Project Management ProfessionalPMP.ppt
项目管理专业(英文)
Project Life Cycle defines: Technical work performed in each phase Who is involved in each phase Project Phases can overlap – “Fast Tracking” Common Characteristics of Project Life Cycles:
Phases are collected into the Project Life Cycle
Set of defined work procedures to establish management control
Chapter 2 – Project Management Context
Chapter 2 – Project Management Context
Project Phases are marked by the completion of a deliverable
Tangible, verifiable work product Review of deliverables and approval/denial are “phase exits, stage gates, or kill points”
Project Management Professional (PMP)
Certification Study Guide
PMI Certification Materials
ห้องสมุดไป่ตู้
To assist PMI candidates for completing the PMI certification exam administered by the Project Management Institute Content is from “A Guide To The Project Management Body Of Knowledge” (PMBOK)
PMP项目管理培训课件完整版PPTppt
申请人在申请PMP认证时,需要提交 一份描述其参与过的项目管理实践经 验的报告,以证明其具备足够的项目 管理实践经验。
教育背景
申请人需要具备本科及以上学历,或 通过PMP认证前的培训课程获得相应 学分。
PMP的优势和价值
提高职业竞争力
PMP认证是国际公认的项目管理专业标准,持有PMP证 书可以证明个人在项目管理领域的专业能力和经验,提高 职业竞争力。
PMP项目管理培训课件完整 版
汇报人:可编辑
2023-12-23
• PMP简介 • PMP项目管理知识体系 • 项目启动与规划 • 项目执行与监控 • 项目收尾与评估 • PMP考试准备与应试技巧
01
PMP简介
PMP的定义
PMP
项目管理专业人士(Project Management Professional) 的缩写,指经过严格、系统培训,具备项目管理专业知识和 技能,并取得国际权威认证的人员。
保责任明确。
进度跟踪
定期跟踪项目进度,确保项目按 计划进行,及时发现并解决潜在
问题。
质量控制
对项目成果进行质量检查,确保 符合预定的质量标准和客户要求
。
项目监控
监控项目进度
通过定期报告、会议和沟通,监控项目进度,确 保项目按计划进行。
监控项目成本
对项目成本进行实时跟踪和控制,确保项目成本 控制在预算范围内。
3
注重实践经验
项目管理是一门实践性很强的学科,考生在备考 过程中应注重积累实践经验,将理论知识与实践 相结合。
PMP考试经验分享与注意事项
经验分享
一些成功的考生会分享他们的学习经验和应试技巧,考生可以通过参加模拟考 试、加入学习小组等方式获取这些经验。
项目管理培训教材ppt课件
面临加入WTO挑战的中国企业
• 中国在今年加入WTO已无大障碍; • 中国将参加全球化的公平的商业市场竞 争; • 中国市场将失去高关税的保护; • 市场竞争的激烈残酷,适应期1--3年; • 中国项目管理事业的发展是企业发展、 民族强盛的重要因素。
2019/3/4
中国第一届项目管理国际研讨会
项目沟通管理 沟通规划 住处传输 进度报告 验收报告 项目交接管理 项目目标再评估 接收人员培训 机构改组 经营流程改造
质量风险管理 风险鉴别 风险估量 风险对策 风险控制
项目采购管理 采购规划 询价与招标 资源选择 合同管理 合同终结
主要的一般管理技能
• 金融和会计、销售和市场、研究和开发、制造 和发售; • 战略规划、战术规划和实施规划; • 组织结构、组织行为、人事管理、补偿、福利 和职业培养; • 通过激励、授权、监督、团队建设、冲突管理 和其他技术来处理各种工作关系; • 通过个人时间管理、压力管理和其他技术来进 行自我管理。
里程碑0 批准概 念研究
里程碑1 批准概 念论证
里程碑2 批准开 发
里程碑3 制造开 发
里程碑4 根据需要 批准主要 的更正
2019/3/4
典型的项目生命期 3
建筑工程项目生命期
满负荷运行
100%
安装实质性完成 主要合 同发包
完 成 百 分 比 阶段1
可行性
•项目描述
项目立 项决策
阶段2
计划编制和设计
PMBOK 项目管理知识体系
项目管理
基本概念
项目范围管理 项目核准 范围规划 范围定义 范围核实 范围改变控制 项目质量管理 质量规划 质量保证 质量控制
内外环境
项目管理PMP简介PPT课件
4.1 制定项目章程
需求文件 需求管理计划
项目章程
10.1 识别干系人
干系人登记册
5.2 定义范围
5.1 收集需求
需求文件
需求文件 需求跟踪矩阵
5.4 核实范围
4.2 制定项目 管理计划
12.1 规划采购
5.3 创建 工作分解结构
5.5 控制范围
第28页/共49页
3、项目时间管理
活 动 ( 资 源 投 入) 水 平
收尾流程
启动阶段
第20页/共49页
结束阶段
交流目录
• 初步了解项目管理 • 项目管理的过程 • 项目管理知识领域
第21页/共49页
项目管理框架
项目 干系 人的 需要 和期 望
9大知识领域的核心功能 范围 时间 成本 质量 管理 管理 管理 管理
项目整体管理
人力 资源 管理
沟通 风险 管理 管理
促成功能
“看见了。”众人满怀希望的回 答。
“根据地图,我们正站在那座山 顶上!”
