Tetra Alsafe training 利乐无菌罐培训

003-01-15 Z S H

INDEX目录

Pre-sterilizing 预杀菌101 -116Production

生产1001 -1101

CIP

清洗601 -632

Depress. After prod.生产结束后卸压

501 -502

Filling/Empty line 填充/排空管道

301 -305 Fil. tank from ster.从消毒机至无菌罐

200 -220

Pre-sterilization101预杀菌步骤101

Pre-sterilization102预杀菌步骤102

Pre-sterilization103预杀菌步骤103 Pre-sterilization104预杀菌步骤104

Pre-sterilization105预杀菌步骤105Pre-sterilization112

预杀菌步骤112

Pre-sterilization111

预杀菌步骤111

Pre-sterilization110

预杀菌步骤110

Pre-sterilization107

预杀菌步骤107

Pre-sterilization106

预杀菌步骤106

Pre-sterilization113

预杀菌步骤113

Pre-sterilization114

预杀菌步骤114

Pre-sterilization115

预杀菌步骤115

Pre-sterilization116

预杀菌步骤116

Production 1001

生产步骤1001

100%

Fully open

From step 101-112

从步骤101-112全开

100%

Step number: 101 Step time: 30Sec

Drain 1.0 Bar steam supply line

100%

100%

Step number: 102 Step time 30Sec

Drain 2.7 Bar steam supply line

100%

100%

A

Step:103

Pressurize 1.

Pressurize tank to 1.0 Bar. PT130

100%

100%

Step number: 104 Step timer: 300Sec

Drain 1

100%

10sec delay activated

延时10秒动作

100%

A

Step:105

Pressurize 2.

Pressurize tank to 1.5 Bar. PT130

100%

100%

Step number: 106

Drain 2. 60Sec

100%

10sec delay activated

延时10秒动作

100%

A

Step:107

Pressurize 3.

Pressurize tank to 2.0 Bar. PT130

100%

100%

Step number: 110

Drain 3. 60Sec

Step:111 Heating Condition to Next Step TT140, TT160, TT170 > 1250C

10sec delay activated 延时10秒动作

Activated/deactivated 60/5sec 每隔5秒,动作60秒

100%

100%

A

Activated/deactivated 60/5sec 每隔5秒,动作60秒

Step:112

Sterilizing 1800Sec AND

TT140, TT160, TT170 > 1250C 100%

100%

A

Step number: 113Cooling 1 150Sec

If TT160<110 0C, Activated 如果TT160 <110 0C ,则动作

Every 15sec, activate d 10sec 每隔15秒动作10秒

2.6Bar

V142 max. allowed open ramped from 0 –50% during appr. 2.5 min.

V142 max. allowed open

ramped from 50–100%

during appr. 2.5 min.

1.3Bar

Step number: 114

Cooling 2 900Sec If TT160<110 0C, Activated

如果TT160 <110 0C ,则动作

1.0Bar

Step number: 115

Condensate Drain 1 240Sec If TT160<110 0C, Activated