beijing Jin Maofu elementary schoolMechanical commissioning contract Part A:Sinochem
FangXing Properties
(Beijing)
part B:ZhongZi engineering construction supervision company
Protocol address:Beijig
The agreement time:2011.7.8
Project name: Beijing Jin Maofu elementary school
Beijing Jin Maofu Beijing Jin Maofu elementary school primary energy system debugging and strengthen debuggingprimary energy system fundamental commissioning and enhanced commissioning Agreement period: according to the requirements of the party awarding the contract, the contractor within 5 days after receiving notice of the party to the scene, Technical standards and requirements
The contract price Method of payment Engineering settlement
there is no service fees for the project's owner, because of the long-term cooperative relation between the two sides
Commissioning
Agent : xinyue jia administrator
Party A's work Party B's work Review design documents, Preparation of commissioning plan and the relevant
commissioning file During the
period of
constructio
n site supervision
, timely
report to
the owner
if have any
questions
installation and
running test
system
performance test
Submit testing record on a regular basis
compile mechanical and electrical operation and maintenance manuals , on property management personnel training
after the project put
into operation,
continuous monitoring
equipment performance
for 10 months, time
limit for a project is
terminated