第26页/共49页
2、项目范围管理
项目范围管理的任务,是确保项目全部包含且只包 含那些必需的工作,以成功完成项目。
活
动
(
资
源
投
入) 水
启动流程
平
启动阶段
计划流程
实施流程 控制流程
第27页/共49页
收尾流程 结束阶段
项目范围管理
启动流程
启动阶段
计划流程
实施流程 控制流程
第33页/共49页
收尾流程 结束阶段
关联图
Quality Planning 质量计划
Quality Improvement 质量改进
PMP介绍(什么是PMP)
PMP 是什么?PMP(Project Management Professional)指项目管理专业人员资格认证。
它是由PMI发起的,严格评估项目管理人员知识技能是否具有高品质的资格认证考试。
其目的是为了给项目管理人员提供统一的行业标准。
1999年,PMP考试在所有认证考试中第一个获得ISO9001国际质量认证。
要想获得PMP专业认证,考生须达到美国项目管理协会(PMI)规定的对项目管理专业知识的掌握程度及其相应的工作经验和要求;另一方面,获得PMP 证书的专业人员应继续从事项目工作,以不断适应项目管理发展的要求。
PMP作为项目管理资格认证考试,已在国际上树立了其权威性:1、PMP为美国培养了一大批项目管理专业人才,项目管理职业已成为美国的"黄金职业"。
在我国许多媒体已把PMP称为继MBA,MPA之后的三大金字招牌之一;2、PMP认证已成为了一个国际性的认证标准,现在同时用英语、德语、法语、日语、朝语、西班牙语、葡萄亚语和中文等九种语言进行认证考试;3、到目前为止,获得"PMP"头衔的已有三万多人,以后将逐年增长;4、各国纷纷效仿美国的项目管理认证制度,推动了世界项目管理的发展。
要想获得PMP专业认证,考生须达到美国项目管理协会(PMI)规定的对项目管理专业知识的掌握程度及其相应的工作经验和要求;另一方面,获得PMP 证书的专业人员应继续从事项目工作,以不断适应项目管理发展的要求。
PMP与PMI的关系PMI(Project Management Institute),即美国项目管理学会,成立于1969年。
它是一个有着近5万名会员的国际性学会,是项目管理专业领域中最大的由研究人员、学者、顾问和经理组成的全球性专业组织。
PMI一直致力于项目管理领域的研究工作,全球PMI成员都在为探索科学的项目管理体系而努力。
今天,PMI制定出的项目管理方法已经得到全球公认,PMI 也已经成为全球项目管理的权威机构,其组织的项目管理资格认证考试(PMP)也已经成为项目管理领域的权威认证。
PMP项目管理培训课件完整版PPTppt
汇报人:可编辑
2023-12-26
目录
CONTENTS
• PMP简介 • 项目管理的五大过程组与十大知识领域 • 项目经理的角色与职责 • 项目管理的工具与技术 • 项目管理案例分析 • PMP考试备考指南
01 PMP简介
PMP的定义
PMP
项目管理专业人士(Project Management Professional) 的缩写,指经过严格、系统培训,具备项目管理专业知识和 技能,并取得国际权威认证的人员。
制定项目的初步沟通计划,明确 项目信息的传递方式和时间。
规划过程组
制定项目预算
根据项目需求和资源计划,制 定项目的预算。
制定风险管理计划
识别项目的风Байду номын сангаас,评估风险的 影响程度和发生概率,制定风 险应对措施和预案。
制定项目管理计划
制定详细的项目管理计划,包 括进度、成本、质量等方面的 计划。
制定人力资源计划
PMP认证
由美国项目管理协会(PMI)颁发的全球公认的项目管理专 业人士认证,是衡量项目管理从业人员专业能力的重要标准 。
PMP的认证标准
学历要求
申请者需具备本科及以上学历, 或持有PMP证书,或具备相关工
作经验。
培训要求
申请者需参加PMP认证培训,并 获得培训机构颁发的培训证书。
考试要求
申请者需通过PMP认证考试,考试 内容涵盖项目管理知识体系、项目 管理实践和项目管理能力评估等。
PMP的认证流程
报名参加PMP认证培训
选择有PMI授权的培训机构参加培训,并获 得培训证书。
参加考试
在规定时间内参加PMP认证考试,考试形式 为笔试。
PMP项目管理培训教材PPT(共 42张)
2识别干系人
16规划沟通
17规划风险管理 18识别风险 19实施定性风险分析 20实施定量风险分析 21规划风险应对
22规划采购
执行8
23指导与管理项目执行
监控10
31监控项目工作 32实施整体变更控制
33核实范围 34控制范围
35控制进度
24实施质量保证 25组建项目团队 26建设项目团队 27管理项目团队 28发布信息 29管理干系人
•一次性——项目有明确的开始时间和结束时间。当 已经实现,或因项目目标不能实现而项目被终止时 项目的结束。 •独特性——项目所创造的产品或服务与已有的相似 务相比较,在有些方面有明显的差别。项目要完成 曾作过的工作,所以它是独特的。
项目
项目是为创造独特的产品、服务或成 果而进行的临时性工作。
项目可以创造:
一个产品 一种服务或提供某种服务的能力 对现有产品线或服务线的改进 一种成果,例如某个结果或文件
项目的例子包括(但不限
开发一种新的产品、服务或成果 改变一个组织的结构、流程、人 开发或购买一套新的或改良后的 执行一项研究、其结果将被恰当 建造一座大楼、工厂或基础设施 实施、改造或提升现有的业务流
华证金服 PMP项目管理培训
华证金服(北京)科技有限公司
第一章
项目
•常见的项目有哪些?下面那些是项目呢? •每天接到M106鼠标的打样 ---- ? •每天接待客户的抱怨 ----? •系统的开发与维护 ----? •系统的开发 ----? •系统的维护 ----?
