DMAIC详解

合集下载
相关主题
  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
Define Phase
Define
A. Identify Project CTQs Deliverable: Identify Customer(s) and Project CTQs Measure Analyze Improve Control C. Define Process Map Deliverable: High Level Process Map Connecting the Customer to the Process
Deliverable: Determine Specification Limits For Your Y Tools: Data Types Discrete vs Continuous Data Minitab Introduction
Analyze Phase
Define
4. Establish Process Capability Deliverable: Baseline Current Process Tools: Basic statistics Graphical Analysis Sampling Continuous Zst, Zlt Normality Discrete Zst, Zlt
10. Validate Measurement System on X’s in Actual Application
Deliverable: Measurement System is Adequate to Measure X’s Tools: See Step 3
11. Determine Process Capability
9. Establish Operating Tolerances
Deliverable: Specify Tolerances on the Vital Few X’s. Tools: Simulation
Control Phase
Define Measure Analyze Improve Conocess Control
Deliverables: Develop and Implement Process Control Plan Tools: Control charts Mistake Proofing FMEA
Deliverables: Determine PostImprovement Capability and Performance Confirm the Improvement Goal Has Been Realized Tools See Step 4
Improve Phase
Define Measure Analyze
Improve
Control
7. Screen Potential Causes
Deliverable: Determine the Vital Few X’s That Are Causing Changes in Y. Tools: Screening DOE Action WO VSM (To Be)
B. Develop Team Charter
Deliverables: 1) Develop The Business Case 2) Develop The Problem and Goal Statements 3) Determine Project Scope 4) Select Team & Define Roles 5) Set Project Milestones
8. Discover Variable Relationships
Deliverables: 1) Establish Transfer Function Between Y and Vital Few X’s. 2) Determine Optimal Setting for the Vital Few X’s. 3) Perform Confirmation Runs. Tools: Factorial Designs LEAN Tools
Deliverable: List of Statistically Significant X’s, Chosen Based on Analysis of Historical Data Tools: Graphical Analysis Hypothesis Testing Regression Analysis Lean VSM (As Is)
Measure Phase – Focus on Steps 1&2
Define
Measure
2.
Analyze
Improve
Control
1. Select CTQ Characteristics Deliverable: Identify Measurable CTQ That Will Be Improved Tools: QFD FMEA Process Mapping
Measure
5.
Analyze
Improve
6.
Control
Identify Variation Sources
Define Performance Objectives
Deliverable: Statistically Define the Goal of the Project Tools: Benchmarking
Define Performance Standards
3. Measurement System Analysis Deliverable: Measurement System Adequate to Measure Y Tools: Continuous Gage R&R Test/Retest Attribute Gage R&R
相关文档
最新文档