Equipment Checklist

合集下载

船舶三副 消防设备检查表

船舶三副 消防设备检查表
66
各层甲板走廊、舱室、机舱、泵仓
13
生活区及机舱安全通道和应急逃生通道
Escape tunnel
4
14
手提式泡沫喷枪Portable Foam Nozzle
1PQ8.C
机舱
15
消防控制站及存放灭火设备处Fire Station
1
船尾左舷CO2间
16
防火门Fire-proof door
57
各层甲板
防火闸Fire-proof damper
b-3.季度检查项目Seasoninspectionchecklist
No
检查项目
Inspection items
数量
Legal
状态
Condition
1
消防控制站及存放灭火设备处Fire Station ---保持清洁,设备与备品与防火控制图一致
2
防火门Fire-proof door ---门板无变形,关闭紧密,磁吸装置实验正常
Portable fire extinguishers (Dry power)
1MFZ/ABC8
2MFZ/ABC2
驾驶台海图桌旁
救生艇内
便携式灭火器(其他)Portable fire extinguishers (Other)
6
手推式泡沫灭火器WheeledFire Extinguishers
2MSTZ/135
状态
Condition
1
便携式灭火器Portable fire extinguishers---由船检认可的机构进行水压试验并出具证书
2
呼吸器钢瓶Bottle for SCBA---由船检认可的机构进行压力测试并在钢瓶上标注日期

API Spec 16A BOP Drill Through Equipment Checklist

API Spec 16A BOP Drill Through Equipment Checklist

No.InstructionsComments and recordedvaluesStandards and instructionsRig'sRam Preventers Drift tests7.1.1The drift test is required on Ram BOP, Annular BOP, Hydraulic connectors, drilling spools and adapters.API Spec 16A chapter 7.5.8.47.1.2The equipment size and rated working pressure: TABLE 1-API 16AAPI Spec 16A chapter 4.2.27.1.3Pass a drift mandrel through the bore of the assembly after all pressure testingAPI Spec 16A chapter 7.5.8.4.17.1.4The drift mandrel diameter shall be in accordance with the drift diameter in Table 1 with a tolerance of plus 0.010 inch and minus 0.000 inchAPI Spec 16A chapter 7.5.8.4.1.17.1.5The drift mandrel gauge length shall be at least 2 inches longer than any cavity that intersects the bore, but no less than 12 inches.API Spec 16A chapter 7.5.8.4.1.2Temperature ratings7.1 GENERALContents of substraction from API Specification 16A Specification for Drill Through Equipment7.1 GENERALvaluesAPI Spec 16A chapter 4.2.2 7.1.6The minimum temperature is the lowest ambient temperature theequipment may be subjected.API Spec 16A chapter 4.2.2 7.1.7The maximum temperature is the highest temperature of the fluid whichmay flow through the equipmentAPI Spec 16A chapter 4.2.2.1 7.1.8Equipment shall be designed for metallic parts to operate with thetemperature shown in Table 2API Spec 16A chapter 8.3.4.2 7.1.9The temperature class of the welfare non metallic components shall be asfollows:7.1.10Temperature Rating Metallic Materials API Spec 16A chapter 8.4.2.4values7.1.11Dimensions for the type 16B integral hubs shall be conform to table 5 of page 10 API Spec 16AAPI Spec 16A chapter 4.3.4.2.2.2.17.1.12Dimensions for the type 16B hubs blind hubs shall be conform Figure 3page 9 API Spec 16AAPI Spec 16A chapter 4.3.4.2.2.2.17.1.13Dimensions for the type 16BX integral hubs shall be conform to table 6.7 or 8 of API Spec 16AAPI Spec 16A chapter 4.3.4.2.3.2.17.1.14Dimensions for the type 16BX blind l hubs shall be conform to fig 3 of API Spec 16AAPI Spec 16A chapter 4.3.4.2.3.2.17.1.15Dimensions for all ring groves shall conform to Tables 6,7, or 8 of API Spec 16AAPI Spec 16A chapter 4.3.4.2.3.2.17.1.16Type BX hubs may be manufactured with corrosion resistant overlays in the ring grooves. Prior to overlay the ring grooves shall conform to API Specification 6AAPI Spec 16A chapter 4.3.4.2.3.47.1.17All clamps shall have grooves in their bores with 25 (+/-0.25) degree angles to fit API 16B and 16BX hubsAPI Spec 16A chapter 4.3.5.2.3.37.1.18All 25 degree surfaces in clamp grooves shall have a surface finish of 32RMS or lessAPI Spec 16A chapter 4.3.5.2.3.47.1.19The clamp bore shall provide a minimum of 0.125 inch radial clearance around the hub neck in the made up condition on all hubs it is designed to fitAPI Spec 16A chapter 4.3.5.2.3.67.1.20Spherical face heavy nuts or spherical washers shall be used to minimize potential bending in bolts.API Spec 16A chapter 4.3.5.2.3.87.1.21Type R, RX and BX ring-joint gaskets are used in flanged, studded and hub connections. Type R and RX gaskets are interchangeable in type R ring grooves. Only type RX gaskets are to be used with SR ring grooves. Only type BX gaskets are to be used with 6BX grooves. Type RX and BX gaskets are not interchangeable.API Spec 16A chapter 4.3.7.17.1.22Hydrostatic proof testing shall be as shown in Table 18 of API Spec 16A API Spec 16A chapter 7.5.8.6.2.2.7.1.22Table 18 - Hydrostatic Test Pressure (psi)API Spec 16A chapter 7.5.8.6.3.1ClampsUse of gasketsHydrostatic Proof Testing16B hubs16BX hubsvalues7.1.23The hydrostatic proof test shall consist of three steps:API Spec 16A chapter 7.5.8.6.4a) the initial pressure-holding period of not less than 3 minutes.b) the reduction of the pressure to zeroc) The second pressure-holding period of not less than 15 minutes7.1.24The timing of the test shall not start until the test pressure has beenstabilized within the manufacturer's specified range and the externalsurfaces have been thoroughly dried.API Spec 16A chapter 7.5.8.6.4.17.1.25The hydraulic operating chamber shall be tested at a minimum testpressure equal to 1.5 times the operating chambers rated workingpressure.API Spec 16A chapter 7.5.8.6.3.27.1.26Each ram and annular blow out preventer shall be subjected to a closedpreventer test after the hydraulic proof test. The hydraulic operating systempressure used shall be equal to or less than the manufacturer's specifiedoperating pressure.API Spec 16A chapter 7.5.8.7.1.17.1.27The timing of all closed preventer tests shall not start until the test pressurehas stabilised .API Spec 16A chapter 7.5.8.7.1.27.1.28Closed preventer tests shall be performed at low and high pressure with thelow pressure tests always preceding the high pressure test API Spec 16A chapter 7.5.8.7.1.37.1.29 A pressure of 200 to 300 psi shall be applied and held below the closedram or annular packing unit for a time period of not less than 10 minutesafter stabilization API Spec 16A chapter 7.5.8.7.1.3.1Hydraulic Operating Chamber Test Closed Preventer Testvaluesvaluesvaluesvaluesvalues。

