供应链管理自测练习八
供应链管理第三版Unit8习题与答案
供应链管理第三版Unit8习题与答案Chapter 8Aggregate Planning in the Supply ChainTrue/False1.The goal of aggregate planning is to satisfy demand in a way thatminimizes profit.Answer: FalseDifficulty: Easy2.Aggregate planning is a process by which a company determines levels ofcapacity, production, subcontracting, inventory, stockouts, and evenpricing over a specified time horizon.Answer: TrueDifficulty: Moderate3.Aggregate planning solves problems involving aggregate decisions ratherthan stock keeping unit (SKU) level decisions.Answer: TrueDifficulty: Easy4.Traditionally, much of aggregate planning is focused within anenterprise and may not always be seen as a part of supply chainmanagement.Answer: TrueDifficulty: Moderate5.Aggregate planning is an important supply chain issuebecause, to beeffective, it requires inputs from throughout the supply chain, but its results have little impact on the supply chain.Answer: FalseDifficulty: Moderate6.Short-term production serves as a broad blueprint for operations andestablishes the parameters within which aggregate planning decisions are made.Answer: FalseDifficulty: Easy7.The aggregate planning problem is concerned with determining theproduction level, inventory level, and capacity level (internal andoutsourced) for each p eriod that maximizes the firm’s profit over theplanning horizon.Answer: TrueDifficulty: Moderate8.To create an aggregate plan, a company must specify the planning horizonfor the plan and the duration of each period within the planning horizon.Answer: TrueDifficulty: Easy9. A planning horizon is usually between three and five years.Answer: FalseDifficulty: Moderate10. A poor aggregate plan can result in improved sales andprofits if theavailable inventory and capacity are unable to meet demand.Answer: FalseDifficulty: Easy11. A poor aggregate plan may result in a large amount of excess inventoryand capacity, thereby raising costs.Answer: TrueDifficulty: Moderate12.The aggregate planner must make a trade-off between capacity, inventory,and backlog costs.Answer: TrueDifficulty: Moderate13.An aggregate plan that increases one cost typically results in theincrease of the other two.Answer: FalseDifficulty: Moderate14.The time flexible strategy is where the production rate is synchronizedwith the demand rate by varying machine capacity or hiring and layingoff employees as the demand rate varies.Answer: FalseDifficulty: Hard15.The time flexible strategy is where workforce (capacity) is kept stablebut the number of hours worked is varied over time in an effort tosynchronize production with demand.Answer: TrueDifficulty: Moderate16.The mixed strategy is where a stable machine capacity and workforce aremaintained with a constant output rate with inventory levels fluctuating over time.Answer: FalseDifficulty: Hard17.Most strategies that an aggregate planner actually uses are incombination, and are referred to as mixed strategies.Answer: TrueDifficulty: Easy18. A highly effective tool for a company to use when it tries to maximizeprofits while being subjected to a series of constraints is aggregateprogramming.Answer: FalseDifficulty: Moderate19.To improve the quality of these aggregate plans, forecast errors must betaken into account when formulating aggregate plans.Answer: TrueDifficulty: Moderate20.Forecasting errors are dealt with in aggregate plans using either safetybacklog or safety capacity.Answer: FalseDifficulty: Moderate21.Safety inventory is defined as inventory held to satisfy demand that ishigher than forecasted.Answer: TrueDifficulty: Easy22.Safety capacity is defined as capacity used to satisfy demand that islower than forecasted.Answer: FalseDifficulty: Easy/doc/456657326.html,panies should work with downstream partners to produce forecasts andwith upstream partners to determine constraints when doing aggregateplanning.Answer: TrueDifficulty: Easy24.The aggregate plan should be viewed primarily as an in-house tool thatdoes not need to be communicated to supply chain partners.Answer: FalseDifficulty: Easy25.Given that forecasts are always wrong to some degree, the aggregate planneeds to have some flexibility built into it if it is to be useful.Answer: TrueDifficulty: Moderate26. A manager should perform sensitivity analysis on the inputs into anaggregate plan to choose the best solution for the range of possibilities that could occur.Answer: TrueDifficulty: Moderate27.As inputs into the aggregate plan change, managers do not need to makechanges to the aggregate plan.Answer: FalseDifficulty: Easy28.As capacity utilization increases, it becomes less important to performaggregate planning.Answer: FalseDifficulty: ModerateMultiple Choice1.The process by which a company determines levels of capacity, production,subcontracting, inventory, stockouts, and even pricing over a specifiedtime horizon isa.aggregate planning.b.detail planning.c.inventory planning.d.sales planning.e.all of the aboveAnswer: aDifficulty: Moderate2.The goal of aggregate planning is toa.dissatisfy customers in a way that maximizes profit.b.dissatisfy customers in a way that minimizes profit.c.satisfy demand in a way that maximizes profit.d.satisfy demand in a way that minimizes profit.e.none of the aboveAnswer: cDifficulty: Easy3.Aggregate planning solves problems involvinga.aggregate decisions and stock keeping unit (SKU) level decisions.b.aggregate decisions or stock keeping unit (SKU) level decisions.c.aggregate decisions rather than stock keeping unit (SKU) leveldecisions.d.stock keeping unit (SKU) level decisions rather than aggregatedecisions.e. b and c onlyAnswer: cDifficulty: Easy4.Aggregate planning, to be effective, requires inputs froma.all customers.b.all departments.c.all suppliers.d.throughout the supply chain.e.throughout the company.Answer: dDifficulty: Moderate5.Much of aggregate planning has traditionally been focuseda.on short-term production scheduling.b.on customer relationship management.c.within an enterprise.d.beyond enterprise boundaries.e.all of the aboveAnswer: cDifficulty: Moderate6.Which of the following are not operational parameters the aggregateplanner is concerned witha.production rateb.workforcec.overtimed.backorderse.inventory on handAnswer: dDifficulty: Moderate7.The operational parameter concerned with the number of units completedper unit time (such as per week or per month) isa.production rate.b.workforce.c.overtime.d.backlog.e.inventory on hand.Answer: aDifficulty: Easy8.The operational parameter concerned with the number of workers/units ofcapacity needed for production isa.production rate.b.workforce.d.backlog.e.inventory on hand.Answer: bDifficulty: Easy9.The operational parameter concerned with the amount of overtimeproduction planned isa.production rate.b.workforce.c.overtime.d.backlog.e.inventory on hand.Answer: cDifficulty: Easy10.The operational parameter concerned with demand not satisfied in theperiod in which it arises, but carried over to future periods isa.production rate.b.workforce.c.overtime.d.backlog.e.inventory on hand.Answer: dDifficulty: Easy11.The operational parameter concerned with the planned inventory carriedover the various periods in the planning horizon isa.production rate.b.workforce.d.backlog.e.inventory on hand.Answer: eDifficulty: Easy12.The operational parameter concerned with the number of units of machinecapacity needed for production isa.machine capacity level.b.subcontracting.c.overtime.d.backlog.e.inventory on hand.Answer: aDifficulty: Easy13.The operational parameter concerned with the subcontracted capacityrequired over the planning horizon isa.machine capacity level.b.subcontracting.c.overtime.d.backlog.e.inventory on hand.Answer: cDifficulty: Easy14.The aggregate plana.serves as a broad blueprint for operations.b.establishes the parameters within which short-term production anddistribution decisions are made.c.allows the supply chain to alter capacity allocations and changesupply contracts.d.all of the abovee. b and c onlyAnswer: dDifficulty: Moderate15.Aggregate planning is concerned with determininga.the production level, sales level, and capacity for each period.b.the demand level, inventory level, and capacity for each period.c.the production level, inventory level, and capacity for eachperiod.d.the production level, staffing level, and capacity for eachperiod.e.none of the aboveAnswer: cDifficulty: Moderate16.To create an aggregate plan, a company must specifya.the planning horizon for the plan.b.the duration of each period within the planning horizon.c.key information required.d.all of the abovee. a and b onlyAnswer: dDifficulty: Moderate17.The planning horizon isa.the time period over which the aggregate plan is toproduce asolution.b.the duration of each time period in the aggregate plan.c.the length of time required to produce the aggregate plan.d.the solution to the aggregate plan.e.none of the aboveAnswer: aDifficulty: Easy18.The length of the planning horizon is usually betweena.one and three months.b.three and eighteen months.c.one and three years.d.three and five years.e.none of the aboveAnswer: bDifficulty: Moderate19.Which of the following is not information needed by the aggregateplannera.demand forecast for each period in the planning horizonb.production costs/doc/456657326.html,bor costsd.cost of subcontracting productione.cost of changing the demand forecastAnswer: eDifficulty: Moderate20.The cost of changing capacity includes thea.cost of adding machine capacity.b.cost of reducing machine capacity.c.cost of hiring workforce.d.cost of laying off workforce.e.all of the aboveAnswer: eDifficulty: Easy21.Which of the following is not a cost of changing capacitya.cost of adding machine capacityb.cost of hiring workforcec.cost of laying off workforced.cost of overtimee.cost of reducing machine capacityAnswer: dDifficulty: Moderate22.Which of the following is not a constraint the aggregate planner needsto considera.limits on stockouts and backlogsb.limits on overtimec.limits on sales commissionsd.limits on layoffse.limits on capital availableAnswer: cDifficulty: Moderate23. A poor aggregate plan can result ina.appropriate inventory levels.b.efficient use of capacity.c.better sales and lost profits.d.lost sales and lost profits.e.lost sales and better profits.Answer: dDifficulty: Hard24.The fundamental trade-offs available to an aggregate planner are betweena.capability, inventory, and backlog costs.b.capability, inventory, and sales costs.c.capacity, inventory, and backlog costs.d.capacity, inventory, and sales costs.e.none of the aboveAnswer: cDifficulty: Easy25.Which of the following is not a distinct aggregate planning strategy forachieving balance between capacity, inventory, and backlog costsa.adjustable strategyb.Chase strategyc.level strategyd.mixed strategye.time flexible strategyAnswer: aDifficulty: Easy26.The strategy where the production rate is synchronized with the demandrate by varying machine capacity or hiring and laying off employees asthe demand rate varies is thea.adjustable strategy.b.Chase strategy.c.level strategy.d.mixed strategy.e.time flexible strategy.Answer: bDifficulty: Moderate27.The strategy where workforce (capacity) is kept stable but the number ofhours worked is varied over time in an effort to synchronize production with demand is thea.adjustable strategy.b.Chase strategy.c.level strategy.d.mixed strategy.e.time flexible strategy.Answer: eDifficulty: Moderate28.The strategy where a stable machine capacity and workforce aremaintained with a constant output rate, with inventory levels fluctuating over time, is thea.adjustable strategy.b.Chase strategy.c.level strategy.d.mixed strategy.e.time flexible strategy.Answer: cDifficulty: Hard29.Most strategies that an aggregate planner actually uses are incombination and are referred to as thea.adjustable strategy.b.Chase strategy.c.level strategy.d.mixed strategy.e.time flexible strategy.Answer: dDifficulty: Easy30. A highly effective tool for a company to use when it tries to maximizeprofits while being subjected to a series of constraints isa.aggregate programming.b.distribution programming.c.production programming.d.linear programming.e.manufacturing programming.Answer: dDifficulty: Moderate31.When formulating aggregate plans,a.forecast errors have no impact.b.forecast errors must be taken into account.c.forecast accuracy is assumed.d.forecast accuracy is not a factor.e.none of the aboveAnswer: bDifficulty: Moderate32.Forecasting errors are dealt with usinga.safety backlog.b.safety capacity.c.safety inventory.d.all of the abovee. b and c onlyAnswer: eDifficulty: Moderate33.Inventory held to satisfy demand that is higher than forecasted isa.safety backlog.b.safety capacity.c.safety inventory.d.safety sales.e.safety workforce.Answer: cDifficulty: Easy34.Capacity used to satisfy demand that is higher than forecasted isa.safety backlog.b.safety capacity.c.safety inventory.d.safety sales.e.safety workforce.Answer: bDifficulty: Easy35.Which of the following is an approach a company can use to create abuffer for forecast error using safety inventorya.overtimeb.carry extra workforce permanentlyc.build and carry extra inventoriesd.subcontractinge.purchase capacity or product from an open or spot marketAnswer: aDifficulty: Easy36.Which of the following is not an approach a company can use to create abuffer for forecast error using safety capacitya.overtimeb.carry extra workforce permanentlyc.build and carry extra inventoriesd.subcontractinge.purchase capacity or product from an open or spot marketAnswer: cDifficulty: Easy37.Aggregate planning should consider information froma.only the enterprise as its breadth of scope.b.downstream partners to produce forecasts.c.upstream partners to determine constraints.d.all of the abovee. b and c onlyAnswer: dDifficulty: Easy38.The quality of the aggregate plan can be improved by using informationfroma.only the local firm.b.only downstream partners.c.only upstream partners.d.all parts of the supply chain.e.none of the aboveAnswer: bDifficulty: Moderate39.The aggregate plan should be communicated toa.only the local firm.b.only downstream partners.c.only upstream partners.。
