20米预应力空心小箱梁张拉伸长量计算

合集下载

20m箱梁张拉伸长量计算1

20m箱梁张拉伸长量计算1

20m箱梁伸长量计算中跨σcon=1860×0.75=1395(MPa)N=σcon×A y=1395×140=195300=195.3(KN)CD:537 BC:2879.8 AB:6348 μ=0.25 k=0.0015Ay-预应力筋的截面面积(mm2)Eg-预应力筋的弹性模量(Eg取值为1.95×105N/mm2)L-从张拉端至计算截面的预应力筋长度θ-从张拉端至计算截面曲线孔道部分切线的夹角之和(rad)κ-孔道每米局部偏差对摩擦的影响系数(κ取值为0.0015)μ-预应力筋与孔道壁的摩擦系数(μ取值为0.25)AB:ΔL1= 45.01767204BC:ΔL2= 19.55681557CD:ΔL3= 3.693505128(45.01767204+19.55681557+ 3.693505128)×2=136.5359855(mm)CD:2015 BC:2879.8 AB:4923.4 μ=0.25 k=0.0015AB:ΔL1=34.86592675BC:ΔL2=19.59828131CD:ΔL3=13.86740714(34.86592675+19.59828131+13.86740714)×2=136.6632304(mm)CD:7901 BC:733 AB:1065 μ=0.25 k=0.0015AB:ΔL1=7.611197676BC:ΔL2=5.179053855CD:ΔL3=55.03988817=(7.611197676+5.179053855+55.03988817)×2=135.6602794(mm)σcon=1860×0.75=1395(MPa)N=σcon×A y=1395×140=195300=195.3(KN)N1(4根):195.3×4=781.2(KN)N2(4根):195.3×4=781.2(KN)N3(3根):195.3×3=585.9(KN)4束:15%:117.18 , 30%:234.36 , 50%:390.63束:15%:87.885, 30%:175.77 , 50%:292.95边跨σcon=1860×0.75=1395(MPa)N=σcon×A y=1395×140=195300=195.3(KN)CD:537 BC:2879.8 AB:6348 μ=0.25 k=0.0015Ay-预应力筋的截面面积(mm2)Eg-预应力筋的弹性模量(Eg取值为1.95×105N/mm2)L-从张拉端至计算截面的预应力筋长度θ-从张拉端至计算截面曲线孔道部分切线的夹角之和(rad)κ-孔道每米局部偏差对摩擦的影响系数(κ取值为0.0015)μ-预应力筋与孔道壁的摩擦系数(μ取值为0.25)AB:ΔL1= 34.00962935BC:ΔL2= 19.60309761CD:ΔL3= 14.6217618(34.00962935+19.60309761+ 14.6217618)×2=136.4689775(mm)CD:2015 BC:2879.8 AB:4923.4 μ=0.25 k=0.0015AB:ΔL1=23.82140171BC:ΔL2=19.64594751CD:ΔL3=24.59225592(23.82140171+19.64594751+24.59225592)×2=136.1192103(mm)CD:7901 BC:733 AB:1065 μ=0.25 k=0.0015AB:ΔL1=7.255000187BC:ΔL2=5.179374891CD:ΔL3=55.72775194=(7.255000187+5.179374891+55.72775194)×2=136.324254(mm)σcon=1860×0.75=1395(MPa)N=σcon×A y=1395×140=195300=195.3(KN)N1(5根):195.3×5=976.5(KN)N2(4根):195.3×4=781.2(KN)N3(4根):195.3×4=781.2(KN)5束:15%:146.48, 30%:292.95 , 50%:488.254束:15%:117.18 , 30%:234.36 , 50%:390.64束:3束:压力表:750184,千斤顶:908194 4束:3束:4束:3束:压力表:750183,千斤顶:908191 4束:3束:rad读作弧度。

20m小箱梁理论伸长值计算

20m小箱梁理论伸长值计算

6752
10250
0.98992312 191374.832 一端伸长量:72.04mm
两端总伸长量:72.04×2=144.08 mm
2208
10264
两端总伸长量:71.70×2=143.4 mm
预应力钢绞线理论伸长量计算(G6标)
涉及相关公式:Δ L= Pp×L/(Ap×Ep) P2=P1×e-(kx+μ θ ) Pp= P×(1-e-(kx+μ θ ))/(kx+μ θ ) P:设计张拉力(N) 点力 K:摩擦系数(0.0015) μ :0.23 θ :夹角 X:单位孔道长度 PP:平均张拉力 P1:分段起点力 P2:分段终
192996.807 193054.718 192244.72 192620.519 191374.832 191809.447 189446.37 190408.973
0.0039045 0.99610311 192996计
0.01648987 0.00453517 0.9954751 0 0.010128
预应力钢绞线理论伸长量计算(G6标)
涉及相关公式:Δ L= Pp×L/(Ap×Ep) P2=P1×e-(kx+μ θ ) Pp= P×(1-e-(kx+μ θ ))/(kx+μ θ ) P:设计张拉力(N) 点力 K:摩擦系数(0.0015) μ :0.23 θ :夹角 X:单位孔道长度 PP:平均张拉力 P1:分段起点力 P2:分段终
192996.807 193054.718
0.99309396 192996.807 191663.963 192329.615
N1
曲线段 直线段2 合计
0.09026494 0.02753044 0.97284507 191663.963 186459.342 189049.712 0 0.001113 0.99888762 186459.342 186251.928 186355.616 一端伸长量:71.81mm

20m小箱梁预应力钢绞线理论伸长量的计算书

20m小箱梁预应力钢绞线理论伸长量的计算书

乐昌至广州高速公路樟市至花东段某合同段20m小箱梁预应力计算书编制人:复核人:编制日期:2012年10月16日20m小箱梁预应力钢绞线理论伸长量的计算一、计算公式:1、《公路桥梁施工技术规范》(JTGT/F50—2011)中关于预应筋伸长值ΔL 的计算按照以下公式(1):ΔL=Pp×L Ap×EpΔL-各分段预应力筋的理论伸长值(mm);Pp—各分段预应力筋的平均张拉力(N);L-预应力筋的分段长度(mm);Ap—预应力筋的截面面积(mm2);Ep—预应力筋的弹性模量(Mpa)(试验检测值);2、《公路桥梁施工技术规范》(JTGT/F50-2011)附录C1中规定了Pp的计算公式(2):Pp=P×(1-e-(kx+μθ))kx+μθP—预应力筋张拉端的张拉力,将钢绞线分段计算后,为每分段的起点张拉力,即为前段的终点张拉力(N);θ-从张拉端至计算截面曲线孔道部分切线的夹角之和,分段后为每分段中每段曲线段的切线夹角(rad);x—从张拉端至计算截面的孔道长度,分段后为每个分段长度或为公式1中L值;k-孔道每束局部偏差对摩擦的影响系数(1/m),管道内全长均应考虑该影响;μ—预应力筋与孔道壁之间的磨擦系数,只在管道弯曲部分考虑该系数的影响。