FFA Check list 消防设备检查表格

FFA Check list 消防设备检查表格

CO2 Fire Extinguishe Measuring weight and record (If the weight decrease by more than 10% of initial weight, recharge) r
*Testing all cylinders by hydostatic pressure.
Every 5 Years
* Testing all cylinders by hydostatic pressure Checking the labels attached fire-extinguisher which record latest dateof renew CO2.
Every 10 years Every month Every month Every 2 years Every year Every 10 years
Checkicondition per Fire Control Plans
*Annually examined by competent peraon or service agent (hk flag)
1 Fire Fighting Equipment (1)
Fire-Fighting Equipment Check Items * To be carried out by a servicing facility or agent.
Checking the labels attached fire-extinguisher which record latest dateof renew foam. Checking the quantity, location and condition per Fire Control Plans

JR Clancy PowerLift 机械设备检查清单说明书

JR Clancy PowerLift 机械设备检查清单说明书

Design, Manufacture and Installation of Theatrical Equipment WorldwidePowerLift ®Inspection Check ListPRODUCT USE REQUIREMENTSThis checklist is provided as a tool for use by a qualified person while inspecting PowerLift machinery. Although an attempt has been made to include all of the most important points of inspection, no such list can anticipate the particular circumstances of every installation. It is the responsibility of the qualified person to make a reasonable effort to identify hazardous conditions not mentioned herein and formally advise the owner to take corrective action. This check list is primarily for inspecting the hoist machinery. Loft blocks, cables, battens, and all other parts of the rigging system must also be inspected.IMPORTANT SAFETY INFORMATION• See Identification Label attached to controls enclosure on each unit for model number, speed, and capacity information.WARNING! Improper installation or maintenance can cause the load to fall.• Equipment must be inspected at the time of installation and annually thereafter. Individual applications may require more frequent inspection and maintenance. • Do not substitute or modify components provided with this equipment. Use only parts provided by JR Clancy.• Remove the load from the hoist before disassembling.DANGER! Electrocution Hazard• Remove power source before opening electrical panels.• Electrical equipment must be serviced by qualified personnel only.WARNING! Moving parts can cut or crush.• Keep body parts away from machinery in motion. • Remove power source before working on machinery.INSTRUCTIONS FOR USE1. Prior to inspection, obtain and review a copy of the PowerLift Maintenance Manual for the hoist configuration being inspected. Contact JR Clancy if the correct Maintenance Manual cannot be located.2. Identify the channel number of the machine to be inspected and write it in one of the boxes at the top of the check list. Duplicate the list as required for larger systems.3. Inspect each of the items on the checklist and verify that the machinery is serviced and adjusted according to the requirements of the maintenance manual. See the manual for questions about specific part names and adjustments. Remove the covers from the machine as required.4. Replace the covers and repeat the process for each machine at the site.5. Inspect the theater. Make sure that capacity labels, safety signs, and dealer contact information are in place.6. Make contact with the authorized person at the theater and make sure that all of the manuals and the service log are available for use.7. File copies of the check lists in the owner’s service log along with any recommendations for service. Complete the attached Certificate of Inspection and fax or mail a copy of the checklist to JR Clancy.PowerLift Inspection ChecklistVenue Name:_____________________________________Date of Inspection : _______________________Channel NumbersCheck machine covers Machines with moving parts within 106 inches (2.7m) vertically from the floor and less than 60 inches (1.5m) horizontally from a safety barrier must be fitted with machine covers. Otherwise covers may be omitted at the discretion of the customer.Roll pins are in place at each end of beam.Beam flanges where the machine is attached are less than 8” (20 cm) wide and less than 1” (2.5cm) thick. Flanges are at least 4” (10 cm) wide and 1/4" (6 mm) thick.Check mounting clampsClamp rods are tightened. Thrust plates installed on both ends of hoist. Jam nuts are installed and tightened.Sheave fleet angles are within 1.5 degrees. Cables do not rub side plates of head or loft blocks. Cables are not twisted.Only one line wraps more than 20 degrees around the sheave of the beam mounted loft blocks(if provided). That line is in the 3rdgroove as marked.The drum/head block fleet angle matches the helix angle of the drum. Checkblocks and reevingWire rope is free of kinks, corrosion, distortion, and broken strands.Cable keeper roller installation matches the directions in the Maintenance ManualExposed parts of drive shaft are clean and lubricated. Drum screw is clean and lubricated. Rubber protective