Operation, Installation and Maintenance Manual
Piping and Valve installation
General instructions for installation Pipes should be supported in such a way that the weight of the pipes is not taken by the screen In locating the supports, take care to ensure that the pipes do not cause stress to the screen The supports must allow for thermal expansion of the pipes If not, connections and screen body will be damaged! Piping Feed, accept, reject, reject dilution, rotor dilution, sealwater, deaeration, junk trap, emptying/flushing
Bending force F
- Check the tensioning after 48 hours use - Do not tension the belt over the recommended range
Fiber Preparation Systems
Slide 7 F_material3_machine book.ppt 10/2002 KN/Kotka
Tension Principle
Power transmission in Andritz screens: V-belts Gearbox - only in large special units
NOTE! Do not tension the belts over the recommended area!
To prevent the screen from plugging one of the most important of the instruments is the pressure difference control alarm
Inspection before operation Check belt tensioning, the direction of the motor rotation, foundation, foundation bolts and “V-belt pulley taperlocks” Check that the interior is clean and that no foreign objects have entered the screen Inspect the pipe supports Remove the screen cylinder before starting the screen for the first time (not always necessary, normally according to Andritz start-up supervisor instructions)
Fiber Preparation Systems
Slide 6 F_material3_machine book.ppt 10/2002 KN/Kotka
Operation, Installation and Maintenance Manual
Tension V-belts
Belt profile SPB
Fiber Preparation Systems
Slide 3 F_material3_machine book.ppt 10/2002 KN/Kotka
Operation, Installation and Maintenance Manual
Safety instructions
During Operation Check the maximum feed pressure of the screen from the dimensional drawing appended to the instructions Do not use the screen at a temperature higher than notified while the order was being made When the operating temperature exceeds 65C (prEN563), even short-term surface contact may cause skin burn All original guards of the screen must be appropriately fastened while the screen is running - do not remove them during operation! All maintenance of the screen and its drive motor is forbidden during operation, except: lubrication of bearings adjusting sealing water flow and pressure de-aeration of the screen
Fiber Preparation Systems
Slide 8 F_material3_machine book.ppt 10/2002 KN/Kotka
Operation, Installation and Maintenance Manual
Operation instructions – Before starting the screen
Operation, Installation and Maintenance Manual
delivered with each machine delivery
includes also assembly and dimension drawings and part lists
Fiber Preparation Systems
Fiber Preparation Systems
Slide 4 F_material3_machine book.ppt 10/20wenku.baidu.com2 KN/Kotka
Operation, Installation and Maintenance Manual
During Operation
Use appropriate hoisting equipment when lifting the screen Before maintenance, stop the drive motor and disconnect it from the electrical supply
Slide 1 F_material3_machine book.ppt 10/2002 KN/Kotka
Operation, Installation and Maintenance Manual
Safety instructions - Lifting
a a
a max = 30?
Fiber Preparation Systems
Instrumentation and alarms Always carry out a test run with water before productive operation - then the flow control instrumentation can be adjusted and the pressure instruments be checked.
Before opening the cover of the screen: make sure that the screen is de pressurized make sure that no liquid or stock can flow into the screen
The screen can be started after maintenance only after: the cover of the screen has been closed all original guards have been installed properly The sealing water valve must be opened before starting the drive motor of the screen!
Fiber Preparation Systems
Slide 9 F_material3_machine book.ppt 10/2002 KN/Kotka
Operation, Installation and Maintenance Manual
Operation instructions – Before starting the screen
SPC
Smaller pulley, 160-224 236-315 224-355 375-560
mm
F (N) 35-50 50-65 60-90 90-120
Belt deflection
Equipment F10 F20 F30 F40 F50 F60
Deflection (mm) 15 15 20 20 25 32
Measure the thickness of the screen material regularly
Fiber Preparation Systems
Slide 5 F_material3_machine book.ppt 10/2002 KN/Kotka
Operation, Installation and Maintenance Manual
Slide 2 F_material3_machine book.ppt 10/2002 KN/Kotka
Operation, Installation and Maintenance Manual
Safety instructions
Mounting of Equipment the supplier of the screen is only responsible for the assembly of the screen prior to delivery during the mounting, the fastening of the washer installed at the end of the shaft of the electric motor must be taken into account! During Operation Check the maximum feed pressure of the screen from the dimensional drawing appended to the instructions Do not use the screen at a temperature higher than notified while the order was being made When the operating temperature exceeds 65C (prEN563), even short-term surface contact may cause skin burn All original guards of the screen must be appropriately fastened while the screen is running - do not remove them during operation! All maintenance of the screen and its drive motor is forbidden during operation