A new critically sampled non-uniform subband adaptive structure
tpo32三篇托福阅读TOEFL原文译文题目答案译文背景知识
![tpo32三篇托福阅读TOEFL原文译文题目答案译文背景知识](https://img.taocdn.com/s3/m/6e0d2e3cf4335a8102d276a20029bd64783e622d.png)
tpo32三篇托福阅读TOEFL原文译文题目答案译文背景知识阅读-1 (2)原文 (2)译文 (5)题目 (7)答案 (16)背景知识 (16)阅读-2 (25)原文 (25)译文 (28)题目 (31)答案 (40)背景知识 (41)阅读-3 (49)原文 (49)译文 (53)题目 (55)答案 (63)背景知识 (64)阅读-1原文Plant Colonization①Colonization is one way in which plants can change the ecology of a site.Colonization is a process with two components:invasion and survival.The rate at which a site is colonized by plants depends on both the rate at which individual organisms(seeds,spores,immature or mature individuals)arrive at the site and their success at becoming established and surviving.Success in colonization depends to a great extent on there being a site available for colonization–a safe site where disturbance by fire or by cutting down of trees has either removed competing species or reduced levels of competition and other negative interactions to a level at which the invading species can become established.For a given rate of invasion,colonization of a moist,fertile site is likely to be much more rapid than that of a dry, infertile site because of poor survival on the latter.A fertile,plowed field is rapidly invaded by a large variety of weeds,whereas a neighboring construction site from which the soil has been compacted or removed to expose a coarse,infertile parent material may remain virtually free of vegetation for many months or even years despite receiving the same input of seeds as the plowed field.②Both the rate of invasion and the rate of extinction vary greatly among different plant species.Pioneer species-those that occur only in the earliest stages of colonization-tend to have high rates of invasion because they produce very large numbers of reproductive propagules(seeds,spores,and so on)and because they have an efficient means of dispersal(normally,wind).③If colonizers produce short-lived reproductive propagules,they must produce very large numbers unless they have an efficient means of dispersal to suitable new habitats.Many plants depend on wind for dispersal and produce abundant quantities of small,relatively short-lived seeds to compensate for the fact that wind is not always a reliable means If reaching the appropriate type of habitat.Alternative strategies have evolved in some plants,such as those that produce fewer but larger seeds that are dispersed to suitable sites by birds or small mammals or those that produce long-lived seeds.Many forest plants seem to exhibit the latter adaptation,and viable seeds of pioneer species can be found in large numbers on some forest floors. For example,as many as1,125viable seeds per square meter were found in a100-year-old Douglas fir/western hemlock forest in coastal British Columbia.Nearly all the seeds that had germinated from this seed bank were from pioneer species.The rapid colonization of such sites after disturbance is undoubtedly in part a reflection of the largeseed band on the forest floor.④An adaptation that is well developed in colonizing species is a high degree of variation in germination(the beginning of a seed’s growth). Seeds of a given species exhibit a wide range of germination dates, increasing the probability that at least some of the seeds will germinate during a period of favorable environmental conditions.This is particularly important for species that colonize an environment where there is no existing vegetation to ameliorate climatic extremes and in which there may be great climatic diversity.⑤Species succession in plant communities,i.e.,the temporal sequence of appearance and disappearance of species is dependent on events occurring at different stages in the life history of a species. Variation in rates of invasion and growth plays an important role in determining patterns of succession,especially secondary succession. The species that are first to colonize a site are those that produce abundant seed that is distributed successfully to new sites.Such species generally grow rapidly and quickly dominate new sites, excluding other species with lower invasion and growth rates.The first community that occupies a disturbed area therefore may be composed of specie with the highest rate of invasion,whereas the community of the subsequent stage may consist of plants with similar survival ratesbut lower invasion rates.译文植物定居①定居是植物改变一个地点生态环境的一种方式。
(完整版)一些英文审稿意见及回复的模板(可编辑修改word版)
![(完整版)一些英文审稿意见及回复的模板(可编辑修改word版)](https://img.taocdn.com/s3/m/570c4c62bed5b9f3f90f1c7d.png)
一些英文审稿意见的模板最近在审一篇英文稿,第一次做这个工作,还有点不知如何表达。
幸亏遇上我的处女审稿,我想不会枪毙它的,给他一个 major revision 后接收吧。
呵呵网上找来一些零碎的资料参考参考。
+++++++++++++++++++++++++++++++1、目标和结果不清晰。
It is noted that your manuscript needs careful editing by someone with expertise in technical English editing paying particular attention to English grammar, spelling, and sentence structure so that the goals and results of the study are clear to the reader.2、未解释研究方法或解释不充分。
In general, there is a lack of explanation of replicates and statistical methods used in the study.Furthermore, an explanation of why the authors did these various experiments should be provided.3、对于研究设计的 rationale:Also, there are few explanations of the rationale for the study design.4、夸张地陈述结论/夸大成果/不严谨:The conclusions are overstated. For example, the study did not show if the side effects from initial copper burst can be avoid with the polymer formulation.5、对 hypothesis 的清晰界定:A hypothesis needs to be presented。
自动化专业英语
![自动化专业英语](https://img.taocdn.com/s3/m/1bc35549fe4733687e21aae6.png)
intrinsic adj. 内在的
circuitry n. 电路
transistor n. 晶体管
semiconductor n. 半导体
dope v. 掺入
predominance n. 优势
crystal n. 晶体
germanium n. 锗
steady-state 稳态
prevent…from doing 使……不……
threshold n. 阈
override v., n. 超过,压倒
converter n. 逆变器,整流器
accelerate v. 加速
saturation n. 饱和
disturbance n. 扰动,干扰
flip-flop n. 触发器
relevance n. 关联
terminology n. 术语
aptness n. 恰当
pilot n. 飞行员
aloft adv. 高高地
cockpit n. 坐舱
deduce v. 演绎
simultaneously adv. 同时地
auto-restoration n. 自动恢复供电
dead substation transfer 故障变电站转移
substation load transfer 变电站负荷转移
load flow 潮流
archive v. 存档
deferment n. 延期,暂缓
responsiveness n. 响应
amplifier n. 放大器
integrated circuit 集成电路
自动控制理论词汇表
![自动控制理论词汇表](https://img.taocdn.com/s3/m/b3e8a2d276eeaeaad1f33013.png)
Glossary for Feedback Control of Dynamic Systems自动控制理论词汇表Chapter 1thermostat n.恒温器predictive control 预测控制power generation plant 发电厂micron n.微米cell phone 移动电话jumbo jet 巨型喷气式客机block diagram 方框图actuator 执行机构process n.过程feedback n.反馈plant n.被控对象mph=mile per houropen-loop 开环closed-loop 闭环throttle n.油门gain n.增益orifice n.孔、小孔controlled variable 被控变量error n.误差incubator n.孵化器flue n.烟道chronicle n.编年史、年代记录conical a.圆锥体的mill wright 技工、造水车工匠inertia n.惯性、惯量oscillate about…在….周围振荡reference input 参考输入prescribed direction 预定的方向actual direction 实际方向flyball n.飞球governor n.控制器、调节器、总督、省长equilibrium n平衡点differencial equation 微分方程characteristicequation 特征方程third-order 三阶polynomial n.多项式state variable 状态变量distortion n.畸变complex variable 复变量methdology n.方法论proportional a. 比例的、成比例的integral a.积分的derivative a.微分的stochastic a.随机的servomechanism n.伺服机构calculus n.微积分ubiquitous a.到处存在的、普遍存在的radar-tracking 雷达跟踪SISO systems 单输入单输出系统Laplace transform 拉普拉斯变换pole n.极点zero n.零点transfer function传递函数trajectory optimization 轨迹优化root locus 根轨迹specifications n.指标、规格、规范discrete-data 离散数据sampled-data 采样数据performance n.性能Chapter 2desired reference variable 期望参考变量prototype n.原型system identification 系统辨识time response 时域响应step input 阶跃输入defer n.推迟、延期vector n.向量、矢量slug n.斯(勒格),质量单位(32.2磅)impart n.赋予、传授、告知heavy line 粗实线dashed line 虚线coordinate n.坐标numerator n.分子denominator n.分母suspension n.悬架、悬挂deflection n.偏移、偏转、偏差displacement n.位移shock absorber 减震器、缓冲器dashpot n.缓冲器bump n. vt.颠簸bounce n. vt.反弹、跳跃moment of inertia 转动惯量、惯性矩attitude n.姿态、姿势antenna n.天线perpendicular n.垂直线 a.垂直的asymmetry a.不对称的torque n.转矩resonant n.谐振、共振damper n.阻尼器prudent a.谨慎的,有远见的,精打细算的anti-alias 抗混频operational amplifer 运算放大器passive circuit 无源电路Kirchhoff’s current law 基尔霍夫电流定律algebraic sum 代数和summer n.加法器integrator n.积分器tesla n.特斯拉(磁通量单位)louderspeaker n.扬声器bobbin线轴,线筒stator n.定子rotor n.转子back emf 反电势maze n.曲径,迷宫specific heat 比热spatially ad.空间地hydraulic a.液压的、水力学的gimbal n.平衡环,万向接头nozzle n.喷嘴grooming n.修饰,美容piston n.活塞porous a.可渗透的,多孔的laminar a.多层的、层流的n.层流turbulent a.