band has been removed from the reducer breather valveFor electric load brake, the manual release bolts of the secondary load brake have beenremoved. The gap between the load brake magnet and armature measures 0.9 mm (0.035”) For mechanical Weston Brake, the bottom of the dust groove in the brake pads is visible on all pads of the brake. The disks of the Weston Brake are free from dirt and oil.Check machineryThe mounting position on the gear reducer name plate matches the actual mounting position of the PowerLift. No apparent oil leaks. Oil level is correct for the mounting position. Replace or lab test gearbox oil every two years.Control enclosure covers are in place. No missing fasteners Strain relief connections are tight.Power plugs are twist-locked into receptacles. Control plugs are latched into receptacles. Check electricalUnused control plugs are closed and latchedLimit switch brackets and activation arms are in good condition and not bentHard limits are set and checked. For electric load brake, 6“ (15 cm) from any obstruction. For mechanical Weston Brake, 6” (15 cm) for fixed speed units, 14” (36 cm) for variable speed units. With the machine on down hard limit there are at least three dead wraps on drum for each line Machine runs smoothly throughout entire range of travel Limit switch locking nuts are tightenedFor electric load brake, when hoist stops after lifting batten, motor brake engages before load brake engages. When the hoist is moving the batten, the load brake is open and does not rub Check operation and limit switchesFor mechanical Weston Brake, when hoist is lifting batten, motor brake stops the load before the load brake pawls engage. When the hoist is lowering batten, the load brake engages consistentlyCapacity labels are in place on each batten and match the machine capacity on the hoist Identification LabelMotorized rigging safety sign is installed and dealer contact information has been filled in Jumper has been removed from service light timer. Timer is reset and light is off.Check the availability of safety information materialsOwner has copies of the Installation, Operation, and Maintenance Manuals, and Service Log.Design, Manufacture and Installation of Theatrical Equipment Worldwide J.R. Clancy, Incorporated7041 Interstate Island Road Syracuse, New York USA 13209-9713 Telephone: (315) 451-3440 Facsimile: (315) 451-1766ISO 9001 CertifiedCertificate of InspectionI have inspected each of the PowerLift machines in this facility and I have verified that the machinery is configured and maintained according to the Maintenance Manual.Is this a new installation or periodic inspection? ___________________________Name of venue: ______________________________________City and State: ______________________________________Date of Inspection: ______________________________________Name of Inspector (print): ______________________________________Company of Inspector: ______________________________________Signature of Inspector: _______________________Date___________Attach checklist for all PowerLift machines to this form and submit to JR Clancy in order to preserve the full duration of the original factory warranty as specified in the owner’s Operations Manual.Place copies of the checklists and this certificate into the owner’s Maintenance and InspectionLog each time the system is inspected.。

设备出厂检查内容equipment ex-factory check list

设备出厂检查内容equipment ex-factory check list
3)外购件质量证明及维护、使用说明书; 3)外购件质量证明及维护、使用说明书; Purchased part qualitity certification and maintainance、operating Purchased part qualitity certification and maintainance、operating manual; manual; 4)检查WPS/PQR; 4)检查WPS/PQR; Inspect WPS/PQR Inspect WPS/PQR 5)检查加工制作过程质量记录; 5)检查加工制作过程质量记录; Inspect process and fabrication qualitity records; Inspect process and fabrication qualitity records; 6)检查无损检测报告; 6)检查无损检测报告; Check NDT reports; Check NDT reports; 7)检查供应商出厂检查报告; 7)检查供应商出厂检查报告; Check supplier ex-factory inspection report; Check supplier ex-factory inspection report; 根据图纸进行外观检查,包括核查尺寸;焊接、喷涂、油漆等; 根据图纸进行外观检查,包括核查尺寸;焊接、喷涂、油漆等; Visual inspection on the basis of drawings ,including Visual inspection on the basis of drawings ,including dimension、welding、painting etc. dimension、welding、painting etc. 检查设备铭牌及标示; 检查设备铭牌及标示; Check nameplate and label; Check nameplate and label; 检查机械操作有效性; 检查机械操作有效性; Machanical operation tests; Machanical operation tests; 检查机械联锁有效性; 检查机械联锁有效性; Machanical interlock reliability tests; Machanical interlock reliability tests; 检查电气间隙和爬电距离; Check insulation distance and creepage distance; 检查电气设备IP等级; Check elctrical equipment IP degree; 机械设备性能测试 电气设备通电测试,包括功能测试: Machanical equipment performance tests. Electrical operation test, including fuction tests: 1)电气主回路通电,各种开关、按钮、指示灯、测量仪表检查; Main circuit power on, switch、button、indicator、measure instrument tests; 2)控制回路通电,各种开关、按钮、指示灯检查,电气联锁检查; Control circuit powre on, switch、button、indicator、interlock tests; 3)接地保护连续性测试; Protective circuit continuity tests; 4)电气设备绝缘电阻测试; Insulation test; 5)电气设备介电强度试验; Dielectric test.