项目
•定义:项目是为完成某一独特的任务所做的一次性
30实施采购
36控制成本 37实施质量控制
38报告绩效 39监控风险 40管理采购
PMP项目管理培训课件
掌握项目管理最佳实践
PMP认证考试涵盖了全球 范围内公认的项目管理最 佳实践,通过学习可以掌 握这些先进的项目管理方
法。
PMP认证考试和课程介绍
PMP认证考试分为两个部分:基础知识和项目管理技能。基 础知识部分包括5个过程组和10个知识领域,考察对项目管 理基本概念和术语的理解;技能部分则主要考察在实际项目 中应用项目管理技能的能力。
通过收集项目相关信息, 识别项目中可能存在的潜 在风险。
风险分类
将识别出的风险进行分类 ,如技术风险、组织风险 、资源风险等。
风险记录
详细记录每个风险的描述 、来源和影响范围。
风险分析
概率-影响矩阵
对每个风险的发生概率和影响程 度进行评估,形成概率-影响矩
阵。
风险排序
根据概率-影响矩阵,对风险进 行排序,确定需要优先处理的风
险。
敏感性分析
分析项目参数变化对风险的影响 ,找出关键项目参数。
风险应对计划
预防策略
采取预防措施,降低风险的发生 概率。
减轻策略
采取措施减轻风险的影响程度。
转移策略
通过合同或保险等方式,将风险 转移给其他方。
接受策略
接受并监控风险,确保项目顺利 进行。
风险监控和控制
定期风险审查
定期审查项目中的风险,确保风险管理计 划的实施效果。
pmp项目管理培训课件
汇报人:可编辑
2023-12-22
CONTENTS
• PMP项目管理介绍 • PMBOK项目管理知识体系 • 项目管理过程和工具 • 风险管理 • 项目质量管理 • 项目沟通管理 • 项目采购管理
01
PMP项目管理介绍
什么是PMP?
PMP项目管理培训教材(共 42张PPT)
项目管理资源投入 半职
知识领域表
知识领域 过程组
启动2
1制定项目章程
规划20
3制定项目管理计划 4收集需求 5定义范围 6创建工作分解结构 7定义活动 8排列活动顺序 9估算活动资源 10估算活动历时 11制定进度计划 12估算成本 13制定预算 14规划质量 15制定人力资源计划
执行8
23指导与管理项目执行
战略
Strategy 战略 : 一带一路(习近
Portfolio
Portfolio 组合: 2016-2020 某城市
Programs
Program 集: 三峡工程 2015 中国国务院
《统筹推进世界一流大学
Projects
Project 项目: 某银行ATM系统更 某公司新建办公大
PMI逻辑
• 项目管理的逻辑
项目
• 项目分类
分类依据 项目规模 复杂程度 项目结果 所属行业 用户状况 项目分类 大型项目、中等项目、小项目 复杂项目、简单项目 结果为产品的项目、结果为服务的项目
农业项目、工业项目、投资项目、教育项目、社 有明确用户的项目、无明确用户的项目
PMP
•PMP是什么?
•Project Management Professional——项目管理专业 证 定义:项目管理是在项目活动中运用知识、技能、工具 满足和超过项目干系人对项目的需求和期望。
•一次性——项目有明确的开始时间和结束时间。当 已经实现,或因项目目标不能实现而项目被终止时 项目的结束。 •独特性——项目所创造的产品或服务与已有的相似 务相比较,在有些方面有明显的差别。项目要完成 曾作过的工作,所以它是独特的。
项目
项目是为创造独特的产品、服务或成 果而进行的临时性工作。
IPMP项目管理认证培训课件
项目人力资源管理
总结词
项目人力资源管理是确保项目团队高效协作的关键, 包括组织计划制定、团队组建、团队建设和团队管理 等过程。
详细描述
项目人力资源管理是项目管理中非常重要的一个环节, 它涉及到组织计划制定、团队组建、团队建设和团队管 理等过程。在组织计划制定阶段,需要根据项目的需求 和特点,确定项目的组织结构和职责分配;在团队组建 阶段,需要选择合适的团队成员并进行有效配置;在团 队建设阶段,需要通过培训、沟通和激励等方式来提高 团队的凝聚力和协作能力;在团队管理阶段,需要对团 队成员进行监督和评估,确保团队高效协作。
THANKS
感谢观看
项目时间管理
• 总结词:项目时间管理是确保项目按时完成的关键,包括活动定义、活动排序、活动资源估算、活动历时估算、 进度计划制定和进度控制等过程。
• 详细描述:项目时间管理是项目管理中非常重要的一个环节,它涉及到活动的定义、排序、资源估算、历时估 算、进度计划制定和进度控制等过程。在活动定义阶段,需要识别项目中包含的所有活动;在活动排序阶段, 需要根据活动之间的逻辑关系,确定活动的先后顺序;在活动资源估算和历时估算阶段,需要根据活动的性质 和规模,估算所需资源和历时;在进度计划制定阶段,需要根据活动排序、资源和历时估算结果,制定项目的 进度计划;在进度控制阶段,需要对项目的进度进行监督和控制,确保项目按时完成。
案例二:IPMP C级认证项目
总结词
中型项目,中级项目管理能力
详细描述
该案例涉及一个中等规模、有一定复杂度的项目,项目团队成员较多,需要协调多个部门和外部合作 伙伴。主要目标是实现项目的既定目标,并在过程中注重团队协作、沟通协调和资源管理等方面的能 力。
案例三:IPMP B级认证项目
项目管理英语
ProjectLocation项目地点ProjectLog项目日志ProjectLogic项目逻辑关系ProjectLogicDrawing项目逻辑图ProjectMaker项目制造者ProjectManagement("PM")项目管理ProjectManagement项目管理ProjectManagementCompetence项目管理能力ProjectManagementElements项目管理要素ProjectManagementInformationSystem项目管理信息系统ProjectManagementIntegration项目管理整合ProjectManagementManual项目管理手册ProjectManagementOffice("PMO")项目管理办公室ProjectManagementPlan项目管理计划ProjectManagementProcess项目管理过程ProjectManagementProfessional("PMP"?)项目管理专业人员ProjectManagementSoftware项目管理软件ProjectManagementTeam项目管理团队ProjectManager("PM")项目经理ProjectManual项目手册ProjectPolicies/Procedures ProjectMatrix项目矩阵组织ProjectMilestone项目里程碑ProjectMissionStatement项目使命说明书ProjectMonitoring项目监测ProjectNetworkDiagram项目网络图ProjectNetworkTechniques项目网络技术ProjectObjective项目目标ProjectObjectives项目目标ProjectOffice项目办公室ProjectOrganization项目组织ProjectOutput项目输出ProjectPerformance项目绩效ProjectPersonnel项目人员ProjectPhase项目阶段ProjectPlan项目计划ProjectPlanDevelopment项目计划制定ProjectPlanExecution项目计划执行ProjectPlanning项目计划编制ProjectPolicies项目方针ProjectPortfolio项目组合ProjectPortfolioManagement项目组合管理ProjectPortfolioPlan项目组合计划ProjectPre-SelectionMeetings项目初选会议ProjectPriorities项目优先权项目优先次序ProjectPriorityClass项目优先等级ProjectProblem项目问题ProjectProceduresManual项目流程手册ProjectProcesses项目过程ProjectProcurementManagement项目采购管理ProjectProcurementStrategy项目采购策略ProjectProductsList("PPL")项目产品清单ProjectProductsListFactSheets项目产品清单情况说明书ProjectProgressReport项目进展报告ProjectQualityManagement项目质量管理ProjectRecordsManagement项目记录管理ProjectReporting项目报告项目汇报ProjectResourcePlan项目资源计划ProjectResponsibility项目责任ProjectReview项目评审ProjectReviewCalendar项目评审日程表ProjectRisk项目风险ProjectRiskAnalysis项目