Supplier Audit Check List供应商审核检查表

Supplier Audit Check List供应商审核检查表

Observations and Notes
Supplier Response
Mandatory Key Questions N Y
N/A Explanation
N
N
N
N
N
N
N
N
N
N N N
OSA
2 of 7
Doubleclick cell if N/A
Partia
N
Y
N
Y
N
N
Y
N
N
Y
OSA
1 of 7
Doubleclick cell if N/A
Partial Credit
Full Credit
Assessment Item 12. Is the supplier ISO or TS registered? 13. Is there a formally documented system used to select and manage suppliers through advanced evaluation or by review of quality performance? (Verify if approved suppliers list exists) 14. Is there a formal corrective action program implemented for the Supplier's purchased material? How do they monitor their supplier compliance to this process? 15. Are raw materials / components identified and traceable to test or certification reports? ·Date Codes ·Serial numbers ·Certificates of Analysis ·Bar coding technology 16. Are raw materials / purchased components inspected, tested or otherwise verified prior to use? Do they use in-house testing or external lab tests? 17. If work is subcontracted to external sources, are there controls to assure the quality of the subcontracted work? 18. Is there a system for verification, storage, reporting and maintenance of their customer’s consigned material, equipment, tools, dies, patterns, gages? 19. Are the environmental conditions in the laboratory and work areas adequate for the work performed? Are the work areas organized (using 5S or other methods) for the work performed? Does the work environment appear safe? 20. Is Statistical Process Control being used as the parts are produced or after the fact? 21. Are statistical methods effectively used for assuring parts are produced within control limits (e.g., histograms, X & R charts, P charts, etc.). If yes, indicate the % of parts involved in the Notes field. 22. If control charts are used throughout the production areas are they used effectively? Note how many are attribute vs. variable charts, how many use control limits vs. spec limits, frequency and recency of updates. Check to see if out of control points are identified and acted on. Include comments in the Notes field. 23. Is there evidence of control charts leading to actions? 24. Are process operators and inspectors trained on the work instructions for their area? 25. Are machine operators and inspection personnel sufficiently trained to utilize the statistical process control concepts?

供应商管理程序 中英文

供应商管理程序 中英文

XXXX LTD.
供应商管理程序 SUPPLIER MANAGEMENT
PROCEDURE
告(附件 8.3)和物料规格说明书。 7.2. New supplier evaluation 新供应商评估
文件编号: OP-QA-02 Document No.: OP-QA-02 版本:02 Version:02
6.2.1. Responsible for the determination and verification of the competitive pricing. 负责决定和确认有竞争力的价格。
6.2.2. Responsible to search for the prospective supplier of the product that Xxxx requires. 负责寻找符合 xxxx 公司产品要求的后备供应商。
6.1.1. Responsible for the verification of the supplier’s quality management system, imposed
requirement for the corrective and preventive action. 负责确认供应商质量管理体系,纠正与预防措施的要求。
6.4. D&D Department 开发部
6.4.1. Responsible to evaluate the supplier’s samples. 负责评估供应商所提供的样品。
6.4.2. Responsible to check the supplier technology and verify that the supplier can meet Xxxx

希尔顿酒店失物招领标准操作(中英)

希尔顿酒店失物招领标准操作(中英)

希尔顿酒店失物招领标准操作(中英)部门:客房部职位:行政楼层服务员任务号:行政楼层 013 任务:失物招领装备要求:日工作表/笔做什么怎么做为什么1.处理2.移交到办公室--任何发现的失物要立即交到客房部办公室--客房部办公室负责管理失物招领的事宜--退房的遗留物都当作失物对待。

一发现有失便立即致电客房部办公室。

失主可在任何时候询问情况。

客房部文员或秘书将失物情况记录在失物招领记录表上--进午餐时要进行交接,能放在工作间或工作车上--交失物的时候要记下准确的地点、房号。

办公室在接收失物时要在失物招领表上做下记录。

--不要把失物留在楼层工作间或是其它地方,员工应该在进午餐之前或是在去客房部办公室的时候将失物交到客房部办公室去--若对失物招领的有关统一失物招领的管理,确保客人行李的安全,以示对客人的尊重通过细心便捷的服务显示出我们对客人的关心确保客人行李的安全,显示出对客人的尊重并使其感到在酒店很安全确保客人物品的安全是对客人的尊重正确处理客人物品以示3.记录4.保存事宜还不清楚,应当立即联系主管--为了便于询问和查找客房部行政人员应负责失物招领的事宜,在记录本上应记下包括日期、地点、物品名称和发现人--客房服务员一接到宾客服务经理打来的关于失物招领的电话应立即进行详细的记录--将相关信息记录在失物招领表上,并将表附于袋上注意表要紧附于袋上以免丢失--将信息输入电脑系统以备客人询问--要确保客人物品的安全,保护好客人的物品、如现金、钱包、相机等,应存放在前厅部的保险箱里--保证客人衣物的洁净,可以洗的衣物送到洗衣房清洗--办公室行政人员应在当天将失物交到储藏室,失物在送出客房部办公室之前对客人的尊重确认客人的询问,通过认真做好自己的工作向客人展示我们为其服务的诚意-保护好客人的物品、照顾好客人的行李显示出我们对客人的关心通过对工作的认真负责以示我们我们努力使客人满意5.认领必须做好失物招领表并将其附于失物上然后交到失物储藏室--注意要按照时间顺序放置物品--当客人认领失物时,文员应询问时间、地点及失物的特征--客人认领失物时应出示身份证或是护照。

小学五年级上册第四次英语第一单元期中试卷(答案和解释)

小学五年级上册第四次英语第一单元期中试卷(答案和解释)

小学五年级上册英语第一单元期中试卷(答案和解释)英语试题一、综合题(本题有50小题,每小题2分,共100分.每小题不选、错误,均不给分)1.I usually wake up at 7:00 a.m. After waking up, I brush my teeth and wash my face. Then, I have breakfast with my family. After breakfast, I put on my uniform and pack my schoolbag. I leave home at 8:00 a.m. and walk to school.2.Which season comes after summer?A. WinterB. SpringC. AutumnD. Summer again3.Tom is visiting his grandparents. They have a big __________ (1) with lots of fruit trees. Tom picks some __________ (2) and apples from the garden. After a fun afternoon, Tom enjoys a delicious __________ (3) made by his grandma with the fresh fruits.4.David is at the dentist. He needs to get a __________ because he has a small__________ in his tooth. The dentist is very __________ and explains the procedure carefully. After the treatment, David feels a little __________ but is happy that his teeth are healthy again.5.Which one is a kind of tree?A. OakB. SpoonC. PlateD. Chair6.We __________ (have) a sports day at school next Friday. All the students__________ (participate) in different sports events like running, jumping, and throwing. I __________ (practice) for the long jump, and my friend __________ (train) for the relay race. I __________ (hope) our class __________ (win) the most points this year!7.I’m learning how to cook with my grandmother. Today, we are making __. First, we mix flour, sugar, and butter together. Then, we roll out the dough and cut it into __ shapes. After baking, we will decorate them with __.8.She ______ to school every day.A. goB. goesC. goingD. gone9.Which of these is a fruit?A. CarrotB. BananaC. LettuceD. Potato10.Which one is a shape?A. CircleB. SpoonC. CupD. Plate11.Which of these is a shape?A. CircleB. TableC. DogD. Book12.Which one is a transportation tool?A. BookB. TrainC. ChairD. Plant13.Which of these is a body part?A. LegB. SpoonC. ForkD. Plate14.Tomorrow, I am going to visit my grandparents. They live in a small house in the countryside. We are going to have lunch together and then take a walk around the garden.I am looking forward to spending time with them.15.Anna is in her room, organizing her __________. She arranges her __________ neatly on the shelf. Anna is very __________ because she likes to keep everything tidy. After finishing, she feels __________.16.What do we use to eat fruit?A. SpoonB. KnifeC. ForkD. Hands17.Which of these animals is a mammal?A. FishB. DogC. BirdD. Snake18.Ben and his friends are at the park playing soccer. Ben has the __________ (soccer ball) and passes it to his friend, Alex, who kicks it towards the __________ (goal). Ben runs to get the ball and passes it to __________ (Lucy). Lucy is very fast and kicks the ball into the __________ (net). They all celebrate because they scored a __________ (goal).19._______ you like to go swimming? The weather is perfect for a day at the beach. (Does, Do, Did, Are)20.My brother _______ (love) to play video games in the evening. Last night, he_______ (invite) me to play with him. We _______ (play) for two hours. I _______ (lose) the game, but my brother _______ (win). Afterward, we _______ (eat) some snacks and _______ (talk) about school. It _______ (be) a fun night.21.Mark and his friends are at the playground. They are playing __________. Mark is very fast, and he tries to __________ the ball into the hoop. His friend __________ the ball to him, and Mark scores a __________! They all cheer and highfive each other.22.Which of these animals can fly?A. DogB. FishC. BirdD. Cow23.Which of these is an animal?A. AppleB. CatC. CarD. Chair24.My mom ______ (make) dinner every evening. She ______ (usually/cook) rice, vegetables, and chicken. Yesterday, she ______ (make) spaghetti, which I ______ (love). After dinner, we ______ (watch) a movie together. I ______ (always/feel) happy when we ______ (spend) time as a family.25.Which color is the sky on a clear day?A. GreenB. YellowC. BlueD. Red26.Which season comes after spring?A. WinterB. SummerC. FallD. Autumn27.Which of these is a time of day?A. BreakfastB. MorningC. LunchD. Dinner28.I like to read books in my free time. My favorite book is "Harry Potter." It is very interesting, and I read it every day. Yesterday, I ______ (read) two chapters.29.I __________ (1) my homework before dinner every day. After I __________ (2) my homework, I __________ (3) some time to play video games. My parents__________ (4) me to finish my homework first. I __________ (5) to play games after that.30.Which of these is a type of tree?A. OakB. DogC. CarD. Table31.Which of these animals live in the water?A. DogB. ElephantC. FishD. Lion32.Today is my birthday. I am very excited because my friends are coming to myho use for a party. We will play games, eat cake, and open presents. I can’t wait to see everyone!33.Which one is a vegetable?A. TomatoB. LettuceC. PeachD. Pear34.Yesterday, I went to the __ with my parents. We saw many different animals, such as __, __, and __. My favorite was the __ because it was very funny. Afterward, we went to the __ to have some ice cream.35.What do you use to clean your hands?A. TowelB. SoapC. ToothbrushD. Pen36.What do you use to write?A. SpoonB. PenC. PlateD. Cup37.In the summer, I __________ (go) swimming in the lake with my cousins. We__________ (have) a lot of fun. Last summer, we __________ (rent) a small boat and__________ (row) it across the lake. We __________ (see) many beautiful birds and fish. It __________ (be) an unforgettable experience.38.How do you say "谢谢" in English?A. PleaseB. Thank youC. SorryD. Excuse me39.Which of these is a shape?A. SquareB. ChairC. DogD. Plate40.Which of these is used to write?A. PenB. ForkC. SpoonD. Cup41.Anna and her friends are planning a birthday party. They are going to decorate the room with __________ (1) and __________ (2). They will have a __________ (3) with candles, and Anna will wear a __________ (4). Afterward, they will play __________ (5) and eat some cake.42.Which one is a food?A. TableB. AppleC. ChairD. Book43.In the winter, we __________ (1) to go skiing in the mountains. I __________ (2) excited because I __________ (3) ski well. I __________ (4) some new ski clothes last week, and they __________ (5) very warm.44.Which one is a food item?A. PizzaB. KnifeC. PlateD. Spoon45.In the morning, I usually have breakfast with my family. I like to eat cereal with __ and some fresh fruit. My little brother prefers toast with __ on top. After breakfast, we all get ready for school. I grab my backpack, put on my shoes, and say goodbye to my parents. It’s time to go to school!46.My father __________ (be) a doctor. He __________ (work) at a hospital. Every day, he __________ (help) many patients. Last week, he __________ (perform) an important surgery. He __________ (be) very tired after the operation, but he __________ (feel) happy to help people.47.I _______ (love) to play basketball. I usually _______ (practice) with my friends every weekend. This weekend, we _______ (play) a match against another team. I hope we _______ (win) the game!48.What is the opposite of "fast"?A. SlowB. TallC. BigD. Light49.What is the opposite of "old"?A. TallB. SmallC. NewD. Big50.Yesterday, my family and I __________ (go) to the beach. We __________ (swim) in the ocean, and I __________ (build) a sandcastle. My little brother __________ (play) with a ball, and we __________ (have) a picnic in the afternoon.(答案及解释)。