供应链管理复习自测题
《供应链管理》复习自测题一、单项选择题1.供应链流程相对于()的执行顺序,供应链上的所有流程可以分为推动流程和拉动流程。
A.制造商需求B.分销商需求C.零售商需求D.顾客需求2.每一个企业的价值链都是由以独特方式联结在一起的()种基本活动构成的。
A.6B.7C.8D.93.以()为基础的竞争和“纵向一体化”的解体,标志着市场开始属于那些在构建供应链和通过供应链竞争方面比对手更强的企业。
A.时间B.成本C.质量D.个性化4.供应链设计的步骤中的分析供应链设计的必要性的下一步是()。
A.分析市场竞争环境B.分析企业现状C.明确供应链设计的目标D.评价供应链设计方案的可行性5.以下供应链合作伙伴选择方法中属于定量方法的是()。
A.直观判断法B.招标法C.采购成本比较法D.协商选择法6.()是采购管理最首要的职能。
A. 供应链B.保障供应C. 信息管理D.盈利7.面向供应链的生产组织计划模式的总体指导思想是(),它体现了纵向和横向信息的集成。
A.事前计划、事中控制B.事中计划、事后控制C.事前控制、事中计划D.事中控制、事后计划8.()是指供应商管理库存。
A.VMIB.JMIC.MRPD.QR9. ECR是起源于美国的()。
A.纺织服装行业B.汽车制造业C.食品杂货行业D.日化用品行业10.下图是什么物流企业组织结构?()A.一体化物流组织形式B.物流功能独立的组织形式C.简单功能集合的物流组织形式D.传统物流管理组织结构11.根据()划分,可以把供应链划分为有效性供应链和反应性供应链。
A.供应链的稳定性B.供应链容量与用户需求的关系C.供应链的功能模式D.供应链的管理对象12.美国学者()第一个提出了企业价值链(value chain)思想。
A.迈克尔·波特B.马丁·克里斯托弗C.加里·哈默尔D.普拉哈拉德13.企业竞争战略的设计必须以()为基础。
A.顾客偏好B.产品C.服务D.质量14.费舍尔(Fisher)认为,供应链的设计要以()为中心,即应设计出与产品特性一致的供应链。
供应链自测题_答案
1【自测评估】一、选择题1.以下描述中正确的是:(A )A、供应链管理是物流管理的新战略B、供应链管理就是物流管理C、供应链管理其实就是对供应商和客户的关系管理D、供应链管理就是对企业流程的综合管理2.采用(C )运作模式的供应链系统的库存量较低.集成度较高.信息交换迅速。
A、分散式供应链B、推动式供应链C、拉动式供应链D、集中式供应链3.供应链管理把资源的范围扩展到( C )A、供应商B、分销商C、整个供应链D、其他节点企业4.供应链管理因企业战略和适应市场需求变化的需要,节点企业需要动态地更新,这使得供应链具有明显的( B )。
A、复杂性B、动态性C、交叉性D、灵活性5.供应链管理强调的是把主要精力放在企业的( C )上.充分发挥其优势。
A、合作关系B、运输仓储C、关键业务(企业核心竞争力)D、生产制造二、判断题1.由于供应链节点企业有一个共同的目标,所以他们之间不再有竞争性 ( 错 )2.推动式供应链的驱动力产生于最终用户.整个供应链的集成度较高.信息交换迅速.可以根据用户的需求实现定制化服务。
( 错)3.供应链不仅是一条连接供应商到用户的物料链、信息链、资金链.而且还是一条增值链。
( 对)4.供应链管理是以同步化、集成化生产计划为指导.以各种信息技术为支持.尤其以Internet/Intranet为依托 ( 对)5.供应链整体成本最小化意味着每个节点企业的成本都是最小。
( 错 )三、简答题1.什么是纵向一体化?什么是横向一体化?2.什么是供应链?供应链有哪些特性?3.供应链管理涉及主要内容有哪些?4.简述供应链管理与传统管理模式的不同。
5.我国供应链管理现状如何?一、选择题1.快速反应的集成是指(A )A、重新设计业务流程.将公司整体业务集成起来.以支持公司整体战略B、商品销售预测的自动化C、跟踪新产品的开发和试销D、共同制定未来需求的计划和预测2.对QR的叙述下列不正确的有:( C )A、制造商可以准确地安排生产计划B、降低了整个供应链系统地流通费用C、降低了单位商品地采购成本D、实施QR后.能够提高顾客地满意度3.ECR是( B )的缩写。
供应链自测题-答案
1【自测评估】一、选择题1.以下描述中正确的是:(A )A、供应链管理是物流管理的新战略B、供应链管理就是物流管理C、供应链管理其实就是对供应商和客户的关系管理D、供应链管理就是对企业流程的综合管理2.采用(C )运作模式的供应链系统的库存量较低,集成度较高,信息交换迅速。
A、分散式供应链B、推动式供应链C、拉动式供应链D、集中式供应链3.供应链管理把资源的范围扩展到( C )A、供应商B、分销商C、整个供应链D、其他节点企业4.供应链管理因企业战略和适应市场需求变化的需要,节点企业需要动态地更新,这使得供应链具有明显的( B )。
A、复杂性B、动态性C、交叉性D、灵活性5.供应链管理强调的是把主要精力放在企业的( C )上,充分发挥其优势。
A、合作关系B、运输仓储C、关键业务(企业核心竞争力)D、生产制造二、判断题1.由于供应链节点企业有一个共同的目标,所以他们之间不再有竞争性 ( 错 )2.推动式供应链的驱动力产生于最终用户,整个供应链的集成度较高,信息交换迅速,可以根据用户的需求实现定制化服务。
( 错)3.供应链不仅是一条连接供应商到用户的物料链、信息链、资金链,而且还是一条增值链。
( 对)4.供应链管理是以同步化、集成化生产计划为指导,以各种信息技术为支持,尤其以Internet/Intranet为依托 ( 对)5.供应链整体成本最小化意味着每个节点企业的成本都是最小。
( 错 )三、简答题1.什么是纵向一体化?什么是横向一体化?2.什么是供应链?供应链有哪些特性?3.供应链管理涉及主要内容有哪些?4.简述供应链管理与传统管理模式的不同。
5.我国供应链管理现状如何?2【自测评估】一、选择题1.快速反应的集成是指(A )A、重新设计业务流程,将公司整体业务集成起来,以支持公司整体战略B、商品销售预测的自动化C、跟踪新产品的开发和试销D、共同制定未来需求的计划和预测2.对QR的叙述下列不正确的有:( C )A、制造商可以准确地安排生产计划B、降低了整个供应链系统地流通费用C、降低了单位商品地采购成本D、实施QR后,能够提高顾客地满意度3.ECR是( B )的缩写。
供应链管理第三版unit8习题与答案
Chapter 8Aggregate Planning in the Supply ChainTrue/False1・ The goal of aggregate planning is to satisfy demand in a way that minimizes profit ・ Answer: Fa Ise Difficulty: Easy2.Aggregate planning is a process by which a company determines levels ofcapacity, production, subcontracting, inventory, stockouts, and evenpr ici ng over a specified time hor izon.Answer: TrueDifficulty: Moderate3.Aggregate planning solves problems involving aggregate deci sions rather thanstock keeping unit (SKU) level deci sions.Answer: TrueDifficulty: Easy4.Traditionally, much of aggregate planning i s focused with in an enterpr ise andmay not always be seen as a part of supply chain management・Answer: TrueDifficulty: Moderate5.Aggregate planning is an important supply chain issue because, to be effective,it requires inputs from throughout the supply chain, but its results have Iittle impact on the supply chain・Answer: Fa IseDifficulty: Moderate6.Short-term production serves as a broad bluepr int for operations and estabIishes the parameters within which aggregate planning decisions are made.Answer: Fa I seDifficulty: Easy7.The aggregate planning problem is concerned with determining the product!onlevel, inventory level, and capacity level (internal and outsourced) for eachperiod that maximizes the firm' s profit over the planning hor izon.Answer: TrueDifficulty: Moderate8.To create an aggregate plan, a company must specify the planning hor izon forthe plan and the duration of each per iod within the planning hor i zon. Answer:TrueDifficulty: Easy9. A planning hor izon i s usuaI Iy between three and five years・Answer: Fa IseDifficulty: Moderate10. A poor aggregate plan can result in improved saIes and profits if the avaiI ableinventory and capacity are unable to meet demand.Answer: Fa IseDifficulty: Easy・ A poor aggregate plan may result in a large amount of excess inventory and capacity, thereby raising costs・Answer: TrueDifficulty: Moderate12.The aggregate planner must make a trade-off between capacity, inventory, andbacklog costs・Answer: TrueDifficulty: Moderate13.An aggregate plan that increases one cost typically results in the increase ofthe other two.Answer: Fa IseDifficulty: Moderate14.The time flexible strategy is where the production rate is synchronized with thedemand rate by varying machine capacity or hiring and laying off employees asthe demand rate varies・Answer: Fa IseDifficulty: Hard15.The time flexible strategy is where workforce (capacity) is kept stable but thenumber of hours worked i s var ied over time i n an effort to synchronizeproduction with demand・Answer: TrueDifficulty: Moderate16.The mixed strategy is where a stable machine capacity and workforce aremaintained with a constant output rate with inventory levels fluctuating overtime・Answer: Fa I seDifficulty: Hard17.Most strategies that an aggregate planner actuaIly uses are in combination, andare referred to as mixed strategies・Answer: TrueDifficulty: Easy18. A highly effective tool for a company to use when it tr ies to maximize profitswhile being sub jected to a ser ies of constraints i s aggregate programmi ng.Answer: Fa IseDifficulty: Moderate19.To improve the qua Iity of these aggregate plans, forecast errors must be takeninto account when formulating aggregate plans・Answer: TrueDifficulty: Moderate20.Forecasting errors are dealt with in aggregate plans using either safety backlogor safety capacity.Answer: Fa I seDifficulty: Moderate21・Safety inventory is defined as inventory held to satisfy demand that is higher than forecasted・Answer: TrueDifficulty: Easy22.Safety capacity is defined as capacity used to satisfy demand that is lower thanforecasted・Answer: Fa IseDifficulty: Easypanies should work with downstream partners to produce forecasts and withupstream partners to determine constraints when doing aggregate planning.Answer: TrueDifficulty: Easy24.The aggregate plan shouId be viewed pr imar ily as an in-house tool that doesnot need to be communicated to supply chain partners・Answer: Fa IseDifficulty: Easy25.Given that forecasts are always wrong to some degree, the aggregate plan needsto have some flexibiIity built into it if it is to be useful・Answer: TrueDifficulty: Moderate26. A manager should perform sensitivity analysis on the inputs into an aggregateplan to choose the best solution for the range of possibiI ities that couldoccur・Answer: TrueDifficulty: Moderate27.As inputs into the aggregate plan change, managers do not need to make changesto the aggregate plan・Answer: Fa IseDifficulty: Easy28.As capacity utiIization increases, it becomes less important to performaggregate planning・Answer: Fa IseDifficulty: ModerateMultiple ChoiceThe process by which a company determines levels of capacity, production,subcontracting, inventory, stockouts, and even pricing over a specified time hor izon i sa.aggregate planning・b・detai I planning・c. inventory planning.d・sales planning.e・al I of the aboveAnswer: aDifficulty: Moderate2.The goal of aggregate planning is toa. dissatisfy customers in a way that maximizes profit・b・ dissatisfy customers in a way that minimizes profit・c. satisfy demand in a way that maximizes profit・d・ satisfy demand in a way that minimizes profit・e. none of the aboveAnswer: cDifficulty: Easy3.Aggregate planning solves problems involvinga.aggregate deci sions and stock keep ing unit (SKU) level deci sions. b・aggregate deci sions or stock keeping unit (SKU) level decisions・c.aggregate decisions rather than stock keeping unit (SKU) level decisions・d・ stock keep ing unit (SKU) level deci sions rather than aggregate decisions・e. b and c onlyAnswer: cDifficulty: Easy4.Aggregate planning, to be effective, requi res inputs froma. a I I customers・b・ a I I departments・c. a I I suppIiers・d・throughout the supplychain・e. throughout the company.Answer: dDifficulty: Moderate5.Much of aggregate planning has traditionally been focuseda. on short-term production scheduling・b・on customer relationship management・c. within an enterprise・d・ beyond enterpr ise boundar ies・e. al I of the aboveAnswer: cDifficulty: Moderate6.Which of the fol lowing are not operational parameters the aggregateplanner is concerned witha. production rateb・workforcec. overtimed・backorderse. inventory on handAnswer: dDifficulty: Moderate7.The operational parameter concerned with the number of units comp I eted perunit time (such as per week or per month) isa. production rate・b・ workforce・c. overtime・d・ backlog・e. inventory on hand.Answer: aDifficulty: Easy8.The operational parameter concerned with the number of workers/units of capacityneeded for production isa. production rate・b・ workforce・c. overtime.d・ backlog・e. inventory on hand.Answer: bDifficulty: Easy9.The operations I parameter concerned with the amount of overtime productionplanned isa. production rate・b・ workforce・c. overtime・d・ backlog・e. inventory on hand.Answer: cDifficulty: Easy10.The operational parameter concerned with demand not satisfied in the per iod inwhich it arises, but carr ied over to future per iods i sa. production rate・ b・ workforce・ c. overtime.d・ backlog・e. inventory on hand.Answer: dDifficulty: EasyThe operations I parameter concerned with the planned inventory carr ied overthe var ious per iods in the planning hor izon isa. production rate・b・ workforce・c. overtime・d・ backlog・e. inventory on hand.Answer: eDifficulty: Easy12.The operational parameter concerned with the number of units of machine capacityneeded for production isa. machine capacity I eve I.b ・ subcontracting ・c. overtime ・d ・ backlog ・e. inventory on hand.Answer: aDifficulty: Easy13. The operational parameter concerned with the subcontracted capacity requi redover the planning hor izon isa. machine capacity I evel ・b ・ subcontracting ・c. overtime ・d ・ backlog ・e. inventory on hand.Answer: cDifficulty: EasyThe aggregate plana. serves as a broad bluepr int for operations ・b. estab Ii shes the parameters within which short-term production and distr ibution decisions are made ・c. a I Iows the supply chain to alter capacity allocations and change supplycontracts ・d. al I of the abovee. b and c onlyAnswer: dDifficulty: Moderate 15. Aggregate planning is concerned with determininga.the product!on level, sales level, and capacity for each period. b ・the demand level, inventory level, and capacity for each per iod. c. the production level, inventory level,and capacity for eachperiod. d ・ the production level, staffing level, and capacity for each period.e. none of the aboveAnswer: cDifficulty: ModerateTo create an aggregate plan, a company must specifythe planning hor izon for the pI an. the duration of each per iod within the planning hor izon. key i nformat ion requ i red ・al I of the above 14.16. a. b ce. a and b onlyAnswer: dDifficulty: Moderate17.The planning hor izon i sa. the time per iod over which the aggregate plan is to produce a solution.b・ the duration of each time period in the aggregate plan・c.the length of time requi red to produce the aggregate plan・d・ the solution to the aggregate plan・e. none of the