3、每段的终点力与起点力(交界点作用力)的关系如下式:Pz=Pq×e-(KX+μθ)(公式3)Pz—分段终点力(N)Pq—分段的起点力(N)理论伸长值计算中,钢绞线对称布置,在进行伸长量计算时取计算一半钢绞线的伸长值然后乘以二的方法进行计算;钢绞线的分段原则:将整束钢绞线根据设计线形分成曲线连续段及直线连续段,而不能将直线段及曲线段分在同一段内。

二、计算书20m 小箱梁预应力钢绞线理论伸长量计算(一、)钢束N1(5Φs 15。

24)已知E P =197000MP , A P =140m 2,u=0。

17, k=0。

0015, f pk =1860MP5。

20m空心板梁预制伸长值计算说明书

20m空心板梁预制伸长值计算说明书

农一师八团至阿拉尔公路第三合同段K90+000---K103+118.2空心板梁预制伸长值计算说明书大庆建筑安装集团有限责任公司驻农一师八团-阿拉尔公路第三合同段项目部2012年10月25日20m空心板梁预制伸长值计算说明书一、工程概况中桥K98+887斜交梁板18块,斜角角度为120度。

预应力钢铰线采用专业厂家生产的公称直径Φs15.2-5,公称面积140mm2,标准强度1860MPa。

预制梁锚具采用M15型锚具及时性其配套设备,管道或孔采用钢波纹管;钢铰线锚下控制应力为0.73fpk=1339MPa。

张拉采用双控,以钢束伸长量进行校核。

主要施工技术特点预应力体系为空心板的重要受力体系因此空心板施工过程中预应力张拉是否合理正确,钢绞线实际伸长量在达到设计张拉应力时是否与理论符合及有关的预应力材料制作是空心板施工质量的关键。

K98+887中桥20 m 预应力空心板的张拉采用2 端对称张拉,张拉时采用张拉吨位及伸长量(此处的伸长量为扣除10 %的初始张拉力后的伸长量) 双控,张拉控制应力σk 控制在1339 MPa ,伸长量不超过计算值的±6 %。

二、后张法预应力空心板张拉工艺1、原材料及锚具技术要求预应力钢绞线采用天津高利预制厂生产的高强度低松弛预应力钢绞线,锚具为柳州海威姆M15-5BC型,锚具、钢绞线进场后应按有关标准和每60 t 或每一批次进行复核和质量检验;所有锚具应记录型号、批号、数量;复验合格的锚具,钢绞线使用前必须进行超预张拉检验。

2、机具设备(1) 由于钢绞线张拉控制应力σk 为1339 MPa ,单根钢绞线的张拉应力为: 1339×140/1000 = 187.46 KN 经上述计算可知应采用20t 的液压穿心式千斤顶、液压顶压器、卷扬器;(2) 测力仪表:油压表、弹簧测力计、荷载表、传感器、数字显示表;(3) 配套机具:液压镦头器、压花机、挤压机、预紧器、电动灌浆机、高压油泵、手提砂轮切割机。

20m空心板伸长量计算书

20m空心板伸长量计算书

20m空心板预应力张拉伸长量计算书一、计算说明:本桥空心板预应力孔道采用预埋塑料波纹管成型,考虑钢绞线与孔道壁摩擦的影响,取摩擦系数μ=0.20,孔道每米局部偏差对摩擦的影响系数取k=0.0015(《公路桥涵施工技术规范JTJ041-2000》)。

预应力钢绞线强度标准为1860Mpa,公称截面积为140mm2,公称直径为15.24mm,,弹性模数Ep=1.95×105Mpa,设计张拉控制应力δ=1395 Mpa,1 Mpa=0.1KN/cm2。

该桥每片空心板均为4束钢绞线,1束为6Φj15.24,2束为6Φj15.24,1、2束钢绞线根数均为6根,边板与中板钢绞线相同。

二、空心板钢绞线伸长量计算:(一)一束钢绞线伸长量计算:(A=6)本束预应力钢绞线使用1Φj15.24,已知:Ap=1*140=140mm2,Ep=1.95×105Mpa,则张拉控制力P=1395*140=195.3KN,钢绞线计算长度:X=(21.112-0.7*2+0.045*2)/2=19.802/2=9.901m,总长L=19.96m,其中0.045为锚具厚度,求曲线段孔道部分切线的夹角:θ=14*π/180=14*3.1415926/180=0.244rad1、预应力的平均张拉力:Pp=P*[1-e-(kx+μθ)]/(Kx+μθ)=1523*[1-e-(0.0015*9.901+0.2*0.244)]/(0.0015*9.901+0.2*0.244)=1523*(1-0.938332)/0.0636515=1523*0.96884=1475.54KN2、理论伸长量:取预应力为10%张拉控制应力,即预应力=0.1Pp=0.1*1475.54=147.554KN△L初= (Pp*L)/(AP*Ep)=(147.554*103*19802)/(1092*1.95*105)=13.7mm 初3、100%预应力理论计算伸长量:△L=(Pp*L)/(AP*Ep)=(1475.54*103*19802)/(1092*1.95*105)=137.2mm 初钢绞线伸长量取值范围(±6%):128.97mm-145.45mm(二)二束钢绞线伸长量计算:(A=6)本束预应力钢绞线使用6Φj15.24,已知:Ap=6*182=1092mm2,Ep=1.95×105Mpa,则张拉控制力P=1395*1092=1523KN,钢绞线计算长度:X=(21.002-0.7*2+0.045*2)/2=19.692/2=9.846m,总长L=19.692m,其中0.045为锚具厚度,求曲线段孔道部分切线的夹角:θ=2.3*π/180=2.3*3.1415926/180=0.04rad3、预应力的平均张拉力:Pp=P*[1-e-(kx+μθ)]/(Kx+μθ)=1523*[1-e-(0.0015*9.846+0.2*0.04)]/(0.0015*9.846+0.2*0.04)=1523*(1-0.977488257)/0.022769=1523*0.9887=1505.79KN 4、理论伸长量:取预应力为10%张拉控制应力,即预应力=0.1Pp=0.1*1505.79=150.579KN*L)/(AP*Ep)=(150.579*103*19.692)/(1092*1.95*105)=13.93mm △L初= (Pp初3、100%预应力理论计算伸长量:*L)/(AP*Ep)=(1505.79*103*19.692)/(1092*1.95*105)=139.3mm △L=(Pp初钢绞线伸长量取值范围(±6%):130.9mm-147.61mm三、伸长量控制从上述计算可以看出,张拉力的大小及钢绞线布筋的弧度对千斤顶内钢绞线伸长量影响不大,相关计算数据详见附表。

20米箱梁张拉计算书

20米箱梁张拉计算书

20米箱梁张拉计算说明一、预应力张拉计算说明根据***公路工程项目施工设计图纸,结合《公路桥涵施工技术规范》JTG/T F50-2011提供的张拉计算公式进行张拉计算。