毕业设计用英语怎么说

毕业设计用英语怎么说

毕业设计用英语怎么说毕业设计是教学过程的最后阶段采用的一种总结性的实践教学环节。

仅对大专以上学校要求在毕业前根据专业的不同进行毕业设计,对中等专业学校的学生不作要求。

那么你知道毕业设计用英语怎么说吗?下面店铺为大家带来毕业设计的英语说法,欢迎各位同学们学习!毕业设计的英语说法:graduation project毕业设计相关英语表达:毕业设计大赛 Graduation Design Competition毕业设计作品 Graduation Design Works毕业设计指导 graduation-project guidance毕业设计论文质量 qualities of graduation design毕业设计模式 graduate design modes毕业设计的英语例句:1. This article introduced the customer system management system realization method.本文介绍了客户管理毕业设计的实现方法.2. Andworked at an insurance company my graduation field work.我在家保险公司进行我毕业设计.3. This project is my graduation design. a sub - item of my tutor's.此项目为本人的毕业设计. 是导师项目下的子项目.4. This graduation design is about project management's new critical chain method. "本毕业设计是对项目进度管理新技术关键链法的研究.5. This graduation project's topic is on - line auto sale management system management system.本次毕业设计的题目就是网上汽车销售管理系统.6. The traveling website construction is faces the realistic demand an utility system.旅游网站建设是面向现实需求的一个实用毕业设计.7. The whole design procedure consists of the architectural and the structural design.此次毕业设计包括两部分:建筑设计,结构设计.8. This graduation project's topic is on - line books management system management system.本次毕业设计的题目就是网络订餐系统.9. During a metalworking and machine tool plant internships, courses and graduate design.其间进行了金工及机床厂实习, 课程及毕业设计.10. This project belongs to reseachful new task, and is of a assignment.本毕业设计是一个属于研究型的新课题, 工程浩大.11. The study are the design of the logistics and transport systems.本毕业设计的研究内容是物流运输的系统.12. My graduation project is about the origin and regulation of stem cells.我的毕业设计是关于干细胞调节的起源的.13. After the graduation project and found a lot of accumulated several more.毕业设计做完了,发现好多,积累了好更.14. Ninety percent of my class is already working on the final project.我们班百分之九十的同学都已经开始做毕业设计了.15. This paper analyzes the Web - based e - commerce platform -- Automobile Sales Management System.本文研究分析了基于的电子商务的平台开发汽车销售管理毕业设计.。

ISO9001 内部审查程序

ISO9001 内部审查程序
某一个情况下证据表明要求已得到有效实施,但依据审核员的经验和知识,通过修改的方
法,额外的有效性和可靠性是可能的。
Form # : 03-2 [QP-4.5-1]
INTERNAL AUDIT 内部审核
DOC NO. REV PAGE DATE
: QP-4.17-1 : 24 : 3 OF 9 : 4-Mar-2014
制定公司内部审核的策划、准备且实施过程,从而验证相关活动是否符合策划的要求并确定环境,
质量和职业健康与安全管理体系的有效性。
2
SCOPE
范围
This process is applicable to internal audits of: 此内部审核过程适用于:
2.1 Quality Management Systems (ISO 9001:2008, TL 9000 QMSR Rel 5.0/ QMSM Rel 5.0, TS 16949:2009), Environmental Management System (ISO 14001:2004) and applicable Product Type Approvals Quality Management System (such as UL and CCC) of XXX Technologies Pte Ltd, XXX Systems (HK) Ltd and XXX Communication De vice (DG) Ltd. XXX Technologies Pte Ltd, XXX Systems (HK) Lt d 和 通信设备 (东莞)有限公司的质
3.8 For ease of documentation, the following abbreviation shall be used widely in this document to represent the locations:

new products approval

new products approval

LiteOn Technology Corp.
Page 8
LiteOn Technology Corp.
Page 2
New Products/New Parts Approval Process Flow -- actual products flow in factory F/G
OQC INSP.
OK
REWORK…
NG
OQA must check NPPR tracking form on intranet before shipping. If the status of “QM Approval” is not “approved” or “Bygone”, OQA have to contact QM engineers and the products can’t be shipped to customers.
New Product/New Parts Approval Flow & Supporting System
•Purpose •Flow •Supporting database & system •Conclusion & actions
LiteOn Technology Corp.
Page 1
3
4 5 6
PD
Tony Liu PD/DQA/OQ Nhomakorabea PD/DQA/OQC
SEP
AUG SEP OCT 1
LiteOn Technology Corp.
Page 7
Remark
• Add product MSA data in Trial run report according to external auditor UL’s suggestion. • Add trial run result Cpk data in Trial run report according to external auditor UL’s suggestion.

PE 教育训练教材之NPI流程简介

PE 教育训练教材之NPI流程简介

LCR/上料掃描系統 資料上傳
制作產品初步 流程圖及PMP
制作OFE/ Complexity/SFC路由
ME
根據Gerber/BOM制作 鋼網/比對板文件并交
付供應商生產
依產品資料或樣品做 PFMEA及新制程/耗
材的評估
跟催和驗收鋼網 及比對板
評估設備及
依據
IE
人力需求
BOM/Drawing 制作并發行SOP
ICT/FVS程式 優化
程式/治具 R&R測試
SUCCESS
THANK YOU
2019/10/21
品保部門
監控新機種品質狀況, 收集相關數據
召開品質檢討會并追蹤 NPI品質異常改善
完成Safe Launch Report發給客戶
制造
點料/測LCR 備料上線/掃描
依品質要求開線生產
NPI check list
Foxconn-Austin
5/11-18 (214pcs)
14 Qual build
LH Foxconn
5/21-22 (100pcs)
15 Qual build boards ETD-ETA
Foxconn-Regions 5/26-6/1 (94pcs)
16 "X" build
LH Foxconn
供應商生產
跟催和驗收載治具
檢測部門
接收測試Plan
按燒錄清單准備 燒錄器/FAI
接收測試治具及 程式
測試硬件/軟件調 試
評估是否需要新購 維修治具(鋼網/吸
嘴等)
發行燒錄/測試/ 維修SOP
教育訓練
評估設備及
依據
IE

Check list评鉴表9-30

Check list评鉴表9-30
Check List评鉴表 Supplier Check List
供方编号(Vendor Code): No 评价项目 Evaluation Items 详细内容 Detailed Contents 有无品质手册、品质方针并且规定了品质关联管理和执行人员的责任和权限 Does the supplier have the quality manual and quality guidelines?And does the supplier definite responsibility and authority for related members? 有无规定品质目标 Does the supplier have quality target? 品质目标是否传达及宣导 Does the quality target is known by employed staff? 有无建立部门达成品质目标的品质计划文件 Does the supplier have quality planning document for completing quality target? 有无内部品质审查规则 Does the supplier have the internal quality audit rules? 有无建立内部品质审查计划 Does the supplier have the internal quality audit plan? 内部品质审查是否检验品质目标达成,客户/工程的要求和 ISO 规定项目 Is the internal quality audit including quality targets,customer/engineering requirements and ISO requirements items? 有无规定内部品质审查判定基准 Whether to have criteria for internal quality audit ? 有无完好地保管审查结果及记录 Whether to keep the audit result and record? 审查中的问题点有无公布相关责任部门和责任人 Whether the audit problems have announced responsible departments and principal? 审查中不足事项是否进行改善 whether the non-conformances were improved? 有无跟踪审查改善措施的实施情况,有无改善效果 Whether the improvement is tracked?Is the result better? 有无跟踪改善措施的进展/实施的体系 Whether to track improvement progress and the system? 所有的改善措施及结果是否都被文件化 Have all the improvement measures and the results been documented? 是否有原材料仓库的物品放置平面图 Whether there is a raw material warehouse floor plan? 原材料仓库的5S情况是否好,是否定点摆放、整齐、规范 Is 5S of raw material warehouse good(fixed-point put, tidy…) 仓库是否避光、防尘 Does warehouse avoid light, dustproof? 是否有程序规定仓库的温度、湿度 Whether there is a procedure document to definite the temperature and humidity of the warehouse? 当温度或湿度超出规定界线时有无采取措施 Whether there is any action if the temperature or humidity is out of the range? 是否有程序规定控制产品的先进先出,是如何运作的 Whether there is a procedure document to control product FIFO(first in,first out), and how to operate? 是否定期对仓库进行盘点,记录 Is the warehouse checked and recorded regularly? 原料的堆放高度是否符合规定 Whether stack of raw materials is higher than requirements? 残余的原料是否保持密封,有无包装敞开 Is the packing of remnants of raw material sealed or open? 原料的保质期是否有规定管理 Whether the shelf life of raw material is definited? 特殊材料,敏感材料是否特别保存 Are those special materials and sensitive materials stored specially? 长期库存是否放置在指定的长期库存仓库 Is long-term inventory placed in certain long-term inventory warehouse? 是否有原料收入检验的标准和准备的样本 Whether there are an incoming inspection criterias and samples? 产品的承认标准、检查标准、检查的结果记录是否吻合 Does the inspection record meet the requirements of product standards and inspection standards? 每批检查完成后是否有承认、否决的标记 Is there any mark to show that pass or rejected for each lot? 不合格批次的特别选用是否符合相关的程序 Whether there has relevant procedure documents to definite how rejected lots are used? 进料检查的结果是否收集并且定期分析汇总(周、月报) Does the supplier keep incoming inspection reports and have weekly or monthly analysis reports? 是否有程序来监控来自物料供货商的任何改动 Whether there has any procedure documents to monitor any change of suppliers? 原料、半成品、及成品的不良品仓库是否分开管理 Whether there has separate management for the warehouse of defective raw materials, defective semifinished products and defective finished warehouse? 是否有不良品处理的清单 Whether there has defective products list? 27 配分 Points 首次稽核 复核 Initial audit Review 得分0-1 Score 备注 Remark

供应商审核CHECKLIST-A3

供应商审核CHECKLIST-A3

Audit List of Vendor /供应商检查表一、Provide copies of following documents as at least 2 working days before the audit at our disposal./在我司审核组到贵公司审核前2天,请提供下列文件的复印件给我司1. Quality Manual ISO 9000/质量手册ISO 9000;2. ISO 9000 Certificate/ISO 9000证书;3. Quality Manual ISO14001/质量手册ISO14001;4. ISO 14001 Certificate/ISO 14001证书;5. Contract Review procedure /合同评审程序文件;6. Production flow chart for Oplink’s/提供给我公司的产品流程图7. RMA-procedure flow chart/不良品退货流程图8. Outgoing procedure flow chart/出货检验流程图二、Grade rule/评分规则:(Full Mark 100:score 4 for each item,Rating: 0,1,2,3,4 / 满分100分:每项4分,分为0,1,2,3,4分共5个等级):●Score 0-no official document, no record to show action is taken.0分—没有书面文件或规定,也没有任何记录及相关证据证明已执行相应条款;●Score 1-no official document, have record to show action is taken.1分—没有书面文件或规定,但有记录或相关证据证明已执行相应条款;●Score 2-have official document, have record to show action is basically taken;2分—有书面文件或规定,而且有记录或相关证据证明已基本按规定执行;●Score 3-have official document, have record to show action is completely taken.3分—有书面文件或规定,而且有记录或相关证据证明已完全按规定执行;●Score 4- have official document, have recored to show achion is well taken.4分—有书面文件或规定,而且记录齐全,所有证据证明已按规定执行且有效。