aboveAnswer: aDifficulty: Easy18.The length of the planning hor izon is usually betweena. one and three months・b・three and eighteen months・c. one and three years・d・three and five years・e. none of the aboveAnswer: bDifficulty: Moderate19.Which of the following is not information needed by the aggregateplannera. demand forecast for each per iod in the planning hor izonb・production costsc. labor costsd・cost of subcontracting productione. cost of changing thedemand forecastAnswer: eDifficulty: Moderate20.The cost of changing capacity includes thea. cost of adding machine capacity.b・ cost of reducing machine capacity.c. cost of hiring workforce・d・ cost of laying off workforce・e. all of the aboveAnswer: eDifficulty: Easy21 ・ Which of the fol lowing is not a cost of changing capacitya. cost of adding machine capacityb・ cost of hiring workforcec. cost of laying off workforced. cost of overtimee. cost of reducing machine capacityAnswer: dDifficulty: Moderate23. A poor aggregate plan can result ina. appropr iate inventory levels ・ b ・ efficient use of capacity.c. better sales and lost profits. d ・ lost sales and lost profits ・e. lost sales and better profits.Answer: dDifficulty: HardThe fundamental trade-offs available to an aggregate planner are betweena.capabiIity, inventory, and backlog costs. b.capabiIity, inventory, and sales costs ・ c.capacity, inventory, and backlog costs ・ d. capacity, inventory, and sales costs ・e. none of the aboveAnswer: c Difficulty: Easy25. Which of the fol lowing is not a distinet aggregate planning strategy forachieving ba I anee between capacity, inventory, and backlog costs a. adjustable strategy b ・Chase strategyc. level strategyd. mixed strategye. time flexible strategyAnswer: aDifficulty: Easy26.The strategy where the production rate is synchronized with the demand rate by varying machine capacity or hiring and laying off employees as the demand rate var i es i s thea. ad justable strategy.b ・ Chase strategy.c. level strategy. 22. Which of the to consider limits limitslimits limits limits Answer: c Difficulty: Moderatea. following is not a constraint the aggregate planner needson on stockouts and backlogs overtimesales commissions layoffs capitalavailable24.d・ mixed strategy.e. time flexible strategy.Answer: bDifficulty: Moderate27.The strategy where workforce (capacity) is kept stable but the number of hoursworked i s varied over time in an effort to synchronize production with demand is thea. ad justable strategy.b・ Chase strategy.c. level strategy.d・ mixed strategy.e. time flexible strategy.Answer: eDifficulty: Moderate28.The strategy where a stable machine capacity and workforce are maintained witha constant output rate, with inventory levels fluctuating over time, is thea. ad justable strategy.b・ Chase strategy.c. level strategy.d・ mixed strategy.e. time flexible strategy.Answer: cDifficulty: Hard29.Most strategies that an aggregate planner actuaIly uses are in comb inat ionand are referred to as thea. ad justable strategy.b・ Chase strategy.c. level strategy.d・ mixed strategy.e. time flexible strategy.Answer: dDifficulty: Easy30. A highly effective tool for a company to use when it tries to maximize profitswhile being subjected to a series of constraints isa. aggregate programming ・b. di str ibution programming ・c. production programming ・d. linear programming ・e. manufacturing programming. Answer: dDifficulty: Moderatenone of the aboveAnswer: bDifficulty: Moderate35. Which of the fol lowing is an approach a company can use to create a buffer for forecast error using safety inventoryWhen a.d.formulating aggregate plans,forecast forecast forecast forecast errors have errors must accuracy is accuracy i s no impact ・ be taken into account, assumed ・not a factor. 32. Forecasting errors are dealt with usinga.b. d.safety safety safety al I of backlog. capacity ・ inventory. b and c onlyAnswer: eDifficulty: Moderate33. Inventory held to satisfy demand that is higher than forecasteda. safety backlog ・b. safety capacity ・ d. safety inventory.safety sales ・e. safety workforce.Answer: cDifficulty: Easy34. Capacity used to satisfy demand that is higher than forecasted isb .c safety backlog ・safety capacity ・safety inventory.safety sales ・safety workforce.Answer: b Difficulty: Easya. overtimeb・carry extra workforce permanentlyc.build and carry extra inventoriesd.subcontractinge.purchase capacity or product from an open or spot market Answer: aDifficulty: Easy36.Which of the fol lowing is not an approach a company can use to create a bufferfor forecast error using safety capacitya. overtimeb・ carry extra workforce permanentlyc. build and carry extra inventor iesd・ subcontractinge. purchase capacity or product from an open or spot market Answer: cDifficulty: Easy37.Aggregate planning shouId consider information froma. only the enterpr ise as its breadth of scope・b・downstream partners to produce forecasts・c. upstream partners to determine constraints・d・al I of the abovee. b and c onlyAnswer: dDifficulty: Easy38.The qua Iity of the aggregate plan can be improved by using information froma. only the I oca I f i rm ・b・only downstream partners・c. only upstream partners・d・ a I I parts of the supply chain.e. none of the aboveAnswer: bDifficulty: Moderate39.The aggregate plan shouId be communicated toa. only the I oca I fi rm・b・ only downstream partners・c. only upstream partners・d・ a I I supply chain partners who will be affected by it.e. none of the aboveAnswer: cDifficulty: ModerateThe aggregate plan needs toa. be a final product because changes are disruptive to the supply chain ・b. be considered fixed because forecasts are usuaI Iy accurate ・c. have some flexibility built into it because forecasts are always wro ng.d. have some flexibiIity built into it because forecasts are usually right.e. none of the aboveAnswer: cDifficulty: ModerateHow frequently should the aggregate plan be reruna.weekly b.monthly c.every 3 to 8 months d. as inputs to theaggregate plan changeneverAnswer: dDifficulty: Hard42. As capacity utiIization increases,a.it becomes less important to perform aggregate planning ・ b ・it becomes more important to perform aggregate planning. c. it does not affect the importanee ofperforming aggregateplanning.d ・ it lessens the importanee of aggregate planning.e. none of the aboveAnswer: bDifficulty: Moderate Essay/Problems1. Discuss the pr imary objective and operational parameters of aggregateplanning.Answer: The goal of aggregate planning is to satisfy demand in a way thatmaximizes profit ・ Aggregate planning is a process by which a companydetermines I eve Is of capacity, production, subcontract i ng, inventory,stockouts, and even pricing over a specified time hor izon.40. 41.The aggregate planner* s main objective is to identify the fol lowingoperations I parameters over the specified time hor izon:•Production rate: the number of units completed per unit time (such as perweek or per month).•Workforce: the number of workers/units of capacity needed for production・•Overtime: the amount of overtime production planned・•Machine capacity level: the number of units of machine capacity needed forproduction・•Subcontracting: the subcontracted capacity requi red over the planning hor i zon・•Backlog: demand not satisfied in the per iod in which it ar i ses butcarried over to future per iods・•Inventory on hand: the planned inventory carr ied over the var ious per iods in the planning hor izon.The aggregate plan serves as a broad bluepr int for operations and estab Iishes the parameters within which short-term production and di str ibution deci sions are made・ The aggregate plan a I Iows the supply chain to alter capacity al locations and change supply contracts・Difficulty: Moderate2.Discuss the information requi red for aggregate planning.Answer: An aggregate planner requi res the fol lowing information:•Demand forecast F t for each Per iod t in the planning hor izon that extends over T per iods•Production costs•Labor costs, regular time ($/hour), and overtime costs ($/hour)•Cost of subcontracting production ($/unit or $/hour)•Cost of changing capacity; specifically, cost of hi r ing/1 aying offworkforce ($/worker) and cost of adding or reducing machine capacity($/machine)Labor/machine hours requi red per unit Inventory holding cost ($/unit/period) Stockout or backlog cost ($/unit/per iod)Constraints:Limits on overtimeLimits on layoffsLimits on capital avaiI ableLimits on stockouts and backlogsConstraints from suppliers to the enterpriseThis information is used to create an aggregate plan that in turn helps acompany make the fol lowing determinations:•Production quantity from regular time, overtime, and subcontractedtime: used to determine number of workers and supplier purchase levels・•Inventory held: used to determine how much warehouse space andworking capita I is needed・•Backlog/stockout quantity: used to determine what the customerservice levels will be.•Workforce hired/laid off: used to determine any labor issues thatwill be encountered・•Machine capacity /ncrease/decrease: used to determine if newproduction equipment needs to be purchased or idled・The qua Iity of an aggregate plan has a signifiesnt impact on theprofitabiIity of a firm・ A poor aggregate plan can result in lost sales andlost profits if the avaiI able inventory and capacity are unable to meet demand・ A poor aggregate plan may also result in a large amount of excess inventoryand capacity, thereby raising costs・ Therefore, aggregate planning is a veryimportant tool in helping a supply chain maximize profitabiI ity.Difficulty: Hard3.Explain the basic strategies that an aggregate planner has avaiI able to balancethe various costs and meet demand.Answer: There are essentially three distinct aggregate planning strategies forachieving balance between these costs・ These strategies involve trade-offsbetween capital investment, workforce size, work hours, inventory, and backlogs/lost sales・ Most strategies that a planner actuaIly uses are a combination of these three and are referred to as mixed strategies. The three strategies are as fol lows:1.Chase strategy—using capacity as the lever: With this strategy, theproduction rate is synchronized with the demand rate by varying machine capacity or hiring and I ay ing off employees as the demand rate varies・ In practice,achieving this synchronization can be very problematic because of the difficulty in varying capacity and workforce on short notice・ This strategy can beexpensive to implement if the cost of varying machine or Iabor capacity overtime i s high・ It can a I so have a significant negative impact on the moraleof the workforce・ The Chase strategy results in low levels of inventory in the supply chain and high levels of change in capacity and workforce・ It should be used when the cost of carrying inventory is very expensive and costs to changelevels of machine and Iabor capacity are low・2.Time flexibility strategy—using uti/ization as the lever: This strategy maybe used if there is excess machine capacity ・,if machines are not used twenty four hours a day, seven days a week)・ In this case, the workforce (capacity) is kept stable but the number of hours worked is var ied over time in an effort to synchronize production with demand. A planner can use variable amounts ofovertime or a flexible schedule to achieve this synchronization. Although thisstrategy does requi re that the workforce be flexible, it avoids some of theproblems associated with the Chase strategy, most notably changing the size ofthe workforce. This strategy results in low levels of inventory but with loweraverage utiIization. It should be used when inventory carrying costs arerelatively high and machine capacity is relatively inexpensive・3.Level strategy—using inventory as the lever: With this strategy, a stablemachine capacity and workforce are maintained with a constant output rate・Shortages and surpluses result in inventory levels fluctuating over time・ Here production is not synchronized with demand・ Either inventories are built up in anticipation of future demand or backlogs are carried over from high- to low-demand per iods・ Employees benefit from stable working condit ions・ A drawback associated with this strategy is that large inventories may accumulate andcustomer orders may be delayed・ This strategy keeps capacity and costs ofchanging capacity relatively low. It should be used when inventory carrying and backlog costs are relatively low・Difficulty: Moderate4.Discuss key issues to be considered when implementing aggregate planning.Answer: 1. Think beyond the enterprise to the entire supply chain. Mostaggregate planning done today takes only the enterpr ise as i ts breadth ofscope・ However, there are many factors outside the enterpr i se throughout the supply chain that can dramatically impact the optimal aggregate plan・Therefore, avoid the trap of only thinking about your enterpr i se whenaggregate planning. Work with partners downstream to