湍流的Chapter 3linear time-invariant systems 线性时不变(定常)系统signal flow graph 信号流图simulation n.仿真frequency-response 频率响应superposition n.叠加convolution n.卷积inpulse-response 脉冲响应unit step function 单位阶跃函数root-locus 根轨迹stability properties 稳定性特性principles linear algebra 线性代数原理state variable methods 状态变量法matrix n..矩阵nonlinear n.非线性mathematical mode 数学模型trivial a.琐碎的、不重要的linearize vt.线性化operating point 工作点state-space 状态空间partial differential equations 偏微分方程equilibrium n.平衡点complex frequency variables 复频率变量zero initial conditions 零初始条件steady-state 稳态ramp input 斜坡输入dc gain 直流增益inverse Laplace transform 逆拉氏变换partial fraction expansion 部分分式展开rantional a.有理的residue n.余式unilateral a.单边的convergence n.收敛final-value theorem 终值定理homogeneous differential equation 齐次微分方程ordinary differential equation 常微分方程overall transfer function 总的传递函数“loading” effect 负载效应cascade blocks 方框串联(级联)to reduce 化简eliminating 消去equivalent a.等效的simplification n.化简、简化integrodifferential a.积分-微分的time constant 时间常数imaginary axis 虚轴damping ratio n.阻尼比natural undamped frequency 自然无阻尼频率overdamped a.过阻尼critically damped n.临界阻尼rectangular coordinate 直角坐标oscillatory a.振荡的transient response 瞬态响应overshoot n.超调量delay time 延迟时间peak time 峰值时间rise time 上升时间settling time 调节时间steady state 稳态characteristic equation 特征方程RHP(Right Half-Plane) 右半平面elevator n.飞机升降舵,飞机升降仪,电梯nonminimum-phase 非最小相位diverge v.发散、分歧asymptotically stable 渐进稳定stability n.稳定性absolute stability 绝对稳定性relative stability 相对稳定性stability criterion 稳定性判据equilibrium state 平衡状态product n.乘积coefficient n..系数nagtive feedback 负反馈positive feedback 正反馈unity feedback system 单位负反馈系统reduction n.化简simultaneous a.联立的common factor 公因子expedient a.权宜的,有用的attenuate v.变弱,衰减,变细,变薄,稀释cofactor n.公因子Routh stability criterion 劳斯稳定性判据determinant n. 行列式tune v.调节retune v.再调节pseudorandom-noise 伪随机噪声signal-to-noise ratio 信-噪比Mason Gain Formula 梅森(增益)公式term n.术语signal flow graph 信号流图nodepathenvelope n.包络线dominant root 主导极点Chapter 4steady-state 稳态with respect to 关于….deviation n.偏离steady-state error 稳态误差load torque 负载转矩viscous friction 粘性摩擦repeater n.中继器drift v.漂移fidelity n.准确性,忠实,忠诚parabolic antenna 抛物线天线position error constant. 位置误差常数velocity error constant 速度误差常数robust property 鲁棒性shaft n.轴tachometer n.转速计inductance n.电感sampled v.采样quantized v.量化extrapolate v.预测,推测trapezoid n.梯形,不等边四边形vertices n.顶点order n.阶次,数量级proportional control 比例控制derivative control 微分控制sinusoidal a.正弦parameter n.参数Chapter 5root-locus method 根轨迹法monic a.首一的feedforward a.前向的denominator n.分母numerator n.分子quadratic n.二次项branch n.分支factored a.分解的asymptote vt.渐进n.渐进线division n.除法vantage point 有利地位,观点imaginary part 虚部breakaway point 分离点common denominator 公分母conjugate pairs 共扼对multiplicity n.多重,多数trial and error 凑试(法)spirule n.螺旋尺intersection n.交汇symmetrical a.对称的magnitude condition 幅值条件angle condition 相角条件phase condition 相角条件origin n.起始点terminus n.终点angle of departure 分离角、出发角angle of arrival汇合角、到达角cubic a.三阶的、立方的quartic a.四次的remainder n.留数、余数remainder theorem 留数定理taking the limit 取…极限synthetic division 综合除法dominant root 主导根compensator n.补偿器azimuth n.地位角、地平经度inertial guidance 惯性导航constant term 常数项symmetrical with respect to 关于…对称trial point 试验点terminate vt.终止于first differentiate 一阶微分real parts实部imaginary part 虚部lag compensator 滞后补偿器lead compensator 超前补偿器spill over 溢出,无法容纳autopilot n.自动导航trim v.n.使整齐,微调trim tab 平衡调整片margin n.裕量iteration n.重复、循环、迭代intact a.完好无缺的,原封不动的Chapter 6frequency response 频率响应rendered v.使成为,提供,报答,着色; 执行ratio of the magnitudes 幅值比bandwidth n.带宽resonant peak 谐振峰值low-pass filter低通滤波器sanity n.神智健全,头脑清楚,健全tangent n.正切、切线reciprocal a.互补的,相互的,互惠的phase difference 相角差transport lag 传输延迟irrational factor 非有理因子phase shift 相位移动moduli n.模(复数)poke vt.戳、刺、捅drudgery n.苦工、单调乏味的工作logarithmic coordinate 对数坐标semilog n.半对数decibel n.分贝decade n.十倍量程octave n.八倍频程、八度、八阶asymptotic behavior 渐进行为dotted n.虚线break frequency 转折频率corner frequency 转折频率slope n.斜率20dB/decade 20分贝/十倍频程superimpose vt.迭加polar plot 极坐标图pass function 旁路函数servomotor-amplifier 伺服电机-放大器angular velocity 角速度minimum phase 最小相位tilt angle 倾斜角lateral force 侧面力、横向力perceived velocity 可察觉的速度croseover frequency 穿越频率appendage n.附件、备件Nyquist criterion 奈奎斯特判据Semi-graphical 半图形Nyquist plot 奈奎斯特图Bode diagram 伯德图positive real part 正实部necessary and sufficient condition 充分必要条件left half of the s-plane s平面左半平面formidable a. 可怕的、令人生畏的determinant 行列式pole-zero cancellation 零极点相消rational functions 有理函数quotient n. 商、份额multi-loop control system 多环控制系统encircled vt. 环绕enclosed vt. 包围closed path 闭合路径counterclockwise a.逆时针的clockwise a.顺时针的encirclement n. 环绕enclosure n. 包围contour n.围线,轮廓线argument principle 幅角原理complex variable 复变量single-valued rational function 单值有理函数analytic a.解析的Nyquist path 奈奎斯特路径singularity n.奇异(点、值)semicircle n.半圆artifice n.技巧、技能gain margin 增益裕量phase margin 相角裕量vicinity n.邻近compromise n.折中,妥协trapezoidal a.梯形的iterate v.重复、循环、迭代bracket v.放在括号内,归入一类,包含octave n.八个一组的事物,八度enumerate v.数,点detrimental a.有害的,不利的threshold n.阈值Chapter 8sampling n.采样sample period 采样周期aliasing n.混频,别名inherent a.内在的z transform Z变换radar tracking system 雷达跟踪系统discrete period 离散周期discrete equivalent 离散等效digitization n.数字化recursive a.递归的,循环的difference equation 差分方程sample rate 采样速率sampler 采样器zero-order holder 零阶保持器inverse Z transform 反Z变换、逆Z变换long division 长除法unit circle 单位圆overlap n.重叠rephrase v.重新措辞,改述extrapolate v.预测,推测alleviate v.减轻,使 ... 缓和judicious a.明智的,贤明的,审慎的fictitious a.假想的,虚伪的impulse transfer function 脉冲传递函数piecewise-continuous 分段连续的pseudo-continuous-time 准连续时间Pade approximation Pade 近似Fourier analysis 傅立叶分析modulation n.调制Fourier transform 傅立叶变换spurious a.寄生的、伪的、假的ideal sampler 理想采样器impulse train 脉冲列、脉冲串transcendental a.超自然的、超常的rational function 有理函数closed form 封闭形式degree n.阶denominator n 分母numerator n 分子initial value 初始值identical a.相等的starred a.打星号的impulse response transfer function 脉冲响应传递函数uniformly spaced 均匀分布map into 影射、映射circles of radius 圆弧multiple-sheeted surfaceRiemann surface 黎曼曲面radial ray 射线by virtue of 借助、凭借、依靠….(的力量)logarithmic spiral 对数螺旋intersection n.相交power series 幂级数sampling instant 采样时刻natural logarithm 自然对数rationalizing 有理化cascading property 串联(级联)特性attenuation factor 衰减因子warp vt.使弯曲、使变形tune vt.调节、调整cross-hatched vt.用交叉线画出(图画上)阴影performance specification 性能指标trial-and-error approach 试凑法bilinear n.双线性Chapter 9equilibrium point 平衡点neighborhood n.邻域saturate n.饱和robotic n.机器人学heuristic a.启发式的,搜索式的sinusoidal a.正弦的sinusoid n.正弦harmonic a.谐波的describing-function 描述函数static nonlinearity 静态非线性dynamic nonlinearity. 动态非线性periodic response 周期响应phase-plane 相平面catastrophe n.灾难、浩劫shaky a.不稳定的,不可靠的scalar function 标量函数Liapunov function 李亚普诺夫函数linearization n.线性化inverse nonlinearity 可逆非线性perturbation n.摄动operating point 工作点eigenvalue n.特征值bearing n.轴承levitate v.浮动,使漂浮,使悬浮turbo n.汽轮机deviation n.偏差rigid link 刚性连接regime n.情形,体制dead-zone 死区viscous friction 粘性摩擦coulomb friction 库仑摩擦relay n.继电(特性)limit cycle 极限环deflect v.使偏,使歪windup n.终结,结束akin a.同类的,相似的odd function 奇函数backlash n.齿轮间隙magnetic hysteresis 磁滞coincident a.重合的,一致的on/off system 通断(控制)系统superposition n. 迭加sub-harmonic a.谐波的magnetic flux 磁通iron-cored coil 铁芯线圈stiction n. 静摩擦力autonomous a.自治的hypersphere n. 超球stability in the sense of Liapunov 李亚普诺夫意义下的稳定性asymptotically stable 渐进稳定monotonically stable 单调稳定origin n. 原点globally stable 全局稳定locally stable 局部稳定electronic oscillator 电子谐振器Van der Pol’s differential equation 范德波尔微分方程nonsinusoidal waveform 非正弦波形rated voltage 额定电压phase variable 相变量phase portrait 相图perpendicular a. 垂直的、正交的、成直角的Taylor series 泰勒级数increment n.增量Euler method 欧拉法singular point 奇异点。
Draft Guidance for Industry and Food and Drug Administration Staff
![Draft Guidance for Industry and Food and Drug Administration Staff](https://img.taocdn.com/s3/m/f6450688cc22bcd126ff0cb3.png)