Factory Survey Checklist(中英文对照)

Factory Survey Checklist(中英文对照)

5
4
3
2
Hale Waihona Puke 17) Management of engineering/production change notice : (工程/制造变更通知之管理) * Are there any rule or flow? (是否有管理流程或准则?) How to inform to operator?(变更如何传达至作业员?) 工程 (生产, 品保) Keeping of record? (记录保存?) * How to confirm correct operation of changing matter? (如何确认变更事项已被正确运 作?)
(制程 制程) Production process (制程)
No
Production general (生产 生产) 生产 1) Is there QC process chart (品管工程图) Are there writing process, control item, specification, jig, tool? (是否有明确定义每一制程, 品管管制项目,规格,工具/治具?) Yes Yes / / No No 5 4 3 2 1
5
4
3
2
1
5
4
3
2
1
5
4
3
2
1
(制程 制程) Production process (制程)
No
scratch, hole, color, sink * Noise(Friction noise, Pop noise, Vibration noise, (噪音) * Are there using X-bar control chart? (是否使用X管制图?) 生产 * What item are there checking Electrical inspection equipment beginning of work?(每天 (IPQC) 白班/夜班工作开始,自主查验检验仪器的项目为何?) * Are there all item confirmed? (所有查验项目均被确认?) * Are there procedure of changing for consumption goods? (耗材变更程序?) SMT process (SMT制程 制程) 制程 1) Cream solder printing (涂锡膏) * Vender name and type No of equipment (设备厂商及其型号) * Vender name and type No cream solder (锡膏供应商及其型号) * Is there incoming inspections standard for cream solder? (是否有生产中的锡膏检验 标准?) * Is there incoming inspection standard screen? (是否有印刷面的检验标准?) * Do you have a check list that is performed at the beginning of each work shift / day? ( 每次白,夜班的开始时,是否完成各检查表?) * Management of cream solder: storage Hour, Temperature, FIFO, Time limit (锡膏管制: 储存时间,温度,先进先出,有效期.) * Do you have rule for using up cream solder until final? (是否有用尽锡膏之管控标准?) B中心 中心 * Is there checking cream solder printing thickness? (是否有检测锡膏之厚度?) 2) Dispenser (点胶) * Vender name and type No of equipment (设备厂商及其型号) * Vender name and type No glue (胶水的供应商及其型号?) * Is there incoming inspections standard for glue? (是否有生产中的胶水检验标准?) * Do you have a check list that is performed at the beginning of each work shift / day? (每次白,夜班开始时是否完成核对表单?) * Is there using condition of glue(Temperature, Viscosity) (是否有胶水温度及粘性的使用管控?)

供应商稽核报告

供应商稽核报告

Section Four︰環境品質保證部分 Environment Quality Assurance Part
廠商Factory: Item Category s Audit Items 「環保管制品」與「非環保管制品」是否共存?如有,是否明確原料倉物料保管手順?以防混入? 是否明確「環保合格品」與「環保不合格品」的隔離保管方法? Is there exiting materials or parts both controlled comform to environment standards and not controlled to comform? if there is, how do you clear define the procedure for raw material maintain in warehouse? and how to ensure without mixture? Is there any method to separate "parts that confirmed to conform to environment standards" and "nonconformity"? 采購管理 Purchasin g managem ent 如何識別所納入的採購品是否適合相關客戶之Foxconn CCPBG 的產 品,還是其他公司的?現場有無識別管理記錄﹖ How do you identify that purchased materials or parts are conforming to related customer's environment management standard? Can materials or parts be identifed clearly they used for products that shipped to Foxconn CCPBG or other companies? Is there any identifiability records ? 對各項委託協力廠商生產品(成品〃半成品)〃部品〃材料,是否有制定選定基準、評價基準、檢查基準、檢查方法、判定方法? Do you have subcontract factory? Is there any standards of selection, evaluation, inspection, inspection methods and judgement for their provided products ( products, WIP), parts and materials? 是否有文件明確生產前已確認確實使用確認合格之部品?如何做? Is there a document defined that all the supplied parts have been confirmed qualified before manufacture? How to do? 長期在庫的部件以及副資材有否重新確認適合?如何確認?記錄否? Are the parts and sub-materials stayed in the warehouse for a long time confirmed again? How to confirm it is suitable? Any records? ◆在製造現場、半成品倉與成品倉︰是否存在「環保管制品」與「非環保管制品」?如有,如何防止混料?是否明確方法 / 識別管理記 錄? 如何確保現場不使用環保合格品以外的物料或輔材? ◆Is there existing parts both controlled comform to environment standards and not controlled to comform on site? or products warehouse? if there is, how to ensure without mixture? Is there any records about methods and identification? How to ensure that materials or sub-material that not confirming to conform to environment standard shouldn't be used? 是否對現場使用之設備、工夾具、藥品列冊管理? 如何確保其不會造成對產品的污染? 若有使用成型機器,如何防範上回用料及更換材料時的剩餘材料引起污染? Have you establish a management list for manufacture equipments, jigs and chemicals to be used? how to confirm they can't caused the pollution of product? If you use the molding machines, how to avoid the pollution caused by recycle materials and remainders after changed? Rules Reco MAJ/ MUST Describe (include doucments, Doc Number, Point rds MIN how to do, etc.)

小学六年级下册K卷英语第五单元期中试卷(答案和解释)

小学六年级下册K卷英语第五单元期中试卷(答案和解释)

小学六年级下册英语第五单元期中试卷(答案和解释)英语试题一、综合题(本题有50小题,每小题2分,共100分.每小题不选、错误,均不给分)1.Lily likes to go to the park after school. Every day, she takes her __________ and goes for a walk. Sometimes, she meets her friend __________ at the park. They like to play __________ and have fun together. Lily brings a __________ with her so she can drink water when she gets thirsty. After playing, they sit on the __________ and talk about their day.2.I love playing __. It is a fun game where you try to hit the ball into a net. I usually play with my friends after school, and we have a great time. Sometimes, we join a team and play in a tournament. My dream is to become a professional player one day.3.Which of these is a mode of transportation?A. BookB. CarC. ChairD. Phone4.Every day, I _______ (walk) to school. I _______ (leave) home at 7:30 and _______ (arrive) at school by 8:00. In the afternoon, I _______ (do) my homework and _______ (read) for 30 minutes. At night, I _______ (watch) TV before bed. It _______ (be) a regular day.5.What do we use to clean our teeth?A. ToothbrushB. SpoonC. KnifeD. Plate6.John loves reading books. His favorite subject is __________ (1). He has many books about __________ (2) and adventure. John’s best friend, Mike, like s books about __________ (3) and mysteries. They both like to read together after school in the__________ (4). Sometimes, they talk about the __________ (5) they read, sharing their favorite parts. John’s mom also likes reading, especially books about __________ (6).7.Which animal says "Woof"?A. CatB. DogC. SheepD. Cow8.Which of these is a source of light?A. BookB. LampC. ChairD. Table9.In the evening, I usually ______ (do) my homework and then ______ (watch) TV fora while. Last night, however, I ______ (read) a book instead of watching TV. The book______ (be) about a detective who ______ (solve) mysteries. It ______ (be) very interesting, and I ______ (finish) it in one night.10.What do we use to write?A. BrushB. PenC. CupD. Plate11.Lily is walking to school. She sees a __________ in the street and a __________ on the sidewalk. She picks up the __________ and puts it in her bag. She doesn’t want to leave it on the ground because it looks __________.12.What do we use to write on paper?A. KnifeB. PenC. SpoonD. Plate13.What do we use to brush our teeth?A. KnifeB. ForkC. SpoonD. Toothbrush14.Which animal can fly?A. FishB. ElephantC. BirdD. Dog15.How many legs do spiders have?A. 2B. 6C. 8D. 1016.What do we use to eat rice?A. KnifeB. ForkC. SpoonD. Chopsticks17.My favorite subject at school ______ (be) English. I ______ (study) English every day because it ______ (be) very interesting. I ______ (like) reading books in English, andI also ______ (enjoy) writing stories. My teacher ______ (help) me a lot with my English.18.My school is very __________. It has a big __________ where we can play sports. There is also a __________ for reading and studying. Every day, we have different__________ like math, science, and English. After school, I go to the __________ to play football with my friends. I love my school because it is a very __________ place to learn.19.This afternoon, I __________ (1) to the library with my friend Lily. We__________ (2) many books. I __________ (3) a storybook, and Lily __________ (4) a science book. We __________ (5) quiet in the library and __________ (6) books for an hour.20.David is at the dentist. He needs to get a __________ because he has a small__________ in his tooth. The dentist is very __________ and explains the procedure carefully. After the treatment, David feels a little __________ but is happy that his teeth are healthy again.21.Which of these is an opposite of "big"?A. SmallB. TallC. RoundD. Heavy22.My father loves gardening. He grows vegetables like tomatoes, cucumbers, and carrots. Every day, he takes care of the plants, waters them, and picks the ripe vegetables.I sometimes help him too.23.What is the opposite of "hot"?A. WarmB. ColdC. BigD. Wet24.What is the opposite of "short"?A. TallB. SmallC. WideD. Large25.Which one is a furniture item?A. BedB. CupC. SpoonD. Plate26.This morning, I ______ (wake) up late. I ______ (not have) time to eat breakfast. I ______ (rush) to school. When I ______ (arrive) at school, I ______ (realize) I ______ (forget) my lunchbox at home. I ______ (ask) my friend Lily if she ______ (have) any extra snacks, and she ______ (give) me some cookies.27.Which of these words is a noun?A. SingB. QuicklyC. AppleD. Run28.This morning, I __________ (1) to the library because I __________ (2) to borrowa book. I __________ (3) a book about space because I __________ (4) the planets. After I __________ (5) the book, I __________ (6) home and __________ (7) some lunch. Later, I __________ (8) to my friend’s house to play video games. It __________ (9) a busy but interesting day.29.My mother is an excellent cook. She prepares delicious meals every day. Last night, she made spaghetti with tomato sauce. It was so tasty that we all ate a lot.30.I live in a __________ house. It has __________ rooms. There is a __________, a __________, and two __________. My bedroom is next to the __________. I like to sit on the __________ in the living room and watch __________. In the evening, we always have __________ together at the __________.31.Which word means "very big"?A. SmallB. BigC. HugeD. Tiny32.My friend Lucy and I love playing sports. Every Saturday, we _______ (go) to the park to play soccer. Sometimes, we _______ (play) basketball instead. Last weekend, we _______ (decide) to try tennis, and it was really fun. We _______ (want) to play again next Saturday.33.Today, I __________ (go) to the park with my friends. We __________ (play) soccer and __________ (have) a lot of fun. After the game, we __________ (sit) on the grass and __________ (eat) snacks. I __________ (bring) some apples, and my friend__________ (bring) sandwiches. It __________ (be) a wonderful afternoon.34.Which of the following is an animal?A. CarB. AirplaneC. DogD. Table35.This is _______ apple.A. aB. anC. theD. some36.Which one is a sweet food?A. CakeB. CarrotC. PotatoD. Onion37.Which sentence is correct?A. I plays tennis every weekend.B. I play tennis every weekend.C. I playing tennis every weekend.D. I played tennis every weekend.38.Where is the cat?A. It is on the chair.B. It is under the chair.C. It is in the bag.D. All of the above.39.Which of these is a shape?A. CircleB. TableC. CarD. Book40.I ______ (not/like) to eat vegetables, but I ______ (eat) them because they are healthy. Yesterday, I ______ (eat) a salad with tomatoes and cucumbers.41.Which animal says "woof"?A. CatB. DogC. BirdD. Cow42.Which of these is a means of transportation?A. CarB. KnifeC. PlateD. Book43.My family __________ (1) a pet dog. His name __________ (2) Max, and he__________ (3) very playful. Every afternoon, he __________ (4) to the park with me. We __________ (5) a lot of fun running and playing fetch. Max __________ (6) to meet other dogs at the park, and he __________ (7) happy when he makes new friends.44.What is the capital of England?A. ParisB. RomeC. LondonD. Tokyo45.Which color is a tomato?A. RedB. BlueC. GreenD. Yellow46.Anna is visiting her grandmother’s house in the countryside. She helps her grandmother plant some __________ in the garden. Then, they pick some __________ to make a delicious __________ for lunch. Afterward, Anna and her grandmother sit on the __________ and enjoy the fresh air.47.Which one is a body part?A. EyeB. SpoonC. PlateD. Fork48.Which of these is a primary color?A. PurpleB. GreenC. YellowD. Orange49.My friend Lily loves to play the __. She practices every day. Her favorite song is __, and she can play it very well. Sometimes, I watch her play and feel __. I want to learn how to play the piano too. After practice, we like to sing __ together.50.How do you say "你好吗?" in English?A. How are you?B. What is this?C. Where are you?D. Who are you?(答案及解释)。