produce forecasts, withupstream partners to determine constraints, and with any other supply chainentities that can improve the qua Iity of the inputs into the aggregate plan・As the plan is only as good as the qua Iity of the inputs, using the supplychain to increase the qua Iity of the inputs will greatly improve the qua Iityof the aggregate plan. Also make sure to communicate the aggregate plan to a I I supply chain partners who wiI I be affected by it.2.Make plans flexible because forecasts are always wrong. Aggregate plans arebased on forecasts of future demand. Given that these forecasts are always wrong to some degree, the aggregate plan needs to have some flexibiIity built into it if it is to be useful・ By buiIding flexibiIity into the plan, when futuredemand changes, or other changes occur, such as increases in costs, the plan can appropriately ad just to handle the new situation・ A manager should performsensitivity ana lysis on the inputs into an aggregate plan・ Using sensitivityanalysis on the inputs into the aggregate plan will enable the planner to choose the best solution for the range of possibiI ities that could occur・3.Rerun the aggregate plan as new data emerges. Aggregate plans provide a mapfor the next three to eighteen months・ This does not mean that a firm shouldonly run aggregate plans once every three to eighteen months. As inputs into the aggregate plan change, managers should use the latest values of these inputs and rerun the aggregate plan. By using the latest inputs, the plan will avoidsuboptimization based on old data and will produce a better solution・ Forinstance, as new demand forecasts become avaiI able, aggregate plans should bereevaluated・e aggregate planning as capacity utiIization increases・Surprisingly, many companies do not create aggregate plans and instead rely solely on orders from thei r distributors or warehouses to determine thei r production schedules ・ These orders are dr i ven either by actuaI demand or through inventory management algorithms・ If a company has no trouble efficiently meeting demand this way, then one could claim the lack of aggregate planning may not signifiesntly harm the company. However, when utiIization becomes high and capacity is an issue, relying on orders to set the production schedule can lead to capacity problems・ When utilization is high, the I ike Iihood of produc ing for a I I the orders as they arrive is very low・ Planning needs to be done to best utilize the capacity to meet the forecasted demand. Therefore, as capacity utiIization increases, it becomes more important to perform aggregate planning. Difficu!ty: Moderate。
供应链管理考核试题及答案
供应链管理考核试题及答案一、选择题(每题2分,共20分)1. 供应链管理的核心是()。
A. 客户需求B. 供应商关系C. 物流管理D. 信息流管理答案:A2. 下列不属于供应链管理基本流程的是()。
A. 采购管理B. 生产管理C. 库存管理D. 人力资源管理答案:D3. 下列哪种组织结构不利于供应链管理的协同效应()。
A. 矩阵式组织结构B. 事业部制组织结构C. 直线式组织结构D. 网络型组织结构答案:C4. 在供应链中,第三方物流供应商的主要职责是()。
A. 负责供应链中的全部物流活动B. 负责供应链中的部分物流活动C. 负责供应链中的信息流和物流活动D. 负责供应链中的资金流和物流活动答案:B5. 供应链风险管理主要包括()。
A. 供应风险B. 生产风险C. 市场风险D. 所有以上风险答案:D6. 下列哪项不是供应链管理的绩效指标()。
A. 订单履行率B. 库存周转率C. 供应商满意度D. 员工满意度答案:D7. 实施供应链管理的企业需要具备的条件有()。
A. 良好的信息技术支持B. 强大的市场竞争力C. 完善的供应链管理体系D. 所有以上条件答案:D8. 供应链协同效应的核心是()。
A. 资源共享B. 流程整合C. 信息共享D. 组织整合答案:C9. 下列哪种方式不属于供应链金融服务的范畴()。
A. 融资服务B. 贷款服务C. 信用保险服务D. 库存管理服务答案:D10. 供应链管理中的可持续发展主要包括()。
A. 环境友好型供应链B. 社会责任型供应链C. 经济效益型供应链D. 所有以上类型答案:D二、简答题(每题10分,共40分)1. 请简述供应链管理的概念及其目标。
答案:供应链管理是指在满足客户需求的前提下,对供应链中的物流、信息流和资金流进行有效整合和优化,以降低供应链总成本,提高供应链的运作效率和响应速度,实现供应链的可持续发展。
供应链管理的目标主要包括降低成本、提高客户满意度、提高供应链的灵活性和稳定性、提高供应链的竞争优势等。
供应链管理第三版unit8习题与答案
Chapter 8Aggregate Planning in the Supply ChainTrue/False1.The goal of aggregate planning is to satisfy demand in a way that minimizes profit.Answer: FalseDifficulty: Easy2.Aggregate planning is a process by which a company determines levels of capacity,production, subcontracting, inventory, stockouts, and even pricing over a specified time horizon.Answer: TrueDifficulty: Moderate3.Aggregate planning solves problems involving aggregate decisions rather than stockkeeping unit (SKU) level decisions.Answer: TrueDifficulty: Easy4.Traditionally, much of aggregate planning is focused within an enterprise and may notalways be seen as a part of supply chain management.Answer: TrueDifficulty: Moderate5.Aggregate planning is an important supply chain issue because, to be effective, itrequires inputs from throughout the supply chain, but its results have little impact onthe supply chain.Answer: FalseDifficulty: Moderate6.Short-term production serves as a broad blueprint for operations and establishes theparameters within which aggregate planning decisions are made.Answer: FalseDifficulty: Easy7.The aggregate planning problem is concerned with determining the production level,inventory level, and capacity level (internal and outsourced) for each period thatmaximizes the firm’s profit over the planning horizon.Answer: TrueDifficulty: Moderate8.To create an aggregate plan, a company must specify the planning horizon for the planand the duration of each period within the planning horizon.Answer: TrueDifficulty: Easy9. A planning horizon is usually between three and five years.Answer: FalseDifficulty: Moderate10. A poor aggregate plan can result in improved sales and profits if the available inventoryand capacity are unable to meet demand.Answer: FalseDifficulty: Easy11. A poor aggregate plan may result in a large amount of excess inventory and capacity,thereby raising costs.Answer: TrueDifficulty: Moderate12.The aggregate planner must make a trade-off between capacity, inventory, and backlogcosts.Answer: TrueDifficulty: Moderate13.An aggregate plan that increases one cost typically results in the increase of the othertwo.Answer: FalseDifficulty: Moderate14.The time flexible strategy is where the production rate is synchronized with the demandrate by varying machine capacity or hiring and laying off employees as the demand rate varies.Answer: FalseDifficulty: Hard15.The time flexible strategy is where workforce (capacity) is kept stable but the number ofhours worked is varied over time in an effort to synchronize production with demand.Answer: TrueDifficulty: Moderate16.The mixed strategy is where a stable machine capacity and workforce are maintainedwith a constant output rate with inventory levels fluctuating over time.Answer: FalseDifficulty: Hard17.Most strategies that an aggregate planner actually uses are in combination, and arereferred to as mixed strategies.Answer: TrueDifficulty: Easy18. A highly effective tool for a company to use when it tries to maximize profits while beingsubjected to a series of constraints is aggregate programming.Answer: FalseDifficulty: Moderate19.To improve the quality of these aggregate plans, forecast errors must be taken intoaccount when formulating aggregate plans.Answer: TrueDifficulty: Moderate20.Forecasting errors are dealt with in aggregate plans using either safety backlog or safetycapacity.Answer: FalseDifficulty: Moderate21.Safety inventory is defined as inventory held to satisfy demand that is higher thanforecasted.Answer: TrueDifficulty: Easy22.Safety capacity is defined as capacity used to satisfy demand that is lower thanforecasted.Answer: FalseDifficulty: Easypanies should work with downstream partners to produce forecasts and withupstream partners to determine constraints when doing aggregate planning.Answer: TrueDifficulty: Easy24.The aggregate plan should be viewed primarily as an in-house tool that does not need tobe communicated to supply chain partners.Answer: FalseDifficulty: Easy25.Given that forecasts are always wrong to some degree, the aggregate plan needs tohave some flexibility built into it if it is to be useful.Answer: TrueDifficulty: Moderate26. A manager should perform sensitivity analysis on the inputs into an aggregate plan tochoose the best solution for the range of possibilities that could occur.Answer: TrueDifficulty: Moderate27.As inputs into the aggregate plan change, managers do not need to make changes to theaggregate plan.Answer: FalseDifficulty: Easy28.As capacity utilization increases, it becomes less important to perform aggregateplanning.Answer: FalseDifficulty: ModerateMultiple Choice1.The process by which a company determines levels of capacity, production,subcontracting, inventory, stockouts, and even pricing over a specified time horizon isa.aggregate planning.b.detail planning.c.inventory planning.d.sales planning.e.all of the aboveAnswer: aDifficulty: Moderate2.The goal of aggregate planning is toa.dissatisfy customers in a way that maximizes profit.b.dissatisfy customers in a way that minimizes profit.c.satisfy demand in a way that maximizes profit.d.satisfy demand in a way that minimizes profit.e.none of the aboveAnswer: cDifficulty: Easy3.Aggregate planning solves problems involvinga.aggregate decisions and stock keeping unit (SKU) level decisions.b.aggregate decisions or stock keeping unit (SKU) level decisions.c.aggregate decisions rather than stock keeping unit (SKU) level decisions.d.stock keeping unit (SKU) level decisions rather than aggregate decisions.e. b and c onlyAnswer: cDifficulty: Easy4.Aggregate planning, to be effective, requires inputs froma.all customers.b.all departments.c.all suppliers.d.throughout the supply chain.e.throughout the company.Answer: dDifficulty: Moderate5.Much of aggregate planning has traditionally been focuseda.on short-term production scheduling.b.on customer relationship management.c.within an enterprise.d.beyond enterprise boundaries.e.all of the aboveAnswer: cDifficulty: Moderate6.Which of the following are not operational parameters the aggregate planner isconcerned witha.production rateb.workforcec.overtimed.backorderse.inventory on handAnswer: dDifficulty: Moderate7.The operational parameter concerned with the number of units completed per unit time(such as per week or per month) isa.production rate.b.workforce.c.overtime.d.backlog.e.inventory on hand.Answer: aDifficulty: Easy8.The operational parameter concerned with the number of workers/units of capacityneeded for production isa.production rate.b.workforce.c.overtime.d.backlog.e.inventory on hand.Answer: bDifficulty: Easy9.The operational parameter concerned with the amount of overtime production plannedisa.production rate.b.workforce.c.overtime.d.backlog.e.inventory on hand.Answer: cDifficulty: Easy10.The operational parameter concerned with demand not satisfied in the period in whichit arises, but carried over to future periods isa.production rate.b.workforce.c.overtime.d.backlog.e.inventory on hand.Answer: dDifficulty: Easy11.The operational parameter concerned with the planned inventory carried over thevarious periods in the planning horizon isa.production rate.b.workforce.c.overtime.d.backlog.e.inventory on hand.Answer: eDifficulty: Easy12.The operational parameter concerned with the number of units of machine capacityneeded for production isa.machine capacity level.b.subcontracting.c.overtime.d.backlog.e.inventory on hand.Answer: aDifficulty: Easy13.The operational parameter concerned with the subcontracted capacity required overthe planning horizon isa.machine capacity level.b.subcontracting.c.overtime.d.backlog.e.inventory on hand.Answer: cDifficulty: Easy14.The aggregate plana.serves as a broad blueprint for operations.b.establishes the parameters within which short-term production and distributiondecisions are made.c.allows the supply chain to alter capacity allocations and change supply contracts.d.all of the abovee. b and c onlyAnswer: dDifficulty: Moderate15.Aggregate planning is concerned with determininga.the production level, sales level, and capacity for each period.b.the demand level, inventory level, and capacity for each period.c.the production level, inventory level, and capacity for each period.d.the production level, staffing level, and capacity for each period.e.none of the aboveAnswer: cDifficulty: Moderate16.To create an aggregate plan, a company must specifya.the planning horizon for the plan.b.the duration of each period within the planning horizon.c.key information required.d.all of the abovee. a and b onlyAnswer: dDifficulty: Moderate17.The planning horizon isa.the time period over which the aggregate plan is to produce a solution.b.the duration of each time period in the aggregate plan.c.the length of time required to produce the aggregate plan.d.the solution to the aggregate plan.e.none of the aboveAnswer: aDifficulty: Easy18.The length of the planning horizon is usually betweena.one and three months.b.three and eighteen months.c.one and three years.d.three and five years.e.none of the aboveAnswer: bDifficulty: Moderate19.Which of the following is not information needed by the aggregate plannera.demand forecast for each period in the planning horizonb.production costsbor costsd.cost of subcontracting productione.cost of changing the demand forecastAnswer: eDifficulty: Moderate20.The cost of changing capacity includes thea.cost of adding machine capacity.b.cost of reducing