风险分析ProjectRiskCharacterization项目风险鉴定ProjectRiskManagement项目风险管理ProjectRisks项目风险ProjectSchedule项目进度ProjectSchedules项目进度表ProjectScope项目范围ProjectScopeManagement项目范围管理ProjectSegments项目组成部分ProjectServices项目服务ProjectSponsor项目发起人项目赞助者ProjectSponsor,SponsoringTeam项目发起人发起组ProjectStage项目小阶段子阶段ProjectStakeholder项目干系人项目利益相关者ProjectStakeholders项目干系人ProjectStandard项目标准ProjectStartDate/Schedule项目开始日期/进度ProjectStartup项目启动ProjectStatusReport项目状态报告ProjectStrategy项目策略ProjectStructure项目结构ProjectSuccess项目成功ProjectSuccessCriteria项目成功标准ProjectSuccess/FailureCriteria项目成功/失败标准ProjectSupportOffice项目支持办公室ProjectTaskForce项目特别工作组ProjectTeam项目团队ProjectTeamMembers项目团队成员ProjectTeamwork项目团队协作ProjectTechnicalPlan团队技术计划ProjectTermination项目终止ProjectTimeFrame项目时间框架ProjectTimeManagement项目时间管理ProjectUsers项目用户ProjectVisibility项目可见性ProjectVision项目远景ProjectVisionStatement项目远景说明书ProjectWebSite项目网站Project/ProgramMethodology项目方法论Project-BasedManagement基于项目的管理EnterpriseProjectManagementProjectized项目化ProjectizedOrganization项目型组织Proposal建议书ProposalForm建议书格式ProposalProjectPlan建议书项目计划ProprietaryInformation所有者信息产权信息ProratedCost比例成本Prospectus计划书说明书Protection保护Prototype原型PrototypeModel原型模型Prototype,software软件原型Prototyping原型制作ProvisionalSum补贴总额补助金PRTProductRealizationTeamPSPlannedStartDatePSAProfessionalServicesAgreement PSOProgramSupportOfficePSPProfessionalServicesProvider Public公众PublicRelations公共关系PublicSources公共资源PublicSpeaking公众演讲技巧Publications出版物PublishedModel[MOF]已发布的模型PunchList剩余工作清单PunishmentoftheInnocent无辜受罚Purchase购买采购PurchaseOrder采购订单Purchasing采购PurchasingStrategy采购策略PureRisk纯风险InsurableRiskPurpose意图PriceVariancePVWAPlanned value forWorkAccomplished PVWSPlanned value forWorkScheduled QAQualityAssuranceQCQualityControlQualification合格证明Qualifications:Contractor承包商资格证明QualifiedProduct合格产品QualifiedProductList("OPL")合格产品清单Qualitative定性的QualitativeRiskAnalysis定性风险分析Quality质量QualityAssurance质量保证质量保证部门QualityAssurancePlan质量保证计划QualityAssurancePolicy质量保证方针QualityAssuranceProgram质量保证程序QualityAssuranceRepresentative("OAR")质量保证代表QualityAssurance)("QA")质量保证QualityAudit质量审核QualityConformance质量合格QualityControl("QC")质量控制质量控制部门QualityCriteria质量准则QualityEvaluationMethods质量评估方法QualityFile质量文件QualityFunctionDeployment质量功能部署QualityGrade质量等级QualityGuide质量指南QualityImprovement质量改进QualityImprovementProgram质量改进计划QualityInspection质量检查QualityInspectionProcedures质量检查程序QualityLoop;QualitySpiral质量环质量螺旋线QualityManagement质量管理QualityManagementFunction质量管理职能QualityPlan质量计划QualityPlanning质量计划编制QualityPolicy质量方针QualityProcessReview质量过程评审QualityProgramRequirement质量计划需求QualityReview质量评审QualityStandards质量标准QualitySurveillance质量监督QualitySystem质量体系QualitySystemReview质量体系评审Quantitative定量的QuantityTake-Off工料估算Quantum定额Queue排队等待QuickReactionCapability快速反应能力RAMResponsibility/AccountabilityMatrixResponsibilityAssignmentMatrix RAMPRiskAnalysisandManagementforProjects RandomObservation随机抽样观察RandomSample随机抽样Range范围Rank等级RankedPositionalWeightMethod("RPWM")重要位置排序法Ranking排序RapidImplementation快速实施FastTrackingRationale原理说明RBSResourceBreakdownStructureRDBMSRelationalDataBaseManagementSystem ReadinessAssessment准备情况评估RealProperty地产房地产RealTime实时RealWorld现实世界Realization实现Re-baseline重定基线Rebaselining重定基线Re_BaseliningRe-baselining重定基线RecognizedProfession公认职业Recommend推荐(动词)建议Recommendation推荐(名词)建议Reconditioned再修复Record记录RecordDrawings图纸记录RecordRetention记录保留RecordingFacts记录事实Records记录RecordsManagement记录管理Recruitment,SelectionandJobPlacement招聘挑选和工作安排RecurringCosts复发性费用RecurringTask复发性任务周期性任务ReducedInspection精简检查ReductioninForce缩编Redundancy冗余多余人员Reengineering重组再设计ReferenceGroup咨询小组ReferentPower威望权力Refinement,ScheduleRefinement改善进度改善RegressionAnalysis回归分析Regulations规则Regulatory调整RegulatoryPersonnel纪检人员ReimbursableExpenditure可退还经费ReinforcementTheory强化理论Rejected被拒绝RejectionNumber遭拒底数RelatedBase关联基Relationship关系RelationshipFloat关系浮动时间Release发布发布版本ReleaseClaims发布声明ReleaseManager发布经理Reliability可靠性ReliabilityAssurance可靠性保证RemainingAvailableResource剩余可用资源RemainingDuration剩余工期RemainingFloat("RF")剩余浮动时间Re-measurement再测量RepetitiveWorkSequence重复工作系列ReplacementTheory替代理论重置理论Replacement