[员工手册]假日酒店礼宾部新员工入职培训手册英文版

[员工手册]假日酒店礼宾部新员工入职培训手册英文版

{员工手册}假日酒店礼宾部新员工入职培训手册英文版ConciergeDearteammember,Firstly,averywarmweletotheCrownePlazaShenzhenaspartofFrontOfficeDepar tment.Ourkeytosuccessdependsverymuchonyourpositiveattitude,creativeflai randeyetodetails.Wearemittedtodeveloppeoplethroughknowledgeenlarging ,skilltrainingandworkforcemotivation.YourremarkablecontributioninFrontOff iceDepartmentwillbegreatlyappreciated.真诚欢迎您加入深圳威尼斯皇冠假日酒店,成为酒店前厅部的成员。

你们积极的工作态度,创造性的思维及细致周到的服务,将是我们取得成功的关键因素。

我们激励员工通过不断的学习和培训,来丰富专业知识,改善服务技巧,提高劳动生产力,最终取得整体前厅部的成功。

IwishyouapleasantandfruitfulworkingexperienceatFrontOfficeDepartment. 祝愿您在这个团队里工作愉快,并获得宝贵的工作经历。

Yourstruly,此致TABLEOFCONTENTSPartOnePart1✍WeleLetterFromDirectorofRoomsPage02✍DepartmentalOrganizationChartPage04Part2✍JobdescriptionPage05✍CheckListPage08Part3✍StandardOperatingProceduresConcierge1TransportationCheckListPage162AirportPickupandsendoffhandlingPage213RoomChangingPage264CheckInandCheckOutLuggageProcedurePage28 5LuggageRoomandStorageProcedurePage336NewspaperDeliveryPage367Guest’sMailParcel&PackagePage398StackingofLuggageOnCartPage419GroupLuggageHandlingPage4310HoldForPickUpPage4511PagingServicePage47Transportation12TransportationCheckListPage1613AirportPickupandsendoffhandlingPage2114Driver’sRulePage4915Driver’sExpensesPage5216VehicleMileagePage5317VehicleMaintenancePage54Part4✍AcknowledgementletterbyemployeePage57 FRONTOFFICEORGANIZATIONCHART JOBDESCRIPTION工作职责描述JobTitle:ConciergeSupervisor职位:礼宾部主管LOCATION:CROWNEPLAZASHENZHEN工作场所:深圳威尼斯皇冠假日酒店Department:FrontOffice部门:房务部/前厅部Responsibleto:ChiefConcierge有责任于:礼宾部经理Responsiblefor:负责:BellBoy行李员Doorgirl门童JobSummary:T oensurethesmoothoperationoftheConciergedailyoperation,BellServicetr ansportation,ensuringmaximumguestsatisfaction.确保礼宾部每天正常运做,行李及车辆服务顺畅运作,保障客人最大满意服务。

