船舶系泊设备布置图

合集下载
  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

78
RR
ET
FORECASTLE
2
1
RR
( 29.35 m )
9.43 m
example.
WINCH
W
WW
SINGLE DRUM DOUBLE DRUM
W WIRE ON DRUM
R ROPE ON DRUM
W WW
TRIPLE DRUM
If the rope is handled with bollards, please put ▲ above the cell. (example) ▲
NIL 13th Sep.,2012 NYLON
×
If there are special comments or other items,
please use columns below or write in the diagram above.
Ropes/Wires End (date of replacement)
NEW ROPES
Mooring Tails (date of replacement) Winch Brakes (date of the last testing) Material of Mooring ropes
BOW

RR
11
POOP DECK
O U
12


#
( 7.60 m) ( 52.40 m )
9 10
RR
P O RT
OOOO
Position of GANGWAY
AFT.MAIN DECK
FWD.MAIN DECK
Position of GANGWAY
OOOO
S T BD
( 22 m) ( 37 m)
Questionnaire for Vessel's Winch and Mooring Arrangement.
Please fill in the following blanks.
Name of vessel(
)
STERN
( 95.610 m )
CENTER OF MANIFOLDS
( 89.270 m )
R ▲= bollБайду номын сангаасrd
Other ropes/wires available.
rope
place
length
forecastle
200
fwd. main deck
200
aft. main deck
200
poop deck
200
number ×6
×2 ×2 ×6
wire
length
number
×
×
×
相关文档
最新文档