1.
GGH
2.
FGD()
(
HSO SO
d)
1.
(DAS)
(DAS)
•
Help
(3)
(4)
•
•
•
(MCS)
•
SO
2
•
1. 4X600MW
FGD
(DAS)(SCS)
4
CPU I/O CPU(#1
)
A3
1
• I/O100M
EtherNet/IP CPU
AI4-20mA802020
RTD1201010
AO622
Dl60080240
DO2402080
SOE30
Project Name
End User Application Description Gibbons Creek Steam Electric Station Texas Municipal Power
All ancillary systems in plant such as Authority San Carlos, Texas
precipitators, FGD, AQCS, soot blowing, I.D.fans, fly ash and ash water municate with Westinghouse WDPF DCS
for supervisory and boiler control.D.B. Wilson Generating Plant
Big Rivers Electric Corporation
Flue gas Desulphurization (FGD) system.
ABB ENVIROMENT SYS USA TAIWAN POWER CORP
Flue gas Desulphurization (FGD) system.
Various Plants
Powergen & National
Various balance-of-plant applications
Power - UK
including sootblowers for steam generation,boiler and burner control, fuel handling, low
NOX and FGD and interface to plant DCS.
1. FGD
(2)
(MCS)
DCS
DCS
Logix
•
•
Profibus DP/PA
•
DeviceNet
•
•
Americas: Rockwell Automation, 1201 South Second Street, Milwaukee, WI 53204-2496 USA, Tel: (1)414 382.2000, Fax: (1)414 382.4444
3(852)28874788 (852)25109436
184
200051 (8621)61206007 (8621)62351099
361006 (86592)6022084 (86592)6021832
568430022 (8627)68850233 (8627)68850232
400010 (8623)63702668 (8623)63702558
1472305
712
504715L 518001 (86755)25847099 (86755)25870900
44
36266071 (86532)86678338 (86532)86678339
2906