machine capacity.c.cost of hiring workforce.d.cost of laying off workforce.e.all of the aboveAnswer: eDifficulty: Easy21.Which of the following is not a cost of changing capacitya.cost of adding machine capacityb.cost of hiring workforcec.cost of laying off workforced.cost of overtimee.cost of reducing machine capacityAnswer: dDifficulty: Moderate22.Which of the following is not a constraint the aggregate planner needs to considera.limits on stockouts and backlogsb.limits on overtimec.limits on sales commissionsd.limits on layoffse.limits on capital availableAnswer: cDifficulty: Moderate23. A poor aggregate plan can result ina.appropriate inventory levels.b.efficient use of capacity.c.better sales and lost profits.d.lost sales and lost profits.e.lost sales and better profits.Answer: dDifficulty: Hard24.The fundamental trade-offs available to an aggregate planner are betweena.capability, inventory, and backlog costs.b.capability, inventory, and sales costs.c.capacity, inventory, and backlog costs.d.capacity, inventory, and sales costs.e.none of the aboveAnswer: cDifficulty: Easy25.Which of the following is not a distinct aggregate planning strategy for achievingbalance between capacity, inventory, and backlog costsa.adjustable strategyb.Chase strategyc.level strategyd.mixed strategye.time flexible strategyAnswer: aDifficulty: Easy26.The strategy where the production rate is synchronized with the demand rate by varyingmachine capacity or hiring and laying off employees as the demand rate varies is thea.adjustable strategy.b.Chase strategy.c.level strategy.d.mixed strategy.e.time flexible strategy.Answer: bDifficulty: Moderate27.The strategy where workforce (capacity) is kept stable but the number of hours workedis varied over time in an effort to synchronize production with demand is thea.adjustable strategy.b.Chase strategy.c.level strategy.d.mixed strategy.e.time flexible strategy.Answer: eDifficulty: Moderate28.The strategy where a stable machine capacity and workforce are maintained with aconstant output rate, with inventory levels fluctuating over time, is thea.adjustable strategy.b.Chase strategy.c.level strategy.d.mixed strategy.e.time flexible strategy.Answer: cDifficulty: Hard29.Most strategies that an aggregate planner actually uses are in combination and arereferred to as thea.adjustable strategy.b.Chase strategy.c.level strategy.d.mixed strategy.e.time flexible strategy.Answer: dDifficulty: Easy30. A highly effective tool for a company to use when it tries to maximize profits while beingsubjected to a series of constraints isa.aggregate programming.b.distribution programming.c.production programming.d.linear programming.e.manufacturing programming.Answer: dDifficulty: Moderate31.When formulating aggregate plans,a.forecast errors have no impact.b.forecast errors must be taken into account.c.forecast accuracy is assumed.d.forecast accuracy is not a factor.e.none of the aboveAnswer: bDifficulty: Moderate32.Forecasting errors are dealt with usinga.safety backlog.b.safety capacity.c.safety inventory.d.all of the abovee. b and c onlyAnswer: eDifficulty: Moderate33.Inventory held to satisfy demand that is higher than forecasted isa.safety backlog.b.safety capacity.c.safety inventory.d.safety sales.e.safety workforce.Answer: cDifficulty: Easy34.Capacity used to satisfy demand that is higher than forecasted isa.safety backlog.b.safety capacity.c.safety inventory.d.safety sales.e.safety workforce.Answer: bDifficulty: Easy35.Which of the following is an approach a company can use to create a buffer for forecasterror using safety inventorya.overtimeb.carry extra workforce permanentlyc.build and carry extra inventoriesd.subcontractinge.purchase capacity or product from an open or spot marketAnswer: aDifficulty: Easy36.Which of the following is not an approach a company can use to create a buffer forforecast error using safety capacitya.overtimeb.carry extra workforce permanentlyc.build and carry extra inventoriesd.subcontractinge.purchase capacity or product from an open or spot marketAnswer: cDifficulty: Easy37.Aggregate planning should consider information froma.only the enterprise as its breadth of scope.b.downstream partners to produce forecasts.c.upstream partners to determine constraints.d.all of the abovee. b and c onlyAnswer: dDifficulty: Easy38.The quality of the aggregate plan can be improved by using information froma.only the local firm.b.only downstream partners.c.only upstream partners.d.all parts of the supply chain.e.none of the aboveAnswer: bDifficulty: Moderate39.The aggregate plan should be communicated toa.only the local firm.b.only downstream partners.c.only upstream partners.d.all supply chain partners who will be affected by it.e.none of the aboveAnswer: cDifficulty: Moderate40.The aggregate plan needs toa.be a final product because changes are disruptive to the supply chain.b.be considered fixed because forecasts are usually accurate.c.have some flexibility built into it because forecasts are always wrong.d.have some flexibility built into it because forecasts are usually right.e.none of the aboveAnswer: cDifficulty: Moderate41.How frequently should the aggregate plan be reruna.weeklyb.monthlyc.every 3 to 8 monthsd.as inputs to the aggregate plan changee.neverAnswer: dDifficulty: Hard42.As capacity utilization increases,a.it becomes less important to perform aggregate planning.b.it becomes more important to perform aggregate planning.c.it does not affect the importance of performing aggregate planning.d.it lessens the importance of aggregate planning.e.none of the aboveAnswer: bDifficulty: ModerateEssay/Problems1.Discuss the primary objective and operational parameters of aggregate planning.Answer: The goal of aggregate planning is to satisfy demand in a way that maximizesprofit. Aggregate planning is a process by which a company determines levels ofcapacity, production, subcontracting, inventory, stockouts, and even pricing over aspecified time horizon. The aggregate planner’s main objective is to identify thefollowing operational parameters over the specified time horizon:Production rate: the number of units completed per unit time (such as per week or per month).Workforce: the number of workers/units of capacity needed for production.Overtime: the amount of overtime production planned.Machine capacity level: the number of units of machine capacity needed for production.Subcontracting: the subcontracted capacity required over the planning horizon.Backlog: demand not satisfied in the period in which it arises but carried over to future periods.Inventory on hand: the planned inventory carried over the various periods in theplanning horizon.The aggregate plan serves as a broad blueprint for operations and establishes theparameters within which short-term production and distribution decisions are made.The aggregate plan allows the supply chain to alter capacity allocations and changesupply contracts.Difficulty: Moderate2.Discuss the information required for aggregate planning.Answer: An aggregate planner requires the following information:Demand forecast F t for each Period t in the planning horizon that extends over TperiodsProduction costsLabor costs, regular time ($/hour), and overtime costs ($/hour)Cost of subcontracting production ($/unit or $/hour)Cost of changing capacity; specifically, cost of hiring/laying off workforce ($/worker)and cost of adding or reducing machine capacity ($/machine)Labor/machine hours required per unitInventory holding cost ($/unit/period)Stockout or backlog cost ($/unit/period)Constraints:Limits on overtimeLimits on layoffsLimits on capital availableLimits on stockouts and backlogsConstraints from suppliers to the enterpriseThis information is used to create an aggregate plan that in turn helps a company make the following determinations:Production quantity from regular time, overtime, and subcontracted time: usedto determine number of workers and supplier purchase levels.Inventory held: used to determine how much warehouse space and workingcapital is needed.Backlog/stockout quantity: used to determine what the customer service levelswill be.Workforce hired/laid off: used to determine any labor issues that will beencountered.Machine capacity increase/decrease: used to determine if new productionequipment needs to be purchased or idled.The quality of an aggregate plan has a significant impact on the profitability of a firm. A poor aggregate plan can result in lost sales and lost profits if the available inventory and capacity are unable to meet demand. A poor aggregate plan may also result in a largeamount of excess inventory and capacity, thereby raising costs. Therefore, aggregateplanning is a very important tool in helping a supply chain maximize profitability.Difficulty: Hard3.Explain the basic strategies that an aggregate planner has available to balance thevarious costs and meet demand.Answer: There are essentially three distinct aggregate planning strategies for achieving balance between these costs. These strategies involve trade-offs between capitalinvestment, workforce size, work hours, inventory, and backlogs/lost sales. Moststrategies that a planner actually uses are a combination of these three and are referred to as mixed strategies. The three strategies are as follows:1. Chase strategy—using capacity as the lever: With this strategy, the production rate issynchronized with the demand rate by varying machine capacity or hiring and laying off employees as the demand rate varies. In practice, achieving this synchronization can be very problematic because of the difficulty in varying capacity and workforce on shortnotice. This strategy can be expensive to implement if the cost of varying machine orlabor capacity over time is high. It can also have a significant negative impact on themorale of the workforce. The Chase strategy results in low levels of inventory in thesupply chain and high levels of change in capacity and workforce. It should be usedwhen the cost of carrying inventory is very expensive and costs to change levels ofmachine and labor capacity are low.2. Time flexibility strategy—using utilization as the lever: This strategy may be used ifthere is excess machine capacity ., if machines are not used twenty four hours a day,seven days a week). In this case, the workforce (capacity) is kept stable but the number of hours worked is varied over time in an effort to synchronize production with demand.A planner can use variable amounts of overtime or a flexible schedule to achieve thissynchronization. Although this strategy does require that the workforce be flexible, itavoids some of the problems associated with the Chase strategy, most notably changing the size of the workforce. This strategy results in low levels of inventory but with lower average utilization. It should be used when inventory carrying costs are relatively highand machine capacity is relatively inexpensive.3. Level strategy—using inventory as the lever: With this strategy, a stable machinecapacity and workforce are maintained with a constant output rate. Shortages andsurpluses result in inventory levels fluctuating over time. Here production is notsynchronized with demand. Either inventories are built up in anticipation of futuredemand or backlogs are carried over from high- to low-demand periods. Employeesbenefit from stable working conditions. A drawback associated with this strategy is that large inventories may accumulate and customer orders may be delayed. This strategykeeps capacity and costs of changing capacity relatively low. It should be used wheninventory carrying and backlog costs are relatively low.Difficulty: Moderate4.Discuss key issues to be considered when implementing aggregate planning.Answer: 1. Think beyond the enterprise to the entire supply chain. Most aggregateplanning done today takes only the enterprise as its breadth of scope. However, thereare many factors outside the enterprise throughout the supply chain that candramatically impact the optimal aggregate plan. Therefore, avoid the trap of onlythinking about your enterprise when aggregate planning. Work with partnersdownstream to produce forecasts, with upstream partners to determine constraints,and with any other supply chain entities that can improve the quality of the inputs into the aggregate plan. As the plan is only as good as the quality of the inputs, using thesupply chain to increase the quality of the inputs will greatly improve the quality of the aggregate plan. Also make sure to communicate the aggregate plan to all supply chainpartners who will be affected by it.2. Make plans flexible because forecasts are always wrong. Aggregate plans are basedon forecasts of future demand. Given that these forecasts are always wrong to somedegree, the aggregate plan needs to have some flexibility built into it if it is to be useful.By building flexibility into the plan, when future demand changes, or other changesoccur, such as increases in costs, the plan can appropriately adjust to handle the new situation. A manager should perform sensitivity analysis on the inputs into an aggregate plan. Using sensitivity analysis on the inputs into the aggregate plan will enable the planner to choose the best solution for the range of possibilities that could occur.3. Rerun the aggregate plan as new data emerges. Aggregate plans provide a map for the next three to eighteen months. This does not mean that a firm should only run aggregate plans once every three to eighteen months. As inputs into the aggregate plan change, managers should use the latest values of these inputs and rerun the aggregate plan. By using the latest inputs, the plan will avoid suboptimization based on old data and will produce a better solution. For instance, as new demand forecasts become available, aggregate plans should be reevaluated.4. Use aggregate planning as capacity utilization increases. Surprisingly, many companies do not create aggregate plans and instead rely solely on orders from their distributors or warehouses to determine their production schedules. These orders are driven either by actual demand or through inventory management algorithms. If a company has no trouble efficiently meeting demand this way, then one could claim the lack of aggregate planning may not significantly harm the company. However, when utilization becomes high and capacity is an issue, relying on orders to set the production schedule can lead to capacity problems. When utilization is high, the likelihood of producing for all the orders as they arrive is very low. Planning needs to be done to best utilize the capacity to meet the forecasted demand. Therefore, as capacity utilization increases, it becomes more important to perform aggregate planning.Difficulty: Moderate。
