Area:VERTICAL BOTTOM

Under water areas

Surface preparation:

Oil and grease etc. to be removed by emulsion cleaning. Entire area to be (high pressure) fresh water cleaned in order to remove salts and other contaminants. When the surface is dry: Abrasive blasting to minimum Sa 2?according to ISO 8501-1:1988 with a surface profile corresponding to Rugotest No. 3 BN 10a.

Area:EXPOSED STEEL DECKS

Anti-skip sand

Surface preparation:

Oil and grease etc. to be removed by emulsion cleaning. Entire area to be (high pressure) fresh water cleaned in order to remove salts and other contaminants. When the surface is dry: Abrasive blasting to minimum Sa 2?according to ISO 8501-1:1988 with a surface profile corresponding to Rugotest No. 3 BN 10a.

Area:AREATYPE NOT SPECIFIED

The areas where to be applied with 1513 such as bilge tanks etc. Surface preparation:

Oil and grease etc. to be removed by emulsion cleaning. Entire area to be (high pressure) fresh water cleaned in order to remove salts and other contaminants. Rusty and damaged areas to be mechanical cleaned to St 3 according to ISO 8501-1:1988.

Area:AREATYPE NOT SPECIFIED

E/R floor

5214 can only be over coated with 4588 while the paint film still tacky. Otherwise, proper sand paper on entire surface to

ensure adhesion prior to application.

Surface preparation:

Oil and grease etc. to be removed by emulsion cleaning. Entire area to be (high

pressure) fresh water cleaned in order to remove salts and other contaminants.

Rusty and damaged areas to be mechanical cleaned to St 3 according to ISO

8501-1:1988.

Area:BALLAST TANKS

Surface preparation:

Oil and grease etc. to be removed by emulsion cleaning. Entire area to be (high pressure) fresh water cleaned in order to remove salts and other contaminants. Rusty and damaged areas to be mechanical cleaned to St 3 according to ISO 8501-1:1988.

Hempel Paints (China)

SPECIFICATION SHEET

Project: Area:Wei Hai Turge

FRESH WATER TANKS

Surface preparation:

Oil and grease etc. to be removed by emulsion cleaning. Entire area to be (high pressure) fresh water cleaned in order to remove salts and other contaminants. When the surface is dry: Abrasive blasting to minimum Sa 2?according to ISO 8501-1:1988 with a surface profile corresponding to Rugotest No. 3 BN 11.