Windows-R-Us Single Hung Line - Current State T

40Trim frame backside corners

8241Install foam dessicant pads in frame 3342Install center rail screws in frame 8243

Install center rail in frame 10644

Insert center rail screw buttons in frame 4445

Install screen (optional) into frame 4246

Install sash into frame 6247

Apply glue to frame and sash 7548Insert insulated glass panels into frame and sash 4

249Stage bumpers on frame and sash 0

050Install left bumpers into frame and sash 4

451Install right bumpers into frame and sash 4

452Clip horizontal glazing bead for frame and sash 1

153Stage glazing bead onto glass panels 0

0Install Bead 154Install right & top glazing bead in frame and sash 28

4Install Bead 255Install left & bottom glazing bead in frame and sash 28

456Apply paint to inside bottom corners of window 1

157Apply energy label to window 2

358Apply Windows-R-Us label to window 2

3Clean Window 59Clean outside of window 20

260Build and install four cardboard corners 4

261Wrap left and right side cardboard corners 8

262Wrap top and bottom cardboard corners 8

263Place window on staging cart 0

0Front End Lead 64Lead for front of line (saw through process)0

0Back End Lead

65Lead for back of line (welders to stocking)0

0Seconds 秒552

188Minutes 分种9.20

3.13Hours 小时0.1530.052Current State (Baseline)

Max Task Time

87Seconds Efficiency Adjusted Max Task Time

96Seconds Max Takt Rate

38Units per Hour Capacity (8 hour shift)

301Units Number of People

27Persons Productivity

1.39Units per PersonHour 目前状态

最高的节拍时间

87秒效率调整后的最大节拍时间

96秒最大节拍速度

38个/小时产能(8小时班)

301个人数

27人生产力 1.39个/人工。小时

(2) P r o d u c e Trim Frame Install Center Rail In Frame Install Sash In Frame Install Glass In Window Install bumpers Apply Corners &Stock (3) P r e p a r e W I n d o w Apply labels

10

2010

164

1415

3118

264

107

158

206

1211

112

102

106

84

416

48481Edwin A2016

48481Melissa A210

29

149

144

26261Nhat A235

118

188

1810

100

001Mark A260

001Bellina A27

441

11811068.57.35

19.6817.810.1230.3280.297(the maximum of the summed task times from above)(adjusted for inefficiencies in the process flow)Units per Hour

(the maximum number of units per hour expected from the process)(the maximum number of units per shift expected from the process)(the number of persons working on the process)Units per PersonHour (the productivity of the process)

由上表查寻的最大总任务时间

依过程中的无效率调整后的值

过程期望的最大单位输出(个/小时)

过程期望的最大单位输出(个/班)

过程使用的人数

过程的生产力

A16A22A19A18A15A1772

1Robert 871Nicolas 251Chris 431Oscar 321Heather 27572Jose,Kit A24A25301Stella