(完整版)供应链管理第三版Unit8习题与答案
Chapter 8Aggregate Planning in the Supply ChainTrue/False1. The goal of aggregate planning is to satisfy demand in a way that minimizesprofit.Answer: FalseDifficulty: Easy2. Aggregate planning is a process by which a company determines levels ofcapacity, production, subcontracting, inventory, stockouts, and even pricing overa specified time horizon.Answer: TrueDifficulty: Moderate3. Aggregate planning solves problems involving aggregate decisions rather thanstock keeping unit (SKU) level decisions.Answer: TrueDifficulty: Easy4. Traditionally, much of aggregate planning is focused within an enterprise andmay not always be seen as a part of supply chain management.Answer: TrueDifficulty: Moderate5. Aggregate planning is an important supply chain issue because, to be effective, itrequires inputs from throughout the supply chain, but its results have little impact on the supply chain.Answer: FalseDifficulty: Moderate6. Short-term production serves as a broad blueprint for operations and establishesthe parameters within which aggregate planning decisions are made.Answer: FalseDifficulty: Easy7. The aggregate planning problem is concerned with determining the productionlevel, inventory level, and capacity level (internal and outsourced) for each period that maximizes the firm’s profit over the planning horizon.Answer: TrueDifficulty: Moderate8. To create an aggregate plan, a company must specify the planning horizon forthe plan and the duration of each period within the planning horizon.Answer: TrueDifficulty: Easy9. A planning horizon is usually between three and five years.Answer: FalseDifficulty: Moderate10. A poor aggregate plan can result in improved sales and profits if the availableinventory and capacity are unable to meet demand.Answer: FalseDifficulty: Easy11. A poor aggregate plan may result in a large amount of excess inventory andcapacity, thereby raising costs.Answer: TrueDifficulty: Moderate12. The aggregate planner must make a trade-off between capacity, inventory, andbacklog costs.Answer: TrueDifficulty: Moderate13. An aggregate plan that increases one cost typically results in the increase of theother two.Answer: FalseDifficulty: Moderate14. The time flexible strategy is where the production rate is synchronized with thedemand rate by varying machine capacity or hiring and laying off employees asthe demand rate varies.Answer: FalseDifficulty: Hard15. The time flexible strategy is where workforce (capacity) is kept stable but thenumber of hours worked is varied over time in an effort to synchronize production with demand.Answer: TrueDifficulty: Moderate16. The mixed strategy is where a stable machine capacity and workforce aremaintained with a constant output rate with inventory levels fluctuating over time.Answer: FalseDifficulty: Hard17. Most strategies that an aggregate planner actually uses are in combination, andare referred to as mixed strategies.Answer: TrueDifficulty: Easy18. A highly effective tool for a company to use when it tries to maximize profits whilebeing subjected to a series of constraints is aggregate programming.Answer: FalseDifficulty: Moderate19. To improve the quality of these aggregate plans, forecast errors must be takeninto account when formulating aggregate plans.Answer: TrueDifficulty: Moderate20. Forecasting errors are dealt with in aggregate plans using either safety backlogor safety capacity.Answer: FalseDifficulty: Moderate21. Safety inventory is defined as inventory held to satisfy demand that is higher thanforecasted.Answer: TrueDifficulty: Easy22. Safety capacity is defined as capacity used to satisfy demand that is lower thanforecasted.Answer: FalseDifficulty: Easy23. Companies should work with downstream partners to produce forecasts and withupstream partners to determine constraints when doing aggregate planning.Answer: TrueDifficulty: Easy24. The aggregate plan should be viewed primarily as an in-house tool that does notneed to be communicated to supply chain partners.Answer: FalseDifficulty: Easy25. Given that forecasts are always wrong to some degree, the aggregate planneeds to have some flexibility built into it if it is to be useful.Answer: TrueDifficulty: Moderate26. A manager should perform sensitivity analysis on the inputs into an aggregateplan to choose the best solution for the range of possibilities that could occur.Answer: TrueDifficulty: Moderate27. As inputs into the aggregate plan change, managers do not need to makechanges to the aggregate plan.Answer: FalseDifficulty: Easy28. As capacity utilization increases, it becomes less important to perform aggregateplanning.Answer: FalseDifficulty: ModerateMultiple Choice1. The process by which a company determines levels of capacity, production,subcontracting, inventory, stockouts, and even pricing over a specified timehorizon isa. aggregate planning.b. detail planning.c. inventory planning.d. sales planning.e. all of the aboveAnswer: aDifficulty: Moderate2. The goal of aggregate planning is toa. dissatisfy customers in a way that maximizes profit.b. dissatisfy customers in a way that minimizes profit.c. satisfy demand in a way that maximizes profit.d. satisfy demand in a way that minimizes profit.e. none of the aboveAnswer: cDifficulty: Easy3. Aggregate planning solves problems involvinga. aggregate decisions and stock keeping unit (SKU) level decisions.b. aggregate decisions or stock keeping unit (SKU) level decisions.c. aggregate decisions rather than stock keeping unit (SKU) level decisions.d. stock keeping unit (SKU) level decisions rather than aggregate decisions.e. b and c onlyAnswer: cDifficulty: Easy4. Aggregate planning, to be effective, requires inputs froma. all customers.b. all departments.c. all suppliers.d. throughout the supply chain.e. throughout the company.Answer: dDifficulty: Moderate5. Much of aggregate planning has traditionally been focuseda. on short-term production scheduling.b. on customer relationship management.c. within an enterprise.d. beyond enterprise boundaries.e. all of the aboveAnswer: cDifficulty: Moderate6. Which of the following are not operational parameters the aggregate planner isconcerned with?a. production rateb. workforcec. overtimed. backorderse. inventory on handAnswer: dDifficulty: Moderate7. The operational parameter concerned with the number of units completed perunit time (such as per week or per month) isa. production rate.b. workforce.c. overtime.d. backlog.e. inventory on hand.Answer: aDifficulty: Easy8. The operational parameter concerned with the number of workers/units ofcapacity needed for production isa. production rate.b. workforce.c. overtime.d. backlog.e. inventory on hand.Answer: bDifficulty: Easy9. The operational parameter concerned with the amount of overtime productionplanned isa. production rate.b. workforce.c. overtime.d. backlog.e. inventory on hand.Answer: cDifficulty: Easy10. The operational parameter concerned with demand not satisfied in the period inwhich it arises, but carried over to future periods isa. production rate.b. workforce.c. overtime.d. backlog.e. inventory on hand.Answer: dDifficulty: Easy11. The operational parameter concerned with the planned inventory carried over thevarious periods in the planning horizon isa. production rate.b. workforce.c. overtime.d. backlog.e. inventory on hand.Answer: eDifficulty: Easy12. The operational parameter concerned with the number of units of machinecapacity needed for production isa. machine capacity level.b. subcontracting.c. overtime.d. backlog.e. inventory on hand.Answer: aDifficulty: Easy13. The operational parameter concerned with the subcontracted capacity requiredover the planning horizon isa. machine capacity level.b. subcontracting.c. overtime.d. backlog.e. inventory on hand.Answer: cDifficulty: Easy14. The aggregate plana. serves as a broad blueprint for operations.b. establishes the parameters within which short-term production anddistribution decisions are made.c. allows the supply chain to alter capacity allocations and change supplycontracts.d. all of the abovee. b and c onlyAnswer: dDifficulty: Moderate15. Aggregate planning is concerned with determininga. the production level, sales level, and capacity for each period.b. the demand level, inventory level, and capacity for each period.c. the production level, inventory level, and capacity for each period.d. the production level, staffing level, and capacity for each period.e. none of the aboveAnswer: cDifficulty: Moderate16. To create an aggregate plan, a company must specifya. the planning horizon for the plan.b. the duration of each period within the planning horizon.c. key information required.d. all of the abovee. a and b onlyAnswer: dDifficulty: Moderate17. The planning horizon isa. the time period over which the aggregate plan is to produce a solution.b. the duration of each time period in the aggregate plan.c. the length of time required to produce the aggregate plan.d. the solution to the aggregate plan.e. none of the aboveAnswer: aDifficulty: Easy18. The length of the planning horizon is usually betweena. one and three months.b. three and eighteen months.c. one and three years.d. three and five years.e. none of the aboveAnswer: bDifficulty: Moderate19. Which of the following is not information needed by the aggregate planner?a. demand forecast for each period in the planning horizonb. production costsc. labor costsd. cost of subcontracting productione. cost of changing the demand forecastAnswer: eDifficulty: Moderate20. The cost of changing capacity includes thea. cost of adding machine capacity.b. cost of reducing machine capacity.c. cost of hiring workforce.d. cost of laying off workforce.e. all of the aboveAnswer: eDifficulty: Easy21. Which of the following is not a cost of changing capacity?a. cost of adding machine capacityb. cost of hiring workforcec. cost of laying off workforced. cost of overtimee. cost of reducing machine capacityAnswer: dDifficulty: Moderate22. Which of the following is not a constraint the aggregate planner needs toconsider?a. limits on stockouts and backlogsb. limits on overtimec. limits on sales commissionsd. limits on layoffse. limits on capital availableAnswer: cDifficulty: Moderate23. A poor aggregate plan can result ina. appropriate inventory levels.b. efficient use of capacity.c. better sales and lost profits.d. lost sales and lost profits.e. lost sales and better profits.Answer: dDifficulty: Hard24. The fundamental trade-offs available to an aggregate planner are betweena. capability, inventory, and backlog costs.b. capability, inventory, and sales costs.c. capacity, inventory, and backlog costs.d. capacity, inventory, and sales costs.e. none of the aboveAnswer: cDifficulty: Easy25. Which of the following is not a distinct aggregate planning strategy for achievingbalance between capacity, inventory, and backlog costs?a. adjustable strategyb. Chase strategyc. level strategyd. mixed strategye. time flexible strategyAnswer: aDifficulty: Easy26. The strategy where the production rate is synchronized with the demand rate byvarying machine capacity or hiring and laying off employees