Draft Guidance for Industry and 1 Food and Drug Administration2 Staff3 45 eCopy Program for Medical Device6 Submissions78 DRAFT GUIDANCE910 This guidance document is being distributed for comment purposes only.11 Document issued on: [use release date of FR Notice]1213 You should submit comments and suggestions regarding this draft document within 30 days of 14 publication in the Federal Register of the notice announcing the availability of the draft guidance. 15 Submit written comments to the Division of Dockets Management (HFA-305), Food and Drug 16 Administration, 5630 Fishers Lane, rm. 1061, Rockville, MD 20852. Submit electronic17 comments to . Identify all comments with the docket number listed in 18 the notice of availability that publishes in the Federal Register . 1920 For questions regarding this document, contact the Premarket Notification (510(k)) Section or 21 the Premarket Approval Section of CDRH at 301-796-5640 or CBER’s Office of 22 Communication, Outreach and Development at 1-800-835-4709 or 301-827-1800. 23 2425262728U.S. Department of Health and Human Services 29 Food and Drug Administration 30 Center for Devices and Radiological Health 31 Center for Biologics Evaluation and Research32Preface3334Additional Copies3536Additional copies are available from the Internet. You may also send an e-mail request to37dsmica@ to receive an electronic copy of the guidance or send a fax request to 301-38827-8149 to receive a hard copy. Please use the document number (1797) to identify the39guidance you are requesting.4041Additional copies of this guidance document are also available from the Center for Biologics42Evaluation and Research (CBER), Office of Communication, Training and Manufacturers43Assistance (HFM-40), 1401 Rockville Pike, Suite 200N, Rockville, MD 20852-1448, or by44calling 1-800-835-4709 or 301-827-1800, or from the Internet at45/BiologicsBloodVaccines/GuidanceComplianceRegulatoryInformation/defau 46lt.htm.4748Table of Contents491.Introduction (1)502.What is an eCopy? (2)513.Are differences between the contents of an eCopy and paper submission acceptable? 2 524.For what submission types would an eCopy be required? (3)535.What submission types would FDA consider exempt from submission of an eCopy? .4 546.What submission types or applicants should be eligible for an eCopy waiver? (4)557.How many copies of a submission would be needed? (4)568.What are the processing steps for an eCopy? (5)57a. What are the standards for an eCopy? (5)58b. How do I know if my eCopy meets FDA’s standards for acceptance?? (6)59c. What if there is another processing party involved? (6)60d. How do you submit an eCopy to FDA? (6)61e. How does FDA process an eCopy? (7)629.What if your device is regulated by CBER? (7)63a. Will the new eCopy Program apply? (7)64b. Can you submit an electronic submission instead? (7)65c. How do you prepare and submit an electronic submission to CBER? (8)66Attachment 1 –Standards for eCopies (7)67A. Cover Letter that accompanies an eCopy (10)68B. Volume versus non-volume structure (11)69C. Folder naming convention for volume-based submissions that house PDF files (13)70D. Adobe Acrobat PDF file format (14)71E. Non-PDF file formats (15)72F. PDF file naming convention (16)73G. PDF file size limit (17)74H. Creating a PDF version from the source document (17)75I. Bookmarks and hypertext links within PDFs (20)76J. PDFs created from scanning paper documents (21)77K. Common mistakes in creating an eCopy (22)7879Guidance for Industry and Food and Drug 80Administration Staff8182eCopy Program for Medical Device83Submissions84851.Introduction86The purpose of this guidance is to explain the new electronic copy (eCopy) Program for medical 87device submissions. At this time, submission of an eCopy of a medical device submission is88voluntary. However, section 745A(b) of the Federal Food, Drug, and Cosmetic Act (FD&C89Act), added by section 1136 of the Food and Drug Administration Safety and Innovation Act90(FDASIA) (Pub. L. 112-144), requires the submission of eCopies after this guidance is finalized.91This draft guidance describes how the Food and Drug Administration (FDA) plans to implement 92the eCopy Program under section 745A(b) of the FD&C Act. The inclusion of an eCopy is93expected to improve the efficiency of the review process by allowing for the immediate94availability of an electronic version for review rather than relying solely on the paper version.9596This draft guidance provides, among other things, the standards for a valid eCopy under section 97745A(b)(2)(A) of the FD&C Act. In accordance with section 745A(b), following the issuance of98a final guidance on this topic, submission types identified in the final guidance must include an99eCopy in accordance with the standards provided by this guidance for the submission to be100processed and accepted for review by FDA. Submissions submitted without an eCopy and101eCopy submissions that do not meet the standards provided in this guidance will be placed on 102hold until a valid eCopy is submitted to FDA and verified to meet the standards, unless a waiver 103or exemption has been granted. While the submission is on hold, the review clock will not104begin.105106In Section 745A(b), Congress granted explicit statutory authorization to FDA to implement the 107statutory eCopy requirement by providing standards, criteria for waivers, and exemptions in108guidance. Accordingly, to the extent that this document provides such requirements under109section 745A(b) of the FD&C Act (i.e., standards, criteria for waivers, and exemptions),110indicated by the use of the words must or required,this document is not subject to the usual111restrictions in FDA’s good guidance practice (GGP) regulations, such as the requirement that 112guidances not establish legally enforceable responsibilities. See 21 CFR 10.115(d).113114However, this document also provides guidance on FDA’s interpretation of the statutory eCopy 115requirement and the Agency’s current thinking on the best means for implementing other aspects 116of the eCopy program. Therefore, to the extent that this document includes provisions that are 117not “standards,” “criteria for waivers,” or “exemptions” under section 745A(b)(2), this document 118does not create or confer any rights for or on any person and does not operate to bind FDA or the 119public, but will represent the Agency’s current thinking on this topic when finalized. The use of 120the word should in such parts of this guidance means that something is suggested or121recommended, but not required. You can use an alternative approach if the approach satisfies 122Draft – Not for Implementationthe requirements of the applicable statutes and regulations. If you want to discuss an alternative 123approach, contact the FDA staff responsible for implementing this guidance. If you cannot124identify the appropriate FDA staff, call the appropriate number listed on the title page of this125guidance.126127To comply with the GGP regulations and make sure that regulated entities and the public128understand that guidance documents are nonbinding, FDA guidances ordinarily contain standard 129language explaining that guidances should be viewed only as recommendations unless specific 130regulatory or statutory requirements are cited. FDA is not including this standard language in 131this draft guidance because it is not an accurate description of all of the effects of this guidance, 132when finalized. This guidance, when finalized, will contain both binding and nonbinding133provisions. Insofar as this guidance, when finalized, provides “standards,” “criteria for waivers,” 134and “exemptions” pursuant to section 745A(b) of the FD&C Act, it will have binding effect. For 135these reasons, FDA is not including the standard guidance language in this draft guidance.136137The eCopy Program is not intended to impact (reduce or increase) the type or amount of data the 138applicant1 includes in a submission to support clearance or approval. Please refer to other FDA 139device or program-specific guidance documents from CDRH140(/MedicalDevices/DeviceRegulationandGuidance/GuidanceDocuments/defau 141lt.htm) and CBER142/BiologicsBloodVaccines/GuidanceComplianceRegulatoryInformation/Guida 143nces/General/ucm214106.htm) for the appropriate contents for submissions.1441452.What is an eCopy?146An electronic copy (eCopy) is defined as an exact duplicate of the paper submission, created and 147submitted on a compact disc (CD), digital video disc (DVD), or in another electronic media148format that FDA has agreed to accept, accompanied by a copy of the signed cover letter and the 149complete original paper submission.21501513.Are differences between the contents of an eCopy and152paper submission acceptable?153While an eCopy is defined as an exact duplicate of the paper copy, there are limited cases in154which differences between the eCopy and the paper copy may be justified because a paper copy 155is not practical or appropriate