Agilent PNA系列RF网络分析器扩频范围升级套件说明书

Agilent PNA系列RF网络分析器扩频范围升级套件说明书

Agilent Part Number:E8801-90026Printed in USADecember2001Installation NoteExtended Frequency Range Upgrade KitsFor PNA Series RF Network Analyzers (E8801A,E8802A,N3381A,and N3382A)Network Analyzer Model Number Upgrade Kit Part Number Frequency Extension E8801A,N3381A E8801-601013GHz to 6GHz E8801A,N3381A E8801-601023GHz to 9GHz E8802A,N3382AE8802-601016GHz to 9GHz1981Notice.The information contained in this document is subject to change without notice.Agilent Technologies makes no warranty of any kind with regard to this material,including but not limited to,the implied warranties of merchantability and fitness for a particular purpose.Agilent shall not be liable for errors contained herein or for incidental or consequential damages in connection with the furnishing, performance,or use of this material.©Copyright2001Agilent Technologies,Inc.All rights reserved.About the Upgrade KitsProducts affected..........................E8801A,E8802A,N3381A,and N3382A;all options(See NOTE below.)Installation to be performed by..............Agilent service center,personnel qualifiedby Agilent,or customerEstimated installation time.................E8801A and N3381A–15minutesE8802A and N3382A–5minutesEstimated verification time.................5minutesEstimated calibration adjustment time........45minutesNOTE If the Time Domain option,Option010,is already installed on your analyzer,you will need a new license key for that option to function after installation of thefrequency upgrade.Contact Agilent for this new license key.If you need assistance,refer to“Getting Assistance from Agilent”on page5.Description of the UpgradesThese upgrade kits are used to extend the frequency range of the:•E8801A or N3381A PNA RF network analyzer from3GHz to either6GHz or9GHz•E8802A or N33802A PNA RF network analyzer from6GHz to9GHzInstallation Note E8801-900263Items Included in the Upgrade KitsThe following three tables list the parts included in the upgrade kits for the affected network analyzers.Check the contents of your kit against the appropriate list.If any item is missing or damaged,contact Agilent Technologies.Refer to“Getting Assistance from Agilent”on page5.Table1Option006Upgrade Kit to Extend the E8801A or N3381A to6GHz (E8801-60101)Description Qty Part Number Installation note(this document)1E8801-90026 License key certificate15964-5136Model number nameplate1E8802-80001 Model number nameplate1N3382-80001A12source assembly1E8803-60062 Table2Option009Upgrade Kit to Extend the E8801A or N3381A to9GHz (E8801-60102)Description Qty Part Number Installation note(this document)1E8801-90026 License key certificate15964-5136Model number nameplate1E8803-80001 Model number nameplate1N3383-80001A12source assembly1E8803-60062 Table3Option009Upgrade Kit to Extend the E8802A or N3382A to9GHz (E8802-60101)Description Qty Part Number Installation note(this document)1E8801-90026 License key certificate15964-5136Model number nameplate1E8803-80001 Model number nameplate1N3383-800014Installation Note E8801-90026Getting Assistance from AgilentBy internet,phone,or fax,get assistance with all your test and measurement needs. Table4Contacting AgilentOnline assistance:/find/assistUnited States (tel)180********Latin America(tel)(305)2697500(fax)(305)2697599Canada(tel)187********(fax)(905)282-6495Europe(tel)(+31)205472323 (fax)(+31)205472390Australia(tel)1800629485(fax)(+61)392105947New Zealand(tel)0800738378(fax)(+64)44958950Japan(tel)(+81)426567832 (fax)(+81)426567840Singapore(tel)180********(fax)(65)8360252Malaysia(tel)1800828848(fax)1800801664India(tel)1600112929 (fax)0008006501101Hong Kong(tel)800930871(fax)(852)25069233Taiwan(tel)0800047866(fax)(886)225456723Philippines(tel)(632)8426802(tel)(PLDT subscriber only) 180016510170(fax)(632)8426809(fax)(PLDT subscriber only) 180016510288Thailand(tel)(outside Bangkok)(088)226008(tel)(within Bangkok)(662)6613999(fax)(66)16613714People’s Republic of China(tel)(preferred)8008100189(tel)(alternate)108006500021(fax)108006500121Installation Note E8801-9002656Installation Note E8801-90026Installation Procedurefor the Upgrade KitThe network analyzer must be in proper working condition prior to installing this option.Any necessary repairs must be made before proceeding with this installation.WARNINGThis installation requires the removal of the analyzer’s protective outer covers.The analyzer must be powered down and disconnected from the mains supply before performing this procedure.Electrostatic Discharge ProtectionProtection against electrostatic discharge (ESD)is essential while removing or connecting cables or assemblies within the network analyzer.Static electricity can build up on your body and can easily damage sensitive internal circuit elements when discharged.Static discharges too small to be felt can cause permanent damage.To prevent damage to the instrument:•always wear a grounded wrist strap having a 1M 9resistor in series with it when handling components and assemblies.•always use a grounded,conductive table mat while working on the instrument.•always wear a heel strap when working in an area with a conductive floor.If you are uncertain about the conductivity of your floor,wear a heel strap.Figure 1shows a typical ESD protection setup using a grounded mat and wrist strap.Refer to “Tools and Equipment Required for the Installation”on page 7for part numbers.Figure 1ESD Protection SetupOverview of the Installation ProcedureNote that step2is necessary only for the E8801A and N3381A network analyzers because they require a new A12source assembly.1.Verify the serial and option numbers of the analyzer.2.Replace the A12source assembly(E8801A and N3381A only).3.Enter the new model number.4.Verify that the new model number is shown correctly.5.Replace the model number nameplate on the front panel.6.Perform source and receiver calibration adjustments.Tools and Equipment Required for the InstallationDescription Model/Part Number Tools for A12Source Assembly Replacement(E8801A and N3381A Only)T-10TORX driver(set to9in-lbs)N/AT-20TORX driver(set to21in-lbs)N/A5/16-inch open-end torque wrench(set to10in-lb)N/AESD EquipmentESD grounding wrist strap9300-13675ft grounding cord for wrist strap9300-09802x4ft conductive table mat and15ft grounding wire9300-0797ESD heel strap(for use with conductive floors)9300-1308Test Equipment for Calibration AdjustmentsPower meter E4419BPower sensor(100kHz–4.2GHz)8482APower sensor(10MHz–18GHz)E4412AType-N adapter(female-to-female)1250-0777Type-N RF cable N6314AStep1.Verify the Serial and Option Numbers of the AnalyzerRefer to the License Key Certificate supplied with the kit:•Verify that the analyzer’s serial number matches the serial number on the certificate.•Verify that the option number on the certificate is correct:M02for an E8801A6GHz upgrade;M03for an E880xA9GHz upgrade;M82for an N3381A6GHz upgrade;M83for an N338xA9GHz upgrade.If either the serial number or the option number does not match the expected results,you will not be able to install the option.If this is the case,contact Agilent for assistance.Refer to “Getting Assistance from Agilent”on page5.Installation Note E8801-900267Step2.Replace the A12Source Assembly(E8801A and N3381A Only) This step is necessary only for the E8801A and N3381A network analyzers.If installing an upgrade kit for the E8802A or N3382A network analyzer,proceed to Step3.Remove the Outer and Inner Covers from the AnalyzerRefer to Figure2for this procedure.Remove the Outer CoverCAUTION This procedure is best performed with the analyzer resting on its front handles in the vertical position.Do not place the analyzer on its front panel without thehandles.This will damage the front panel assemblies.1.Disconnect the power cord(if it has not already been disconnected).2.With a T-20TORX driver,remove the strap handles(item )by loosening the screws (item )on both ends until the handle is free of the analyzer.3.With a T-20TORX driver,remove the four rear panel feet(item )by removing the center screws(item ).4.Slide the four bottom feet(item )off the cover.5.Slide the cover off of the frame.Remove the Inner Cover1.With a T-10TORX driver,remove the15screws(item ).2.Lift off the cover.8Installation Note E8801-90026Installation Note E8801-900269Figure2Outer and Inner Cover Removal10Installation Note E8801-90026Replace theA12Source Assembly Refer to Figure 3for this step.1.Place the A31hard disk drive assembly in the service position.a.With a T-10TORX driver,remove the mounting screw (item).b.Move the HDDA to the outside of the analyzer and slide the HDDA bracket feet into the slots on the frame to the horizontal position.This is the service position.Figure 3Placing the A31HDDA in the Service PositionRefer to Figure 4for the following steps.2.Disconnect the two flexible cables (item )from the A12source assembly being careful to note their locations for reconnection later.CAUTIONBe careful not to damage the center pins of the semirigid cables.Some flexing of the cables is necessary to remove the assembly.Do not over-bend the semirigid cables.3.With a 5/16-in torque wrench,disconnect the two semirigid cables (item )from thebottom of the A12source assembly.CAUTIONTo avoid damage to the semirigid cables (item ),pull down on the cables from the bottom of the analyzer to move them away while sliding out the A12source assembly.The cables have some spring to them and the RF pins could be damaged by the A12source assembly .4.Slide the A12source assembly out of the analyzer.5.Slide the new A12source assembly into the analyzer being careful not to damage the semirigid cables.Refer to the CAUTION s above.6.With a5/16-in torque wrench,reconnect the two semirigid cables(item¦ )to the bottomof the A12source assembly.7.Reconnect the two flexible cables(item )to the A12source assembly.Refer to Figure3for the following steps.8.Reinstall the A31hard disk drive assembly into its original position.9.With a T-10TORX driver,replace the mounting screw(item )Figure4A12Source Assembly ReplacementReinstall the Inner and Outer CoversRefer to Figure5for this procedure.Reinstall the Inner Cover1.Place the inner cover on the analyzer.There are two alignment pins on the front framethat must be aligned with holes in the cover.2.With a T-10TORX driver,install the15screws(item ).Reinstall the Outer CoverCAUTION This procedure is best performed with the analyzer resting on its front handles in the vertical position.Do not place the analyzer on its front panel without thehandles.This will damage the front panel assemblies.1.Slide the cover onto the frame.2.With a T-20TORX driver,install the four rear panel feet(item )by installing the center screws(item ).3.Slide the four bottom feet(item )onto the cover.4.With a T-20TORX driver,install the strap handles(item )by tightening the screws(item )on both ends.Figure5Inner and Outer Cover ReinstallationStep3.Enter the New Model NumberProcedure Requirements•The analyzer must be powered up and operating to perform this procedure.•The Network Analyzer program must be running.•A keyboard is required for this procedure.•A mouse is recommended for this procedure but is not required.Mouse Procedure1.On the analyzer’s System menu,point to Service,then click Option Enable.2.Click Repair.3.Check Model shown is incorrect!,then click Begin Repair.4.In the Model Change box,select the appropriate new model number:E8802A or N3382A(for the6GHz upgrade)or E8803A or N3383A(for the9GHz upgrade).ing the keyboard,enter the keyword in the box provided.The keyword is printed on theLicense Key Certificate.Enter this keyword exactly as it is printed on the certificate.6.Click Enter Model.7.Verify that the new model number displayed is correct,then click YES.If it is not correct,click NO and repeat the repair.8.When the installation is complete,click Exit.Front Panel Keys Procedure1.In the COMMAND block,press Menu/Dialog.2.In the NAVIGATION block,press the Right Tab and Arrows to move over to the Systemmenu and down to the Service selection.Press the Right Tab to display the extended menu and the Arrows to select Option Enable.Press Click.3.Press Menu/Dialog,then press R on the keyboard to select Repair.4.Tab to Model shown is incorrect!,then press Click.5.Tab to the Model Change box,then use the Arrows to select the appropriate new modelnumber:E8802A or N3382A(for the6GHz upgrade)or E8803A or N3383A(for the9GHz upgrade).6.Tab to the Keyword box and,using the keyboard,enter the keyword.The keyword isprinted on the License Key Certificate.Enter this keyword exactly as it is printed on the certificate.7.Tab to Enter Model,then press Click.8.Verify that the new model number displayed is correct,then tab to Yes and press Click.Ifit is not correct,tab to NO,press Click,and repeat the repair.9.When the installation is complete,Tab to Exit,then press Click.Step4.Verify that the New Model Number Is Shown Correctly Procedure Requirements•The analyzer must be powered up and operating to perform this procedure.•The Network Analyzer program must be running.•A mouse is recommended for this procedure but is not required.Mouse Procedure1.On the analyzer’s Help menu,click About Network Analyzer.2.Verify that the new model number is shown correctly in the display.Click OK.3.On the analyzer front panel,press Preset.Verify that the full frequency range of theanalyzer is correct.Front Panel Keys Procedure1.In the COMMAND block,press Menu/Dialog.2.In the NAVIGATION block,press the Right Tab and Arrows to move over to the Help menu,and down to the About Network Analyzer selection.Press Click.3.Verify that the new model number is shown correctly,then press Click.4.On the analyzer front panel,press Preset.Verify that the full frequency range of theanalyzer is correct.Step5.Replace the Model Number Nameplate on the Front Panel Refer to Figure6for this procedure.Remove the Old Nameplateing a sharp object such as a knife blade,lift one end of the old nameplate(item ).Becareful not to scratch the painted surface.ing your fingers,pull the nameplate completely off of the front panel and discard it.3.If any adhesive remains on the front panel surface,it can be removed by rubbing it withyour finger.Do not use a sharp object to remove this adhesive.If necessary,the surface can be cleaned with isopropol alcohol.Install the New NameplateNOTE There are two nameplates provided in the upgrade kit.Make sure that you install the correct one for your analyzer.The E8802A and E8803A nameplatesare for2-port analyzers,and the N3382A and N3383A nameplates are for3-portanalyzers.1.Remove the protective backing from the new nameplate to expose the adhesive.Avoidtouching the adhesive with your fingers as this may affect its ability to adhere to the front panel surface.2.Loosely align the new nameplate over the recess in the front panel and apply lightly.3.Once the overlay is properly aligned,press it firmly onto the surface to secure it.Figure6Model Number Nameplate ReplacementStep6.Perform Source and Receiver Calibration AdjustmentsThe following adjustments must be made due to the change in the full frequency range of the analyzer.Source Calibration AdjustmentThe source calibration is used to adjust your network analyzer for a flat source power across its full frequency range.The differences between Port1and Port2are negligible;therefore,a Port2adjustment is not required.1.Connect the equipment as shown in Figure7.Connect a GPIB cable between the networkanalyzer and the power meter.Figure7Setup for the Source Calibration Adjustment2.On the System menu,point to Service,Adjustments,then click Source Calibration.3.Ensure the GPIB settings are correct.4.Click Calibrate,then follow the instructions as they are displayed.Receiver Calibration AdjustmentThe receiver calibration is used to adjust the network analyzer receivers for a flat response across its full frequency range.A power meter is connected to Port1,as shown inFigure8,to establish a reference for flatness.A signal from Port1,as shown inFigure9,is used to adjust the“B”receiver at Port2.The adjustment is repeated using a signal from Port2to adjust the“A”receiver at Port1.1.Connect the equipment as shown in Figure8.Connect a GPIB cable between the networkanalyzer and the power meter.Figure8Setup for the Receiver Calibration AdjustmentFigure9Setup for the Receiver Calibration Adjustment of Port22.On the System menu,point to Service,Adjustments,then click Receiver Calibration.3.Ensure the GPIB settings are correct.4.Click Calibrate,then follow the instructions as they are displayed.Performance Tests and System VerificationThe analyzer should now operate and phase lock over its entire frequency range.If you experience difficulty with the basic functioning of the analyzer,contact Agilent.Refer to “Getting Assistance from Agilent”on page5.Although the analyzer functions,its performance relative to its specifications has not been verified for the additional frequency range enabled by this upgrade.It is recommended that a full instrument calibration be performed using the N2721A performance test software.If the testing of the analyzer’s full range of specifications is not required,a system verification can be performed.Refer to the analyzer’s Service Guide for information on performance tests and system verification.。

小学五年级下册第9次英语第三单元期测验题(答案和解释)

小学五年级下册第9次英语第三单元期测验题(答案和解释)