采用平均张拉法,计算箱梁主体钢束张拉力和预应力筋理论伸长值。

1、计算参数确定:采用符合GB/T 5224-2003标准的低松弛高强度预应力钢绞线,结构1*7-15.2-1860-GB/T5224-2003。

单根钢绞线直径为15.2mm,钢绞线公称面积为140mm2,标准强度为1860MPa,弹性模量Eg=1.9687×105MPa,U=0.25,K=0.0015。

钢绞线张拉锚下控制应力为σcon=1395 MPa。

钢筋回缩和锚具变形为6mm(一端)。

二、连续端箱梁张拉计算1)钢束N1钢绞线:Ay=4×140=560mm2,L=AB+BC+CD=7.034+2.879+0.537=10.45m。

钢束的张拉力a、张拉力的计算:ΡA=σk×Ay×n×1/1000=1395×1×560×1/1000=781.2KNΡB= P A=781.2KNΡC=ΡB*[1-e-(Kx+μθ)]/(Kx +μθ)μ=0.25,k=0.0015,θ=0.095993109rad ,x=2.879ΡC=766.193KNb、伸长值的计算:△L AB=ΡA *L/Ay*Eg=50.321mm△L BC=ΡC *L/Ay*Eg=20.493mm△L CD=``````ΡC *L/Ay*Eg=3.768mm理论伸长值L=2(△L AB +△L BC +△L CD )=149.16mm伸长值=理论伸长值+ 回缩量=149.16+12=161.16mm2)钢束N2钢绞线:Ay=4×140=560mm2,L=AB+BC+CD=5.573+2.879+2.015=10.467m。

钢束的张拉力a、张拉力的计算:ΡA=σk×Ay×n×1/1000=1395×1×560×1/1000=781.2KNΡB= P A=781.2KNΡC=ΡB*[1-e-(Kx+μθ)]/(Kx +μθ)μ=0.25,k=0.0015,θ=0.095993109rad ,x=2.879ΡC=767.032KNb、伸长值的计算:△L AB=ΡA *L/Ay*Eg=39.869mm△L BC=ΡC *L/Ay*Eg=20.515mm△L CD=ΡC *L/Ay*Eg=14.153mm理论伸长值L=2(△L AB +△L BC +△L CD )=149.08m伸长值=理论伸长值+ 回缩量=149.08+12=161.08mm3)钢束N3钢绞线:Ay=3×140=420mm2,L=AB+BC+CD=7.901+0.733+1.716=10.35m。

20米箱梁预应力张拉伸长量计算(最终10.9)

20米箱梁预应力张拉伸长量计算(最终10.9)

