Chapter 3 Planning and Managing Projects
• Tracking project progress • Project personnel and organization
• Effort and schedule estimate
• Risk management
Milestone: some events, and they indicate to us and our customers that a measurable level of progress has been made. The distinguishing between activities and milestones: A activity is a part of the project that takes place over a period of time; A milestone is the completion of an activity and occurs at a particular point in time. Activity1.1 Step 1 Activity1.2 Work Phase 1 Step 2 Activity1.3 breakdown : : Activity1.1 structure Step 1 Activity1.2 Project Phase 2 Activity1.3 Step 2 : : : Step 1 Phase n Step 2 :
Step 1.3: planting shrubs and trees
Activity1.3.1: Obtain shrubs and trees Activity1.3.2: Dig holes Activity1.3.3: Planting shrubs and trees Activity1.3.4: Anchor the trees and mulch around them
Biblioteka Baidu
Step 2.1: prepare the site
Activity2.1.1: Survey the land Activity2.1.2: Request permits Activity2.1.3: Excavate for the foundation Activity2.1.4: Buy materials
Step 1.1: clearing and grubbing
Activity1.1.1: Remove trees Activity1.1.2: Remove stumps
Phase 1: Landscaping the Lot
Step 1.2: seeding the turf
Activity1.2.1: Aerate the soil Activity1.2.2: Disperse the seeds Activity1.2.3: Water and weed
……,if a post mortem were to be conducted for every project,it is very likely that a consistent theme would be encountered:project management was weak
问题 1.什么是软件项目管理? 2.软件项目管理的内容是什么? 3.如果我是项目经理,我应该做什么 4.我可以胜任软件项目管理吗?
• Using process modeling with project planning
1995年SEI统计,美国共取消了810亿美元的商业软件项目,其中 31%的项目未做完就被取消,53%的软件项目进度通常要延长50%的 时间,只有9%的软件项目能够及时交付并且费用也控制在预算之内。 2000年Tech Republic公司发表了有关IT项目的调查结果。该调查 是以北美的1375个IT专家为对象实施问卷调查进行的。根据此调查, IT项目中有40%失败,这些项目的平均成本每年花费100万美元。
Activity2.2.1: Lay the foundation Activity2.2.2: Build the outside walls Activity2.2.3: Install exterior plumbing Activity2.2.4: Exterior electrical work Activity2.2.5: Exterior siding Activity2.2.6: Painting the exterior Activity2.2.7: Install doors and fixtures Activity2.2.8: Install roofs
3.1 Tracking Progress Usually, customers have several questions to be answered: • Do you understand my problems and my needs?
• Can you design a system that will solve my problem or satisfy my needs?
• How long will it take you to develop such a system? • How much will it cost to have you develop such a system? A Project Schedule describes the software development cycle for a particular project by enumerating the phases or stages of a project and breaking each into discrete tasks or activities to be done. The schedule also portrays the interactions among these activities and estimates the time that each task or activity will take.