EquipmentChecklist设备检查表_EN

EquipmentChecklist设备检查表_EN
Com pact or
7. No black gas diach arged
Inspe ctor:_ _____ _____ _
Inspe ction date: ____ ____ __
Air Comp ressor Inspe ction
Owne r:
Year of Manuf acture :
17. Opera tor Certifi cation
Inspe ctor:_ _____ _____ _
Inspe ction date: ____ ____ __
CON CRE TE CUT TING / PLA TE COM PAC TOR M/C INSP ECTI ON
混凝 土切 割机 M/C
16.Fir e Exting uisher
17. Inside cleani ng up(no waste and greas e)
18. Tyre
19. Soun d and light alarm signal
20. Outsi de arrest er suppo rt
21. Opera tor certifi cation
4. No crack and leakin g on the engin e
5. Contr ol and emerg ency button of the engin e is availa ble
6. Box cover is availa ble on the fuel box
盘形 夯土 机 M/C
Inspe ctor:_ _____ _____ _
Inspe ction date: ____ ____ __
FOR K TRU CK INSP ECTI ON

Equipment Checklist设备检查表_CN

Equipment Checklist设备检查表_CN

移动式起重机压挖掘机
推土机分级机
降机转臂起重机压路机
C混凝土切割机/盘形夯土机检查混凝土切割机M/C
盘形夯土机 M/C
夯土机
空气压缩机检查
发电机检查
场分布面板检查
临时接线电缆检查
焊接机检查
电动钻孔机/转矩扳手检查
电机炉检查
气割设备检查
背带检查
铰链辘检查
钢绳吊带检查
尼龙网吊带检查
聚酯环形吊带检查
挂钩检查
升降台与转臂升降机工作安全使用指导
升降台
起重臂升降机
移动型脚手架安全使用指导
在站点上进行燃料补充的安全操作指导
临时危险性材料存放检查。

Equipment Checklist设备检查表_EN

Equipment Checklist设备检查表_EN

3. Distrubite valve in good condition 4. Engine cover is well supported 5. Tow connection in good condition 6. Accumulator cover is in place 7. Air storage tank is in good condition 8. No crack and leaking on the engine 9. Safety valve installed on air system 10. 与分配阀相连接的的空气主连接 器有安全电缆 11. Fire Extinguisher 12. 有轮震器
3. Creepage breaker is installed 4. Standard cable is used 5. Connection is fixup 6. Jacket is available for the plug and it's waterproof 7. The size of earthing cable is one fifth of the power supply cable 8. Connet to the earthing stick 9. Warning lable should be available 10. Located in dry area 11. 使用电缆带紧固电缆 12. Cut off the power while connecting or disconnecting
HEAVY Heavy Equipment EQUIPMENT Inspection INSPECTION 移动式起重机 压挖掘机
Heavy Equipment Inspection Manufacture/Model: Product Serial Number: Loading capacity: Inspection Date: Detail Inspection Items Checklist OK Not OK N/A 1. Handrail/Protection Equipment 2. Windows(Clear,no crack, 观后镜) 3. Cover-Top structure 4. Lifting Arm(Position limit switch) 5. Hook(Small hook, big hook),安全 止动销 6. 机架,滚筒 7. Rope(串形绳索,球形绳索) 8. 承力支架,联锁 9. Hydraulic pressure pipeline 10. Leaking 11. Recruiting gas 12. 承载表 13. Gesture signal 14. Improvement which qualified by manufacturer Owner: Year of Manufacture: Date of Using: Inspection Report: 15. 带有合格刻度数的计量器 16.Fire Extinguisher 17. Inside cleaning up(no waste and grease) 18. Tyre 19. Sound and light alarm signal 20. Outside arrester support 21. Operator certification