value重置价值Replan再计划Replanning再次制定计划Report汇报报告ReportSpecificationFile报告规范文件Reporting报告编写报告ReportingbyResponsibility根据职责汇报Repository储存库Re-profiling重新规划Reprogramming重新计划Reputation名誉RequestforAppropriation("RFA")经费申请CapitalAppropriationRequest RequestforChange("RFC")变更申请RequestforInformation信息申请RequestforProposal建议书邀请函征求建议书RequestforProposals建议书邀请函征求建议书RequestforQuotation报价邀请函RequestforQuotations报价邀请函Requirement需求RequirementAttribute需求特征RequirementSpecification需求规范RequirementType需求类型Requirements需求RequirementsDefinition需求定义RequirementsFlowdown需求分解RequirementsManagement需求管理RequirementsofSociety社会需求RequirementsTraceability需求的可追溯性RequirementsTraceabilityMatrix需求的追溯模型RequirementsTracing需求跟踪RequirementsWorkflow需求工作流Reschedule重定进度Rescheduling重定进度Research研究ResearchandDevelopment研究和开发Reserve储备金ReserveForScopeChanges范围变更储备金ResidentialConstruction民用建筑住宅建设ResidualRisks剩余风险Residual value残值ResidueFile剩余资源文件Resolution解决Resource资源ResourceAccumulation资源累计ResourceAggregation资源总和ResourceAllocation资源分配ResourceAllocationProcess资源分配过程ResourceAnalysis资源分析ResourceAssignment资源分配ResourceAvailability资源可用性ResourceAvailabilityDate资源可用日期ResourceAvailabilityPool资源可用库ResourceBreakdownStructure("RBS")资源分解结构ResourceCalendar资源日历ResourceCategory资源目录ResourceCode资源代码ResourceConstraint资源制约条件(约束) ResourceDe script ion资源描述ResourceDrivenTaskDurations资源驱动的任务工期ResourceEffort资源工作量ResourceGroup资源工作组ResourceHistogram资源柱状图ResourceIdentification资源鉴别ResourceLevel资源水平ResourceLeveling资源平衡ResourceAllocation ResourceLimitedScheduling资源受限的进度规划ResourceLevelingResourceList资源清单ResourceManagement资源管理ResourceNeeds资源需求ResourceOffset资源偏移量资源互补ResourceOptimization资源优化ResourcePeriod资源持续时间ResourcePlan资源计划ResourcePlanning资源计划安排ResourcePlots资源图表ResourcePool资源库ResourceProfile资源量变曲线ResourceScheduling资源进度计划ResourceSmoothing资源平滑ResourceThresholds资源阀值ResourceTotal资源总和ResourceUnit资源单元Resource-BasedDuration基于资源的工期Resource-LimitedPlanning资源受限的计划Resource-LimitedResourceScheduling资源受限的资源进度计划Resources资源ResourcingPlan资源计划ResponsePlanning响应计划编制ResponseSystem响应系统ResponseTime响应时间Responsibility职责ResponsibilityAssignmentMatrix("RAM")责任分配矩阵(RAM) ResponsibilityChart职责表Responsibility/AccountabilityMatrix ResponsibilityCharting职责表制作ResponsibilityMatrix责任矩阵ResponsibilityAssignmentMatrix.Responsibility/AccountabilityMatrix("RAM")责任矩阵(RAM) ResponsibleOrganization责任组织Restraint制约因素Restructuring重组ResubmittedLot再次提交的组(批次)Result结果Results结果Retainage定金Retention保留金ReturnonInvestment("ROI")投资回报Reuse复用Revamp改进Revenue收入RevenueCost收入成本收益成本Review评审Reviewers评审员Revision修订Reward奖赏RewardPower奖赏权力Rework返工RF剩余浮动时间RemainingFloatRFA经费申请RequestforAppropriation RFC变更申请RequestforChangeRFP建议书邀请函RequestforProposalRFQ报价邀请函RequestforQuotationRisk风险Risk&ReadinessAssessment风险和准备情况评估RiskAnalysis风险分析RiskAnalysisandManagementforProjects("RAMP")项目的风险分析和管理(RAMP)RiskAnalyst风险分析员RiskandContingencyManagement风险和应急管理RiskAssessment风险评估RiskAssessmentTables风险评估表RiskAssumption风险假设条件RiskAvoidance风险回避RiskBrainstorming风险头脑风暴RiskCustodian风险监督人RiskDataApplications风险数据应用RiskDeflection风险转移RiskDiary风险日志RiskEvaluation风险评价RiskEvent风险事件RiskEventStatus风险事件状态RiskFactor风险因素RiskIdentification风险识别RiskManagement风险管理RiskManagementBudget("RMB")风险管理预算(RMB) RiskManagementPlan风险管理计划RiskMatrix风险矩阵RiskMitigation风险减轻RiskMitigationStrategy风险减轻战略RiskPrioritizing风险排序RiskProbability风险概率RiskProcessManager风险过程经理RiskQuantification风险量化RiskRanking风险分级RiskReduction风险降低RiskResponse风险响应RiskResponseControl风险响应控制RiskResponseDevelopment风险响应计划制定RiskResponsePlan风险响应计划RiskResponsePlanning风险响应计划编制RiskResponseSystem风险响应系统RiskReview风险评审RiskSharing风险共担RiskTransfer风险转移RiskTreatment风险处理Risk