for analysis purposes (e.g., raw data and statistical analysis156programs,3 data line listings to facilitate a bioresearch monitoring review) or is not feasible (e.g., 157videos, x-rays). The critical attribute of an eCopy is that it must include in electronic form all 1581 For the purposes of this guidance, applicant includes “submitter,” “sponsor,” or “holder.”2 An eCopy is not considered to be an electronic submission. For information on eSubmissions, refer to “FDAeSubmitter” (/ForIndustry/FDAeSubmitter/default.htm) and “Regulatory Submissions inElectronic Format for Biologic Products”(/BiologicsBloodVaccines/DevelopmentApprovalProcess/ucm163685.htm).3 For information on electronically submitted data, refer to “Clinical Data for Premarket Submissions”(/MedicalDevices/DeviceRegulationandGuidance/HowtoMarketYourDevice/PremarketSubmissi ons/ucm136377.htm).Draft – Not for Implementationdata required for that submission type.4 In other words, the eCopy must include all of the159required information for FDA review, whereas the paper copy can include a page cross-160referencing the location of certain information in the eCopy.161162The cover letter must contain the eCopy statement described in Attachment 1 and describe any 163differences between the paper version and the eCopy. The paper version must also have a164placeholder (e.g., a piece of paper printed with the appropriate section title or a divider165appropriately cross-labeled to the table of contents) that cross-references the eCopy to indicate 166that there are additional data/information in the eCopy and where in the eCopy that information 167is located.168169FDA will consider the eCopy loaded into the appropriate Center’s official document repository 170to be the official record. Any undisclosed differences between the eCopy and the paper version 171may need to be rectified and could delay the review of the submission.1721734. For what submission types is an eCopy required?174Once FDA finalizes this guidance, section 745A(b) of the FD&C Act, as added by section 1136 175of FDASIA, will require an eCopy for the following submission types5:176•Premarket notification submissions (510(k)s), including third party 510(k)s;177•Evaluation of automatic class III designation petitions (de novos);178•Premarket approval applications (PMAs)6;179•Modular PMAs;180•Transitional PMAs;181•Product development protocols (PDPs);182•Investigational device exemptions (IDEs);183•Humanitarian device exemptions (HDEs), including Humanitarian Use Device184designation requests (HUDs);185•Certain investigational new drug applications (INDs)7;186•Certain biologics license applications (BLAs)8; and187•Pre-Submissions9.1884 For example, the content requirements for a 510(k) submission are found in 21 CFR 870.87 and 807.92; those fororiginal PMA submissions are found in 21 CFR 814.20.5 Although not subject to the eCopy legislation, FDA accepts and strongly encourages eCopies for Master AccessFiles (“MAF” submissions), 513(g) Requests for Classification (“C” submissions), and Clinical LaboratoryImprovement Act (CLIA) Categorization – Exempt Device submissions (“X” submissions). If you choose to submit an eCopy, it must meet the standards outlined in Attachment 1.6 This includes all PMA submission types, including, but not limited to, original PMAs, panel-track supplements,180-day supplements, manufacturing site change supplements, and post-approval study supplements.7 Applicable only to those devices regulated by CBER that are also biologics under section 351 of the Public HealthService (PHS) Act and that also require submission of an IND prior to submission of a BLA. Such devices aregenerally those intended for use in screening donated blood for transfusion transmissible diseases.8 Applicable only to those devices regulated by CBER that are also biologics under Section 351 of the PHS Act,including those that do not require submission of an IND prior to the submission of the BLA. Such devicesgenerally include those reagents used in determining donor/recipient compatibility in transfusion medicine inaddition to those for use in screening blood for transfusion transmissible diseases.9 Refer to the draft guidance entitled, “Medical Devices: The Pre-Submission Program and Meetings with FDAStaff” (/MedicalDevices/DeviceRegulationandGuidance/GuidanceDocuments/ucm310375.htm).Draft – Not for Implementation189eCopies for all subsequent submissions to an original submission, including amendments,190supplements, and reports10 to the submission types identified above would also be required even 191if the original was submitted to FDA prior to implementation of the eCopy requirement.1921935.What submission types does FDA consider exempt from 194submission of an eCopy?195Due to the potential urgent nature of the following types of submissions, FDA considers these to 196be exempt from the requirement for an eCopy:197•Compassionate use IDE submissions;198•Emergency use IDE submissions11; and199•Emergency Use Authorizations (EUAs)12.200201However, we encourage you to submit eCopies of these submissions, when feasible, in order to 202facilitate the review process. In addition, this exemption would not preclude you from sending 203in pertinent electronic information, such as imaging data, as supporting information for these 204submission types when an eCopy is not submitted.2052066.What submission types or applicants are eligible for an207eCopy waiver?208FDA believes that, given the widespread availability of software to enable the creation of an209acceptable eCopy at little to no cost, all applicants should have the ability to provide an eCopy. 210Therefore, at this time, FDA does not anticipate the need for waivers, except as described in211Section 9.2122137.How many copies of a submission are needed?214The eCopy Program would not change the overall number of copies to submit to FDA. Upon 215finalization of this guidance document, an eCopy (with a signed cover letter) will serve as one of 216the required number of copies for the various submission types. (See Table 1 below.) FDA will 217accept additional eCopies (each with a signed cover letter) in lieu of additional paper copies as 218long as at least one paper copy is submitted along with the eCopy and the total number of219required copies remains the same.22022110 Reports include all reports submitted to an applicable submission type, including annual/periodic and post-approval reports. Section 745A(b) of the FD&C Act does not apply to Medical Device Reports submitted under 21 CFR Part 803 .11 Please refer to CDRH’s device advice page entitled “IDE Early/Expanded Access”(/MedicalDevices/DeviceRegulationandGuidance/HowtoMarketYourDevice/InvestigationalDevi ceExemptionIDE/ucm051345.htm#compassionateuse) and FDA’s “Guidance on IDE Policies and Procedures”(/MedicalDevices/DeviceRegulationandGuidance/GuidanceDocuments/ucm080202.htm) for additional details on compassionate and emergency use IDE submissions.12 Refer to the guidance entitled, “Emergency Use Authorization of Medical Products”(/RegulatoryInformation/Guidances/ucm125127.htm) for more information on EUAs.Draft – Not for ImplementationFor submission types for which only two copies are required to be submitted, one must be an 222eCopy and the other must be a paper copy. For submission types requiring more than two223copies, this policy would allow additional flexibility in how the application is submitted. For 224example, for an original PMA, you would submit: (1) one eCopy and five paper copies; (2) five 225eCopies and one paper copy; or (3) any other combination that results in six total copies as long 226as there is at least one eCopy and one paper copy.227228Table 1, provides the total number of copies to be submitted to FDA. As explained above, you 229must submit at least one eCopy and one paper submission. The format for the remaining copies 230(i.e., eCopy or paper) is your choice.231232Table 1 – Number of Copies for Submission233Submission Type Total Number ofCopies510(k)s 213Third Party 510(k)s 213Original PMAs and Panel-Track Supplements 614Other PMA supplement types 315PMA reports 2Modular PMAs 3HDEs Same as PMAs,16except for HUDdesignationrequests, whichrequire two.17PDPs Same as PMAsIDEs 318INDs 319BLAs 3Pre-Submissions 32348.What are the processing steps