20米箱梁预应力张拉伸长量计算钢铰线强度:1860MPa 控制应力:1860×0.75=1395 MPa钢铰线公称面积:140 mm2单根控制力:1395×140.0=195300 N伸长量计算公式:△L=Pp×L÷(Ap×Ep)一、中跨1#束①直线段长 0.537米②竖曲线段长 L=π÷180°×a×R=3.1415926÷180°×5.5°×30.0=2.880米③直线段长4.869 米④平曲线段长 L=π÷180°×a×R=3.1415926÷180°×1.8°×25.0=0.785÷COS5.5°=0.789 ⑤直线段长 0.728米⑥工具段长 0.74米(由于箱梁板顶预埋筋影响,千斤顶不能靠近锚环,为不弯曲板顶预埋筋,需增加一个过渡环,具体尺寸为:锚环0.046m+限位板0.035m+过渡环0.25m+千斤顶0.363m+锚环0.046m=0.74m)Pp=P×(1-e-(kx+μθ))÷(kx+μθ)Pp=P=195300 N Ep=198 GPa得:⑥的伸长量:e=2.718281828 k=0.0015 x=0.74 μ=0.25θ=0°195300×(1-2.71828-(0.0015×0.74))÷(0.0015×0.74)=195191.52 N195191.52×740÷(140×198000)=5.21mm⑤的伸长量:e=2.718281828 k=0.0015 x=1.468 μ=0.25θ=0°195300×(1-2.71828-(0.0015×1.468))÷(0.0015×1.468)=195085.00 N195085.00×728÷(140×198000)=5.12mm④的伸长量:e=2.718281828 k=0.0015 x=2.257 μ=0.25θ=1.8°×0.017453293=0.03142195300×(1-2.71828-(0.0015×2.257+0.25×0.03142))÷(0.0015×2.257+0.25×0.03142)=194206.34 N194206.34×789÷(140×198000)=5.53 mme=2.718281828 k=0.0015 x=7.126 μ=0.25θ=1.8°×0.017453293=0.03142195300×(1-2.71828-(0.0015×7.126+0.25×0.03142)))÷(0.0015×7.126+0.25×0.03142)=193500.19 N193500.19×4869÷(140×198000)=34.00mm②的伸长量:e=2.71828 k=0.0015 x=10.006 μ=0.25θ=7.3°×0.017453293=0.12741195300×(1-2.71828-(0.0015×10.006+0.25×0.12741))÷(0.0015×10.006+0.25×0.12741)=190794.5 N190794.5×2880÷(140×198000)=19.82mm①的伸长量:e=2.718281828 k=0.0015 x=10.543 μ=0.25θ=7.3°×0.017453293=0.12741195300×(1-2.71828-(0.0015×10.543+0.25×0.12741))÷(0.0015×10.543+0.25×0.12741)=190718.28 N190718.28×537÷(140×198000)=3.69mm1#束的伸长量为:5.21+5.12+5.53+34.0+19.82+3.69=73.37×2=146.74 mm 2#束①直线段长 2.015米②竖曲线段长 L=π÷180°×a×R=3.1415926÷180°×5.5°×30.0=2.88米③直线段长 3.408 米④平曲线段长 L=π÷180°×a×R=3.1415926÷180°×1.8°×25.0=0.785÷COS5.5°=0.789 ⑤直线段长 0.728米⑥工具段长0.49米(锚环0.046m+限位板0.035m+千斤顶0.363m+锚环0.046m=0.49m)Pp=P×(1-e-(kx+μθ))÷(kx+μθ)Pp=P=195300 N Ep=198 GPa得:⑥的伸长量:e=2.718281828 k=0.0015 x=0.49 μ=0.25θ=0°195300×(1-2.71828-(0.0015×0.49))÷(0.0015×0.49)=195228.11 N195228.11×490÷(140×198000)=3.45 mme=2.718281828 k=0.0015 x=1.218 μ=0.25θ=0°195300×(1-2.71828-(0.0015×1.218))÷(0.0015×1.218)=195121.57 N195121.57×728÷(140×198000)=5.12mm④的伸长量:e=2.718281828 k=0.0015 x=2.007 μ=0.25θ=1.8°×0.017453293=0.03142195300×(1-2.71828-(0.0015×2.007+0.25×0.03142))÷(0.0015×2.007+0.25×0.03142)=194242.69 N194242.69×789÷(140×198000)=5.53 mm③的伸长量:e=2.718281828 k=0.0015 x=5.415 μ=0.25θ=1.8°×0.017453293=0.03142195300×(1-2.71828-(0.0015×5.415+0.25×0.03142))÷(0.0015×5.415+0.25×0.03142)=193747.94 N193747.94×3408÷(140×198000)=23.82 mm②的伸长量:e=2.71828 k=0.0015 x=8.295 μ=0.25θ=7.3°×0.017453293=0.12741195300×(1-2.71828-(0.0015×8.295+0.25×0.12741))÷(0.0015×8.295+0.25×0.12741)=191037.63 N191037.63×2880÷(140×198000)=19.85 mm①的伸长量:e=2.718281828 k=0.0015 x=10.31 μ=0.25θ=7.3°×0.017453293=0.12741195300×(1-2.71828-(0.0015×10.31+0.25×0.12741))÷(0.0015×10.31+0.25×0.12741)=190751.34 N190751.34×2015÷(140×198000)=13.87 mm2#束的伸长量为:3.45+5.12+5.53+23.82+19.85+13.87=71.64×2=143.28 mm 3#束①直线段长 7.901米②竖曲线段长 L=π÷180°×a×R=3.1415926÷180°×1.4°×30.0=0.733米③直线段长 1.065 米④工具段长 0.74米(由于箱梁板顶预埋筋影响,千斤顶不能靠近锚环,为不弯曲板顶预埋筋,需增加一个过渡环,具体尺寸为:锚环0.046m+限位板0.035m+过渡环0.25m+千斤顶0.363m+锚环0.046m=0.74m)Pp=P×(1-e-(kx+μθ))÷(kx+μθ)Pp=P=195300 N Ep=198 GPa得:④的伸长量:e=2.718281828 k=0.0015 x=0.74 μ=0.25θ=0°195300×(1-2.71828-(0.0015×0.74))÷(0.0015×0.74)=195191.52 N195191.52×740÷(140×198000)=5.21 mm③的伸长量:e=2.718281828 k=0.0015 x=1.805 μ=0.25θ=0°195300×(1-2.71828-(0.0015×1.805))÷(0.0015×1.805)=195035.72 N195035.72×1065÷(140×198000)=7.49 mm②的伸长量:e=2.71828 k=0.0015 x=2.538 μ=0.25θ=1.4°×0.017453293=0.02443195300×(1-2.71828-(0.0015×2.538+0.25×0.02443))÷(0.0015×2.538+0.25×0.02443)=194334.91 N194334.91×733÷(140×198000)=5.14 mm①的伸长量:e=2.71828 k=0.0015 x=10.439 μ=0.25θ=1.4°×0.017453293=0.02443195300×(1-2.71828-(0.0015×10.439+0.25×0.02443))÷(0.0015×10.439+0.25×0.02443)=193189.76 N193189.76×7901÷(140×198000)=55.06mm3#束的伸长量为:5.21+7.49+5.14+55.06=72.9×2=145.8 mm二、边跨1#束①直线段长 2.148米②竖曲线段长 L=π÷180°×a×R=3.1415926÷180°×5.5°×30.0=2.880米③直线段长 3.308 米④平曲线段长 L=π÷180°×a×R=3.1415926÷180°×1.8°×25.0=0.785÷COS5.5°=0.789 ⑤直线段长 0.724米⑥工具段长 0.64米(由于箱梁板顶预埋筋影响,千斤顶不能靠近锚环,为不弯曲板顶预埋筋,需增加一个过渡环,具体尺寸为:锚环0.046m+限位板0.035m+过渡环0.15m+千斤顶0.363m+锚环0.046m=0.64m)Pp=P×(1-e-(kx+μθ))÷(kx+μθ)Pp=P=195300 N Ep=198 GPa得:⑥的伸长量:e=2.718281828 k=0.0015 x=0.64 μ=0.25θ=0°195300×(1-2.71828-(0.0015×0.64))÷(0.0015×0.64)=195206.15 N195206.15×640÷(140×198000)=4.51 mm⑤的伸长量:e=2.718281828 k=0.0015 x=1.364 μ=0.25θ=0°195300×(1-2.71828-(0.0015×1.364))÷(0.0015×1.364)=195100.21 N195100.21×724÷(140×198000)=5.10 mm④的伸长量:e=2.718281828 k=0.0015 x=2.153 μ=0.25θ=1.8°×0.017453293=0.03142195300×(1-2.71828-(0.0015×2.153+0.25×0.03142))÷(0.0015×2.153+0.25×0.03142)=194221.46 N194221.46×789÷(140×198000)=5.53 mm③的伸长量:e=2.718281828 k=0.0015 x=5.461 μ=0.25θ=1.8°×0.017453293=0.03142195300×(1-2.71828-(0.0015×5.461+0.25×0.03142))÷(0.0015×5.461+0.25×0.03142)=193741.28 N193741.28×3308÷(140×198000)=23.12 mm②的伸长量:e=2.71828 k=0.0015 x=8.341 μ=0.25θ=7.3°×0.017453293=0.12741195300×(1-2.71828-(0.0015×8.341+0.25×0.12741))÷(0.0015×8.341+0.25×0.12741)=191031.09 N191031.09×2880÷(140×198000)=19.85 mm①的伸长量:e=2.718281828 k=0.0015 x=10.489 μ=0.25θ=7.3°×0.017453293=0.12741195300×(1-2.71828-(0.0015×10.489+0.25×0.12741))÷(0.0015×10.489+0.25×0.12741)=190725.94 N190725.94×2148÷(140×198000)=14.78 mm1#束的伸长量为:4.51+5.10+5.53+23.12+19.85+14.78=72.89+73.37=146.26 mm 2#束①直线段长 3.608米②竖曲线段长 L=π÷180°×a×R=3.1415926÷180°×5.5°×30.0=2.88米③直线段长 1.84 米④平曲线段长 L=π÷180°×a×R=3.1415926÷180°×1.8°×25.0=0.785÷COS5.5°=0.789 ⑤直线段长 0.724米⑥工具段长0.64米(由于箱梁板顶预埋筋影响,千斤顶不能靠近锚环,为不弯曲板顶预埋筋,需增加一个过渡环,具体尺寸为:锚环0.046m+限位板0.035m+过渡环0.15m+千斤顶0.363m+锚环0.046m=0.64m)Pp=P×(1-e-(kx+μθ))÷(kx+μθ)Pp=P=195300 N Ep=198 GPa得:⑥的伸长量:e=2.718281828 k=0.0015 x=0.64 μ=0.25θ=0°195300×(1-2.71828-(0.0015×0.64))÷(0.0015×0.64)=195206.15 N195206.15×640÷(140×198000)=4.51 mm⑤的伸长量:e=2.718281828 k=0.0015 x=1.364 μ=0.25θ=0°195300×(1-2.71828-(0.0015×1.364))÷(0.0015×1.364)=195100.21 N195100.21×724÷(140×198000)=5.10 mm④的伸长量:e=2.718281828 k=0.0015 x=2.153 μ=0.25θ=1.8°×0.017453293=0.03142195300×(1-2.71828-(0.0015×2.153+0.25×0.03142))÷(0.0015×2.153+0.25×0.03142)=194221.46 N194221.46×789÷(140×198000)=5.53mm③的伸长量:e=2.718281828 k=0.0015 x=3.993 μ=0.25θ=1.8°×0.017453293=0.03142195300×(1-2.71828-(0.0015×3.993+0.25×0.03142))÷(0.0015×3.993+0.25×0.03142)=193954.17 N193954.17×1840÷(140×198000)=12.87mm②的伸长量:e=2.71828 k=0.0015 x=6.873 μ=0.25θ=7.3°×0.017453293=0.12741195300×(1-2.71828-(0.0015×6.873+0.25×0.12741))÷(0.0015×6.873+0.25×0.12741)=191240.01N191240.01×2880÷(140×198000)=19.87 mm①的伸长量:e=2.718281828 k=0.0015 x=10.481 μ=0.25θ=7.3°×0.017453293=0.12741195300×(1-2.71828-(0.0015×10.481+0.25×0.12741))÷(0.0015×10.481+0.25×0.12741)=190727.08 N190727.08×3608÷(140×198000)=24.82 mm2#束的伸长量为:4.51+5.10+5.53+12.87+19.87+24.82=72.7+71.64=144.34 mm 3#束①直线段长 8.021米②竖曲线段长 L=π÷180°×a×R=3.1415926÷180°×1.4°×30.0=0.733米③直线段长 1.065 米④工具段长 0.74米(由于箱梁板顶预埋筋影响,千斤顶不能靠近锚环,为不弯曲板顶预埋筋,需增加一个过渡环,具体尺寸为:锚环0.046m+限位板0.035m+过渡环0.25m+千斤顶0.363m+锚环0.046m=0.74m)Pp=P×(1-e-(kx+μθ))÷(kx+μθ)Pp=P=195300 N Ep=198 GPa得:④的伸长量:e=2.718281828 k=0.0015 x=0.74 μ=0.25θ=0°195300×(1-2.71828-(0.0015×0.74))÷(0.0015×0.74)=195191.52 N195191.52×740÷(140×198000)=5.21 mm③的伸长量:e=2.718281828 k=0.0015 x=1.805 μ=0.25θ=0°195300×(1-2.71828-(0.0015×1.805))÷(0.0015×1.805)=195035.72 N195035.72×1065÷(140×198000)=7.49 mm②的伸长量:e=2.71828 k=0.0015 x=2.538 μ=0.25θ=1.4°×0.017453293=0.02443195300×(1-2.71828-(0.0015×2.538+0.25×0.02443))÷(0.0015×2.538+0.25×0.02443)=194334.91 N194334.91×733÷(140×198000)=5.14 mm①的伸长量:e=2.71828 k=0.0015 x=10.559 μ=0.25θ=1.4°×0.017453293=0.02443195300×(1-2.71828-(0.0015×10.559+0.25×0.02443))÷(0.0015×10.559+0.25×0.02443)=193172.44 N193172.44×8021÷(140×198000)=55.90 mm3#束的伸长量为:5.21+7.49+5.14+55.90=73.74+72.9=146.64 mm。