小学五年级下册英语第三单元期测验题(答案和解释)英语试题一、综合题(本题有50小题,每小题2分,共100分.每小题不选、错误,均不给分)1.Which of these animals has a long neck?A. ElephantB. GiraffeC. TigerD. Dog2.Which one is a kind of animal?A. DogB. SpoonC. TableD. Car3.Emma is going to the movies with her friends. They are watching a __________ about space. The movie is very __________, and Emma feels __________ because she loves space stories. After the movie, they talk about their favorite parts.4.What is the opposite of "fast"?A. SlowB. TallC. ShortD. Big5.I have two ______.A. PenB. PencilsC. BookD. Chair6.Which of these animals is known for its long trunk?A. ElephantB. TigerC. DogD. Cat7.John is at the library. He is reading a book about __________ (1). The book has pictures of __________ (2) and __________ (3). John learns a lot about different__________ (4) in the wild.8.I __________ (1) my homework at 4:00 PM every day. After I __________ (2) my homework, I __________ (3) to play video games. My brother __________ (4) to play with me, but he __________ (5) to finish his homework first.9.What do we use to clean our teeth?A. TowelB. SoapC. ToothbrushD. Comb10.I __________ (1) a delicious sandwich for lunch today. It __________ (2) with cheese, lettuce, and tomato. I __________ (3) the sandwich with some juice. My friend Emma __________ (4) a salad for lunch. After lunch, we __________ (5) to the playground. There, we __________ (6) on the swings and __________ (7) a lot of fun.11.Which one is the correct translation of "猫" in English?A. DogB. BirdC. CatD. Elephant12.Which of these is a type of animal?A. LionB. CarC. PhoneD. Shoe13.Which one is a holiday?A. ChristmasB. MondayC. SummerD. April14.I ______ (love) animals, especially cats. I ______ (have) two cats at home. Their names ______ (be) Whiskers and Snowball. Every morning, I ______ (feed) them, and in the evening, we ______ (play) together. I ______ (feel) happy when I ______ (spend) time with my cats.15.I have a pet __. Its name is __. It is very __ and loves to play with me. In the morning, I give it some __. It likes to run in the __ and chase after a ball. After playing, we both rest and feel __.st night, I ______ (dream) about a magical castle. I ______ (be) a knight, and I ______ (fight) dragons to save the kingdom. It ______ (be) an exciting adventure.17.What is the opposite of "fast"?A. SlowB. TallC. LightD. Bright18.Which one is used for writing?A. PlateB. PencilC. SpoonD. Fork19.I _______ (study) English every day. My teacher _______ (give) us a lot of homework, but I _______ (enjoy) learning new words. I also _______ (read) English books at home to improve my language skills.20.This afternoon, I helped my mom bake some cookies. First, we mixed the __ and __ in a big bowl. Then, we added some chocolate chips and __. After baking for about 20 minutes, the cookies smelled so good! We couldn’t wait to taste them, and they were delicious!21.What is the opposite of "fast"?A. SlowB. HeavyC. TallD. Warm22.Where do we live?A. HouseB. CarC. ParkD. School23.We are going to have a __ at school next month. The students will sing, dance, and perform plays. Sarah is practicing her __ every day, while Tom is preparing for his role in the __. Everyone is excited about the event!24.Which of these animals is a reptile?A. SnakeB. DogC. LionD. Elephant25.Which one is a vegetable?A. CarrotB. AppleC. OrangeD. Pear26.I ______ (love) animals, and I ______ (have) a pet cat named Bella. She ______ (be) very playful and friendly. Every morning, I ______ (give) her some food, and she______ (eat) it quickly. In the afternoon, Bella ______ (like) to sleep on my bed. Sometimes, we ______ (play) with her toys. I ______ (enjoy) spending time with her because she ______ (make) me happy.27.What is the opposite of "new"?A. OldB. BigC. HotD. Fast28.What is the color of the sky on a clear day?A. redB. yellowC. blueD. green29.What do we use to listen to music?A. HeadphonesB. PenC. TableD. Chair30.Which one is a body part?A. LegB. ChairC. TableD. Spoon31.Which of these is a type of animal?A. DogB. CarC. KnifeD. Plate32.Which of these is a fruit?A. TomatoB. OnionC. CarrotD. Potato33.Which of the following is a food item?A. AppleB. TableC. SpoonD. Chair34.I __________ (1) a new jacket last week. It __________ (2) very warm and comfortable. I __________ (3) it when the weather __________ (4) cold. Today, I__________ (5) my jacket to school. It __________ (6) chilly in the morning, but it__________ (7) warm in the afternoon.35.Which of these is a sweet food?A. CakeB. PotatoC. OnionD. Carrotst summer, we __________ (go) to a farm to see how vegetables __________ (grow). We __________ (learn) that it __________ (take) a lot of work to grow food. We __________ (pick) tomatoes and __________ (help) plant some new seeds. After that, we __________ (have) a picnic on the farm. It __________ (be) a great experience, and we __________ (decide) to visit the farm again next year.37.What do we use to write?A. KnifeB. PenC. SpoonD. Fork38.Which of these is used to drink water?A. CupB. ForkC. SpoonD. Plate39.Which of these is a shape?A. SquareB. DogC. CarD. Chair40.Which is the largest?A. AntB. ElephantC. DogD. Tiger41.Jack is learning about the planets. He knows that Earth is the __________ (1) planet from the Sun. He also knows that the __________ (2) is the closest planet to the Sun. Jack’s favorite planet is __________ (3), because it has beautiful rings. He also thinks the planet __________ (4) is very interesting because it has many moons. Jack dreams of visiting __________ (5) one day.42.I __________ (love) reading books in my free time. My favorite book __________ (be) about animals. Yesterday, I __________ (read) a story about a tiger and a rabbit. It __________ (be) so interesting that I __________ (finish) the whole book in one day.43.What is the color of the sun?A. GreenB. YellowC. BlueD. Black44.I __________ (go) to the zoo last Saturday with my family. We __________ (see) many animals. My little brother __________ (like) the monkeys the most because they__________ (be) so funny. I __________ (take) a lot of pictures of the lions and the tigers. After we __________ (finish) visiting the animals, we __________ (have) lunch ata nearby restaurant. It __________ (be) a fun day.45.David and his friends are going on a picnic. They bring a __________ (1) and some __________ (2). They sit on a __________ (3) and enjoy the __________ (4).46.Which subject pronoun should be used to replace the noun “Sarah”?A. IB. HeC. SheD. They47.Emily and Sarah are at the zoo. They are looking at a __________. The__________ is very tall and has a long neck. Next, they see some __________ playing in the water. After visiting the animals, they go to the __________ to get some ice cream.48.David is at the dentist. He needs to get a __________ because he has a small__________ in his tooth. The dentist is very __________ and explains the procedure carefully. After the treatment, David feels a little __________ but is happy that his teeth are healthy again.49.Which one is a shape?A. CircleB. ChairC. TableD. Plate50.What do we use to write?A. TableB. PenC. ShoesD. Shirt(答案及解释)。