for an eCopy?235Below are the processing steps for the submission and acceptance of an eCopy.236237a.What are the standards for an eCopy?238With regard to the standards for an eCopy submitted to FDA, please refer to Attachment 2391. Because an eCopy cannot be accepted by our eCopy loading system if it does not meet 240the standards, you should carefully review this information.24124213 See 21 CFR 807.90(a)(3)(c).14 See 21 CFR 814.20(b)(2).15 See 21 CFR 814.39(c).16 See 21 CFR 814.104(b)(4).17 See 21 CFR 814.102(d).18 See 21 CFR 812.20(a)(3).19 See 21 CFR 312.23(d).b.How do I know before submission whether my eCopy meets FDA’s243standards for acceptance?244To confirm that your eCopy will meet FDA’s standards, we strongly encourage you to 245use the new free eSubmitter-eCopies tool available on FDA’s website at246/ForIndustry/FDAeSubmitter/ucm317334.htm. One of the benefits of 247utilizing the eSubmitter-eCopies tool is that it creates an eCopy in real-time that is248consistent with the standards. Use of the eSubmitter-eCopies tool is intended to prevent 249delays in review of your submission due to the need to resolve technical issues.250Although it is highly encouraged, you will not be required to utilize the eSubmitter-251eCopies tool and may choose to skip the eSubmitter step.252253Should you have any technical questions when generating your eCopy, please contact 254cdrhesub@ prior to submission of the eCopy to FDA.255256c.What if there is another processing party involved?257In the case that another party (e.g., law firm, consultant) submits a submission on behalf 258of an applicant, the eCopy must still meet the standards for an eCopy in order to be259successfully processed whether accomplished by you (the applicant) or the submitting 260party. While the applicant may or may not include their own cover letter as part of the 261eCopy, our standards require that the submitting party include a signed cover letter with 262an eCopy statement, as described in Attachment 1.263264In the case of Third Party 510(k)s, two separate CDs comprise the eCopy. The first CD 265includes the applicant’s submission and should be clearly marked as such. The contents 266of the CD must include a cover letter with an eCopy statement, as described in267Attachment 1, that the applicant has provided. The second CD includes the Accredited 268Person’s review records and should be clearly marked as such. The Accredited Person is 269responsible for ensuring that the CDs meet the standards in Attachment 1 for an eCopy. 270In addition, the Accredited Person is responsible for providing a signed cover letter that 271includes an eCopy statement, as described in Attachment 1, that speaks to both: (1) the 272Accredited Person’s portion of the eCopy and (2) the presence of the eCopy statement 273provided by the applicant. It is not sufficient for the Accredited Person to address only 274one of these two eCopy statement issues in their cover letter.275276d.How do you submit an eCopy to FDA?277An eCopy is submitted simultaneously with the paper submission(s). First, attach the 278signed cover letter with the eCopy statement to your eCopy. Then attach this eCopy279package to the paper submission(s) and send them to CDRH’s or CBER’s Document280Control Center20 (DCC). An eCopy that is sent to the DCC without a cover letter and 281accompanying paper submission(s) will be placed on hold.282283If more than one eCopy is to be submitted, then you must attach a signed cover letter as 284described above to each additional eCopy.28528620 Refer to 21 CFR 807.90 for the DCC addresses for CDRH and CBER.e.How does FDA process an eCopy?287If an eCopy passes the validation check, the cover letter and eCopy contents will be288loaded into the appropriate Center’s official submission repository.289290If an eCopy fails the validation check (i.e., is rejected), we will notify you in writing291(e.g., by email or fax) of the reason(s). The notification will describe the logistics for 292submitting a replacement eCopy, including how to properly mark it as a replacement293eCopy, the address to which to send it, and the submission number to write on it. It is 294important that you follow these directions to avoid delays in processing the replacement 295eCopy. The submission will be placed on hold until a valid replacement eCopy is296submitted to FDA and verified to meet the standards.2972989.What if your device is regulated by CBER?299a.Will the new eCopy Requirement apply?300Yes, unless your submission is an entirely electronic submission exempted under this 301guidance, as described below. Upon implementation of the statutory requirement, all 302medical device submission types listed in Section 4 must be accompanied by an eCopy 303regardless of the Center in FDA in which the submission will be reviewed unless the304requirement is waived or exempted. Accordingly, submissions for devices subject to 305review under the FD&C Act and submitted by filing paper copies with CBER’s DCC 306must be accompanied by an eCopy, except where exempted as described below.307308While many submissions made to CBER are still in paper format and require submission 309of multiple copies, CBER is also currently able to receive and manage submissions that 310are entirely electronic.311312Submissions for devices that are subject to licensure under the Public Health Service313(PHS) Act, including biologics license applications and supplements, investigational new 314drug applications, and EUAs and pre-submissions for these devices, may be submitted as 315entirely electronic submissions as detailed in sections 9b and 9c below. FDA will316exempt such entirely electronic submissions from the eCopy requirement.317318FDA additionally waives the eCopy requirement to submit paper copies of any entirely 319electronic submission made to CBER. Accordingly, entirely electronic submissions that 320comply with CBER guidance identified in Section 9.c. below do not need to be321accompanied by paper copies.322323b.Can you submit an electronic submission instead?324Yes, and there are several advantages for both industry and for CBER staff when you 325choose to make submissions electronically.326327The main advantage to you is in the financial savings that will likely result. The costs 328associated with printing, binding, labeling, and shipping multiple paper copies can be 329significant, especially for submissions that contain a great deal of supporting330Draft – Not for Implementationdocumentation. Likewise, we anticipate that FDA will recognize financial savings in that 331FDA avoids the costs associated with tracking, routing, and storing large amounts of332paper when you choose to submit electronically.333334Another advantage with the use of the electronic submission process is that all parties 335involved in the submission and review are referencing the same document – the336electronic one. There is no question about whether the paper copy is an exact copy of the 337eCopy. Electronic submissions may also reduce the need for reviewers to request re-338submission of previously submitted information due to an inability to read or interpret the 339information on the paper copy, as sometimes occurs when documents are photocopied. 340341c.How do you prepare and submit an electronic submission to CBER?342CBER has several resources available to applicants who choose to submit electronic343submissions as outlined in the document “Regulatory Submissions in Electronic Format 344for Biologic Products.”345(/BiologicsBloodVaccines/DevelopmentApprovalProcess/ucm163685 346.htm). Thus, specific details are available in the cited references and will not be repeated 347in this guidance.348349For devices that are regulated under the PHS Act and require the submission of a BLA, 350consult the guidance document entitled “Providing Regulatory Submissions to the Center 351for Biologics Evaluation and Research (CBER) in Electronic Format - Biologics352Marketing Applications”353(/downloads/BiologicsBloodVaccines/GuidanceComplianceRegulator 354yInformation/Guidances/General/UCM192413.pdf) for details on preparing your355electronic submission. Note that certain sections of this guidance, for example, those on 356pharmacology and toxicology, are generally not pertinent to licensed devices.357358For guidance on preparing electronic submissions for other device submissions (e.g.,359510(k)s, PMAs) sent to CBER, please see “Guidance for Industry: Providing Regulatory 360Submissions in Electronic Format - General Considerations”361(/downloads/Drugs/GuidanceComplianceRegulatoryInformation/Guidances 362/UCM072390.pdf) and “CBER SOPP 8110: Submission of Paper Regulatory363Applications to CBER”364(/BiologicsBloodVaccines/GuidanceComplianceRegulatoryInformati 365on/ProceduresSOPPs/ucm079467.htm), which includes information about providing366electronic copies to CBER.367368We are currently developing additional, updated guidance for other electronic369submissions sent to CBER and have issued a revised, updated draft guidance document 370for comment entitled, “Draft Guidance for Industry: Providing Regulatory Submissions 371in Electronic Format-General Considerations”372(/RegulatoryInformation/Guidances/ucm124737.htm). When373finalized, this document will provide an additional resource for applicants preparing374electronic submissions.375376。
