最新奥斯陆歌剧院

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

奥斯陆歌剧院

奥斯陆歌剧院/斯内赫塔 07 07 May 2008 2008年5月 By Nico Saieh — Filed under: Institutional Architecture , Selected , Ballet , Marble , Norway , Opera , Steel , Stone , Terrace , Wood由尼科Saieh -提起下:体制结构,选择,芭蕾舞,大理石,挪威,歌剧,钢铁,石材,阳台,木

Architects: Snohetta建筑师:斯内赫塔

Location: Bjørvika, Oslo, Norway地点:Bjørvika,奥斯陆,挪威

Client: Ministry of Church an Cultural Affairs客户:教会的文化事务部

Area: 38.500sqm面积:38.500sqm

Construction start: 2004建设启动:2004

Completion: 2007竣工时间:2007

Contractors: 55 contracts承建商:55合同

Geological Engineer: NGI地质工程师:下一代互联网

Structural Engineer: Reinertsen Engineering ANS结构工程师:赖纳特森工程答Electrical Engineer: Ingeniør Per Rasmussen AS电气工程师:每拉斯姆森由于Ingeniør

Theatre Planning: Theatre Project Consultants剧院规划:剧院工程顾问Acoustics: Brekke Strand Akustikk, Arup Acoustic声学:布雷克东街Akustikk,奥雅纳声

Artists, integrated artwork: Kristian Blystad, Kalle Grude, Jorunn Sannes, Astrid

Løvaas og Kirsten Wagle艺术家,集成艺术品:克里斯蒂安Blystad,卡勒格鲁德Jorunn的Sannes,阿斯特丽德Løvaas摹基尔斯滕韦格尔

Photos: Snohetta, Nina Reistad, Statsbygg, Erik Berg & Nicolas Buisson照片:斯内赫塔,尼娜赖斯塔德,Statsbygg,伯格和埃里克尼古拉斯比松

About the Building Client and the User关于创建客户端和用户

Statsbygg is Norway's largest civil property manager, with 650 employees. Statsbygg 是挪威最大的民用物业管理的650名员工。 It is the state's main consultant on building and property issues, development and management.这是国家的建设和财产问题,发展和管理的主要顾问。 Statsbygg is a management company under the Ministry of Renewal and Administration, but provides services and support to all ministries and state organs. Statsbygg是根据重建和行政部管理公司,但提供服务和支持,各部委和国家机关。

In 1998 the National Assembly decides that Statsbygg would be the building client for the new operahouse, responsible for planning and management. 1998年,国民议会决定Statsbygg将是新的歌剧院,规划建设和管理的客户负责。 Statsbygg procure services in the private sector, but are responsible for professional coordination and quality control of the consultants, contractors and suppliers. Statsbygg采购私营部门的服务,但专业的协调和质量顾问,承包商和供应商控制的责任。

The Norwegian Opera and Ballet is the building's end user.挪威歌剧院和芭蕾舞团的建设的最终用户。 They are Norway's largest music and theatrical institution.他们是挪威最大的音乐和戏剧的机构。 Their core purpose is to be the national producer of opera, ballet, music and dance theatre, and concerts.其核心目的是要在歌剧,芭蕾舞,民族音乐和舞蹈制作戏剧和音乐会。 They intend to have approx.他们打算为约。 300 shows and 250,000 visitors per year. 300个节目和25万人次来参观。 The Operahouse will be a workplace for approx.该歌剧院将是约的工作

场所。 600 employees from more than 50 professions. 600名来自50多个专业的员工。

Architect's description建筑师的说明

The operahouse is the realisation of the winning competion entry.该歌剧院是获胜的比赛参赛的实现。 Four diagrams, which were part of the entry, explain the building's basic concept.四图,这些条目的一部分,说明该建筑的基本概念。

“The wave wall”“波墙”

Opera and ballet are young artforms in Norway.歌剧和芭蕾舞在挪威青年艺术形式。 These artforms evolve in an international setting .这些艺术形式的演变在国际环境。 The Bjørvika peninsula is part of a harbour city, which is historically the meeting point with the rest of the world..该Bjørvika半岛是一个港口城市,这是历史上与世界其他地区的交汇点部分.. The dividing line between the ground 'here' and the water 'there'is both a real and a symbolic threshold.地面之间的'分界线在这里',水'there'is既是一个现实和象征性的门槛。 This threshold is realised as a large wall on the line of the meeting between land and sea, Norway and the world, art and everyday life.这个界限是为实现对陆地和海洋之间,挪威和世界,艺术和日常生活上线大墙。 This is the threshold where the public meet the art.这是门槛,让市民在符合艺术。

“The Factory”“工厂”

相关文档
最新文档