value风险值Risk,close-downreport风险结束报告Risk,processplan风险过程计划Risk,projectrisk风险项目风险Risks风险Role角色workerRoles角色RollUp总成RollingWave滚动计划RollingWaveConcept滚动计划概念RollingWavePlanning滚动计划规划RoughOrderofMagnitudeEstimate("ROM")粗数量级估计(ROM) Royalties特许使用费版税RubberBaselining橡皮基线RuleofThumb经验法则Rules规则RulesofEvidence证据规则RunTime运行时间RunawayProject失控项目SCurveS曲线SCurveTrackingS曲线跟踪Safety安全措施SafetyPlan安全计划SalaryAdministration薪酬管理Sales销售Salvage残值Sample样品SamplePlan,Multiple多次抽样计划SampleSize抽样规模SampleUnit抽样单元Sample,Representative典型抽样Sampling抽样SamplingFrequency("f")抽样频率SamplingPlan抽样计划SamplingPlan,double二次抽样计划SamplingPlan,multi-level多层次抽样计划SamplingPlan,sequential顺序抽样计划SamplingPlan,single单次抽样计划SamplingPlan,single-level单层次抽样计划Sampling,biased有歧视性抽样SARSubsequentApplicationReview Satisfaction满意SCScheduledCostScanning扫描式检查Scenario情景ScenarioPlanning情景规划Schedule进度表进度计划ProjectScheduleNetworkAnalysisScheduleCompression进度压缩DurationCompressionScheduleControl进度控制ScheduleDates进度日期ScheduleDevelopment进度安排ScheduleManagement进度管理SchedulePerformanceIndex("SPI")进度绩效指数ScheduleRefinement进度调整ScheduleRevision进度修正ScheduleStatus进度状态ScopeReportingScheduleUpdate进度更新ScheduleVariance("SV")进度偏差("SV") ScheduleWorkUnit进度工作单元ScheduledCost("SC")计划成本ScheduledCostofWork工作的计划成本BudgetedCostofWorkScheduled ScheduledFinish("SF")计划完成点("SF") ScheduledFinishDate("SF")计划完成日期("SF")ScheduledNetwork时间表/进度网络图ScheduledPerformanceIndicator("SPI")进度绩效指数ScheduledPerformanceRatio("SPR")进度绩效比ScheduledPerformanceIndicatorScheduledStart("SS")计划开始点ScheduledStartDate("SSD")计划开始日期Scheduling进度安排SchedulingTechniques进度安排技巧ScientificWildAnatomicalGuess("SWAG")科学粗略剖析性猜测Scope范围ScopeAllowance范围允许量ScopeBaseline范围基线另BaselineScopeBaselineApproval范围基线核准ScopeBoundaries范围边界ScopeChange范围变更ScopeChangeControl范围变更控制ScopeChanges范围变更ScopeConstraints范围约束ScopeCost范围成本ScopeCreep范围蔓延ScopeCriteria范围标准ScopeDefinition范围定义ScopeDe script ion范围描述ScopeInterfaces范围界面ScopeManagement范围管理ScopeofWork工作范围ScopePerformance/Quality范围性能/质量ScopeQuality范围质量ScopeReporting范围报告ScopeRisk范围风险ScopeRiskLimits范围风险限度ScopeSchedule范围进度ScopeStatement范围说明ScopeVerification范围验证范围确认Score评分ScoringaProject'sContribution项目贡献评分ScoringPlan评分计划SCR系统概念评审SystemConceptReviewScrap废料Screening筛选法ScreeningInspection筛选检查SDL软件开发库SoftwareDevelopmentLibrary SDR系统设计评审SystemDesignReview SDWT自我指导工作团队SelfDirectedWorkTeams SealedBidding封标SecondSource第二货源SecondaryFloat("SF")次要浮动时间SecondaryRisk次级风险SecondaryRisks次级风险SecondmentMatrix借调矩阵型Sector部分扇区Sectors部门Security安全SecurityAcceptanceLetter安全许可证/函SecurityPlan安全计划Segment部分Selection选择SelfDirectedWorkTeams("SDWT")自我指导工作团队Self-Inspection自检Self-Insurance自我保险Seller卖方Seller'sMarket卖方市场Selling销售Semantics语义学Semi-Time-ScaledLogicDrawing半时标逻辑图SeniorTechnical高级技术人员SeniorUser高级用户Sensitivity敏感性SensitivityAnalysis敏感性分析Sequence序列ServiceandSupportPersonnel服务和支持人员ServiceContract服务合同ServiceLiability服务责任ProductLiabilityServices服务Setup安装SFLevelFinish/Schedule ScheduledFinish SecondaryFloat ScheduledFinishDateShall必须Shareholders股东Shipment发货ShopDrawings施工图,制造图ShopInspection出厂检验ShortTerm短期ShortTermPlan短期计划ShortTermSchedule短期进度ShortTermPlanShould-CostEstimate应该成本估算ShowStopper项目障碍物Sign-Off签署同意Simulation模拟ComputerModeling SimultaneousEngineering/Design并行工程/设计ConcurrentEngineeringSite现场SiteInstruction现场指导FieldClarificationSiteLayout现场布局图SitePreparation现场准备SiteWorks现场工作SituationAnalysis形势分析SituationPlanning形势计划制定Situational情形的SizingEstimate分/量级估算EstimateClassCSkill技能SkillGroups技能组Skills专门技术技能SkunkWorks特殊团队QuickReactionCapability Slack时差浮动时间FloatSlackTime时差/浮动时间SlipChart趋势图Slippage偏移SLVAR差异分析报告汇总SummaryLevelVarianceAnalysisReporting Smoothing缓和平滑Social社交的社会的SocialFactors社会因素SocialLoafing懒散地工作Socioeconomic社会经济学的SoftProject软项目SoftSkills软技能Software软件ComputerSoftwareSoftwareArchitecture软件构架SoftwareDevelopment软件开发SoftwareDevelopmentLibrary("SDL")软件开发库SoftwareDevelopmentPlan软件开发计划SoftwareEngineering软件工程SoftwareProductSpecification软件产品规范SoftwareProject软件项目SoftwareQualityAssurance软件质量保证SoftwareSpecificationReview软件规范评审SoleSource唯一供方SoleSourcing唯一供方的采购Solicitation询价SolicitationPlanning询价计划制定SolutionSelection方案选择Solving解决Source来源SourceCode源代码SourceList供方目录SourceSelection供方选择SourceSelection,inprocurement供方选择,在采购过程中Sourcing决定供方SOW工作说明书StatementofWorkSpanActivity。
