外高桥船厂简介

合集下载
相关主题
  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
SWS Introduction
China State Shipbuilding Corporation (CSSC Group)
CSSC holding Ltd. 600150 listed in Shanghai Stock Exchange
Shanghai Waigaoqiao Shipbuilding Co., Ltd. (SWS)
2005/4/30
Steel Plate P/O
2005/7/4
Steel Cutting
2005/11/8
Keel laying
2006/2/22
Hull Launching
2006/12/8
Commission Completion 2007/3/31
Delivery
2007/5/1
SWS
Scope of work :
Annual Capacity
4
About USD192 M
2.1 M ㎡
1500 m length 12,000 ( Including ship designer & engineer about 1,000 people)
Dock 1: 480*106 m 600ton Gantry Crane×2
~287.4 m 51 m 20.6 m 14.5m 162000 Metric Tons
SWS
Scope of work :
SWS —— hull, LQ, topside support, turret install, 7 topside module fabrication & installation, all system commissioning, detail design, etc.
Dock 2: 540*76 m 600ton Gantry Crane×1 800ton Gantry Crane×1
650,000 tons per year
24 Vessels (5,150,000 DWT)
SWS
Working Flow of SWS Shipyard
Grand assembly ErectioBnBlolioncckdkpryaasidnSsoteuicnmbkg-balsysembly
Centrofin
Nationality: Greece Quantity: 3
OSG
Nationality: USA Quantity: 1
Cardiff
Nationality: Greece Quantity: 35
Frontline
Nationality: Norway Quantity: 4
SWS
Fwd End Systems: • Seawater Lift • Compressed Air • Fresh Water Generator • Fwd Fire Water Pumps • Hypochlorite System • HVAC for LQ • Hydraulic system for winches • Paint Locker • Emergency Generator • UPS, Battery room • LER, transformers, switchgear
The steel plate with thickness up to 160mm is applied in our offshore projects and such has been successfully carried out during construction.
2. Qualification All of the welders in our company have obtained the qualification of Class.
SWS —— hull, LQ, topside support, mooring structure fabrication. Basic design; detail and production design; Procurement all equipments and material; Mechanical completion; Commissioning. ConocoPhillips —— Topside fabrication in Singapore
Overall Length Breadth (Moulded) Depth (Moulded) Scantling draught
~313 m 63 m 32.5 m 20.8m
SWS
MILESTONE:
LOI Signing
2005/1/28;
Contract Signing
2005/3/1
Basic Design Finish
COSCO
Nationality: China Quantity: 16
RBD
Nationality: Italy Quantity: 5
18
SWS
NAPA modeling for 13,300TEU
PATRAN FEM Modeling for a VLCC
TRIBON modeling
SWS
Principal Dimensions:
Length overall Length of loaded water line Breadth, moulded Depth, moulded Design draught, moulded DWT Design Displacement
262.20m 250m 46.00m 24.60 m 17.10 m 150,000 t 185,000 t
Pre-outfitting Mooring on quay side
Steel cutting and unit assembly
SCS Shipyard
Investment Area
Quayside Employee
Dry Docks
Steel Treatment
Annual Capacity
Panel block
Curve block
Platform
Subcontra ctor
Assembly
In dock
SWS
HIGH STANDARD
HSE MANAGEM
ENT
BEST RECORD OF DELIVERY
No delay for 200 vessels
TOP 1 IN OUTPUT 8million dwt per
SEM – working time management
21
SWS
1. WPS In addition to approved WPS of general ship, we have achieved WPS of high tension and thickness steel plate which are approved by classification.
About USD7wk.baidu.com0 M
1.7 M ㎡
1320m length 10,000 ( Including 2,000 from Jiangnan Shipyard)
Dock 1: 520*76 m 600ton Gantry Crane×2
Dock 2: 510*106 m 600ton Gantry Crane×2
SCS Shipyard
SWS Shipyard
SWS Offshore
2
SWS
Shanghai
SCS SWS
SWS Offshore
3
SWS
SWS Shipyard
Registered Capital Area Quayside
Employee
Dry Docks
Steel Treatment
year
Ensuring timely delivery of high
quality ships
MOST ADVANCED & COMPLICATED
PRODUCT 6th generation
Semi Rig
25
TOP 1 IN EFFICIENCY
Deliver 3 vessels every
Surface Preparation
Part Assembly
Material Storage
Grand Assembly Dock Erection
Launching
Quay Outfitting
SWS
Summary of Facilities
Area (m2)
Waterfront
Dry Dock/ Slipway
40 days
TOP 1 IN ACCURACY CONTROL
SWS
1. PANYU 4-2 / 5-1 FPSO for CNOOC
Kick off meeting 2001.9.6
Steel cutting
2002.2.28
Keeling Launching Delivery
2002.6.22 2003.5.28 2003.6.22
Tanks:
Cargo Oil
10 148,758 m3
Slops
2 3,829 m3
Water Ballast 10 61,585 m3
Diesel
2 1,578 m3
Fresh Water 1
164 m3
Produced Water 4 5,610 m3
SWS
Scope of work PANYU 4-2 / 5-1 FPSO
In a leading position in China.
Department
Accuracy Department (SWS+SCS)
Branch
Technique Management
Workshop Management
Outfield Management
Work Area
Cutting center
SWS
Outfitting precision management is implemented by 3D data software.
23
SWS
Accuracy management department of SWS was established on April 30th, 2008. The first accuracy management department to in charge of precision management fulltime in domestic shipyards. Now there are more than 150 accuracy administrators in accuracy management department, including Korea precision experts.
CNOOC —— 6 topside module fabrication, hook up, equipment purchase;
Turn key at SWS
SWS
Outfitting Quayside
SWS
28th Aug. 2004 First oil SWS
3. BoHai Phase II FPSO For ConocoPhillips (EPC Contract)
Length
SWS shipyard
2.1 milli
1700
Dock 1
480m
Width
Crane
106m
2*600 T 1*600 T
1
Main Clients NYK
Nationality: Japan Quantity: 4
Bocimar
Nationality: Belgium Quantity: 12
SWS —— hull, LQ, topside support, turret install, topside installation, all system commissioning, detail design, etc. CNOOC —— topside module fabrication, hook up, equipment purchase; Turn key at SWS
SWS
STP Swivel Installation
SWS/APL
SWS
Un-docking 2003.05.28
SWS
SWS
2. BZ 25-1 FPSO for CNOOC
Overall Length Breadth (Moulded) Depth (Moulded) Scantling draught Deadweight
350,000 tons per year
14 vessels (3,300,000 DWT)
6
SWS
Working Flow of SCS Shipyard
3D Block Assembly Block Turn Over Blasting & Painting
Panel Block Assembly Steel Cutting
相关文档
最新文档