电动汽车电机电机控制器检查清单Checklist

电动汽车电机电机控制器检查清单Checklist

BOM、图纸、三维数据、实物、技术文 件零部件名称、件号、生产厂家检查
满足设计要求
图纸、三维数据、实物表面粘贴标识
(接地、高压、精确追溯码、铭牌、 满足设计要求
数据不一致
钢印等)检查
7 数据一致性
图纸、三维数据、实物高压、低压线 束线长检查
满足设计要求
图纸、实物外观尺寸、关键尺寸、重 量检查
满足设计要求
5 配接校核 23PIN低压插件与对接端配接不到位
电控接地螺栓配接不到位
紧固件合理选择 6 固定校核
电机控制器CH
高压标识 汽车禁用物质要求 电磁辐射发射、抗扰度 电控防水防尘等级 一般性、温升、输入输出特性、安全 性、环境适应性、可靠性测试结果 电控固定孔孔距及孔径检查 电控散热翅片方向 单件气密性 三相线束及直流母线线束出线方向及 紧固方式 电控与车架安全间隙 电控与车身的安全间隙 电控不能作为底盘最低点 电控与低压线束不干涉 电控与三相线及直流母线不干涉 与周边零部件安全间隙满足要求 低压信号线束远离三相线或与三相线 垂直 三相线束路径尽可能短 电控直流母线装配位置 电控固定螺栓设计位置 电控接地螺栓设计位置 电控与电控支架固定孔同轴校核 三相线端子与固定孔同轴校核 母线端子与固定孔同轴校核 接插件型号和对插端型号校核,脚位 定义校核 接插件及对插端拔插空间足够 接插件配合后与周边件无干涉 电控接地螺栓固定孔与接地螺栓、接 地线束端子同轴校核 电控接地线束固定孔规格校核 固定扎带,卡箍规格选择
检查最大效率
参考强检报告
检查高效区占比
参考强检报告
功能参数达不到技术要求
检查温升 检查耐电压
参考强检报告 参考强检报告
检查绝缘电阻
参考强检报告
检查接地电阻

Checklist-Equipment Safety Standard-HazardousSubstances-20150526

Checklist-Equipment Safety Standard-HazardousSubstances-20150526

启动前完成Finished before start up
4.1
启动前完成Finished before start up
4.2
启动前完成Finished before start up
4.3
启动前完成Finished before start up
4.4
启动前完成Finished before start up
启动前完成Finished before start up
启动前完成Finished before start up
5.5
启动前完成Finished before start up
5.6
启动前完成Finished before start up
5.70
启动前完成Finished before start up
1.1
个人和集体防护用品 PPE/ Eye shower station
启动前完成Finished before start up
1.2
喷淋洗眼器必须易于接近,放置在无障碍区域;最 好放置在最显眼的逃生路线上;如果放置在室外, 则做好防霜冻措施(如适用) easily accessible, area free from obstructions preferably located in the most obvious escape route. protected against frost when located outside (where applicable). checked at least weekly via the weekly checks (see VPO.SAFE.3.2.04.Safety Monitoring) and checked thoroughly (recorded) at least monthly

设备评估表

设备评估表
Conclusion:
Manufacturer/ 设备制造商: Serial #/设备序 列号: Production Line/ 安装地
Yes No N/A
Yes No N/A
Yes No N/A
Yes No N/A
Yes No N/A
Yes No N/A
Evaluation Team/检查评估组
淄博正拓气体有限公司新设备检查评估表
Equipment Basic Info/设备基本信息
Equipment/设备名称 : Model/型号 Date of installation/安
Checklist/检查表
A. Machine hazard and Safeguarding /机械危险及防护 A.1 设备的外形结构是否平整光滑,避免尖锐的角和棱? A.2 是否把人员投料区域与设备动作区域分开,如使用送料轨道或转盘? A.3 控制方式是否保证人员身体部分远离危险区域后启动,如双手按钮? A.4 是否采取整体防护防止任意身体部分进入危险区域,达到“零进入”,如防护挡板、光栅? A.5 防护罩是否固定,可活动的门、窗被打开时,运动部件自动停止,如联锁? A.6 设备是否安装有急停开关(设备超过3米需要前后两个)? A.7 能量源是否可以通过阀门、开关被断开,有LOTO提醒标识? A.8 Others? B. Electrical hazard and safeguarding /电气危险及防护 B.1 绝缘是否完好(容易剐蹭部位需要适当保护)? B.2 导电部件或其他电气危害的隔离保护是否充分? B.3 设备保护接地是否符合标准要求? B.4 是否有防止过载、短路等电气危害的保护措施?若涉水作业,是否更换为带漏电保护开关? B.5 易燃、易爆区域的电气设施和装置是否达到相关防护标准? B.6 others? C. Hazardous Substance /危险物质 C.1 所使用的化学品是否都已经过相关流程评估批准? C.2 化学品是否有符合要求的MSDS? C.3 化学品的使用情况是否符合相关要求? C.4 化学品的储存、废弃等情况是否符合相关要求? C.5 针对高温或低温危害物质的预防措施是否充分有效? C.6 Others? D. Health harm and prevention /健康危害及预防 D.1 设备运行过程中产生的粉尘、有害化学品等有害物质是否符合相关标准要求? D.2 设备运行产生的噪声任何方向1m外,1.5m高是否低于80dB ? D.3 设备运行产生的辐射危害(或激光)是否符合相关卫生及环境标准要求 ? D.4 针对设备运行产生有害物质的预防措施,如通风排气措施,是否符合要求? D.5 设备对地振动加速度是否低于0.2m/S2,员工接触振动是否满足相关职业健康要求? D.6 others? E. Ergonomics /人机工程 E.1 作业空间,如工作台高度、设计作业姿态等是否符合人机工效? E.2 操作设备时,人员重复或负重的动作是否足够少? E.3 工艺流程是否避免涉及膝盖以下、肩膀以上任何提升动作 ? E.4 操作、维修设备时,是否存在不良姿势? E.5 设备无绊倒、(滴油漏液、冷凝潮湿)滑倒风险 ? E.6 others? F. Others Requirement F.1 设备的原始图纸及技术资料是否齐全 ? F.2 设备的安全操作规程是否已经制定 ? F.3 设备操作员工是否已经经过培训 ? F.4 是否为员工配备合适的 PPE ? F.5 设备安全标志是否符合要求 ? F.6 OtRemarks Remarks Remarks Remarks