项目管理ppt课件
优化资源配置
项目管理可以优化资源配置, 提高资源利用效率,降低成本
。
提升团队效率
项目管理可以提升团队协作效 率,提高团队士气和凝聚力。
项目管理知识体系与认证
项目管理知识体系(PMBOK)
PMBOK是项目管理领域的一部权威指南,涵盖了项目管理的各个方面,包括项目整合 管理、范围管理、时间管理、成本管理、质量管理、人力资源管理、沟通管理、风险管
制定变更管理计划, 明确变更申请、审批 和实施流程。
建立风险管理机制, 定期评估风险状况并 及时调整风险管理策 略。
识别项目风险并制定 风险应对策略,包括 风险规避、减轻、转 移和接受。
04
资源整合与沟通协调技巧
合理配置和利用资源
明确项目所需资源类型
人力、物力、财力、时间等
制定详细资源计划
根据项目进度和需求合理分配资源
独特性
每个项目都是独特的, 其产品或服务具有独特
性。
临时性
项目有明确的开始和结 束时间,具有临时性。
目标性
项目有明确的目标,包 括范围、时间、成本和
质量等方面。
项目管理概念及重要性
01
02
03
04
项目管理定义
项目管理是将知识、技能、工 具和技术应用于项目活动,以
满足项目的要求。
提高成功率
通过有效的项目管理,可以提 高项目的成功率,减少失败的
01
案例一
某大型工程项目成功实施风险管理,通过全面识别、评估、应对项目风
险,确保项目按期完成,并节约了大量成本。
02 03
案例二
某软件开发项目在风险管理方面取得了显著成效,通过制定详细的风险 管理计划和应对措施,有效避免了技术难题和市场变化带来的风险,保 证了项目的成功实施。
pmp课件
报名时间
PMP考试每年举行4次,分别在3月、6月、9月和12月,通常提前2个月开始报名。
具体的报名时间需要查询官方网站公布的信息。
报名费用
PMP考试报名费用因考试机构和地区而异,一般在2000-3000元人民币之间。
考生需要在官方网站或指定渠道支付报名费用,并确保付款成功。
03
PMP考试备考攻略
职业道德
PMP考试还将考察考生的职业道德和职业素养, 包括项目管理人员的职责、权利和义务,以及项 目管理中的道德和职业规范等。
02
PMP考试报名流程
报名条件
01 02 03 04
考生需满足以下条件之一
获得学士学位或以上学历
持有大专学历,同时具有5年的项目管理经验 持有大专学历,同时具有3年的项目管理经验,并至少获得2年以上的
情景分析题
PMP考试还将考察考生的情景分析能力,即面对 具体的项目情境时,考生是否能运用所学的项目 管理知识和经验进行分析和判断,制定出合理的 项目计划和方案。
项目管理知识领域
PMP考试将考察考生对项目管理知识领域的了解 程度,包括项目范围管理、时间管理、成本管理 、质量管理、人力资源管理、沟通管理、风险管 理以及采购管理等九大知识领域。
PMP认证是对项目管理专业人员知识、经验和能力水平的综合评 估,旨在提高项目管理专业人员的素质和水平,以促进项目管理 的最佳实践。
PMP认证适用于任何领域或行业,无论是IT、工程、医疗、金融 还是其他领域,只要是涉及到项目管理的领域,PMP认证都能提 供项目管理方面的专业知识和技能。
PMP考试的目的
感谢观看
THANKS
以便更好地记忆和应用。
备考策略
坚持学习 注重细节 灵活应对 积极心态
pmp项目描述
PMP项目描述项目概述PMP(Project Management Professional)是一种国际认可的项目管理专业资质,具有全球范围内的认可度和影响力。
本文档旨在提供关于PMP项目的详细描述和概述,以帮助读者全面了解PMP项目的目标、范围和重要性。
项目背景项目管理作为一门重要的管理学科,在不同领域的实践中已经取得了显著的进展。
PMP项目作为一种全球范围内的项目管理标准,旨在确保项目在按时、按质、按成本完成的同时,满足项目干系人的需求和期望。
项目目标PMP项目的目标是提供一种标准化的方法,使项目管理人员能够有效地规划、实施和控制项目,以确保项目的成功交付。
通过PMP认证,项目管理人员能够展示其专业知识和技能,增强项目管理能力,并在全球范围内获得认可。
项目范围PMP项目的范围涵盖了项目管理的核心知识领域,包括项目整体管理、项目范围管理、项目时间管理、项目成本管理、项目质量管理、项目资源管理、项目沟通管理、项目风险管理、项目采购管理和项目干系人管理。
具体来说,PMP项目的范围包括:1.项目整体管理:包括项目启动、规划、执行、监控和收尾等项目管理过程。
2.项目范围管理:确保项目交付的产品、服务和成果符合项目干系人的需求。
3.项目时间管理:为项目制定合理的时间计划,并按照计划进行监控和控制。
4.项目成本管理:估算和控制项目的成本,确保项目在预算范围内完成。
5.项目质量管理:确保项目交付的产品和服务满足质量标准和要求。
6.项目资源管理:合理管理和利用项目所需的人力、物力和财力资源。
7.项目沟通管理:确保项目团队和干系人之间的有效沟通和信息交流。
8.项目风险管理:识别、评估和应对项目潜在的风险和问题。
9.项目采购管理:进行采购活动,获得项目所需的外部资源和服务。
10.项目干系人管理:识别、分析和管理项目相关的干系人,以满足其需求和期望。
项目重要性PMP项目的重要性主要体现在以下几个方面:1.提高项目管理能力:通过学习和实践PMP项目管理标准,项目管理人员能够提高其项目管理能力和技能水平,提升项目交付的成功率。
pmp柱前衍生法
pmp柱前衍生法PMP柱前衍生法PMP(Project Management Professional)柱前衍生法是项目管理中常用的一种工具和技术,用于确定项目进度和资源分配。
柱前衍生法是基于项目中各个任务的前置关系和工期来进行计算和规划的,能够帮助项目经理合理安排项目的进度和资源,从而提高项目的执行效率和成功率。
柱前衍生法的核心思想是通过确定任务之间的前置关系,推算出项目的工期和资源需求。
在进行柱前衍生法计算之前,首先需要明确项目的目标和需求,并对项目的任务进行细化和规划。
然后,根据任务之间的逻辑关系,确定各个任务的前置关系,即哪些任务必须在其他任务完成后才能开始。
这样,就可以形成一个任务网络图,清晰地展示了任务之间的依赖关系。
柱前衍生法的计算基于三个重要概念:最早开始时间(ES)、最早结束时间(EF)、最晚开始时间(LS)和最晚结束时间(LF)。
最早开始时间指的是任务能够开始的最早时间,最早结束时间则是任务能够完成的最早时间。
最晚开始时间是指任务不能延迟的最晚时间,最晚结束时间则是任务不能延迟的最晚完成时间。
柱前衍生法的计算步骤如下:1. 确定关键路径:通过计算每个任务的最早开始时间和最早结束时间,确定项目的关键路径,即项目的最长路径和最短工期。
2. 计算浮动时间:浮动时间指的是任务能够延迟的时间,不会对项目工期产生影响。
通过计算每个任务的最晚开始时间和最晚结束时间,可以确定每个任务的浮动时间。
3. 确定资源需求:根据任务的工期和前置关系,确定项目所需的资源数量和类型。
可以通过资源直方图和资源平衡表来进行资源需求的分析和调度。
4. 优化资源分配:根据资源需求和资源可用性,对项目的资源进行合理分配和调度,以最大限度地提高资源的利用率和项目的执行效率。
PMP柱前衍生法的应用可以帮助项目经理更好地管理项目的进度和资源,避免资源的过度分配或闲置,提高项目的执行效率和成功率。
通过合理规划和调度任务的前置关系和工期,可以确保项目按时完成,并能够及时应对项目中的风险和变化。
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
– Leading (establishing direction, aligning resources, motivating) – Communicating (clear, unambiguous, and complete) – Negotiating (conferring with others to reach an agreement) – Problem Solving (definition and decision making)
• Distinguish causes and symptoms • Identify viable solutions – Influencing Organization (understanding power and politics)