as the demand rate varies is thea. adjustable strategy.b. Chase strategy.c. level strategy.d. mixed strategy.e. time flexible strategy.Answer: bDifficulty: Moderate27. The strategy where workforce (capacity) is kept stable but the number of hoursworked is varied over time in an effort to synchronize production with demand is thea. adjustable strategy.b. Chase strategy.c. level strategy.d. mixed strategy.e. time flexible strategy.Answer: eDifficulty: Moderate28. The strategy where a stable machine capacity and workforce are maintained witha constant output rate, with inventory levels fluctuating over time, is thea. adjustable strategy.b. Chase strategy.c. level strategy.d. mixed strategy.e. time flexible strategy.Answer: cDifficulty: Hard29. Most strategies that an aggregate planner actually uses are in combination andare referred to as thea. adjustable strategy.b. Chase strategy.c. level strategy.d. mixed strategy.e. time flexible strategy.Answer: dDifficulty: Easy30. A highly effective tool for a company to use when it tries to maximize profits whilebeing subjected to a series of constraints isa. aggregate programming.b. distribution programming.c. production programming.d. linear programming.e. manufacturing programming.Answer: dDifficulty: Moderate31. When formulating aggregate plans,a. forecast errors have no impact.b. forecast errors must be taken into account.c. forecast accuracy is assumed.d. forecast accuracy is not a factor.e. none of the aboveAnswer: bDifficulty: Moderate32. Forecasting errors are dealt with usinga. safety backlog.b. safety capacity.c. safety inventory.d. all of the abovee. b and c onlyAnswer: eDifficulty: Moderate33. Inventory held to satisfy demand that is higher than forecasted isa. safety backlog.b. safety capacity.c. safety inventory.d. safety sales.e. safety workforce.Answer: cDifficulty: Easy34. Capacity used to satisfy demand that is higher than forecasted isa. safety backlog.b. safety capacity.c. safety inventory.d. safety sales.e. safety workforce.Answer: bDifficulty: Easy35. Which of the following is an approach a company can use to create a buffer forforecast error using safety inventory?a. overtimeb. carry extra workforce permanentlyc. build and carry extra inventoriesd. subcontractinge. purchase capacity or product from an open or spot marketAnswer: aDifficulty: Easy36. Which of the following is not an approach a company can use to create a bufferfor forecast error using safety capacity?a. overtimeb. carry extra workforce permanentlyc. build and carry extra inventoriesd. subcontractinge. purchase capacity or product from an open or spot marketAnswer: cDifficulty: Easy37. Aggregate planning should consider information froma. only the enterprise as its breadth of scope.b. downstream partners to produce forecasts.c. upstream partners to determine constraints.d. all of the abovee. b and c onlyAnswer: dDifficulty: Easy38. The quality of the aggregate plan can be improved by using information froma. only the local firm.b. only downstream partners.c. only upstream partners.d. all parts of the supply chain.e. none of the aboveAnswer: bDifficulty: Moderate39. The aggregate plan should be communicated toa. only the local firm.b. only downstream partners.c. only upstream partners.d. all supply chain partners who will be affected by it.e. none of the aboveAnswer: cDifficulty: Moderate40. The aggregate plan needs toa. be a final product because changes are disruptive to the supply chain.b. be considered fixed because forecasts are usually accurate.c. have some flexibility built into it because forecasts are always wrong.d. have some flexibility built into it because forecasts are usually right.e. none of the aboveAnswer: cDifficulty: Moderate41. How frequently should the aggregate plan be rerun?a. weeklyb. monthlyc. every 3 to 8 monthsd. as inputs to the aggregate plan changee. neverAnswer: dDifficulty: Hard42. As capacity utilization increases,a. it becomes less important to perform aggregate planning.b. it becomes more important to perform aggregate planning.c. it does not affect the importance of performing aggregate planning.d. it lessens the importance of aggregate planning.e. none of the aboveAnswer: bDifficulty: ModerateEssay/Problems1. Discuss the primary objective and operational parameters of aggregate planning.Answer: The goal of aggregate planning is to satisfy demand in a way thatmaximizes profit. Aggregate planning is a process by which a companydetermines levels of capacity, production, subcontracting, inventory, stockouts,and even pricing over a specified time horizon. The aggregate planner’s mainobjective is to identify the following operational parameters over the specifiedtime horizon:• Production rate: the number of units completed per unit time (such as per week or per month).• Workforce: the number of workers/units of capacity needed for production.• Overtime: the amount of overtime production planned.• Machine capacity level: the number of units of machine capacity needed forproduction.• Subcontracting: the subcontracted capacity required over the planning horizon.• Backlog: demand not satisfied in the period in which it arises but carried over to future periods.• Inventory on hand: the planned inventory carried over the various periods in the planning horizon.The aggregate plan serves as a broad blueprint for operations and establishesthe parameters within which short-term production and distribution decisions are made. The aggregate plan allows the supply chain to alter capacity allocationsand change supply contracts.Difficulty: Moderate2. Discuss the information required for aggregate planning.Answer: An aggregate planner requires the following information:• Demand forecast F t for each Period t in the planning horizon that extends over T periods• Production cos ts• Labor costs, regular time ($/hour), and overtime costs ($/hour)• Cost of subcontracting production ($/unit or $/hour)• Cost of changing capacity; specifically, cost of hiring/laying off workforce($/worker) and cost of adding or reducing machine capacity ($/machine)• Labor/machine hours required per unit• Inventory holding cost ($/unit/period)• Stockout or backlog cost ($/unit/period)• Constraints:• Limits on overtime• Limits on layoffs• Limits on capital available• Limits on stockouts and ba cklogs• Constraints from suppliers to the enterpriseThis information is used to create an aggregate plan that in turn helps a company make the following determinations:• Production quantity from regular time, overtime, and subcontracted time:used to determine number of workers and supplier purchase levels.• Inventory held: used to determine how much warehouse space andworking capital is needed.• Backlog/stockout quantity: used to determine what the customer servicelevels will be.• Workforce hired/laid off: used to determine any labor issues that will beencountered.• Machine capacity increase/decrease: used to determine if newproduction equipment needs to be purchased or idled.The quality of an aggregate plan has a significant impact on the profitability of a firm. A poor aggregate plan can result in lost sales and lost profits if the available inventory and capacity are unable to meet demand. A poor aggregate plan mayalso result in a large amount of excess inventory and capacity, thereby raisingcosts. Therefore, aggregate planning is a very important tool in helping a supply chain maximize profitability.Difficulty: Hard3. Explain the basic strategies that an aggregate planner has available to balancethe various costs and meet demand.Answer: There are essentially three distinct aggregate planning strategies forachieving balance between these costs. These strategies involve trade-offsbetween capital investment, workforce size, work hours, inventory, andbacklogs/lost sales. Most strategies that a planner actually uses are acombination of these three and are referred to as mixed strategies. The threestrategies are as follows:1. Chase strategy—using capacity as the lever: With this strategy, the productionrate is synchronized with the demand rate by varying machine capacity or hiring and laying off employees as the demand rate varies. In practice, achieving thissynchronization can be very problematic because of the difficulty in varyingcapacity and workforce on short notice. This strategy can be expensive toimplement if the cost of varying machine or labor capacity over time is high. Itcan also have a significant negative impact on the morale of the workforce. TheChase strategy results in low levels of inventory in the supply chain and highlevels of change in capacity and workforce. It should be used when the cost ofcarrying inventory is very expensive and costs to change levels of machine andlabor capacity are low.2. Time flexibility strategy—using utilization as the lever: This strategy may beused if there is excess machine capacity (i.e., if machines are not used twentyfour hours a day, seven days a week). In this case, the workforce (capacity) iskept stable but the number of hours worked is varied over time in an effort tosynchronize production with demand. A planner can use variable amounts ofovertime or a flexible schedule to achieve this synchronization. Although thisstrategy does require that the workforce be flexible, it avoids some of theproblems associated with the Chase strategy, most notably changing the size of the workforce. This strategy results in low levels of inventory but with loweraverage utilization. It should be used when inventory carrying costs are relatively high and machine capacity is relatively inexpensive.3. Level strategy—using inventory as the lever: With this strategy, a stablemachine capacity and workforce are maintained with a constant output rate.Shortages and surpluses result in inventory levels fluctuating over time. Hereproduction is not synchronized with demand. Either inventories are built up inanticipation of future demand or backlogs are carried over from high- to low-demand periods. Employees benefit from stable working conditions. A drawback associated with this strategy is that large inventories may accumulate andcustomer orders may be delayed. This strategy keeps capacity and costs ofchanging capacity relatively low. It should be used when inventory carrying andbacklog costs are relatively low.Difficulty: Moderate4. Discuss key issues to be considered when implementing aggregate planning.Answer: 1. Think beyond the enterprise to the entire supply chain. Mostaggregate planning done today takes only the enterprise as its breadth of scope.However, there are many factors outside the enterprise throughout the supplychain that can dramatically impact the optimal aggregate plan. Therefore, avoidthe trap of only thinking about your enterprise when aggregate planning. Workwith partners downstream to produce forecasts, with upstream partners todetermine constraints, and with any other supply chain entities that can improve the quality of the inputs into the aggregate plan. As the plan is only as good asthe quality of the inputs, using the supply chain to increase the quality of theinputs will greatly improve the quality of the aggregate plan. Also make sure tocommunicate the aggregate plan to all supply chain partners who will be affected by it.2. Make plans flexible because forecasts are always wrong. Aggregate plans arebased on forecasts of future demand. Given that these forecasts are alwayswrong to some degree, the aggregate plan needs to have some flexibility builtinto it if it is to be useful. By building flexibility into the plan, when future demand changes, or other changes occur, such as increases in costs, the plan canappropriately adjust to handle the new situation. A manager should performsensitivity analysis on the inputs into an aggregate plan. Using sensitivityanalysis on the inputs into the aggregate plan will enable the planner to choosethe best solution for the range of possibilities that could occur.3. Rerun the aggregate plan as new data emerges. Aggregate plans provide amap for the next three to eighteen months. This does not mean that a firm should only run aggregate plans once every three to eighteen months. As inputs into the aggregate plan change, managers should use the latest values of these inputsand rerun the aggregate plan. By using the latest inputs, the plan will avoidsuboptimization based on old data and will produce a better solution. Forinstance, as new demand forecasts become available, aggregate plans shouldbe reevaluated.4. Use aggregate planning as capacity utilization increases. Surprisingly, manycompanies do not create aggregate plans and instead rely solely on orders from their distributors or warehouses to determine their production schedules. Theseorders are driven either by actual demand or through inventory managementalgorithms. If a company has no trouble efficiently meeting demand this way,then one could claim the lack of aggregate planning may not significantly harmthe company. However, when utilization becomes high and capacity is an issue, relying on orders to set the production schedule can lead to capacity problems.When utilization is high, the likelihood of producing for all the orders as theyarrive is very low. Planning needs to be done to best utilize the capacity to meet the forecasted demand. Therefore, as capacity utilization increases, it becomesmore important to perform aggregate planning.Difficulty: Moderate。