Checklist-Equipment Safety Standard-ExplosionPreventive-V4-20150526

Checklist-Equipment Safety Standard-ExplosionPreventive-V4-20150526

防爆安全要求Explosion Proof新厂GF:机器/设备Equipment日期Date:审核员Auditor:是Yes否No1.1.1.Equipment设备Al equipment (including all electrical equipment, including all portableequipment (portable lamps, portable vacuum cleaners, portable metersetc. and including PPE), that is used in zones with potential EA must besuitable for the zone they are used in (reckon with issues such as ingressprotection (IP / NEMA), maximum allowable surface temperature(temperature class), conductivity…).在存在爆炸性风险的区域使用的所有设备(包括所有电气设备,包括所有便携设备(便携灯具、便携真空吸尘器、便携仪表等,并包括PPE))必须适合在该区域使用(考虑进入防护(IPNEMA)、最高允许表面温度(温度级别)、导电率等问题)。

启动前完成Finished before start up1.2.The equipment must be properly earthed: including trucks for unloading.设备必须进行妥善接地:包括卸载卡车。

启动前完成Finished before start up2.12、Specificrequirements for Gasrelated ExplosionPrevention.Natural and biogas.天然气和沼气(BTS区域按照防爆要求设计)2.2气体防爆具体要求• Plans: A detailed plan of the natural gas and biogas piping andequipment (including the underground piping and the cut-off valves) mustbe available. 设计图:必须提供天然气和沼气管道和设备(包括地下管道和截止阀)的详尽设计图。

产线设备和工艺验收checklist(浓缩版)

产线设备和工艺验收checklist(浓缩版)

工序项目裁剪房温湿度裁剪尺寸开孔焊接参数焊接外观拉托力层压机EL EL图片直角焊接间距返工区域层压参数温度偏差剥离力真空度交联率接线盒打胶非自动益胶补胶的胶量自动溢胶的总胶量接线盒焊接温度AB胶配比rate of A and B inweight 自动串焊机裁剪层压机叠层装框标准温度范围为23+/-3℃,湿度小于30~70RH%;3mmfollow作业指导书无锡珠、毛刺,表面清洁,无明显助焊剂;无空焊、虚焊、侧焊、过焊、破片;焊带与电池片主栅线错位≤0.5mm≥2N-焊接标准见作业指导书见60和72pcs间距要求,和胶带贴方式串焊返工不良区域均需要有吸盘实测温度与设定温度的误差-1℃~+2℃以内 ;±3℃EVA和背板≥40NEVA和玻璃≥40N120s内真空度达到100pa以下80~95%接头处预留5~7mm,400+/-15℃AB胶配比标准,回天5299W-S,质量比A:B为5:1,质量比值范围4.8~5.2;天山1533,质量比A:B为5.5:1,质量比值范围5.3~5.7;天辰HT6360/AB,质量比A:B为5.5:1,质量比值范围5.3~5.7 ;要求Y/N备注温湿度要求24h均达到分别记录裁剪样品量50pcs,按照点检表单以样品为准,无毛刺,光滑满足作业指导书中焊接温度等参数要求工废建议值≤0.2%正反面EL图片清晰可见要求员工熟练要求层压后无间距不良(此为重点关注)要求员工手不能拿电池片在层压要求的范围内,满足要求,I区域: A≤2mm2,Q≤2E区域: A≤2mm2,Q≤3距玻璃边沿5mm,距电池片边缘0.3mm,电池片上,都不允许有气泡,无鼓包;不允许有尖锐物造成之穿刺性凹坑,无破损、孔洞及任何尺寸的带电体伸出背板,无污迹、硅胶、EVA、纸屑等残留,无水印;分别是使用长杆和多路测温仪进行温度监控层压机4个位置均要做层压机4个位置的交联率均要做按照接线盒轨迹设定好程序型材内框打胶两侧空留≤5mm;底部铺满,总胶量≥65ml;边框型材打胶,平铺槽底深度2-3mm拆框后型材底部均有胶量,并且四周均匀益胶要求灌胶设备能打达到上述参数要求。

建筑工人职业技能鉴定设施设备清单【模板】

建筑工人职业技能鉴定设施设备清单【模板】

建筑工人职业技能鉴定设施设备清单【模板】以下是一个建筑工人职业技能鉴定设施设备清单的模板。

这份清单旨在确保建筑工人在工作中所需的设备和设施得到鉴定和确认。

请根据具体情况进行修改和调整。

项目信息- 项目名称:- 项目地点:- 职业技能鉴定日期:- 鉴定结果:设施设备清单1. 安全帽2. 护目镜3. 口罩4. 防护手套5. 防护鞋6. 高强度安全带7. 工作服8. 手持工具:- 扳手- 锤子- 手电钻- 切割机9. 电气设备:- 电缆- 插座- 塑料线槽10. 梯子11. 脚手架12. 起重机13. 手动运输设备:- 手推车- 手动叉车14. 动力运输设备:- 小型挖掘机- 建筑吊车- 推土机15. 安全警示标识牌16. 急救箱17. 灭火器备注请确保在工人进行职业技能鉴定前,所有的设施设备均经过检查和确认。