20米预应力空心小箱梁张拉伸长量计算

20米预应力空心小箱梁张拉伸长量计算

20⽶预应⼒空⼼⼩箱梁张拉伸长量计算20⽶预应⼒空⼼⼩箱梁张拉伸长量计算⼀、钢绞线张拉控制⼒计算边跨:N1=N2=N3=5×(1860×0.75×140)=976.5KN中跨:N1=N3=4×(1860×0.75×140)=781.2 KNN2=5×(1860×0.75×140)=976.5 KN⼆、钢绞线伸长量计算已知θ1=(2×3.14)÷180=0.035θ2=θ3=(6×3.14)÷180=0.1047E=2.0×105Mpa A=140mm2U=0.17 K=0.0015边跨:N1 L ab=2.198+(0.05+0.35+0.025)=2.198+0.425=2.623mL bc=1.047mm L CD=5.256+1.237=6.493m§=0.75×1860×140=195.3KNAB段:Pq=195.3×5=976.5KNPz=976.5×e-(0.0015×2.623+0.17×0)=974.35KNPp=Pq×(1-e-(KX+UQ))/(KX+UQ)=(Pq+ Pz)/2=(976.5+974.35)/2=975.42KN△L1=Pp*L/(A×E)=975.42×2.623/(5×140×200)×1000=18.34mmBC段:Pq=974.35KNPz=974.35×e-(0.0015×1.047+0.17×0.035)=967.05KNPp=(974.35+967.05)÷2=970.7KN△L2=Pp*L/(A×E)=970.7×1.047÷(5×140×200)×1000=7.26mmCD段:Pq=967.05KNPz=967.05×e-(0.0015×6.493+0.17×0)=957.68KNPp=(967.05+957.68)÷2=962.37KN△L3= 962.37×6.493÷(5×140×200)×1000=44.63mm则总伸长值为:L=(△L1+△L2+△L3)×2=(18.34+7.26+44.63)×2=140.46mmN2L ab=2.637+0.425=3.062m L bc=3.142m L cd=2.716+1.237=3.953mAB段:Pq=195.3×5=976.5KNPz=976.5×e-(0.0015*3.062+0.17*0)=972.03KNPp=(976.5+972.03)÷2=974.27KN△L1=Pp*L/(A*E)=974.27×3.062/(5×140×200)×1000=21.31mmBC段:Pq=Pzab=972.03KN Pz=972.03×e-(0.0015×3.142+0.17×0.1047)=955.14KNCD段:Pq=955.14KNPz=955.14×e-(0.0015×3.953+0.17×0)=950.74KNPp=(955.14+950.74)÷2=952.94KN△L3= 952.94×3.953÷(5×140×200)×1000=26.91mm则总伸长值为:L=(△L1+△L2+△L3)×2=(21.31+21.63+26.91)×2=139.7mm N3 L ab=5.077+0.425=5.502m L bc=3.142m L cd=0.29+1.237=1.527mAB段:Pq=195.3×5=976.5KNPz=976.5×e-(0.0015×5.502+0.17×0.1047)=951.39KNPp=(976.5+951.39)÷2=963.95KN△L1= 963.95×5.502÷(5×140×200)×1000=37.88mmBC段:Pq=Pzab=951.39KNPz=951.39×e-(0.0015×3.142+0.17×0.1047)=934.86KNPp=(951.39+934.86)÷2=943.13KN△L2= 943.13×3.142÷(5×140×200)×1000=21.17mmCD段:Pq=934.86KNPz=934.86×e-(0.0015×1.527+0.17×0)=933.19KNPp=(934.86+933.19)÷2=934.03KN△L3= 934.03×1.527÷(5×140×200)×1000=10.19mm则总伸长值为:L=(△L1+△L2+△L3)×2=(37.88+21.17+10.19)×2=138.48mm 中跨:N1L ab=2.198+(0.05+0.35+0.025)=2.198+0.425=2.623mL bc=1.047m L cd=5.256+1.194=6.45mAB段:Pq=4×(1860×0.75×140)=781.2 KNPz=781.2×e-(0.0015×2.623+17×0)=778.81KNPp=(781.2+778.81)÷2=780.01KN△L1= 780.01×2.623÷(4×140×200)×1000=18.27mmBC段:Pq=778.81KNPz=778.81×e-(0.0015×1.047+0.17×0.1047)=767.15KNPp=(778.81+767.15)÷2=772.98KN△L2 =772.98×1.047÷(4×140×200)×1000=7.23mmCD段:Pq=767.15KNPz=767.15×e-(0.0015×6.45+0.17×0)=761.39KN则总伸长值为:L=(△L1+△L2+△L3)×2=(18.27+7.23+44.01)×2=139.02mm N2 L ab=2.637+0.425=3.062m L bc=3.142m L cd=2.716+1.194=3.91mAB段:Pq=195.3×5=976.5KNPz=976.5×e-(0.0015×3.062+0.17×0)=972.03KNPp=(976.5+972.03)÷2=974.27KN△L1 =974.27×3.062÷(5×140×200)×1000=21.31mmBC段:Pq =972.03KNPz=972.03×e-(0.0015×3.142+0.17×0.1047)=955.14KNPp=(972.03+955.14)÷2=963.59KN△L2= 963.59×3.142÷(5×140×200)×1000=21.63mmCD段:Pq=955.14KNPz=955.14×e-(0.0015×3.91+0.17×0)=950.81KN△L3= 950.81×3.91÷(5×140×200)×1000=26.55mm则总伸长值为:L=(△L1+△L2+△L3)×2=(21.31+21.63+26.55)×2=138.98mm N3 L ab=5.077+0.425=5.502mm L bc=3.142mm L cd=0.29+1.194=1.484mmAB段:Pq=4×(1860×0.75×140)=781.2 KNPz=781.2×e-(0.0015×5.502+0.17×0)=774.78KNPp=(981.2+774.78)÷2=777.99KN△L1= 777.99×5.502÷(4×140×200)×1000=38.22mmBC段:Pq =774.78KNPz=774.78×e-(0.0015×3.142+0.17×0.1047)=757.53KNPp=(774.78+757.53)÷2=766.16KN△L2= 766.16×3.142÷(4×140×200)×1000=21.49mmCD段:Pq=757.53KNPz=757.53×e-(0.0015×1.484+0.17×0)=755.85KNPp=(757.53+755.85)÷2=756.69KN△L3= 756.69×1.484÷(4×140×200)×1000=10.03mm则总伸长值为:L=(△L1+△L2+△L3)×2=(38.22+21.49+10.03)×2=139.48mm设计控制张拉⼒及伸长量⼀览表实际计算控制张拉⼒及伸长量⼀览表。