软件测试专业英语

软件测试专业英语

常见专业术语:组织过程定义控制程序process for organizational process definition 软件生命周期模型software life cycle model组织标准过程集合描述description of organization's set of standard process.组织标准过程裁剪指南tailoring guideline for organizational standard process过程数据库使用规范usage specification for process metrics library过程财富度量报告measurement report for process asserts项目生命周期模型选择工作单sheet for selecting project software lifecycle model组织过程焦点控制程序process for organizational process focus EPG工作章程EPG charterEPG工作考核细则performance appraisal rules for EPG member过程改进建议处理控制程序process for handling process improvement proposal过程定义文件配置管理规范configuration management specification for process definition document过程行动组(PAT)工作记录process action team (PAT) working record过程定义文件试验结果评定表evaluation form for pilot result of process definition document过程状态季度报告模板process status quarterly report template过程行动计划process action plan过程推广计划process promotion plan过程试验计划process pilot plan公司年度过程评估计划organizational process assessment annual plan 公司过程改进总体要求 General objectives for organizational process improvement会议记录meeting minutes过程改进建议和意见汇总表summary form of comments and suggestions of PI过程改进实践状态清单 status list for process improvement practice EPG工作度量epg metrics程序文件评审讨论问题记录表issue record of process document review过程改进总体计划General plan for process improvement过程改进工作度量报告 metrics report for process improvement过程豁免申请单 process exempt application过程改进任务列表 process improvement tasks list组织级培训过程控制程序organization- level training process兼职讲师管理规定part-time instructor management regulation 免修规程training waiver procedure培训课程开发规程training course development procedure外购培训管理规程outsourcing training management procedure培训效果评估规定training effectiveness evaluation procedure 培训效果跟踪表 training effectiveness tracking record员工培训计划申请表application for employee training plan员工外训学习申请表application for employee external training 免修培训申请表application for training waiver战略培训需求表demands form for strategic training需求管理控制程序requirement management process需求变更控制规程requirement change control procedure变更影响分析控制规程 Impact analysis procedure of change确定项目已定义过程规程procedure for establishing project's defined process项目协调与沟通规程project communication & negotiation procedure 风险管理控制程序risk management process风险管理指导书risk management guidebook风险管理计划risk management plan风险列表risk list商业现货软件产品选择控制程序COTS product selection process COTS软件产品评价准则COTS product evaluation criteriaCOTS软件产品评价报告COTS product evaluation report供应商合作通知单cooperation notification to supplier第三方产品评估表the 3rd party's product evaluation form商业现货采购控制程序 COTS product procurement process软件子合同管理控制程序software sub-contract management process子合同评审规程sub-contract review procedure子合同开发监管规程sub-contract development monitoring procedure子合同配置管理规程sub-contract Configuration Management procedure子合同配置监督计划模版sub-contract configuration monitoring plan template子合同QA审核规程sub-contract QA audit procedure软件子承包商评定标准 sub-contractor evaluation criteria直真软件开发子合同模板(商务) contract template (business) for ZZ's software sub-contract子合同开发过程监控报告sub-contract development monitoring report子合同开发过程监控计划sub-contract development monitoring plan子合同工作计划sub-contract working plan产品(项目)子合同申请单application form for product( project ) sub-contract候选子承包商评估报告 candidate sub-contractor evaluation report 软件子合同评审记录software sub-contract review record项目策划控制程序project planning process规模估计规程size estimation procedure工作量估计规程effort estimation procedure编制进度规程schedule generation procedure项目策划计划plan for project planningPDSP文档PDSP document项目环境列表project's environment list项目的任务WBS列表project's task WBS list产品规模估计表product size estimation form工作量估计表effort estimation form关键计算机资源表CCR list外来工作产品清单out-sourcing work product list主要工作产品清单main work product list交付工作产品清单deliverable work product list人力资源需求表HR demands form人力资源评估表HR evaluation form项目人员计划表project's HR plan项目预算工时表project's budget/ effort form项目需增加硬件、软件成本预算表Budget form for hardware & software added共利益者协调计划表stakeholder negotiation plan资料管理计划表materials management plan开发计划development plan项目培训计划project training plan项目进度表project schedule项目总体进度表abstract project schedule合同项目立项报告initiating report for contract project研发项目立项报告initiating report for R&D project项目跟踪监控程序SPTO process研发中心例会管理规定 Review meeting procedure for R&D center研发项目组例会管理规定Review meeting procedure for R&D project team项目关闭控制程序project closure process里程碑评审规程milestone review procedure软件开发计划变更规程 Software development plan revise procedure 对外承诺变更控制规程 External commitment change procedure测量与分析控制程序 measurement & analysis process度量项定义规程measurement item definition procedure测量目标选择表measurement goal selection list项目测量数据集合project's metrics set项目度量周报project's metrics weekly report测量规格说明书metrics specification度量报告metrics report项目度量计划project's measurement plan决策分析与解决方案控制程序discussion analysis and resolution processDAR运用指南DAR practice guideline决策方案评价准则desiccation resolution evaluation criteria 过程与产品质量保证控制程序process& product quality assurance process不符合问题处理规程non-compliance issue handle procedure项目过程活动评审规程 project's process activity review procedure 项目工作产品审核规程 project's work product audit procedure质量保证活动策划规程 SQA planning procedure不符合问题等级标准non-compliance issue grade standard评价工作产品任务集合 work product evaluation tasks set评价过程活动任务集合 process activity evaluation tasks set不符合问题报告表non-compliance issue report不符合问题跟踪记录表 non-compliance issue tracking record工作产品审核记录表work product audit record过程活动评审记录表process activity review record项目QA计划进度表project's QA planned schedule 外部专家审核报告external expert audit report跨项目QA报告QA report across projects项目QA报告project QA report项目QA计划project QA plan软件配置管理控制程序 software configuration management process配置管理标准configuration management standard测试阶段CI变更规程CI change procedure in testing phase产品出库规程product check-out procedure产品入库规程product check-in procedure产品发布管理规程product release management procedure产品日常备份规程product daily backup procedure配置变更分析规程configuration change impact analysis procedure配置变更管理子过程configuration change management sub-process 配置审核管理规程configuration audit management procedure产品库管理规程product library management procedure配置项状态报告CI status report功能配置审核报告模板 FCA report template物理配置审核报告模板 FCA report template基线配置审核报告模板 baseline configuration audit report template 软件送测单delivering software to testing form日常备份记录daily backup record配置项清单CI list产品发布通知product release notification产品发布报告product release report配置管理计划模版CM plan template配置管理任务列表CM tasks list配置审核问题跟踪记录表configuration audit issues tracking record文件归档申请单application form for document archiving项目SCM任务单project's SCM task list最终产品规模测量记录final product size metrics record销售管理控制程序sales management control process售前支持控制程序pre-sales support control process售前技术支持计划pre-sales technical support plan售前技术申请pre-sales technical application产品定义过程控制程序 product definition process需求调研规程requirement investigation procedure软件需求分析控制程序 software requirement analysis process面向对象需求分析规程 O-O requirement analysis procedure需求分析方法工具指南 guideline for methods /tools of requirement analysis需求缺陷分类标准standard of requirement defect types需求规格说明Checklist checklist for requirement specification需求分析计划跟踪表requirement analysis plan and tracking record 需求不一致项跟踪记录表requirement defect tracking record 产品(产品构件)需求product ( product component) requirement产品(产品构件)需求规格说明书-By Object product ( product component) requirement specification template -by object产品(产品构件)需求规格说明书-By Feature product ( productcomponent) requirement specification template -by feature产品(产品构件)需求规格说明书-By User Class product( product component) requirement specification template -by user class产品(产品构件)需求规格说明书-By Fun Hierarchy product( product component) requirement specification template -by Fun Hierarchy软件概要设计控制程序 software preliminary design process软件详细设计控制程序 software detailed design process概要设计说明书模板一(面向对象) PD document template (OO)概要设计说明书模板PD document template软件开发计划模版SDP template数据库设计说明书模板 database design document template用户界面设计说明书user interface design document详细设计说明书模板DD document template产品实现控制程序-代码实现product realization process-coding设计问题跟踪记录表tracking record for design issuesC++编码规范C++ coding specificationJAVA编程规范JAVA coding specification产品构件实现清单product component realization list产品构件实现方法和计划product component realization method and plan产品实现控制程序-支持文档实现product realization process- supportive document realization产品集成控制程序product integration process接口管理规程interface management procedure集成产品评价规程integrated product evaluation procedure《产品集成策略》模版 product integration strategy template《产品集成评价报告》模版product integration evaluation report template接口跟踪表interface tracking record接口不一致项列表interface non-compliance list部件测试控制程序component testing process产品集成测试控制程序product integration testing process系统测试控制程序system testing processFIRST OFF测试控制程序FIRST OFF testing processBUG管理系统使用规范bug management system usage specification BUG确认规程Bug confirmation procedure正式评审规程formal review procedure同级评审指导书PR guidebook技术评审规程technical review procedure同级评审策划规程PR planning procedure正式评审申请表formal review application技术评审申请表technical review application评审工作分析报告review analysis report评审工作表review working form评审准备数据表review preparation metric form同级评审计划PR plan评审记录和缺陷跟踪表 review record and defect tracking record系统测试数据和测试环境设计system testing metrics and testing environment design部件测试数据和测试环境设计component testing metrics and testing environment design部件测试用例component testing use-case系统测试用例system testing use-case系统测试方案system testing scheme部件测试方案component testing scheme接受系统测试检查单 system testing checklist接受产品集成测试检查单 product integration testing checklist接受部件测试检查单 component testing checklist接受First off测试检查单 FIRST OFF testing checklistFirst off测试计划Fist Off testing plan测试计划testing plan产品集成测试计划product integration testing plan测试问题记录表testing issue record单个自由产品测试总结 independent product testing summary测试报告testing report测试总结testing summary产品集成测试报告product integration testing report代码走查规程code walk-through procedure单元测试规程unit testing procedure制定确认策划规程validation planning procedure确认规程validation procedure需求确认方法描述requirement validation methods description 产品确认方法描述product validation methods description确认计划书模板validation plan template产品验收控制程序product acceptance processFIRST OFF规程Fist off procedure产品发布规程product release procedure产品移交规程product delivery procedure系统集成控制程序system integration process系统集成项目测试验收规程acceptance procedure for system integration project testing系统集成项目维护规程 maintenance procedure for system integration project售后服务控制程序post-sales service control process客户服务请求处理表handle form for customer service application 客户服务请求解决情况统计表statistics for closure status of customer service application客户满意度调查表customer satisfaction questionnaire客户满意度统计分析报告statistics analysis report for customer satisfaction客户满意改进方案customer satisfaction improvement plan售后客户档案(原有文件) post-sales customer profile ( original documents)维护项目控制程序maintenance project control process一级维护任务单the 1st level maintenance tasks form维护项目立项报告initiating report for maintenance project 维护项目工作计划working plan for maintenance project现场服务记录on-site service record现场培训记录on-site training record维护项目总结报告summary report for maintenance project二级任务单the 2nd tasks form项目结束通知单project closure notification项目决算报告project settlement report软件维护控制程序software maintenance control process维护需求记录表maintenance demands record软件维护申请表software maintenance application软件维护记录单software maintenance formAcceptance Testing--可接受性测试一般由用户/客户进行的确认是否可以接受一个产品的验证性测试. actual outcome--实际结果被测对象在特定的条件下实际产生的结果.Ad Hoc Testing--随机测试测试人员通过随机的尝试系统的功能,试图使系统中断.algorithm--算法(1)一个定义好的有限规则集,用于在有限步骤内解决一个问题;(2)执行一个特定任务的任何操作序列.algorithm analysis--算法分析一个软件的验证确认任务,用于保证选择的算法是正确的、合适的和稳定的,并且满足所有精确性、规模和时间方面的要求.Alpha Testing--Alpha测试由选定的用户进行的产品早期性测试.这个测试一般在可控制的环境下进行的.analysis--分析(1)分解到一些原子部分或基本原则,以便确定整体的特性;(2)一个推理的过程,显示一个特定的结果是假设前提的结果;(3)一个问题的方法研究,并且问题被分解为一些小的相关单元作进一步详细研究.anomaly--异常在文档或软件操作中观察到的任何与期望违背的结果.application software--应用软件满足特定需要的软件.architecture--构架一个系统或组件的组织结构.ASQ--自动化软件质量(Automated Software Quality)使用软件工具来提高软件的质量.assertion--断言指定一个程序必须已经存在的状态的一个逻辑表达式,或者一组程序变量在程序执行期间的某个点上必须满足的条件.assertion checking--断言检查用户在程序中嵌入的断言的检查.audit--审计一个或一组工作产品的独立检查以评价与规格、标准、契约或其它准则的符合程度.audit trail--审计跟踪系统审计活动的一个时间记录.Automated Testing--自动化测试使用自动化测试工具来进行测试,这类测试一般不需要人干预,通常在GUI、性能等测试中用得较多.Backus-Naur Form--BNF范式一种分析语言,用于形式化描述语言的语法baseline--基线一个已经被正式评审和批准的规格或产品,它作为进一步开发的一个基础,并且必须通过正式的变更流程来变更.Basic Block--基本块一个或多个顺序的可执行语句块,不包含任何分支语句.basis test set--基本测试集根据代码逻辑引出来的一个测试用例集合,它保证能获得100%的分支覆盖.behavior--行为对于一个系统的一个函数的输入和预置条件组合以及需要的反应.一个函数的所有规格包含一个或多个行为.benchmark--标杆/指标/基准一个标准,根据该标准可以进行度量或比较.Beta Testing--Beta测试在客户场地,由客户进行的对产品预发布版本的测试.这个测试一般是不可控的.big-bang testing--大锤测试/一次性集成测试非渐增式集成测试的一种策略,测试的时候把所有系统的组件一次性组合成系统进行测试.Black Box Testing--黑盒测试根据软件的规格对软件进行的测试,这类测试不考虑软件内部的运作原理,因此软件对用户来说就像一个黑盒子.bottom-up testing--由低向上测试渐增式集成测试的一种,其策略是先测试底层的组件,然后逐步加入较高层次的组件进行测试,直到系统所有组件都加入到系统.boundary value--边界值一个输入或输出值,它处在等价类的边界上.boundary value coverage--边界值覆盖通过测试用例,测试组件等价类的所有边界值.boundary value testing--边界值测试通过边界值分析方法来生成测试用例的一种测试策略.Boundary Value Analysis--边界值分析该分析一般与等价类一起使用.经验认为软件的错误经常在输入的边界上产生,因此边界值分析就是分析软件输入边界的一种方法.branch--分支在组件中,控制从任何语句到其它任何非直接后续语句的一个条件转换,或者是一个无条件转换.branch condition--分支条件branch condition combination coverage--分支条件组合覆盖在每个判定中所有分支条件结果组合被测试用例覆盖到的百分比. branch condition combination testing--分支条件组合测试通过执行分支条件结果组合来设计测试用例的一种方法.branch condition coverage--分支条件覆盖每个判定中分支条件结果被测试用例覆盖到的百分比.branch condition testing--分支条件测试通过执行分支条件结果来设计测试用例的一种方法.branch coverage--分支覆盖通过测试执行到的分支的百分比.branch outcome--分支结果见判定结果(decision outcome)branch point--分支点branch testing--分支测试通过执行分支结果来设计测试用例的一种方法.Breadth Testing--广度测试在测试中测试一个产品的所有功能,但是不测试更细节的特性.bug--缺陷capture/playback tool--捕获/回放工具参考capture/replay toolCapture/Replay Tool--捕获/回放工具一种测试工具,能够捕获在测试过程中传递给软件的输入,并且能够在以后的时间中,重复这个执行的过程.这类工具一般在GUI测试中用的较多. CASE--计算机辅助软件工程(computer aided software engineering) 用于支持软件开发的一个自动化系统.CAST--计算机辅助测试在测试过程中使用计算机软件工具进行辅助的测试.cause-effect graph--因果图一个图形,用来表示输入(原因)与结果之间的关系,可以被用来设计测试用例.certification--证明一个过程,用于确定一个系统或组件与特定的需求相一致.change control--变更控制一个用于计算机系统或系统数据修改的过程,该过程是质量保证程序的一个关键子集,需要被明确的描述.code audit--代码审计由一个人、组或工具对源代码进行的一个独立的评审,以验证其与设计规格、程序标准的一致性.正确性和有效性也会被评价.Code Coverage--代码覆盖率一种分析方法,用于确定在一个测试套执行后,软件的哪些部分被执行到了,哪些部分没有被执行到.Code Inspection--代码检视一个正式的同行评审手段,在该评审中,作者的同行根据检查表对程序的逻辑进行提问,并检查其与编码规范的一致性.Code Walkthrough--代码走读一个非正式的同行评审手段,在该评审中,代码被使用一些简单的测试用例进行人工执行,程序变量的状态被手工分析,以分析程序的逻辑和假设. code-based testing--基于代码的测试根据从实现中引出的目标设计测试用例.coding standards--编程规范一些编程方面需要遵循的标准,包括命名方式、排版格式等内容. Compatibility Testing--兼容性测试测试软件是否和系统的其它与之交互的元素之间兼容,如:浏览器、操作系统、硬件等.complete path testing--完全路径测试completeness--完整性实体的所有必须部分必须被包含的属性.complexity--复杂性系统或组件难于理解或验证的程度.Component--组件一个最小的软件单元,有着独立的规格Component Testing--组件测试computation data use--计算数据使用一个不在条件中的数据使用. computer system security--计算机系统安全性计算机软件和硬件对偶然的或故意的访问、使用、修改或破坏的一种保护机制.condition--条件一个不包含布尔操作的布尔表达式,例如:Acondition coverage--条件覆盖通过测试执行到的条件的百分比.condition outcome--条件结果条件为真为假的评价.configuration control--配置控制配置管理的一个方面,包括评价、协调、批准、和实现配置项的变更. configuration management--配置管理一套技术和管理方面的原则用于确定和文档化一个配置项的功能和物理属性、控制对这些属性的变更、记录和报告变更处理和实现的状态、以及验证与指定需求的一致性.conformance criterion--一致性标准判断组件在一个特定输入值上的行为是否符合规格的一种方法. Conformance Testing--一致性测试测试一个系统的实现是否和其基于的规格相一致的测试.consistency--一致性在系统或组件的各组成部分和文档之间没有矛盾,一致的程度. consistency checker--一致性检查器一个软件工具,用于测试设计规格中需求的一致性和完整性.control flow--控制流程序执行中所有可能的事件顺序的一个抽象表示.control flow graph--控制流图通过一个组件的可能替换控制流路径的一个图形表示.conversion testing--转换测试用于测试已有系统的数据是否能够转换到替代系统上的一种测试. corrective maintenance--故障检修用于纠正硬件或软件中故障的维护.correctness--正确性软件遵从其规格的程度.correctness--正确性软件在其规格、设计和编码中没有故障的程度.软件、文档和其它项满足需求的程度.软件、文档和其它项满足用户明显的和隐含的需求的程度. coverage--覆盖率用于确定测试所执行到的覆盖项的百分比.coverage item--覆盖项作为测试基础的一个入口或属性:如语句、分支、条件等.crash--崩溃计算机系统或组件突然并完全的丧失功能.criticality--关键性需求、模块、错误、故障、失效或其它项对一个系统的操作或开发影响的程度.criticality analysis--关键性分析需求的一种分析,它根据需求的风险情况给每个需求项分配一个关键级别. cyclomatic complexity--循环复杂度一个程序中独立路径的数量.data corruption--数据污染违背数据一致性的情况.data definition--数据定义一个可执行语句,在该语句上一个变量被赋予了一个值.data definition C-use coverage--数据定义C-use覆盖在组件中被测试执行到的数据定义C-use使用对的百分比.data definition C-use pair--数据定义C-use使用对一个数据定义和一个计算数据使用,数据使用的值是数据定义的值.data definition P-use coverage--数据定义P-use覆盖在组件中被测试执行到的数据定义P-use使用对的百分比.data definition P-use pair--数据定义P-use使用对一个数据定义和一个条件数据使用,数据使用的值是数据定义的值.data definition-use coverage--数据定义使用覆盖在组件中被测试执行到的数据定义使用对的百分比.data definition-use pair--数据定义使用对一个数据定义和一个数据使用,数据使用的值是数据定义的值.data definition-use testing--数据定义使用测试以执行数据定义使用对为目标进行测试用例设计的一种技术.data dictionary--数据字典(1)一个软件系统中使用的所有数据项名称,以及这些项相关属性的集合.(2)数据流、数据元素、文件、数据基础、和相关处理的一个集合. data flow analysis--数据流分析一个软件验证和确认过程,用于保证输入和输出数据和它们的格式是被适当定义的,并且数据流是正确的.data flow coverage--数据流覆盖测试覆盖率的度量是根据变量在代码中的使用情况.data flow diagram--数据流图把数据源、数据接受、数据存储和数据处理作为节点描述的一个图形,数据之间的逻辑体现为节点之间的边.data flow testing--数据流测试根据代码中变量的使用情况进行的测试.data integrity--数据完整性一个数据集合完全、正确和一致的程度.data use--数据使用一个可执行的语句,在该语句中,变量的值被访问.data validation--数据确认用于确认数据不正确、不完整和不合理的过程.dead code--死代码在程序操作过程中永远不可能被执行到的代码.Debugging--调试发现和去除软件失效根源的过程.decision--判定一个程序控制点,在该控制点上,控制流有两个或多个可替换路由. Decision condition--判定条件判定内的一个条件.decision coverage--判定覆盖在组件中被测试执行到的判定结果的百分比.decision outcome--判定结果一个判定的结果,决定控制流走哪条路径.decision table--判定表一个表格,用于显示条件和条件导致动作的集合.Depth Testing--深度测试执行一个产品的一个特性的所有细节,但不测试所有特性.比较广度测试. design of experiments--实验设计一种计划实验的方法,这样适合分析的数据可以被收集.design-based testing--基于设计的测试根据软件的构架或详细设计引出测试用例的一种方法.desk checking--桌面检查通过手工模拟软件执行的方式进行测试的一种方式.diagnostic--诊断检测和隔离故障或失效的过程.dirty testing--肮脏测试参考负面测试(negative testing)disaster recovery--灾难恢复一个灾难的恢复和重建过程或能力.documentation testing--文档测试测试关注于文档的正确性.domain--域值被选择的一个集合.domain testing--域测试参考等价划分测试(equivalence partition testing)dynamic analysis--动态分析根据执行的行为评价一个系统或组件的过程.Dynamic Testing--动态测试通过执行软件的手段来测试软件.embedded software--嵌入式软件软件运行在特定硬件设备中,不能独立于硬件存在.这类系统一般要求实时性较高.emulator--仿真一个模仿另一个系统的系统或设备,它接受相同的输入并产生相同的输出. End-to-End testing--端到端测试在一个模拟现实使用的场景下测试一个完整的应用环境,例如和数据库交互,使用网络通信等.entity relationship diagram--实体关系图描述现实世界中实体及它们关系的图形.entry point--入口点一个组件的第一个可执行语句.Equivalence Class--等价类组件输入或输出域的一个部分,在该部分中,组件的行为从组件的规格上来看认为是相同的.equivalence partition coverage--等价划分覆盖在组件中被测试执行到的等价类的百分比.equivalence partition testing--等价划分测试根据等价类设计测试用例的一种技术.Equivalence Partitioning--等价划分组件的一个测试用例设计技术,该技术从组件的等价类中选取典型的点进行测试.error--错误IEEE的定义是:一个人为产生不正确结果的行为.error guessing--错误猜测根据测试人员以往的经验猜测可能出现问题的地方来进行用例设计的一种技术.error seeding--错误播种/错误插值故意插入一些已知故障(fault)到一个系统中去的过程,目的是为了根据错。