鉴定结果应准确记录,并在工作现场进行公示。

如有任何设施设备缺失或损坏,应及时修复或更换,以确保工人的安全和工作的顺利进行。

---English TranslationTemplate for Construction Worker Occupational Skills Assessment Facility and Equipment ChecklistBelow is a template for a facility and equipment checklist for the occupational skills assessment of construction workers. This checklist is intended to ensure that the necessary equipment and facilities needed for construction work are assessed and confirmed. Please modify and adjust according to specific circumstances.Project Information- Project Name:- Project Location:- Occupational Skills Assessment Date:- Assessment Result:Facility and Equipment Checklist1. Safety helmet2. Safety goggles3. Face mask4. Protective gloves5. Safety shoes6. High-strength safety harness7. Work uniform8. Hand tools:- Wrench- Hammer- Power drill- Cutting machine9. Electrical equipment:- Cables- Sockets- Plastic wire conduits10. Ladder11. Scaffolding12. Crane13. Manual transportation equipment: - Handcart- Manual forklift14. Powered transportation equipment: - Mini excavator- Construction crane- Bulldozer15. Safety warning signs16. First aid kit17. Fire extinguisherRemarksPlease ensure that all facilities and equipment have been inspected and confirmed before workers undergo occupational skills assessment. The assessment result should be accurately recorded and displayed at the worksite. If any facilities or equipment are missing or damaged, they should be repaired or replaced promptly to ensure the safety of workers and the smooth progress of work.。

能源维保检测资质设备清单

能源维保检测资质设备清单

能源维保检测资质设备清单以下是能源维保检测所需的资质设备清单:1. 电力量测设备- 数字式电能表- 电流钳形表- 电能质量分析仪2. 温度测量设备- 红外线测温仪- 温度计3. 压力测量设备- 压力表- 压力传感器4. 湿度测量设备- 湿度计5. 光照测量设备- 光照度计6. 电池测试设备- 电池测试仪7. 声音测量设备- 声级计请确保以上设备在进行能源维保检测时正常工作,并进行定期的校准和维护。

在使用设备前,请详细阅读相应的操作手册,并遵守操作规范和安全要求。

建议根据实际需要和项目要求,选择适宜的设备品牌和型号,以确保测试结果的准确性和可靠性。

以上是能源维保检测资质设备清单,如有其他问题或需求,请随时与我们联系。

谢谢!---Energy Maintenance and Inspection Qualification Equipment Checklist Below is the equipment checklist for energy maintenance and inspection:1. Power Measurement Equipment- Digital energy meter- Clamp meter- Power quality analyzer2. Temperature Measurement Equipment- Infrared thermometer- Thermometer3. Pressure Measurement Equipment- Pressure gauge- Pressure sensor4. Humidity Measurement Equipment- Hygrometer5. Illumination Measurement Equipment- Lux meter6. Battery Testing Equipment- Battery tester7. Sound Measurement Equipment- Sound level meterThe above is the equipment checklist for energy maintenance and inspection. If you have any further questions or requirements, please feel free to contact us. Thank you!。

精密设备加工组装Checklist

精密设备加工组装Checklist

精密设备加工组装Checklist精密设备加工组装Checklist设备编码:序号类别检查条款检查标准检查工具评审级别自检状况自检结果抽检结果备注(若不涉及请备注)1来料标准件、外购件来料标准件须和BOM完全一致,所有外购件收货必须检查检验合格证,且零件分开包装运输。

关键外购件要保留出厂检验报告。

目检 AOK□NO□OK□NO□2 机加来料机加件收货时要求保留出厂检验报告,所有机加件形位公差、粗糙度、表面处理应符合图纸要求。

并对零部件关键尺寸使用三坐标进行入厂检验,并保留检验记录。

三坐标AOK□NO□OK□NO□3精密零件、模组来料1.精密零件及外购组件来料尺寸,外观,颜色等均符合图纸要求,并保留检验记录。

三坐标ANO□OK□NO□4 2.在检时需用酒精、清洁油等对表面清洁干净,严禁中转途中碰伤,划伤等。

目检 BOK□NO□OK□NO□5 装配环境及装配人员要求装配环境及装配人员要求1.车间温度、湿度、5S等符合相关要求;整机装配平面干净,且过程必须保证机台底座水平。