Indradrive 系列 故障代码
![Indradrive 系列 故障代码](https://img.taocdn.com/s3/m/4db152b065ce0508763213ca.png)
Error MessagesF9001 Error internal function call.F9002 Error internal RTOS function callF9003 WatchdogF9004 Hardware trapF8000 Fatal hardware errorF8010 Autom. commutation: Max. motion range when moving back F8011 Commutation offset could not be determinedF8012 Autom. commutation: Max. motion rangeF8013 Automatic commutation: Current too lowF8014 Automatic commutation: OvercurrentF8015 Automatic commutation: TimeoutF8016 Automatic commutation: Iteration without resultF8017 Automatic commutation: Incorrect commutation adjustment F8018 Device overtemperature shutdownF8022 Enc. 1: Enc. signals incorr. (can be cleared in ph. 2) F8023 Error mechanical link of encoder or motor connectionF8025 Overvoltage in power sectionF8027 Safe torque off while drive enabledF8028 Overcurrent in power sectionF8030 Safe stop 1 while drive enabledF8042 Encoder 2 error: Signal amplitude incorrectF8057 Device overload shutdownF8060 Overcurrent in power sectionF8064 Interruption of motor phaseF8067 Synchronization PWM-Timer wrongF8069 +/-15Volt DC errorF8070 +24Volt DC errorF8076 Error in error angle loopF8078 Speed loop error.F8079 Velocity limit value exceededF8091 Power section defectiveF8100 Error when initializing the parameter handlingF8102 Error when initializing power sectionF8118 Invalid power section/firmware combinationF8120 Invalid control section/firmware combinationF8122 Control section defectiveF8129 Incorrect optional module firmwareF8130 Firmware of option 2 of safety technology defectiveF8133 Error when checking interrupting circuitsF8134 SBS: Fatal errorF8135 SMD: Velocity exceededF8140 Fatal CCD error.F8201 Safety command for basic initialization incorrectF8203 Safety technology configuration parameter invalidF8813 Connection error mains chokeF8830 Power section errorF8838 Overcurrent external braking resistorF7010 Safely-limited increment exceededF7011 Safely-monitored position, exceeded in pos. DirectionF7012 Safely-monitored position, exceeded in neg. DirectionF7013 Safely-limited speed exceededF7020 Safe maximum speed exceededF7021 Safely-limited position exceededF7030 Position window Safe stop 2 exceededF7031 Incorrect direction of motionF7040 Validation error parameterized - effective thresholdF7041 Actual position value validation errorF7042 Validation error of safe operation modeF7043 Error of output stage interlockF7050 Time for stopping process exceeded8.3.15 F7051 Safely-monitored deceleration exceeded (159)8.4 Travel Range Errors (F6xxx) (161)8.4.1 Behavior in the Case of Travel Range Errors (161)8.4.2 F6010 PLC Runtime Error (162)8.4.3 F6024 Maximum braking time exceeded (163)8.4.4 F6028 Position limit value exceeded (overflow) (164)8.4.5 F6029 Positive position limit exceeded (164)8.4.6 F6030 Negative position limit exceeded (165)8.4.7 F6034 Emergency-Stop (166)8.4.8 F6042 Both travel range limit switches activated (167)8.4.9 F6043 Positive travel range limit switch activated (167)8.4.10 F6044 Negative travel range limit switch activated (168)8.4.11 F6140 CCD slave error (emergency halt) (169)8.5 Interface Errors (F4xxx) (169)8.5.1 Behavior in the Case of Interface Errors (169)8.5.2 F4001 Sync telegram failure (170)8.5.3 F4002 RTD telegram failure (171)8.5.4 F4003 Invalid communication phase shutdown (172)8.5.5 F4004 Error during phase progression (172)8.5.6 F4005 Error during phase regression (173)8.5.7 F4006 Phase switching without ready signal (173)8.5.8 F4009 Bus failure (173)8.5.9 F4012 Incorrect I/O length (175)8.5.10 F4016 PLC double real-time channel failure (176)8.5.11 F4017 S-III: Incorrect sequence during phase switch (176)8.5.12 F4034 Emergency-Stop (177)8.5.13 F4140 CCD communication error (178)8.6 Non-Fatal Safety Technology Errors (F3xxx) (178)8.6.1 Behavior in the Case of Non-Fatal Safety Technology Errors (178)8.6.2 F3111 Refer. missing when selecting safety related end pos (179)8.6.3 F3112 Safe reference missing (179)8.6.4 F3115 Brake check time interval exceeded (181)Troubleshooting Guide | Rexroth IndraDrive Electric Drivesand ControlsI Bosch Rexroth AG VII/XXIITable of ContentsPage8.6.5 F3116 Nominal load torque of holding system exceeded (182)8.6.6 F3117 Actual position values validation error (182)8.6.7 F3122 SBS: System error (183)8.6.8 F3123 SBS: Brake check missing (184)8.6.9 F3130 Error when checking input signals (185)8.6.10 F3131 Error when checking acknowledgment signal (185)8.6.11 F3132 Error when checking diagnostic output signal (186)8.6.12 F3133 Error when checking interrupting circuits (187)8.6.13 F3134 Dynamization time interval incorrect (188)8.6.14 F3135 Dynamization pulse width incorrect (189)8.6.15 F3140 Safety parameters validation error (192)8.6.16 F3141 Selection validation error (192)8.6.17 F3142 Activation time of enabling control exceeded (193)8.6.18 F3143 Safety command for clearing errors incorrect (194)8.6.19 F3144 Incorrect safety configuration (195)8.6.20 F3145 Error when unlocking the safety door (196)8.6.21 F3146 System error channel 2 (197)8.6.22 F3147 System error channel 1 (198)8.6.23 F3150 Safety command for system start incorrect (199)8.6.24 F3151 Safety command for system halt incorrect (200)8.6.25 F3152 Incorrect backup of safety technology data (201)8.6.26 F3160 Communication error of safe communication (202)8.7 Non-Fatal Errors (F2xxx) (202)8.7.1 Behavior in the Case of Non-Fatal Errors (202)8.7.2 F2002 Encoder assignment not allowed for synchronization (203)8.7.3 F2003 Motion step skipped (203)8.7.4 F2004 Error in MotionProfile (204)8.7.5 F2005 Cam table invalid (205)8.7.6 F2006 MMC was removed (206)8.7.7 F2007 Switching to non-initialized operation mode (206)8.7.8 F2008 RL The motor type has changed (207)8.7.9 F2009 PL Load parameter default values (208)8.7.10 F2010 Error when initializing digital I/O (-> S-0-0423) (209)8.7.11 F2011 PLC - Error no. 1 (210)8.7.12 F2012 PLC - Error no. 2 (210)8.7.13 F2013 PLC - Error no. 3 (211)8.7.14 F2014 PLC - Error no. 4 (211)8.7.15 F2018 Device overtemperature shutdown (211)8.7.16 F2019 Motor overtemperature shutdown (212)8.7.17 F2021 Motor temperature monitor defective (213)8.7.18 F2022 Device temperature monitor defective (214)8.7.19 F2025 Drive not ready for control (214)8.7.20 F2026 Undervoltage in power section (215)8.7.21 F2027 Excessive oscillation in DC bus (216)8.7.22 F2028 Excessive deviation (216)8.7.23 F2031 Encoder 1 error: Signal amplitude incorrect (217)VIII/XXII Bosch Rexroth AG | Electric Drivesand ControlsRexroth IndraDrive | Troubleshooting GuideTable of ContentsPage8.7.24 F2032 Validation error during commutation fine adjustment (217)8.7.25 F2033 External power supply X10 error (218)8.7.26 F2036 Excessive position feedback difference (219)8.7.27 F2037 Excessive position command difference (220)8.7.28 F2039 Maximum acceleration exceeded (220)8.7.29 F2040 Device overtemperature 2 shutdown (221)8.7.30 F2042 Encoder 2: Encoder signals incorrect (222)8.7.31 F2043 Measuring encoder: Encoder signals incorrect (222)8.7.32 F2044 External power supply X15 error (223)8.7.33 F2048 Low battery voltage (224)8.7.34 F2050 Overflow of target position preset memory (225)8.7.35 F2051 No sequential block in target position preset memory (225)8.7.36 