EQUIPMENT NAME:# 2 Demin-water Pump
EQUIPMENTMODLE:
DATE:
TRAIL RUN TIME:
NO.
Item
Data
Remark
1
Theworking/starting current of motor (A)
2
The voltage of motor (V)
Open
5
HT cooling water expansion tank
feed valves#1 ~ #4
Close
6
LT cooling water expansion tank
feed valves#1 ~ #4
Close
7
Nozzle cooling water tank
feed water inlet valves #1 ~ #12



5
Pump drive-end bearing vibration



6
Motor bearing vibration



7
The stability of motor current
0h:
3h:
6h:
1h:
4h:
7h:
2h:
5h:
8h:
8
Pump outlet pressure (bar)
2
Equipment bolts
Fixed
Yes□
3
Outlet pressure gauge
Fixed
Yes□
4
Lube oil
Injected
Yes□
5
Equipment center and coupling bolts
Center accord with limits/fix bolts
Yes□
6
Motor single turning test
Running well, parameter normally
Yes□
7
Rotation directionof motoris correct
Correct
Yes□
8
Motor power on
Yes
Yes□
9
Thetripbutton isOK
Remark
1
Demin-water tank (20m3) water feed valve
Open
2
Demin-water pump inlet valves
Open
3
Demin-water pump outlet valves
Open
4
Demin-water pump recycle valve
0h:
3h:
6h:
1h:
4h:
7h:
2h:
5h:
8h:
HEI:
CELEC:
Close
8
Phosphate dosing tank feed water valve
Close
9
Hydrazine dosing tank feed water valve
Close
HEI:
CELEC:
TRAIL RUN REPORT
EQUIPMENT NAME:# 1Demin-water Pump
Correct
Yes□
HEI:
CELEC:
CHECK LIST FOR TRAIL RUN
Valves Position Checking Card
EQUIPMENT NAME:
Demin-waterSystem
NO.
Valve Description
Position
Operated
Checked by
Yes
Yes□
10
Theearth grounding
Correct
Yes□
11
Thedirection of systemvalveis right
Correct
Yes□
12
The screw of the valveis tightened
Yes
Yes□
13
All valves position
EQUIPMENTMODLE:
DATE:
TRAIL RUN TIME:
Байду номын сангаасNO.
Item
Data
Remark
1
Theworking/starting current of motor (A)
2
The voltage of motor (V)
3
Frequency of motor (HZ)
4
Pump free-end bearing vibration (μm)
CHECK LISTFOR TRAIL RUN
EQUIPMENT NAME:
Demin-waterPump
NO.
Item
Requirements
Result
Remark
1
All equipment/nameplatesand supportsinstallation position
Correct
Yes□
0h:
3h:
6h:
1h:
4h:
7h:
2h:
5h:
8h:
8
Pump outlet pressure (bar)
0h:
3h:
6h:
1h:
4h:
7h:
2h:
5h:
8h:
9
Pump bearing temperature
0h:
3h:
6h:
1h:
4h:
7h:
2h:
5h:
8h:
10
Motor bearing temperature
3
Frequency of motor (HZ)
4
Pump free-end bearing vibration (μm)



5
Pump drive-end bearing vibration



6
Motor bearing vibration



7
The stability of motor current
0h:
3h:
6h:
1h:
4h:
7h:
2h:
5h:
8h:
9
Pump bearing temperature
0h:
3h:
6h:
1h:
4h:
7h:
2h:
5h:
8h:
10
Motor bearing temperature
0h:
3h:
6h:
1h:
4h:
7h:
2h:
5h:
8h:
HEI:
CELEC:
TRAIL RUN REPORT