• Content is from “A Guide To The Project Management Body Of Knowledge” (PMBOK)
•
Recurring Themes
• Historical Records – need to collect and use for planning, estimating and risk
• Has a definite beginning and end and interrelated activities
• Programs adopt new set of objectives and continue to work; projects cease when declared objectives have been attained
– Projectized Organization –blend functional and projectized characteristics. Mix crossdepartment personnel with full-time Project Manger
Chapter 2 – Project Management Context
– Series of repetitive or cyclical undertakings
• Projects are often divided into “subprojects” for more manageability
– Often contracted out to external organizations
Chapter 2 – Project Management
Context
• Organizational Structures
– Functional (classical) marked by identifiable superiors. Staff grouped by specialty . Perceived scope of project limited by function (Engineering, HR). Typically have part-time Project Manager
• Scope of project should remain constant even as characteristics are “progressively elaborated”
Chapter 1 - Introduction
• Project Management: the application of knowledge, skills, tools and techniques to project activities in order to meet or exceed stakeholder needs and expectations from a defined project – balancing the following:
• Programs are groups of projects managed in a coordinated way to obtain benefits not available from managing the projects individually
• Most programs have elements of ongoing operations
Chapter 1 – Introduction
• Projects are unique – characteristics are progressively elaborated
– Progressively: proceeding in steps – Elaborated: worked with care and detail
Chapter 2 – Project Management
Context
• Project Life Cycle defines: – Technical work performed in each phase – Who is involved in each phase
• Project Phases can overlap – “Fast Tracking” • Common Characteristics of Project Life Cycles:
during all projects • Team Members must be involved in project planning • Project Mangers must be pro-active
Chapter 1 – Introduction
• Project – temporary endeavor undertaken to create a unique product or service
– Project Managers – Customers – Performing Organizations, owners – Sponsor – Team – Internal/External – End User – Society, citizens – Others: owner, funders, supplier, contractor
Project Management Professional (PMP)
Certification Study Guide
PMI Certification Materials
• To assist PMI candidates for completing the PMI certification exam administered by the Project Management Institute
– Non-Project Based – seldom have management systems designed to support project needs (manufacturing, financial services)
Chapter 2 – Project Management Context
– Often have conflicting expectations and objectives – In general, differences should be resolved in favor of
the customer – individual(s) or organization(s) that will use the outcome of the project – Stakeholder management is a proactive task
– Stakeholder influence is high at the beginning and progressively lowers as project continues
Chapter 2 – Project Management Context
• Stakeholders: individuals and organizations who are actively involved in the project
• Project Mangers must determine all stakeholders and incorporate their needs into the project
Chapter 2 – Project Management Context
• Stakeholders are:
– Cost and Staffing levels are low at start and move higher towards the end
– Probability of successfully completing project is low at beginning, higher towards the end as project continues
– Scope, time, cost, and quality – Stakeholders’ expectations – Requirements (needs) vs. unidentified requirements
(expectations)
Chapter 1 - Introduction
• Kickoff meetings are important • Work Breakdown Structures • Do not introduce benefits that are not stated in
requirements • Needs of all stakeholders should be taken into account