施耐德精益生产系统定义

合集下载
  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
Terms & Definitions
Schneider Production System Version 2010 r1
How to Use
1. View the presentation in “Slide Show” mode 2. Go to the index on the next two pages 3. Select a topic, click on the button 4. To return to the index, in the
Process Process Capacity
Process map
Schneider Electric - GSCT-SPS - Definitions – Ver 2010
Pull / Push Shojinka
TPM Total Productive Maintenance
U-Shaped Layout
Best Available Technique Constant Daily Output Component and Product Quality Control Plan Design Time Direct Variable Cost Environmental Management System External Non-Conforming Rate Enterprise Resource Planning External Supplier Service Rate Field Failure Rate Industrial Efficiency Internal Non-Conforming Cost Rate Internal Supplier Service Rate
Efficiency Coefficient for Reference Support Coefficient Support Coefficient for Reference Manufacturing Base Cost Manufacturing Defect Rate Manufacturing Execution System Material Handling & Providing Material Providing and Handling Master Production Scheduling Material Requirement Planning Mean Time Between Failure Mean Time To Repair
Short Interval Management Visual control
Six sigma
Visual Refill
SMED Standard Operations
Value Stream Loops & Mapping
Waterspider
Suggestion Systems
Waste
Supermarket Takt time
Mixed Model
MOS
Move Time
MPS MRP MTBF MTM
Multi function worker Multi skilled worker Normative Inspection
One Piece Flow Order for Order
Order Queue
Pitchຫໍສະໝຸດ Baidu
Poka Yoke
KPI’s: OE, KE, IE KD, KER, KSR KPI’s: NEE, OEE
3
INDEX 2
Lead Time, Production Process Lead Time, Order
Lean Six Sigma Lean Enterprise Level Loading Little Train – Water Spider Material Handler
Jidoka
Just In Time
Kanban
Kaizen Kaizen Blitz KPI’s: ISSR, INCR ESSR, ENCR KPI’s: MDR, FFR PRR, NQC KPI’s: OLT, OTA, OTDLM, OTDM KPI’s:
Forecast Planning Heijunka Hoshin
Backflushing
Differentiation Tree
BAT Best Available
DMAIC
Technique
Schneider Electric - GSCT-SPS - Definitions – Ver 2010
Effective Motion
Inventory Rate
Elasticity Employee Involvement EPEI Ergonomics Ergonomic Zone Flexibility FMEA
WIP Zero Defect
Time Reference
VSM Symbols
Time: UT, DT, OTR
VSM Symbols
Time: TSR, OT, TS
VSM Time
4
Acronyms A-M
BAT CDO CPQ CP DT DVC EMS ENCR ERP ESSR FFR IE INCR ISSR
Schneider Electric - GSCT-SPS - Definitions – Ver 2010
JIT
Just In Time
KD
Design Coefficient
KE
Efficiency Coefficient
KER KS KSR MBC MDR MES MPH MPAH MPS MRP MTBF MTTR
Bullwhip Effect Capacity Cell Continuous Flow
8D
Constant Daily Output
7 Wastes Andon
COG’s MBC / DVC
Cycle Time
Autonomous Maintenance
Autonomation
Customer Service Delivery Lead Time
lower right corner, click on the
Schneider Electric - GSCT-SPS - Definitions – Ver 2010
2
INDEX 1
Acronyms A – M
Batch & Queue
Acronyms M – P Acronyms R – Z 5S 5 WHYS
相关文档
最新文档