统一用语中英对照

统一用语中英对照
模具廠品質管理系統文件 品質手冊 程序書(25 篇) 程序書 品質手冊 程序書中文名稱 品質系統程序書 管理責 任/資 源管理 管理審查程序書 5篇 文件與資料管制程序書 品質記錄管理程序書 教育訓練程序書 訂單審查程序書 客戶財產管理程序書 模具設計程序書 採購管理程序書 產 品 的 實 現 進料檢驗程序書 12 篇 製程管制程序書 製程與出貨檢驗程序書 倉儲管理程序書 模具之鑑別與追溯性程序書 未結案模具程序書 試模服務程序書 服務程序書 客戶滿意度程序書 量 測 分 析 與 改 善 內部品質稽核程序書 不合格品管制程序書 8篇 檢驗設備之校正與保養程序書 檢驗狀況標示與記錄程序書 持續改善程序書 矯正預防程序書 統計技術程序書 作業規定中文名稱 管理審查作業規定 溝通管理作業規定 文件管制作業規定 編號原則作業規定 10 篇 資料整理作業規定 電子媒體管制作業規定 Quality Manual 程序書英文名稱 Quality System Operation Procedure Management Review Operation Procedure Document Control Operation Procedure Quality Management Record Operation Procedure Educational Training Operation Procedure Order Review Operation Procedure Customer Property Operation Procedure Mold Design Operation Procedure Purchasing Operation Procedure Incoming Material Inspection Operation Procedure Process Control Operation Procedure Process and Outgoing Inspection Operation Procedure Warehouse Management Operation Procedure Mold Identification & Traceability Operation Procedure Mold Of Unclosed Project Operation Procedure Mold Trial Service Operation Procedure Service Operation Procedure Customer Satisfaction Management Operation Procedure Internal Quality Audit Operation Procedure Control of Nonconforming Product Operation Procedure Calibration and Maintenance of Inspection Equipment Operation Procedure Inspection Condition Label & Record Standard Operating Procedure Continuous Improvement Operation Procedure Corrective and Preventive Action Operation Procedure Statistic Technology Operation Procedure 作業規定英文名稱 Management Review Standard Operating Procedure Communication Management Standard Operating Procedure Document Control Standard Operating Procedure Principle of Numbering Standard Operating Procedure Data Processing Standard Operating Procedure Electronic Media Control Standard Operating Procedure 備註 備註

检测隐藏进程WEB安全电脑资料

检测隐藏进程WEB安全电脑资料

检测隐藏进程WEB平安电脑资料Detection of the hidden processes俄语原文:wasm.ru/article.php?article=hiddndt俄文翻译:kaomunity.reverse-engineering./viewtopic.php?t=4685中文翻译: prince后期校验:firstrose=============================侦测隐藏进程[C] Ms-Remxx-xx wasm.ru - all rights reserved and reversed许多用户都有过用Windows自带的任务器查看所有进程的经历,并且很多人都认为在任务管理器中隐藏进程是不可能的,自然地,也就有必要研究进程隐藏的对抗技术。

杀毒软件和防火墙制造商就像他们的产品不能发现隐藏进程一样了。

在少之又少的工具中,可以胜任的也只有Klister(仅运行于Windows 2000平台)了。

所有其他公司关注的只有金钱(俄文译者kao注:不完全正确,FSecure的BlackLight Beta也是的)。

除此之外,所有的这些工具都可以很容易的anti掉。

用程序实现隐藏进程探测技术,我们有两种选择:* 基于某种探测原理找到一种隐藏的方法;* 基于某个程序找到一种隐藏的方法,这个要简单一些。

购置商业软件产品的用户不能修改程序,这样可以保证其中绑定的程序的平安运行。

因此第2种方法提到的程序就是商业程序的后门(rootkits)(例如hxdef Golden edition)。

唯一的解决方案是创立一个的隐藏进程检测的开源工程,这个程序使用几种不同的检测方法,这样可以发现使用某一种方法进展隐藏的进程。

任何一个用户都可以抵挡某程序的捆绑程序,当然那要得到程序的源代码并且按照自己的意愿进展修改。

在这篇文章中我将讨论探测隐藏进程的根本方法,列出该方法的例如代码,并创立一个可以检测上面我们提到的隐藏进程的程序。

快递公司退改件操作流程

快递公司退改件操作流程

快递公司退改件操作流程英文回答:Returns and Exchanges Processing Procedure for Courier Companies.1. Receiving Returns.The courier company receives the returned package from the customer.The package is inspected for any damage or tampering.The package is scanned into the system to track its status.2. Verifying the Return.The courier company verifies the return by matching the package to the original order.The customer's reason for the return is noted.The condition of the returned item is assessed.3. Processing the Refund.If the return is approved, the courier company will process the refund to the customer.The refund amount will be based on the original purchase price and any applicable fees.The refund will be issued through the same method that was used for the original payment.4. Issuing an Exchange.If the customer requests an exchange, the courier company will issue a new item.The new item will be shipped to the customer's address.The customer may be required to pay any additional shipping costs for the exchange.5. Handling Damaged or Defective Items.If the returned item is damaged or defective, the courier company will investigate the issue.The courier company will determine whether the damage or defect was caused by the customer or by the courier company.If the damage or defect was caused by the courier company, the customer will be issued a replacement item.6. Disposing of Returned Items.If the returned item is not eligible for a refund or exchange, the courier company will dispose of the item.The item may be donated to a charity or disposed of ina landfill.中文回答:快递公司退件换货操作流程。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
1.3FIELD OF APPLICATION:
This procedure will be applied in Production planning department.
This procedure will be used for all relevant departments that relate to the production produced .
TSHALI
OperativeProcedureMP-TS-PL0025-2007
The procedure aboutcheck list of new items report
Rev. 0
Data:2.14.2008
Language:English
1.1CONTENTS:
1.1Contents
1.2Scope
YES
NO
LO
PL
Y
AF
MA
SS
IT
HR
PC
PO
Y
QA
PM
Y
1.9APPROVAL SIGNATURE:
PROCEDURE No.
AUDIT
APPROVAL SIGNATURE
MP-TS-PL0025-2007
Elena
Saverino Musicco
(3). Combineall feedback Jenny and Tshal_pur and update the check list of new items report.
(4). The employee of production planning-Alex put thischeck list of new items reportto folder every Tuesday and send to sunny chen and all relevant departments of Tshali and Italy that relate to the production produced .
1.4RESPONSIBILITY:
Production planning manager and the employee of the work-Alex are responsible for the correct of the data.
1.5DESCRIPTION:
There are some processes of making the procedure about check list of new items report.
1.6 REF. DOCUMENTS:
1.7 INDEX OF REVISION:
Index of revision
Rev.
Date
Description
editor
Approval person
0
31.Jan. 2007
Issuing
Jenny
Elena
1.8DISTRIBUTION LIST:
DEPARTMENT
(1). The Italy BZ colleagueEmanuela.Diberardinosends the new version check list of new items excel file weekly.
(2). After receiving the new version check list , forward the check list file to the employee of the work-Jenny and all relevant employees in Tshali_pur that relate to the new items produced .
1.3Field of application
1.4 Responsibility
1.5 Description
1.6Ref. Documon
1.8 Distribution list
1.9 Approval signature
1.2SCOPE:
Thisprocedure edited byProduction planning department, defines the rightprocedure about the procedure about check list of new items report, the purpose is to guarantee that supply the data to Italy and China colleague on time.