无菌罐培训知识
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
Tetra Alsafe training 利乐无菌罐培训
003-01-15 Z S H
INDEX目录
Pre-sterilizing 预杀菌101 -116Production
生产1001 -1101
CIP
清洗601 -632
Depress. After prod.生产结束后卸压
501 -502
Filling/Empty line 填充/排空管道
301 -305 Fil. tank from ster.从消毒机至无菌罐
200 -220
Pre-sterilization101预杀菌步骤101
Pre-sterilization102预杀菌步骤102
Pre-sterilization103预杀菌步骤103 Pre-sterilization104预杀菌步骤104
Pre-sterilization105预杀菌步骤105Pre-sterilization112
预杀菌步骤112
Pre-sterilization111
预杀菌步骤111
Pre-sterilization110
预杀菌步骤110
Pre-sterilization107
预杀菌步骤107
Pre-sterilization106
预杀菌步骤106
Pre-sterilization113
预杀菌步骤113
Pre-sterilization114
预杀菌步骤114
Pre-sterilization115
预杀菌步骤115
Pre-sterilization116
预杀菌步骤116
Production 1001
生产步骤1001
100%
Fully open
From step 101-112
从步骤101-112全开
100%
Step number: 101 Step time: 30Sec
Drain 1.0 Bar steam supply line
100%
100%
Step number: 102 Step time 30Sec
Drain 2.7 Bar steam supply line
100%
100%
A
Step:103
Pressurize 1.
Pressurize tank to 1.0 Bar. PT130
100%
100%
Step number: 104 Step timer: 300Sec
Drain 1
100%
10sec delay activated
延时10秒动作
100%
A
Step:105
Pressurize 2.
Pressurize tank to 1.5 Bar. PT130
100%
100%
Step number: 106
Drain 2. 60Sec
100%
10sec delay activated
延时10秒动作
100%
A
Step:107
Pressurize 3.
Pressurize tank to 2.0 Bar. PT130
100%
100%
Step number: 110
Drain 3. 60Sec
Step:111 Heating Condition to Next Step TT140, TT160, TT170 > 1250C
10sec delay activated 延时10秒动作
Activated/deactivated 60/5sec 每隔5秒,动作60秒
100%
100%
A
Activated/deactivated 60/5sec 每隔5秒,动作60秒
Step:112
Sterilizing 1800Sec AND
TT140, TT160, TT170 > 1250C 100%
100%
A
Step number: 113Cooling 1 150Sec
If TT160<110 0C, Activated 如果TT160 <110 0C ,则动作
Every 15sec, activate d 10sec 每隔15秒动作10秒
2.6Bar
V142 max. allowed open ramped from 0 –50% during appr. 2.5 min.
V142 max. allowed open
ramped from 50–100%
during appr. 2.5 min.
1.3Bar
Step number: 114
Cooling 2 900Sec If TT160<110 0C, Activated
如果TT160 <110 0C ,则动作
1.0Bar
Step number: 115
Condensate Drain 1 240Sec If TT160<110 0C, Activated
如果TT160 <110 0C ,则动作