20米空心板预应力张拉方案及参数计算

20米空心板预应力张拉方案及参数计算

20米空心板预应力张拉方案及参数计算1、工程概况XX桥6跨,跨径20m,预应力空心板梁共30片,梁体混凝土强度等级为C50。

预应力钢绞线强度为1860Mpa,钢绞线张拉控制应力为1395Mpa。

2、施工机具准备和安排本工程的施工机具在进场前都经过严格的检验和验收,机具数量和型号见下表。

3、张拉工期安排本桥梁板已全部预制完毕,计划一次性张拉完毕。

从2015年3月6日开始张拉,3月10日结束。

4、施工方法与施工工艺4.1张拉当梁体强度达到设计强度的90%以上,并经监理工程师同意后方可张拉,预应力张拉前先进行标高观察并做好记录,然后进行预应力张拉工作。

预应力张拉根据设计要求的步骤和程序进行。

张拉完成后,再测定空心板标高并做好记录,并且与张拉前的空心板标高作比较,分析预应力张拉前后空心板的反弹。

张拉、压浆施工时按规定做好各项施工记录,报监理工程师。

钢绞线下料长度应根据孔道长度、锚具长度、限位板厚度、千斤顶长度、工作锚长度、预留长度来进行下料,编束采用铅线每隔50~80cm绑扎一道,然后利用自制穿束器穿束,安装锚具,千斤顶,接着张拉。

张拉采用双控法一端张拉工艺,张拉程序为:0→初拉力(15%δk)→30%δk→100%δk(持荷2min)→锚固。

预应力张拉应注意以下事项:a、锚具和夹具出厂前由供方提供质量证明书。

锚具的强度、硬度、锚固能力等应按有关规定进行检验,符合要求才能使用。

b、张拉前,应对预应力孔道钢筋按规定要求做试验,张拉前必须对构件端部预埋件、砼、预应力孔道全面检查,如发现有蜂窝、裂缝、露筋、空洞及孔道穿孔等缺陷,须按有关规定采取措施,端部的预埋钢板一定要垂直于孔道中心线,钢板上的焊渣、毛刺、砼残渣等要清除干净。

c、张拉时砼强度不低于设计强度的90%,张拉顺序严格按照设计规定。

d、为确保张拉的准确性,在张拉前对张拉设备进行标定。

e、锚头平面必须与钢束孔道垂直,锚孔中心要对准管道中心。

f、张拉应标注出标记以直接测定各钢绞线的伸长量,对伸长量不足的钢绞线应再次张拉到设计吨位。

20米箱梁预应力张拉计算书

20米箱梁预应力张拉计算书
5 2
μ——预应力筋与孔道壁的摩擦系数,取 0.25 2、预应力筋的理论伸长值△LL 计算公式及参数: △LL= Pp L Ap Ep
Pz=Pq× e-(kX+μθ) 式中: Pp——预应力筋平均张拉力(N) L——预应力筋的长度(m) Ap——预应力筋的截面面积(mm2) ,取 140mm2 Ep——预应力筋的弹性模量(N/mm2)取 1.95×105N/mm2 Pz——分段终点力(N) Pq——分段的起点力(N) 二、 伸长值计算: 1、 N1 束一端的伸长量(中跨): 单根钢绞线张拉的张拉力 P=0.75×1860×140=195300N XAB=6.384m θ =5.5× XBC=2.880m XCD=0.537m
20m 箱梁预应力张拉计算书
第一章 伸长量计算 省道 309 线宝昌至沽源(蒙冀界)段公路 20m 箱梁,设计采用 1、 标准强度 fpk=1860Mpa 的高强度、低松弛钢绞线 2、 钢绞线公称直径Φ15.2mm 3、 钢绞线公称截面面积 Ap=140mm 4、 弹性模量 Eg=1.95×10 Mpa 5、 塑料波纹管μ=0.25,k=0.0015 为保证施工符合设计要求, 施工中采用油压表读数和钢绞线拉 伸测定值双控。 理论伸长量计算采用 《公路桥涵施工技术规范》 JTG/T F50-2011 第 7.6.3 条及附录 C1 预应力钢绞线理论伸长 值及平均张拉力计算公式。 一、 计算公式及参数 1、 预应力平均张拉力计算公式及参数: P(1-e-(kx+µθ)) Pp= kx+μθ P=0.75fpk×Ap×1860 Pp ——预应力筋的平均张拉力(N) P ——预应力筋张拉端的张拉力(N) x ——从张拉端至计算截面的孔道长度(m) θ ——从张拉端至计算截面的曲线孔道部分切线的夹角之和(rad) k ——孔道每米局部偏差对摩擦的影响系数,取 0.0015

20米箱梁张拉计算书

20米箱梁张拉计算书

20米箱梁张拉计算书20米预制箱梁张拉计算方案一、基础数据本标段20米预制箱梁正弯矩预应力钢束共有N1、N2、N3各2束,设计锚下张拉控制应力:σcon=1860×0.75=1395MP a。

按设计要求箱梁砼强度达到设计强度的90%后方可张拉,并采用两端对称张拉,张拉程序为:0 初应力σcon(持荷2min)锚固,张拉顺序为N1、N2、N3。

二、预应力钢束张拉力计算1、经咨询设计单位,因设计图中张拉控制应力已经考虑了预应力损失,故张拉力按公式:F n=σcon×A×n进行计算,如下:N1钢束锚下张拉力F1=σcon×A×n=1395 MP a×140㎜2×3=585.9KN其中:A为每根预应力钢绞线的截面积;n为同时张拉的预应力钢绞线的根数;F为钢绞线锚下张拉力。