F2053 Incr. encoder emulator: Pulse frequency too high (226)8.7.37 F2054 Incr. encoder emulator: Hardware error (226)8.7.38 F2055 External power supply dig. I/O error (227)8.7.39 F2057 Target position out of travel range (227)8.7.40 F2058 Internal overflow by positioning input (228)8.7.41 F2059 Incorrect command value direction when positioning (229)8.7.42 F2063 Internal overflow master axis generator (230)8.7.43 F2064 Incorrect cmd value direction master axis generator (230)8.7.44 F2067 Synchronization to master communication incorrect (231)8.7.45 F2068 Brake error (231)8.7.46 F2069 Error when releasing the motor holding brake (232)8.7.47 F2074 Actual pos. value 1 outside absolute encoder window (232)8.7.48 F2075 Actual pos. value 2 outside absolute encoder window (233)8.7.49 F2076 Actual pos. value 3 outside absolute encoder window (234)8.7.50 F2077 Current measurement trim wrong (235)8.7.51 F2086 Error supply module (236)8.7.52 F2087 Module group communication error (236)8.7.53 F2100 Incorrect access to command value memory (237)8.7.54 F2101 It was impossible to address MMC (237)8.7.55 F2102 It was impossible to address I2C memory (238)8.7.56 F2103 It was impossible to address EnDat memory (238)8.7.57 F2104 Commutation offset invalid (239)8.7.58 F2105 It was impossible to address Hiperface memory (239)8.7.59 F2110 Error in non-cyclical data communic. of power section (240)8.7.60 F2120 MMC: Defective or missing, replace (240)8.7.61 F2121 MMC: Incorrect data or file, create correctly (241)8.7.62 F2122 MMC: Incorrect IBF file, correct it (241)8.7.63 F2123 Retain data backup impossible (242)8.7.64 F2124 MMC: Saving too slowly, replace (243)8.7.65 F2130 Error comfort control panel (243)8.7.66 F2140 CCD slave error (243)8.7.67 F2150 MLD motion function block error (244)8.7.68 F2174 Loss of motor encoder reference (244)8.7.69 F2175 Loss of optional encoder reference (245)Troubleshooting Guide | Rexroth IndraDrive Electric Drivesand Controls| Bosch Rexroth AG IX/XXIITable of ContentsPage8.7.70 F2176 Loss of measuring encoder reference (246)8.7.71 F2177 Modulo limitation error of motor encoder (246)8.7.72 F2178 Modulo limitation error of optional encoder (247)8.7.73 F2179 Modulo limitation error of measuring encoder (247)8.7.74 F2190 Incorrect Ethernet configuration (248)8.7.75 F2260 Command current limit shutoff (249)8.7.76 F2270 Analog input 1 or 2, wire break (249)8.7.77 F2802 PLL is not synchronized (250)8.7.78 F2814 Undervoltage in mains (250)8.7.79 F2815 Overvoltage in mains (251)8.7.80 F2816 Softstart fault power supply unit (251)8.7.81 F2817 Overvoltage in power section (251)8.7.82 F2818 Phase failure (252)8.7.83 F2819 Mains failure (253)8.7.84 F2820 Braking resistor overload (253)8.7.85 F2821 Error in control of braking resistor (254)8.7.86 F2825 Switch-on threshold braking resistor too low (255)8.7.87 F2833 Ground fault in motor line (255)8.7.88 F2834 Contactor control error (256)8.7.89 F2835 Mains contactor wiring error (256)8.7.90 F2836 DC bus balancing monitor error (257)8.7.91 F2837 Contactor monitoring error (257)8.7.92 F2840 Error supply shutdown (257)8.7.93 F2860 Overcurrent in mains-side power section (258)8.7.94 F2890 Invalid device code (259)8.7.95 F2891 Incorrect interrupt timing (259)8.7.96 F2892 Hardware variant not supported (259)8.8 SERCOS Error Codes / Error Messages of Serial Communication (259)9 Warnings (Exxxx) (263)9.1 Fatal Warnings (E8xxx) (263)9.1.1 Behavior in the Case of Fatal Warnings (263)9.1.2 E8025 Overvoltage in power section (263)9.1.3 E8026 Undervoltage in power section (264)9.1.4 E8027 Safe torque off while drive enabled (265)9.1.5 E8028 Overcurrent in power section (265)9.1.6 E8029 Positive position limit exceeded (266)9.1.7 E8030 Negative position limit exceeded (267)9.1.8 E8034 Emergency-Stop (268)9.1.9 E8040 Torque/force actual value limit active (268)9.1.10 E8041 Current limit active (269)9.1.11 E8042 Both travel range limit switches activated (269)9.1.12 E8043 Positive travel range limit switch activated (270)9.1.13 E8044 Negative travel range limit switch activated (271)9.1.14 E8055 Motor overload, current limit active (271)9.1.15 E8057 Device overload, current limit active (272)X/XXII Bosch Rexroth AG | Electric Drivesand ControlsRexroth IndraDrive | Troubleshooting GuideTable of ContentsPage9.1.16 E8058 Drive system not ready for operation (273)9.1.17 E8260 Torque/force command value limit active (273)9.1.18 E8802 PLL is not synchronized (274)9.1.19 E8814 Undervoltage in mains (275)9.1.20 E8815 Overvoltage in mains (275)9.1.21 E8818 Phase failure (276)9.1.22 E8819 Mains failure (276)9.2 Warnings of Category E4xxx (277)9.2.1 E4001 Double MST failure shutdown (277)9.2.2 E4002 Double MDT failure shutdown (278)9.2.3 E4005 No command value input via master communication (279)9.2.4 E4007 SERCOS III: Consumer connection failed (280)9.2.5 E4008 Invalid addressing command value data container A (280)9.2.6 E4009 Invalid addressing actual value data container A (281)9.2.7 E4010 Slave not scanned or address 0 (281)9.2.8 E4012 Maximum number of CCD slaves exceeded (282)9.2.9 E4013 Incorrect CCD addressing (282)9.2.10 E4014 Incorrect phase switch of CCD slaves (283)9.3 Possible Warnings When Operating Safety Technology (E3xxx) (283)9.3.1 Behavior in Case a Safety Technology Warning Occurs (283)9.3.2 E3100 Error when checking input signals (284)9.3.3 E3101 Error when checking acknowledgment signal (284)9.3.4 E3102 Actual position values validation error (285)9.3.5 E3103 Dynamization failed (285)9.3.6 E3104 Safety parameters validation error (286)9.3.7 E3105 Validation error of safe operation mode (286)9.3.8 E3106 System error safety technology (287)9.3.9 E3107 Safe reference missing (287)9.3.10 E3108 Safely-monitored deceleration exceeded (288)9.3.11 E3110 Time interval of forced dynamization exceeded (289)9.3.12 E3115 Prewarning, end of brake check time interval (289)9.3.13 E3116 Nominal load torque of holding system reached (290)9.4 Non-Fatal Warnings (E2xxx) (290)9.4.1 Behavior in Case a Non-Fatal Warning Occurs (290)9.4.2 E2010 Position control with encoder 2 not possible (291)9.4.3 E2011 PLC - Warning no. 1 (291)9.4.4 E2012 PLC - Warning no. 2 (291)9.4.5 E2013 PLC - Warning no. 3 (292)9.4.6 E2014 PLC - Warning no. 4 (292)9.4.7 E2021 Motor temperature outside of measuring range (292)9.4.8 E2026 Undervoltage in power section (293)9.4.9 E2040 Device overtemperature 2 prewarning (294)9.4.10 E2047 Interpolation velocity = 0 (294)9.4.11 E2048 Interpolation acceleration = 0 (295)9.4.12 E2049 Positioning velocity >= limit value (296)9.4.13 E2050 Device overtemp. Prewarning (297)Troubleshooting Guide | Rexroth IndraDrive Electric Drivesand Controls| Bosch Rexroth AG XI/XXIITable of ContentsPage9.4.14 E2051 Motor overtemp. prewarning (298)9.4.15 E2053 Target position out of travel range (298)9.4.16 E2054 Not homed (300)9.4.17 E2055 Feedrate override S-0-0108 = 0 (300)9.4.18 E2056 Torque limit = 0 (301)9.4.19 E2058 Selected positioning block has not been programmed (302)9.4.20 E2059 Velocity command value limit active (302)9.4.21 E2061 Device overload prewarning (303)9.4.22 E2063 Velocity command value > limit value (304)9.4.23 E2064 Target position out of num. range (304)9.4.24 E2069 Holding brake torque too low (305)9.4.25 E2070 Acceleration limit active (306)9.4.26 E2074 Encoder 1: Encoder signals disturbed (306)9.4.27 E2075 Encoder 2: Encoder signals disturbed (307)9.4.28 E2076 Measuring encoder: Encoder signals disturbed (308)9.4.29 E2077 Absolute encoder monitoring, motor encoder (encoder alarm) (308)9.4.30 E2078 Absolute encoder monitoring, opt. encoder (encoder alarm) (309)9.4.31 E2079 Absolute enc. monitoring, measuring encoder (encoder alarm) (309)9.4.32 E2086 Prewarning supply module overload (310)9.4.33 E2092 Internal synchronization defective (310)9.4.34 E2100 Positioning velocity of master axis generator too high (311)9.4.35 E2101 Acceleration of master axis generator is zero (312)9.4.36 E2140 CCD error at node (312)9.4.37 E2270 Analog input 1 or 2, wire break (312)9.4.38 E2802 HW control of braking resistor (313)9.4.39 E2810 Drive system not ready for operation (314)9.4.40 E2814 Undervoltage in mains (314)9.4.41 E2816 Undervoltage in power section (314)9.4.42 E2818 Phase failure (315)9.4.43 E2819 Mains failure (315)9.4.44 E2820 Braking resistor overload prewarning (316)9.4.45 E2829 Not ready for power on (316)。
