aduation General Information
1, Project Name: Character Area Building 2.
2, the construction unit: Hunan Country Gain Properties Limited.
3, Location: Changsha, Hunan, West Second Ring Road intersection with the northwest corner of Azalea
4, the building structure: frame-wall structure.
5, the seismic intensity: 6 degrees.
6, construction categories: high-rise.
7, the size of the project: The total floor area of 24,312.39 square meters, construction area of 2019.03 square meters, building layers underground 1 layer, ground layer 28, one to two shopping centers for the layer, three to twenty eighth floor of a residential class high-rise commercial and residential.
8, total building height: 84.1 meters.
Second, the main work of the graduate design
1, get familiar with the drawings, a clear mandate graduation, fill opening report and mission statement;
2, the division of the project, calculate the list of quantities, and calculated under the fixed quantities;
3, calculate the amount of steel works;
4, calculated measures and other costs project costs;
5, the price of collecting information, taking on the fee rate as the machine in preparation;
6, combined with the computer preparation of the tender offer, the output valuation results;
7, the indicators of project cost analysis, evaluation.
Third, the basis for the preparation of the graduation project
1, according to International Engineering Design and Research Institute in machine design character of Hunan States Gain Properties Limited 2 # floor area of the civil construction drawings;
2, Atlas and drawings related information, etc.;
3, the "construction of the Bill of Quantities Specification" (GB50500-2008);
4, "consumption of fixed construction projects of Fujian Province" (2005);
5, "Building Decoration Engineering of Fujian Province fixed consumption" (2005); 6, the building materials market research information on price and price;
7, the "Fujian construction installation engineering cost rating";
8, "civil engineering installation period in Fujian Province fixed";
9, "gross floor area specifications" (GB/T5053-2005)
10, Fujian Province, the existing provisions related to project cost management;
11, this project used in April 2011 the price of materials, Jixietaiban fee by the first
quarter of 2011, Fujian Province, the information value, construction labor costs by Min [2007] 15 Man for pricing;
Four,graduation calculation conditions
1, the standard fee of: engineering class as a class, labor insurance fee of the CPI, taking into account taxes by 3.445 percent;
2, total duration: 445 calendar days
3, glue the template using the template;
4, the main project using premixed concrete, beam, lintel, steeplechase, cushion, structural columns and other use of premixed concrete, mixing concrete materials for the stone;
5, outer wall steel tubular scaffolding used scaffolding, masonry scaffolding scaffolding used in the scaffolding and full house;
6, the vertical transport machinery construction by two lifts, a crane.
Five, graduate design-related description of the problem
1, the drawing does not indicate the ring beam, through beam, tailgate of the concrete strength, are used C20;
2, the drawing does not indicate the scaffold material, exterior scaffolding with steel tubular scaffolding;
3, the drawings are not clear stair handrails, handrails Vincent Fang calculated by stainless steel railings;
4, booth decoration ad did not say, calculated according to paint.
5, which wall structure of the building construction plans and construction plans do not match, structural drawings shall prevail.
Sixth,composed of graduate design results
1, cover (quotations)
2, the preparation instructions (quotations)
3, the bid price table
4, single project summary
5, the unit construction cost summary table
6, sub-segment of the integrated unit quantities of the table
7, the list of items the meter measures
8, sub-segment of the Bill of Quantities Table
9, the statement of fees of
10, measures the project cost analysis table
11, the main materials price list
12, reinforced engineering analysis table
13, engineering calculations
14, cost index analysis
15, the paper of the project claim ----" "
16, CD-ROM
17 Records of the Graduation Week