其余钢束张拉力计算同N1,各钢束张拉力如下表:中跨箱梁预应力钢束张拉力计算明细表(表一)边跨箱梁预应力钢束张拉力计算明细表(表二)钢束号锚下张拉控制应力钢绞线根数(n) 截面积(A)㎜ 2 张拉力(Fn)KNN11395MPa 4 140 781.2N2 4 140 781.2N3 4 140 781.2三、压力表读数计算本桥采用200吨千斤顶进行张拉,经校验:编号为312#千斤顶对应的压力表编号为Y01280283,Y01280257,校准方程分别为F=0.0353P+0.6243, F=0.0351P+0.4491。

编号为80602号千斤顶对应的压力表编号为20087029,校准方程为P=0.013172F+0.004535。

故N1钢束采用312#千斤顶张拉时的压力表度数分别为:1)压力表编号为Y01280283:F1=0.0353P+0.6243=0.0353×585.9+0.6243=21.3 MP a2)压力表编号为Y01280257:F2=0.0351P+0.4491=0.0351×585.9+0.4491=21MP a其余钢束压力表读书计算同N1,压力表度数详见下表:预应力钢束100%бk张拉力所对应的压力表度数明细表(中跨箱梁)(表三)预应力钢束10%бk张拉力所对应的压力表度数明细表(中跨箱梁)(表四)N3 2.1 2.1 2.1 2.1 2.1 2.1 2.1 2.1钢束号20%бk时304#千斤顶压力表读数(MPa)20%бk时309#千斤顶压力表读数(MPa)20%бk时312#千斤顶压力表读数(MPa)20%бk时313#千斤顶压力表读数(MPa)编号(Y01280327)编号( Y01280336)编号(Y01196290)编号( Y01280347)编号(Y01280283)编号( Y01280257)编号(Y01280315)编号(Y01280309)预应力钢20%бk张拉力所对应的压力表度数明细表(中跨箱梁)(表五)另边跨箱梁的腹板N 1、N 2、 N 3钢束均为4根钢绞线,张拉时其各钢束的压力表读数同中跨箱梁N 2钢束的数据。

后张法20米空心板梁张拉计算

后张法20米空心板梁张拉计算

后张法20米空心板梁张拉计算在进行后张法计算之前,首先需要了解梁的基本概念。

空心板梁是指梁截面内部部分为空洞,形状通常为长方形或矩形。

空心板梁常见于建筑结构中,其具有自重轻、抗弯刚度大等特点。

通过张拉钢筋可以增加空心板梁的承载能力和抵抗变形能力。

张拉钢筋即通过预应力作用,将钢筋施加拉力,使其能够抗压。

后张法是在梁的施工中,先进行浇筑混凝土,待混凝土硬化后再进行钢筋张拉。

现在来进行后张法20米空心板梁张拉计算。

假设已给出的数据如下:梁长L=20米梁宽b=1米梁高h=0.4米梁的混凝土强度Fcu=30MPa钢筋的抗拉强度Fp=1770MPa(即螺纹钢筋)钢筋自重γst=7850N/m^3混凝土自重γc=2400N/m^3首先进行预应力力度设计。

1.计算梁的净高度h0净高度h0=梁高h-2倍保护层厚度2.计算荷载由于是空心板梁,通常采用纯弯矩模型进行计算。

假设梁只受到重力荷载作用,不考虑外部集中荷载。

梁的重力荷载G=混凝土自重*单位长度*梁宽=γc*b*h03.计算计算弯矩M弯矩是在受力钢筋处产生的正弯矩和由于梁自重产生的负弯矩之和。

正弯矩M=预应力钢筋的设计张力*杆长*弹性模量Es负弯矩M=G*杆长^2/8其中预应力钢筋的设计张力和杆长需要根据梁的几何形状、纵向钢筋布置、锚固长度等因素进行综合考虑。

4.计算预应力钢筋的设计张力P设计张力P=M/(杆长*弹性模量Es)5. 计算锚固长度la锚固长度la需要根据预应力工程规范进行确定。

通常为常数值,如10倍钢筋直径。

6.计算螺纹钢筋的长度l螺纹钢筋长度l = 梁长L + 2 * 锚固长度la7.计算预应力钢筋的截面面积A设计伸长量e=P/(A*弹性模量Es)A=P/(设计伸长量e*弹性模量Es)8.根据预应力钢筋的截面面积和钢筋的抗拉强度,选择适当的钢筋规格。

以上是进行后张法20米空心板梁张拉计算的一些基本步骤和计算公式。

在实际计算中,还需要根据具体情况进行细致的分析和计算,确保计算结果准确可靠。

新房子大桥20米小箱梁钢绞线伸长量计算书

新房子大桥20米小箱梁钢绞线伸长量计算书

20m小箱梁钢绞线伸长量计算书一、主要计算公式1.伸长量计算公式:△L=(P p×L)/(E p×A p)△L:钢绞线伸长量,mmP p:钢绞线平均张拉力,NL:钢绞线长度,mmE p:钢绞线弹性模量,MPa,一般图纸中有说明,但以试验室实测数据为准;A p:钢绞线截面积,单根φ15.24钢绞线有效截面积为140㎜22.平均张拉力P p=P×{1-e-(kL+μθ)}/(KL+μθ)P:张拉端张拉力,N1、N2钢束单根钢绞线张拉力P=781.2/4=195.3KNN3、N4钢束单根钢绞线张拉力P=585.9/3=195.3KNK:孔道摩擦影响系数;(附表C-1)μ:钢绞线与孔道的摩擦系数;(附表C-1)θ:从张拉端至计算截面的孔道切线转角之和,当有平弯时同样参与计算,Rad(弧度)。

二、长度计算(一)预应力钢绞线示意图桥梁中心线(二)N1钢束长度1、计算长度L AB=6850/cos5.1718°-2258=4620mmL BC =2×π×50000×5.1718°/360°=4513mmL CD=3000-2258=742mmL J= (L AB + L BC + L CD)×2=(4620+4513+742)=19750mm2、下料长度L x= (L工 +L AB + L BC + L CD) ×2=(450+4620+4513+742) ×2=20650mm (三)N2钢束长度1、计算长度L AB=5850/cos5.1718°-1793=4072mmL BC =2×π×50000×4.1065°/360°=3584mmL CD=4000-1793=2207mmL J= (L AB + L BC + L CD)×2=(4072+3584+2207)×2=19726mm2、下料长度张拉工作长度考虑450mmL x= (L工 +L AB + L BC + L CD) ×2=(450+4072+3584+2207) ×2=20626mm (四)、N3钢束1、计算长度L AB=2850/cos0.9448°-247=2603mmL BC =2×π×30000×0.9448°/360°=495mmL CD=7000-247=6753mmL J= (L AB + L BC + L CD)×2=(2603+495+6753)×2=19702mm2、下料长度L x= (L工 +L AB + L BC + L CD) ×2=(450+2603+495+6753) ×2=20602mm (五)、N4钢束1、计算长度L AB=2850/cos0.9448°-247=2603mmL BC =2×π×30000×0.9448°/360°=495mmL CD=7000-247=6753mmL J= (L AB + L BC + L CD)×2=(2603+495+6753)×2=19702mm2、下料长度L x= (L工 +L AB + L BC + L CD) ×2=(450+2603+495+6753) ×2=20602mm (六)、根据通用图可得出各线段参数,详见下表:三、伸长值计算根据试验检测报告可查得钢绞线的平均弹性模量为:E=2.01×105截面积A=140mm²。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