供应链自测题-标准答案
1【自测评估】一、选择题1.以下描述中正确的是:(A )A、供应链管理是物流管理的新战略B、供应链管理就是物流管理C、供应链管理其实就是对供应商和客户的关系管理D、供应链管理就是对企业流程的综合管理2.采用(C )运作模式的供应链系统的库存量较低,集成度较高,信息交换迅速。
A、分散式供应链B、推动式供应链C、拉动式供应链D、集中式供应链3.供应链管理把资源的范围扩展到( C )A、供应商B、分销商C、整个供应链D、其他节点企业4.供应链管理因企业战略和适应市场需求变化的需要,节点企业需要动态地更新,这使得供应链具有明显的( B )。
A、复杂性B、动态性C、交叉性D、灵活性5.供应链管理强调的是把主要精力放在企业的( C )上,充分发挥其优势。
A、合作关系B、运输仓储C、关键业务(企业核心竞争力)D、生产制造二、判断题1.由于供应链节点企业有一个共同的目标,所以他们之间不再有竞争性 ( 错 )2.推动式供应链的驱动力产生于最终用户,整个供应链的集成度较高,信息交换迅速,可以根据用户的需求实现定制化服务。
( 错)3.供应链不仅是一条连接供应商到用户的物料链、信息链、资金链,而且还是一条增值链。
( 对)4.供应链管理是以同步化、集成化生产计划为指导,以各种信息技术为支持,尤其以Internet/Intranet为依托 ( 对)5.供应链整体成本最小化意味着每个节点企业的成本都是最小。
( 错 )三、简答题1.什么是纵向一体化?什么是横向一体化?2.什么是供应链?供应链有哪些特性?3.供应链管理涉及主要内容有哪些?4.简述供应链管理与传统管理模式的不同。
5.我国供应链管理现状如何?2【自测评估】一、选择题1.快速反应的集成是指(A )A、重新设计业务流程,将公司整体业务集成起来,以支持公司整体战略B、商品销售预测的自动化C、跟踪新产品的开发和试销D、共同制定未来需求的计划和预测2.对QR的叙述下列不正确的有:( C )A、制造商可以准确地安排生产计划B、降低了整个供应链系统地流通费用C、降低了单位商品地采购成本D、实施QR后,能够提高顾客地满意度3.ECR是( B )的缩写。
《供应链管理》测试题
《供应链管理》测试题试卷总分:100 得分:100一、单选题(共25 道试题,共50 分)1.下列哪项不属于供应链合作伙伴关系的特点()A.企业与其合作伙伴在信息共享方面合作B.以加强基于产品质量和服务的物流关系为特征C.强调基于时间的供应链管理D.强调基于价值的供应链管理正确答案:B2.供应链中信息流、产品/服务流、资金流运作的驱动源是()A.用户的需求拉动B.供应商的产品/服务推动C.核心企业的推动D.分销企业的拉动正确答案:A3.()是制定一套运营政策用于控制短期运营A.供应链战略B.供应链设计C.供应链规划D.供应链运营正确答案:C4.两阶段序贯供应链包括()A.一个购买者和一个供应商B.两个零售商C.两个或多个供应商D.一个供应商、一个批发商和一个零售商正确答案:A5.供应链管理方法之一的快速反应方法的英文缩写是()A.ECRB.MRPC.QRD.DRP6.实施供应链管理的第一步,就是()A.实施MRPB.实行JIT采购C.在原有企业供应链的基础上分析、总结企业现状,分析企业内部影响供应链管理的阻力和有利之处,同时分析外部市场环境,对市场的特征和不确定性作出分析和评价,最后相应地完善企业的供应链D.建立战略伙伴关系7.在()中,供应商对部分退回产品给予全额返还A.销售回扣合同B.弹性数量合同C.收入共享合同D.补偿合同8.每一条供应链的目标是()A.整体价值最大化B.整体成本最小化C.整体收益最大D.整体资金规模大9.()是指基于相对稳定、单一的市场需求而组成的供应链。
A.敏捷供应链B.稳定的供应链C.动态供应链D.响应型供应链10.QR是指在供应链中,为了实现共同的目标,至少在()环节之间进行的紧密合作A.三个B.所有节点C.两个D.四个11.供应链合作伙伴关系的目的是()A.缩短采购提前期,提高供货的柔性B.加快资金周转C.缩短供应链总周转期达到降低成本和提高质量的目的D.减少供应商数目12.()根据实际需求生产A.推动式供应链B.效率型供应链C.推-拉式供应链D.拉动式供应链13.市场竞争力强,产品或服务增值率高的合作伙伴应该作为()A.有影响力的合作伙伴B.战略性合作伙伴C.普通合作伙伴D.竞争性/技术性合作伙伴14.供应链管理的主要内容不包括()A.分销网络配置B.库存控制C.生产管理D.产品设计15.供应链管理的本质是在追求(),以较小的产品前置时间与运营成本为最佳考量。
供应链管理 第八章练习与答案
一、单选题问题 1 通过对储存物的保管保养,可以克服产品的生产和消费在时间上的差异,创造物资的()正确答案:时间效用问题 2 下列哪种经营业态的大量发展是仓储交易功能高度发展、仓储与商业密切结合的结果()正确答案:仓储式商店问题3 储存合理化的哪项标志和数量有关()正确答案:时间标志问题4 营销库场选址的成本因素是()正确答案:原材料供应问题5 在梅雨季节或阴雨天,采用商品温湿度的控制方法是()正确答案:通风问题6 先进先出就是指()正确答案:先入库的商品先出库问题7 在库存控制中,对A类货物的管理方法是()正确答案:同供应商建立良好关系二、判断题问题8 经济订货批量模型(EOQ)模型是一种周期性检查模型.正确答案:对问题9 零库存就是说把企业的库存降低为零。
正确答案:错问题10 供应商库存管理中,库存由供应商管理,而零售商对库存可以不用管理。
正确答案:错问题11 连续型检查模型中,要确定经济订货批量或经济订货期;确定安全库存量;确定订货点和订货后最大库存量等问题。
正确答案:错问题12 库存控制要解决确定库存检查周期、确定订货量、确定订货点等问题。
正确答案:对三、名词解释问题13 牛鞭效应正确答案:牛鞭效应指供应链上的信息流从最终客户向原始供应商端传递时候,由于无法有效地实现信息的共享,使得信息扭曲而逐渐放大,导致了需求信息出现越来越大的波动。
问题14 联合库存管理正确答案:联合库存管理(Jointly Managed Inventory,JMI),是一种在VMI 的基础上发展起来的上游企业和下游企业权利责任平衡和风险共担的库存管理模式。
联合库存管理强调供应链中各个节点同时参与,共同制定库存计划,使供应链过程中的每个库存管理者都从相互之间的协调性考虑,保持供应链各个节点之间的库存管理者对需求的预期保持一致,从而消除了需求变异放大现象。
问题15 零库存管理正确答案:零库存管理并不是指以仓库储存形式的某种或某些物品的储存数量真正为零,而是通过实施特定的库存控制策略,实现库存量的最小化。
供应链管理 自测题
《供应链管理自测题》一、单选题1.下面哪个是“先来先处理”原则的简称 ( )A、EDDB、FCFSC、SPTD、CR2、当库存量下降到预定的最低库存量即订购点时,按规定数量进行订货补充的库存管理方式是()A、经济订货批量法B、定量订货方法C、安全库存设置D、定期订货方法3、供应链上一般有()个核心企业。
A、 1B、 2C、3D、04、当订购数量大,合作伙伴竞争激烈时,供应链合作伙伴的选择方法是()A、协商选择法B、招标法C、层次分析法D、采购成本比较法5、下列选项中源于“关键少数,次要多数”的观点的是()A、经济订货批量法B、ABC分类控制法C、定量订货法D、定期订货法6、制作甘特图的目的是()A、展示工作实际进展B、展示计划要求C、进行作业排序D、表示活动完成7、RFID是一种()的自动识别技术,它通过自动射频信号自动识别目标对象并获取相关数据,识别工作无须人工干预,课工作于各种恶劣环境。
A、非接触式B、接触式C、自动D、非自动8.MPR 的依据是()A.主生产计划 B.物流清单 C.企业资源计划 D.库存信息9.下列说法正确的是()A.根据供应链的结构特征将供应链分为A型供应链,Y型供应链,T型供应链B.A型供应链输入原材料范围和数量众多,成品种类有限,一般用MRP安排生产C.Y型供应链其输入原材料范围有限,总体形式呈分叉型D.T型供应链通常根据库存规律来确定通用件订单。
10.小米与高通,苹果与富士康更接近于()供应链。
A. A型供应链 B.V型供应链 C.T型供应链.11.传统采购与供应链采购()A.两者都是基于库存的采购 B.两者都是基于需求的采购C.前者是基于需求的采购,后者是基于库存的采购D.前者是基于库存的采购,后者是基于需求的采购12.甲仓库A商品的年需求量是3000个,单位商品的购买价格为20元,每次订货成本为240元,单位商品的年保管费为10元,该商品的经济订货批量为()A.1200个 B.1300个 C.1100个 D.1000个13.适应性最强的生产作业排序原则为()A.先来先处理原则 B.最早交货期限原则 C. 最短处理时间原则D.最长处理时间原则15.可以形象地表示出特定项目的活动顺序及持续时间的图形是()A.PEPR图 B.思维导图 C.拓扑图 D.甘特图16.在一个企业当中,某项业务对企业的重要性程度低,但企业该项业务的研发能里较强,此时应选择()基本策略。
供应链管理知识测试题及答案
供应链管理知识测试题及答案题目一:什么是供应链管理?供应链管理是指在各个环节协调、管理和优化供应链活动,以实现高效的物流运作、减少库存和提升整体业务绩效的管理方法。
题目二:供应链管理的主要目标是什么?供应链管理的主要目标是在保持高质量服务的同时,通过合理的资源配置,降低物流成本,提高供应链的可持续发展能力,并增加客户满意度和企业利润。
题目三:请列举三个影响供应链管理运作的因素。
- 需求的不稳定性:需求变化频繁会影响供应链规划和库存管理。
- 供应商可靠性:供应商的交货准时性和产品质量将直接影响到供应链的正常运作。
- 物流网络设计:物流网络的设计和布局,包括仓储、运输方式等,会影响到物流效率和成本。
题目四:请解释供应链中的“跨界合作”是什么意思。
供应链中的“跨界合作”是指不同企业之间跨越业务边界进行合作,实现资源共享、优势互补,以提高整个供应链的效率和竞争力。
题目五:供应链中的信息流、物流和资金流分别指什么?- 信息流:供应链中各个环节之间的信息传递和共享,包括订单、库存、需求等信息。
- 物流:供应链中商品和物资的运输、仓储和配送等物流活动。
- 资金流:供应链中涉及到的支付、结算和资金流转等金融活动。
题目六:请简要说明供应链管理中的质量管理和风险管理的重要性。
- 质量管理:质量管理是确保产品和服务达到高质量标准的关键环节,它可以提高客户满意度,减少产品缺陷和退货,增强企业品牌形象。
- 风险管理:风险管理旨在识别和评估潜在的供应链风险,并采取相应的措施进行预防和应对,以减少对供应链运作的不利影响。
题目七:供应链中的关键绩效指标有哪些?请列举三个。
- 交货准时率:指供应链中按时交付产品的百分比。
- 库存周转率:指供应链中库存的周转速度,可以反映供应链的运作效率。
- 成本效益比:指供应链中成本与收益之间的比例关系,用来评估供应链的经济效益。
题目八:请简要介绍一种供应链管理工具或技术。
EDI(电子数据交换)是一种常用的供应链管理工具,通过电子手段实现各环节之间的数据传递和交换,可以提高数据准确性和时效性,减少人工操作和纸质文件,提高供应链的响应速度和效率。
供应链管理习试题库和参考题答案解析
供应链运作管理部分习题库一、单项选择题1.()是生产及流通过程中,为了将产品或服务交付给最终用户,由上游与下游企业共同建立的网链状组织。
AA.供应链 B.合作伙伴 C.联盟组织 D.供应链管理2. 供应链管理的英文简写为:()。
CA. SSTB. SCC. SCMD. CIMS3. 供应链管理目的:()。
AA. 既提高服务水平又降低物流总成本B. 在于提高服务水平C. 在于降低物流总成本D. 以上答案都不是4. 供应链特征中不包含的因素有( C )。
A.动态性B.面向用户需求C.静态性D.交叉性5. 供应链不仅是一条连接供应商到用户的物料链、信息链、资金链,而且是一条( )。
DA.加工链B.运输链C.分销链D.增值链6. 商流是货物所有权的转移过程,是在供货商与消费者之间进行的( )流动。
AA.双向B.价值C.单向D.信息7. 供应链是一个网链结构,由围绕( )的供应商、供应商的供应商和用户、用户的用户组成。
DA.主要B.最终用户C.一级D.核心企业8. 以最低的成本将原材料转化成零部件和成品,并尽量控制供应链中的库存和运输成本,这种供应链属()。
CA. 平衡的供应链B. 反应型供应链C. 有效型供应链D. 稳定的供应链9. 选择恰当的供应链战略对企业发展非常重要,在客户市场需求稳定,且生产的产品相对成熟的情况下,哪种供应链更能发挥竞争优势:()。
DA. 响应型供应链B. 拉动式供应链C. 动态的供应链D. 效率型供应链10. 基于相对稳定、单一的市场需求而形成的供应链,我们称为()。
AA. 稳定的供应链B. 动态的供应链C. 平衡的供应链D. 倾斜的供应链11. 在市场变化加剧情况下,若供应链成本增加,库存增加、浪费增加时,企业不能在最优状态下运作,此时的供应链是:()。
DA. 稳定供应链B. 反应供应链C. 平衡供应链D. 倾斜供应链12. 当企业订购的产品数量大、竞争激烈时,合作伙伴选择最适宜的方法是()。
供应链专家供应链优化与管理能力测试题
供应链专家供应链优化与管理能力测试题一、背景介绍供应链是一个企业内外部各个环节无缝衔接的生态系统,它通过优化运作流程、降低成本、提升效率,为企业创造价值和竞争优势。
作为供应链专家,对供应链的优化与管理能力是至关重要的。
本文将通过一系列测试题来考察您的供应链优化与管理能力。
二、测试题1. 零售企业A的销售季节性波动较大,导致供应链上的库存管理难度较大。
请根据该情况,提出供应链优化方案。
2. 制造企业B生产过程中,某一环节出现质量问题,需要立即停产进行排查和修复。
请问您会如何管理这个供应链中的紧急情况?3. 电子商务企业C在快速发展中,面临物流配送时效和成本压力。
请列举出三种提高物流配送效率和降低成本的措施。
4. 某供应商D经常延迟交货,给客户带来了诸多不便。
请问您会如何与供应商进行有效沟通和协商,以解决交货延迟的问题?5. 快消品企业E决定采购一批新产品,但不确定销售情况。
请问您会如何确定采购数量和配送计划,以尽量避免库存积压和缺货现象?6. 食品生产企业F的供应链中存在多个层级的供应商,您如何管理这样一个复杂的供应链网络,以确保原材料供应的及时性和稳定性?7. 新零售企业G计划扩大业务,从国内拓展到国际市场。
您将如何处理跨境供应链的问题,以确保顺畅的货物流转和海关清关?8. 在供应链管理中,数据的分析和决策支持非常重要。
请说明您在过去的项目中如何运用数据分析来指导供应链优化和决策制定。
9. 在供应链管理中,协同合作是关键。
请举例说明您与不同部门、合作伙伴和供应商之间如何进行有效的协同合作,以实现供应链的最优化。
10. 最后,请问您在过去的供应链优化和管理项目中遇到的最大挑战是什么?您是如何应对和解决的?三、总结供应链专家需要具备良好的供应链优化与管理能力。
通过上述测试题的回答,您可以自我评估自己在供应链优化与管理方面的能力水平,并找到改进的方向。
希望您能够持续不断地提升自己,在后续的供应链工作中取得更好的成绩。
供应链管理自测练习八
第八章供应链管理中的信息技术一、重点名词1•信息技术2.射频识别3.地理信息系统4.全球定位系统5.条形码6. 电子数据交换7•信息共享8•信息集成9.信息安全二、单项选择题1•信息流是供应链管理中的关键因素,()已经被看成是提高企业生产效率和获得竞争优势的主要来源。
A. 信息技术B.GPS技术C. EDI技术D.条形码技术2. 供应链竞争中的速度完全由()来控制。
A. 计算机技术B.通讯技术C.专家系统D.信息技术3. 供应链管理的效率取决于各成员间的协调,而协调的基础又依赖于信息()。
A.共享B.交换C.独占D.安全4. 传统的供应链中,各个成员一般()意愿和其他的合作伙伴分享自己的商业信息和运营信息。
A.有B.没有C.不确定D.可能有5. 在计算机安全中,保密是指()。
A. 防止未经授权的数据暴露并确保数据源的可靠性B. 防止未经授权的数据修改C. 防止延迟服务D. 防止拒绝服务6. ()的优点是不局限于视线,识别距离比光学系统远。
A.遥感技术B.条形码技术7. 地理信息系统是20世纪60年代开始迅速发展起来的()研究新成果。
A.光学B.物理学C.天文学D.地理学8. 全球定位系统是美国从20世纪()年代开始研制的。
A.50B.60C.70D.809. 在供应链管理中利用()技术实现货物远距离的跟踪管理。
A.Bar CodeB.GPSC.GISD.EDI10. 条形码是一组宽度不同、反射率不同的条和()按规定的编码规则组合起来的,用以表示一组数据和符号。
A.码B.条C.字D.空11. ()技术可以形成结构化的事务处理或报文数据格式。
A.EFTB.ERPC.EDID.GIS12. ()技术注重异构数据库的整合以及数据挖掘工作。
A.数据库B.数据仓库C.数据挖掘D.数据集成13. ()是指简单的提供数据,数据未经过加工转换。
A.信息共享B.信息集成C.信息融合D.信息交换14. ()的概念除了提供数据外,还可能包括信息的传递、加工和转化的过程。
《供应链管理》习题和答案
《供应链管理》习题和答案专科物流专业《供应链管理》练习题姓名学号班级练习题一1. 供应链运行绩效的评估()A.涉及到的是供应链上的部分企业B.涉及到了供应链上所有的企业;C.只涉及到核心企业 D.只与上下游企业之间有关系。
2.下列不属于供应链环境管理下的库存问题的是()A、侧重于优化单一的库存成本B、供应链的战略与规划问题C、供应链的运作问题D、信息类问题3.不属于产品生命周期的是哪个()A.计划期B.成长期C.成熟期D.衰退期4.供应链合作伙伴关系的主要目的是()A.缩短采购提前期,提高供货的柔性B.加快资金周转C.通过缩短供应链总周期,达到降低成本和提高质量的目的D.减少供应商数目5.()指超越一家一户的以一个社会为范畴面向社会为目的的物流。
A. 宏观物流B.社会物流C. 微观物流D.企业物流6.下列不属于QR对厂商的优点的是()A. 更好的为顾客服务B. 降低了费用C. 生产计划准确D.增加了收入7、下列不是供应链特性的是()A.供应链是交错链状的网络结构。
B.供应链是企业的主体部分。
C.供应链是一条增值链。
D.供应链的网络结构是由顾客需求拉动的。
8、属于多级库存优化与控制的方法有()A.减少成本B.中心化(集中式)策略C.改进服务质量D.获得更多的市场信息9.TOC理论对供应链的启迪是企业的经营业绩应该是加强链条中()。
A.最强的一环 B.最薄弱的一环C.所有环节D.部分环节10. 建立战略合作关系的第一步必须明确战略关系对于企业的必要性,企业必须评估潜在的()A、利益与风险B、成本与风险C、资金与风险D、投资与风险11. 下列不属于供应链环境管理下的库存问题的是()A、侧重于优化单一的库存成本B、供应链的战略与规划问题C、供应链的运作问题D、信息类问题12.供应链管理中提到的客户主要是指()A、只是指最终的消费者B、与企业内部的部门无关C、可以指代供应链上的每个相关企业和部门D、只指代渠道分销员13.对于供应链下库存管理的方法,以下说法正确的是()A、联合库存管理比供应商管理库存的方式更优越B、制造商管理库存体现了战略供应商联盟的新型合作企业合作关系C、联合库存管理体现了战略供应商联盟的新型企业合作关系D、自动库存补充方法体现了战略供应商联盟的新型企业合作关系14.在大多数的跨国公司中,选择供应商的基本准则“Q.C.D.S.”是()A、质量、成本、交付与服务并重的原则B、数量、成本、交付与服务并重的原则C、价格、质量、成本与服务并重的原则D、质量、价格、成本与服务并重的原则15.供应链管理的初级阶段,典型的供应链策略主要是指()A、企业资源计划与准是制B、高效客户响应和准是制;C、高效客户响应和快速响应D、企业资源计划与快速响应。
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
供应链管理自测练习八一、重点名词1.信息技术2.射频识不3.地理信息系统4.全球定位系统5.条形码6.电子数据交换7.信息共享8.信息集成9.信息安全二、单项选择题1.信息流是供应链治理中的关键因素,()差不多被看成是提升企业生产效率和获得竞争优势的要紧来源。
A.信息技术B.GPS技术C.EDI技术D.条形码技术2.供应链竞争中的速度完全由()来操纵。
A.运算机技术B.通讯技术C.专家系统D.信息技术3.供应链治理的效率取决于各成员间的和谐,而和谐的基础又依靠于信息()。
A.共享B.交换C.独占D.安全4.传统的供应链中,各个成员一样()意愿和其他的合作伙伴分享自己的商业信息和运营信息。
A.有B.没有C.不确定D.可能有5.在运算机安全中,保密是指()。
A.防止未经授权的数据暴露并确保数据源的可靠性B.防止未经授权的数据修改C.防止延迟服务D.防止拒绝服务6.()的优点是不局限于视线,识不距离比光学系统远。
A.遥感技术B.条形码技术C.射频技术D.遥控技术7.地理信息系统是20世纪60年代开始迅速进展起来的()研究新成果。
A.光学B.物理学C.天文学D.地理学8.全球定位系统是美国从20世纪()年代开始研制的。
A.50B.60C.70D.809.在供应链治理中利用()技术实现物资远距离的跟踪治理。
A.Bar CodeB.GPSC.GISD.EDI10.条形码是一组宽度不同、反射率不同的条和()按规定的编码规则组合起来的,用以表示一组数据和符号。
A.码B.条C.字D.空11.()技术能够形成结构化的事务处理或报文数据格式。
A.EFTB.ERPC.EDID.GIS12.()技术注重异构数据库的整合以及数据挖掘工作。
A.数据库B.数据仓库C.数据挖掘D.数据集成13.()是指简单的提供数据,数据未通过加工转换。
A.信息共享B.信息集成C.信息融合D.信息交换14.()的概念除了提供数据外,还可能包括信息的传递、加工和转化的过程。
A.信息共享B.信息集成C.信息融合D.信息交换15.()确实是保证信息的保密性、完整性和可用性。
A.信息保密B.信息完整C.信息可靠D.信息安全16.()强调信息系统整个生命周期的防备和复原。
A.信息安全B.信息保证C.信息保证D.信息可靠17.设置在被爱护网络和外部网络之间的、以防止发生不可推测的、潜在的破坏性进入的屏障我们称为()。
A.屏蔽墙B.防火墙C.网关D.网特18.拥有两个连接到不同网络上的网络接口的防火墙是()。
A.包过滤型防火墙B.双宿网关防火墙C.屏蔽主机防火墙D.屏蔽子网防火墙19.DES算法是由()公司在20世纪70年代进展的,于1976年1 1月被美国政府采纳。
A.MicrosoftB.IBMC.通用电器D.美国电话电报公司20.加密的密钥和解密用的密钥不一样是一种()思想。
A.私钥B.公钥C.明钥D.暗钥21.将加密设备放在网络层和传输层之间,在源结点和目的结点中对传送的信息进行加密和解密,如此的加密方式是()。
A.链路加密B.端到端加密C.密钥加密D.通道加密22.压缩文档一样被看成电子文档的第()次加密。
A.一B.二C.三D.四23.按照人体各器官或个人行为之间的差异来鉴不个人身份是()身份鉴不方法。
A.形状特点B.生理特点C.生物特点D.生态特点24.语音、签名、步态特点等被称为是()生物特点。
A.动态B.静态C.仪态D.变态25.()生物特点指用于鉴不的人体器官本身的特点,不随客观条件和主观意愿发生改变。
A.动态B.静态C.仪态D.变态26.分销打算关心企业分析()信息。
A.原始B.短期C.长期D.治理27.与供应链有关的软件能够分为三类:()、中间件软件和应用软件。
A. 原始软件B.平台软件C.SAP软件D.i2软件28. 从治理范畴上看,() 能够满足供应链横向一体化运作的要求,在考虑了资源约束、优化和决策的技术支持下,有效利用和整合外部资源。
A.ERPB. i2C.SCMD.Baan29.SAP公司成立于(),总部位于德国沃尔多夫市,是全球领先的企业治理软件及协同商务解决方案供应商、独立软件供应商。
A.1982年B.1985年C.1975年D.1972年30.在i2的供应链治理系统中,()处于供应链治理的核心地位。
A.客户B. 运输C.打算D.销售三、多项选择题1.以下属于供应链治理中使用的信息技术的有()。
A.RFIDB.GISC.GPSD.Bar CodeE.EDI2.GPS系统由三大部分构成,即()。
A.GPS卫星星座B.地面监控系统C.空中监视系统D.用户接收系统E.用户反馈系统3.以下属于射频系统优点的有()。
A.距离比光学系统近B.距离比光学系统远C.不局限于视线D.难以伪造E.可携带少量数据4.条形码技术涉及到的技术领域有()。
A.机械技术B.光传感技术C.编码技术D.印刷技术E.运算机识不技术5.条形码系统能否成功地应用,在技术上要紧取决于系统的()。
A.识读能力B.条形码印制质量C.运算机质量D.人员操作熟练度E.货品质量6.目前应用最为广泛的条形码有()。
A.交叉三九码B.UPC码C.EAN码D.128码E.256码7.运用EDI技术实现从运算机到运算机的信息传递有两种方式,即()。
A.直截了当方式B.间接方式C.广义方式D.狭义方式E.递进方式8.以下属于EDI组成的有()。
A.硬件设备B.报文格式标准C.转换软件D.用户应用系统E.网络系统9.信息安全确实是要保证信息的()。
A.保密性B.完整性C.可用性D.可更换性E.可读性10.以下属于防火墙体系结构的有()。
A.包过滤B.双宿网关C.屏蔽主机D.屏蔽子网E.牺牲主机结构11.当今两类差不多的加密算法分不是()。
A.保密密钥B.公布密钥C.公布/私有密钥D.私有密钥E.保密/私有密钥12. 密钥一样能够分为()。
A.主密钥B.次密钥C.传输密钥D.工作密钥E.治理密钥13.用于身份鉴不的人体生物特点可分为()两大类。
A.常态B.异态C.动态D.静态E.变态14.动态生物特点是指()。
A.语音B.签名C.指纹D.虹膜E.步态15.通用信道加密方式有()。
A.链条加密B.通道加密C.链路加密D.端到端加密E.门对门加密16.指纹图像的采集要紧用光学方法,与传统的油墨采集法相比,光学采集方法更加()并具有实时性。
A. 清晰B. 整洁C.复杂D. 方便E. 安全17.供应链治理系统进行的是跨企业的所有活动的和谐与整合,用心于整合和改进企业内部及企业之间的物流、()。
A. 信息流B.资金流C. 运输D. 供应链技术E. 物流治理18.一样SCM软件由()等模块组成。
A.需求打算B.生产打算和排序C.分销打算D.运输打算E.企业或供应链分析19.供应链治理软件向()方面进展。
A.集成化B.协同优化C.标准化D.功能模块的进展E. 全球化20.随着供应链从供应推动模式进展到需求拉动模式,SCM产品今后将具备()特点。
A.实时的可视性B.灵活性C.响应性D.按照市场潮流E. 新型设计四、判定分析()1.传统的供应链中,各个成员一样没有意愿和其他的合作伙伴分享自己的商业信息和运营信息。
()2.RFID技术的优点是不局限于视线,但识不距离比光学系统近。
()3.地理信息系统是20世纪80年代开始迅速进展起来的地理学研究新成果。
()4.全球定位系统是美国从20世纪70年代开始研制的。
()5.在供应链治理中利用GPS实现物资的远程跟踪治理。
()6.商业零售业是条码应用最成熟的领域。
()7.通信技术的最差不多的利益并不是降低成本,而是改善顾客服务。
()8.信息共享是信息集成的高级形式。
()9.信息集成和信息共享之间是有联系和区不的。
()10.在信息社会中,企业能否在猛烈的市场竞争中生存和进展,关键是要看企业能不能及时有效地获得生产经营治理中所需要的各种信息。
()11.信息共享是实现供应链治理的基础。
()12.射频技术的差不多原理是电工理论。
()13. GIS系统中的车辆路线模型用于解决一个起始点、一个终点的物资运输中。
()14.EDI技术是将商业或行政事务处理按照一个公认的标准,形成结构化的事务处理或报文数据格式。
()15.及时的信息交流是供应链同步化运作的必要条件。
()16.在供应链治理模式下,需求和供应信息是逐级传递的。
()17.为了实现供应链的同步化运作,供应链成员间的信息往来不可能保持隐秘。
()18.防火墙是防止火灾蔓延的围墙。
()19.语音和签名是属于动态生物特点。
()20.安全意识是最好的防火墙。
()21.ERP在业务治理上具有比SCM更好、更多的功能。
()22.博安(Baan)软件创建于1988年的i2公司总部设在美国达拉斯,是供应链治理市场的制造者与领先者,致力于为全球领先的企业提供供应链管明白得决方案。
()23.BAANIV是专为满足如离散型工业、流程型工业、项目型工业等重点行业市场的需求而设计的。
()24.快速供应链应用(商业)软件包由总账、报表、现金流量表、存货核算系统组成。
()25.供应链治理源于交易伙伴和扩展的合作伙伴,共同协作达到竞争性优势。
五、咨询答题1.GIS由哪些部分组成?其差不多功能有哪些?2.EDI系统有哪些部分组成?EDI系统的信息传递有哪几种方式?3.信息安全技术有哪些种类?4.供应链治理软件(SCM)一样由哪些模块组成?它与ERP有何区不?。