水平仪AOK□NO□NO□6 2.装配人员要求有精密设备装配经验。

目检 AOK□NO□OK□NO□7设备整体要求外观1.外观整体造型讲究、美观、协调,设备尺寸和外观颜色与技术要求一致。

目检 AOK□NO□OK□NO□8 2.外观表面平整光滑、缝隙均匀,无以下明显缺陷(如凹凸、无尖锐凸台,无撞伤,划伤人员风险、无掉漆、锈蚀等)。

设备主体架构及其它各部件均需进行防锈处理。

目检 AOK□NO□OK□9 3.设备铭牌格式符合技术要求书要求,信息填写完整,并已安装目检 BOK□NO□OK□NO□于设备上。

10装配过程要求部件、组件、零件等装配过程1.所有组件部件在装配过程中必须使用相关检测设备对精度进行把控。

千分表AOK□NO□OK□NO□11 2.零件有掉落、撞击、划伤等异常情况必须送检验室从新检验经检验员签字后方可继续使用。

目检 AOK□OK□NO□12 3.严禁设备,组件,部件上存在零件有划伤,撞伤等不良品装配使用。

健身器材缺陷检查表Fitness equipment defect checklist

健身器材缺陷检查表Fitness equipment defect checklist
Fitness Equipment Defect Inspection Checklist 健身器材缺陷检查表
1st Check 第一次检查 Inspection item 检查项目 Good 良好 Date 日期 Defect 缺点 Description fo Defect 叙述缺陷 Good 良好 2nd Check 第二次检查 Date 日期 Defect 缺点 Good 良好 3rd Check 第三次检查 Date 日期 Defect 缺点
10osle11oslc12oslp13osab14ospo15osbc16oste17osdap18ossm19lfod100120sdr221lfdb100022osadj23sadb24sbe25lfgb5526lfgb6527vt006virafitnessequipmentdefectinspectionchecklist健身器材缺陷检查表inspectionitem检查项目1stcheck第一次检查descriptionfodefect叙述缺陷2ndcheck第二次检查3rdcheck第三次检查date日期date日期date日期good良好defect缺点good良好defect缺点good良好defect缺点number序号equipmentname设备名称跑步机配置19寸内置触屏板有线板lifefitnesselevationseries95tdiscoversetreadmilwired95tdiscoversestd美国力健lifefitness全功能训练器配置16寸内置触屏板有线板lifefitnesselevationseries95xdiscoversecrosstrainerwired96xdiscoversestd美国力健lifefitness靠背式健身自行车配16寸内置触屏板有线板lifefitnesselevationseries95rdiscoverserecumbentlifecycleexercisebikewired97rdiscoversestd美国力健lifefitness直立式健身自行车配16寸内置触屏板有线板lifefitnesselevationseries95cdiscoveruprightlifecycleexercisebikewired95cdiscoversestd美国力健lifefitness攀登机lifefitnessintegrityclslsummittrainer美国力健lifefitness分动式登山机lifefitnessintegrityclssindependentstairclimber美国力健lifefitness美国力健坐式肩膀推举训练器lifefitnessshoulderpress美国力健lifefitness美国力健胸肌推举训练器lifefitnesschestpress美国力健lifefitness美国力健蝴蝶式胸肌及

作业安全Checklist

作业安全Checklist
是否安装自动电击防止装置,及装置启动是否正常
电源部分是否连接漏电保护装置
电焊机是否接地良好
施工结束后是否将线路收回,并关闭电源




是否配置并使用电焊面罩
是否配置并适用电焊用皮手套、皮袖套、皮脚套
高空作业是否配备并适用安全带




施工作业地点是否通风良好
作业场所周围易燃物、危险物是否清除或隔离防护
电焊机内外部是否有灰尘覆盖,是否清洁
线路接头是否锁紧
电焊把手及电缆尺寸是否与电流大小匹配


线

导线绝缘是否有破损,作业地面是否潮湿
电源线是否固定与保护良好
电源线与电焊机是否以段子确实连接
焊接柄与绝缘、耐热装置是否破损
电焊线配置线路是否规划良好,不妨碍通道
电焊机是否装装遮雨设施,潮湿环境及雨天禁止作业
电焊设备安全Checklist
作业内容
作业时间
年 月 日 时 分
至 时 分
设备编号
作 业 者
检 查 者
证件编号
检查项目
结果
不合格改善措施
合格
不合格


作业人员是否持证作业,并且证件在有效期内
作业人员是否饮酒或精神不佳




金属部件是否腐蚀不全
焊接回路是否有足够的断面积,且接触良好
电焊机控制装置是否损坏
氧气瓶与乙炔发生器、明火热源的距离应大于5m



是否选用符合气体特性、检验合格的减压器
不同气体专用减压器,禁止互用或替用
禁止用棉、一般橡胶等作为减压器的密封垫圈。
  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

X
X
X
X X Revision Date : 20.Oct. '06(R0) Prepared By : K. W. Lee
X
X
Preventive maintenance plan will be developed
K.W.Lee
20.Nov.2006
X
X
Will preliminary process capability studies be 16 run at the producing plant? Have process characteristics that affect special product 17 characteristics been identified? Were special product characteristics used in determining 18 accepance criteria? Does the manufacturing equipment have sufficient capacity 19 to handle forcasted production and service volumes? 20 Is testing capacity sufficient to provide adequate testing?
● ● ●
New equipment New tooling? New test equipment?
X X X X
Will a preliminary capability study be conducted 11 at the tooling and/or equipment manufacturer? Has test equipment feasibility and accuracy 12 been established? Is a preventive maintenance plan completed for 13 equipment and tooling? Are setup instructions for new equipment and 14 tooling completed and understandable? Will capable gages be available to run preliminary process 15 capability studies at the equipment supplier's facility?
X X X X



Have lists been prepared identifying: 5 6 7
● ● ●
New equipment New tooling? New test equipment?
X X X
Has acceptance criteria agreed upon for: 8 9 10
A-3 NEW EQUIPMENT,TOOLING AND TEST EQUIPMENT CHECKLIST
Customer or Interal Part No. : 13219198/9, 13229151/2 Question Has tool and equipment design provided for : 1 2 3 4

Epsilon 2 Front Caliper Ass'y Yes No Comment/Action Required Person Reponsible Due date
Flexible system, e.g. cell mfgtion? Mistake proofing?
相关文档
最新文档