20米预应力空心小箱梁张拉伸长量计算一、钢绞线张拉控制力计算边跨:N1=N2=N3=5×(1860×0.75×140)=976.5KN中跨:N1=N3=4×(1860×0.75×140)=781.2 KNN2=5×(1860×0.75×140)=976.5 KN二、钢绞线伸长量计算已知θ1=(2×3.14)÷180=0.035θ2=θ3=(6×3.14)÷180=0.1047E=2.0×105Mpa A=140mm2U=0.17 K=0.0015边跨:N1 L ab=2.198+(0.05+0.35+0.025)=2.198+0.425=2.623mL bc=1.047mm L CD=5.256+1.237=6.493m§=0.75×1860×140=195.3KNAB段:Pq=195.3×5=976.5KNPz=976.5×e-(0.0015×2.623+0.17×0)=974.35KNPp=Pq×(1-e-(KX+UQ))/(KX+UQ)=(Pq+ Pz)/2=(976.5+974.35)/2=975.42KN △L1=Pp*L/(A×E)=975.42×2.623/(5×140×200)×1000=18.34mmBC段:Pq=974.35KNPz=974.35×e-(0.0015×1.047+0.17×0.035)=967.05KNPp=(974.35+967.05)÷2=970.7KN△L2=Pp*L/(A×E)=970.7×1.047÷(5×140×200)×1000=7.26mmCD段:Pq=967.05KNPz=967.05×e-(0.0015×6.493+0.17×0)=957.68KNPp=(967.05+957.68)÷2=962.37KN△L3= 962.37×6.493÷(5×140×200)×1000=44.63mm则总伸长值为:L=(△L1+△L2+△L3)×2=(18.34+7.26+44.63)×2=140.46mmN2L ab=2.637+0.425=3.062m L bc=3.142m L cd=2.716+1.237=3.953mAB段:Pq=195.3×5=976.5KNPz=976.5×e-(0.0015*3.062+0.17*0)=972.03KNPp=(976.5+972.03)÷2=974.27KN△L1=Pp*L/(A*E)=974.27×3.062/(5×140×200)×1000=21.31mmBC段:Pq=Pzab=972.03KN Pz=972.03×e-(0.0015×3.142+0.17×0.1047)=955.14KN Pp=(972.03+955.14)÷2=963.59KN△L2= 963.59×3.142÷(5×140×200)×1000=21.63mmCD段:Pq=955.14KNPz=955.14×e-(0.0015×3.953+0.17×0)=950.74KNPp=(955.14+950.74)÷2=952.94KN△L3= 952.94×3.953÷(5×140×200)×1000=26.91mm则总伸长值为:L=(△L1+△L2+△L3)×2=(21.31+21.63+26.91)×2=139.7mm N3L ab=5.077+0.425=5.502m L bc=3.142m L cd=0.29+1.237=1.527mAB段:Pq=195.3×5=976.5KNPz=976.5×e-(0.0015×5.502+0.17×0.1047)=951.39KNPp=(976.5+951.39)÷2=963.95KN△L1= 963.95×5.502÷(5×140×200)×1000=37.88mmBC段:Pq=Pzab=951.39KNPz=951.39×e-(0.0015×3.142+0.17×0.1047)=934.86KNPp=(951.39+934.86)÷2=943.13KN△L2= 943.13×3.142÷(5×140×200)×1000=21.17mmCD段:Pq=934.86KNPz=934.86×e-(0.0015×1.527+0.17×0)=933.19KNPp=(934.86+933.19)÷2=934.03KN△L3= 934.03×1.527÷(5×140×200)×1000=10.19mm则总伸长值为:L=(△L1+△L2+△L3)×2=(37.88+21.17+10.19)×2=138.48mm中跨:N1L ab=2.198+(0.05+0.35+0.025)=2.198+0.425=2.623mL bc=1.047m L cd=5.256+1.194=6.45mAB段:Pq=4×(1860×0.75×140)=781.2 KNPz=781.2×e-(0.0015×2.623+17×0)=778.81KNPp=(781.2+778.81)÷2=780.01KN△L1= 780.01×2.623÷(4×140×200)×1000=18.27mmBC段:Pq=778.81KNPz=778.81×e-(0.0015×1.047+0.17×0.1047)=767.15KNPp=(778.81+767.15)÷2=772.98KN△L2 =772.98×1.047÷(4×140×200)×1000=7.23mmCD段:Pq=767.15KNPz=767.15×e-(0.0015×6.45+0.17×0)=761.39KNPp=(767.15+761.39)÷2=764.27KN△L3=764.27×6.45÷(4×140×200)×1000=44.01mm则总伸长值为:L=(△L1+△L2+△L3)×2=(18.27+7.23+44.01)×2=139.02mm N2L ab=2.637+0.425=3.062m L bc=3.142m L cd=2.716+1.194=3.91mAB段:Pq=195.3×5=976.5KNPz=976.5×e-(0.0015×3.062+0.17×0)=972.03KNPp=(976.5+972.03)÷2=974.27KN△L1 =974.27×3.062÷(5×140×200)×1000=21.31mmBC段:Pq =972.03KNPz=972.03×e-(0.0015×3.142+0.17×0.1047)=955.14KNPp=(972.03+955.14)÷2=963.59KN△L2= 963.59×3.142÷(5×140×200)×1000=21.63mmCD段:Pq=955.14KNPz=955.14×e-(0.0015×3.91+0.17×0)=950.81KN△L3= 950.81×3.91÷(5×140×200)×1000=26.55mm则总伸长值为:L=(△L1+△L2+△L3)×2=(21.31+21.63+26.55)×2=138.98mm N3L ab=5.077+0.425=5.502mm L bc=3.142mm L cd=0.29+1.194=1.484mmAB段:Pq=4×(1860×0.75×140)=781.2 KNPz=781.2×e-(0.0015×5.502+0.17×0)=774.78KNPp=(981.2+774.78)÷2=777.99KN△L1= 777.99×5.502÷(4×140×200)×1000=38.22mmBC段:Pq =774.78KNPz=774.78×e-(0.0015×3.142+0.17×0.1047)=757.53KNPp=(774.78+757.53)÷2=766.16KN△L2= 766.16×3.142÷(4×140×200)×1000=21.49mmCD段:Pq=757.53KNPz=757.53×e-(0.0015×1.484+0.17×0)=755.85KNPp=(757.53+755.85)÷2=756.69KN△L3= 756.69×1.484÷(4×140×200)×1000=10.03mm则总伸长值为:L=(△L1+△L2+△L3)×2=(38.22+21.49+10.03)×2=139.48mm设计控制张拉力及伸长量一览表实际计算控制张拉力及伸长量一览表。

相关文档
最新文档