The Craft of Scientific Writing
![The Craft of Scientific Writing](https://img.taocdn.com/s3/m/ed998e9d6bec0975f465e2e1.png)
The Craft of Scientific Writing:A Workshop on Technical WritingMichael AlleyCollege of Engineering Virginia TechYou should begin the writing process by analyzing your constraintsaudiencepurposeoccasionto informto persuadeformatformalitydeadline processwhat do they know?why are they reading?what expectations do they have?how will they read?Draftinghome.tiscalinet.chRevisingA critical error of process is inefficientlyusing one’s writing timeThinking and CalculatingProofreadingStyle is the way that you express the ideas of your workStructureIllustrationwordswordswords wordswordswords wordswordswords wordswordswords wordswordswords wordswordswordswords wordswords wordswordswords wordswordswordswordsLanguageThis session focuses on avoiding critical errors of structure and language in scientific writing(1)Writing the wrong document(2)Not properly organizing the document(3) Making the writing needlessly complex (4) Communicating the wrong messageOne critical error of structure is writingthe wrong documentThe audience determines the appropriate level of detailOperations at the plant stopped momentarily because the thermal storage charging system desuperheater attemperator valve was replaced.The audience determines the appropriate level of detailOperations at the plant stopped momentarily because the thermal storage charging system desuperheater attemperator valve was replaced.WeakThe audience determines the appropriate level of detailOperations at the plant stopped momentarily because the thermal storage charging system desuperheater attemperator valve was replaced.WeakThe audience determines the appropriate levelof detailOperations at the plant stopped momentarily because the thermal storage charging system desuperheater attemperator valvewas replaced.Operations at the plant stopped for 1.5 hours so that a valve in the thermal storage system could be replaced.The purpose affects how you support assertions Artist rendition of Superconducting supercollider [Brookhaven, 1976]$1.7 billion project Several states competing (Illinois had edge)Congress to decide site locationThe purpose affects how you support assertionsAnnual rainfall > 48 inches More than 120 freezing days High relief and mountainsCoastal sedimentation High seismic hazard Limits of glaciationThe purpose affects how you support assertions Annual rainfall > 48 inches More than 120 freezing days High relief and mountainsCoastal sedimentation High seismic hazard Limits of glaciationThe purpose affects how you support assertionsAnnual rainfall > 48 inches More than 120 freezing days High relief and mountainsCoastal sedimentation High seismic hazard Limits of glaciationThe purpose affects how you support assertionsAnnual rainfall > 48 inches More than 120 freezing days High relief and mountainsCoastal sedimentation High seismic hazard Limits of glaciationThe formality of the occasion affects which words and terms you useToo Informal a lot of In addition,…However,...Appropriate & vs....you can...And …But ...can’tmuch; many ...one can...and versus cannotTitles have to target the appropriate audience, purpose, and occasion A Proposed Site for the SuperconductingSupercolliderTexas Railroad CommissionWest Antarctic Ice Sheet and CO 2Greenhouse Effect:A Threat of DisasterJ.H. MercerOhio State UniversityA strong title orients readers to your area of workEffects of Humidity on the Growth of AvalanchesEffects of Humidity on the Growthof Electron Avalanchesin Electrical Gas DischargesA strong title also separates your work from everyone else's work Studies on the Electrodepositionof Lead on Copper Effects of Rhodamine-B on the Electrodeposition of Lead on CopperUse of AC-Cyclic Voltammetryto Study the Effects of Organic Agents in the Electrodeposition of Nickel on PlatinumEffects of Rhodamine-B and Saccharinon the Electric Double Layer During Nickel Electrodepositionon Platinum Studied by AC-Cyclic VoltammetryToo many details in a title will overwhelm the audienceA strong title also presents details in an understandable form 10 MWe Solar Thermal Central ReceiverBarstow Power Pilot Plant Conversion StudyProposal to Select aNew Heat Transfer Fluid forthe Solar One Power PlantNew Chemical Process for Eliminating Nitrogen Oxidesfrom Engine ExhaustsSandia National LaboratoriesThis paper presents a new method for eliminating nitrogen oxides from the exhausts of engines and furnaces.One common way to begin a document is to restate that document’s titleDesign ofSteam Generators for the Downhole Portionof Oil WellsSandia National LaboratoriesMore than half of the oil in a reservoir is too viscous to pump out with conventional methods. By heating theseoils with steam and decreasingtheir viscosity, we can recover billions of gallons. For oilsbelow 800 meters, the steam produced on the surface loses too much energy in transit to heat the oil. We are developing a downhole steam generator to apply hot steam directly.Another way, often used with unfamiliar topics, is to start with background informationAvoid abrupt beginnings to documents or sectionsHeadingExperiment. The specimens were thin-walled tubes of 304L stainless steel...Experiment. The experiment for the project consisted of several specimens placed inside a recirculating wind tunnel. The specimens were thin-walled tubes of 304L stainless steel...Also avoid first sentences that do not accomplish muchIntroductionMan has since the beginning of timeattempted to acquire a greater and greater control over his environment. Man's need for better control over his environment has increased greatly since World War II. This need for control is evident in all technological settings, including the welding field.IntroductionThe behavior of materials in combustionsystems has considerable technological significance. This paper presents….TitleSummary IntroductionMiddle SectionsConclusions Back MatterA second critical error is not properlyorganizing the documentAlthough several names exist for summaries, there are essentially two approachesThis paper describes a new inertial navigation system for mapping oil and gas wells. In this paper, we will compare the mapping accuracy and speed for this new system against the accuracy and speed for conventional systems.DescriptiveThis paper describes a new inertial navigation system that will increase the mapping accuracy of oil wells by a factor of ten. The new system uses three-axis navigation that protects sensors from high-spin rates. The system also processes its information by Kalman filtering (a statistical sampling technique) in an on-site computer. Test results show the three-dimensional location accuracy is within 0.1 meters for every 100 meters of well depth, an accuracy ten times greater than conventional systems.InformativeA document's introduction prepares readers for the discussionTopic?Importance?IntroductionArrangement?Background?Scope and Limitations ObjectivesAssumptionsIn research, one common background section is the literature reviewPurpose:Structure:Organization: often chronological DepthWhat work was done Assessment of that work What is missing in workWhat we know(1) To acknowledge work of others (2) To establish your credibility (3) To give needed background(4) To show that your work is uniqueWhat is missingThe middle can be organized in several waysChronological[Maizels, 2001][Pratt & Whitney, 2000]SpatialFlow [Sandia, 1985]Parallel Parts[Corel, 1999]The organization of a document is reflected in the headings, subheadings, and paragraphs The headings and subheadings reveal the overall strategy of the documentThe paragraphs reveal the organization of each sectionIntroduction to Deep Earthquakes (Scientific American )These deep earthquakes are common...2. Occurrences of deep earthquakes Most deep earthquakes are not destructive...3. Destruction by deep earthquakes 1. Definition of deep earthquakes In most earthquakes, the earth's crust cracks like porcelain...4. Information learned from deep earthquakesMuch has been learned by studying deep earthquakes...Each sentence then presents one ideaIn most earthquakes, the earth's crust cracks like porcelain.12345Stress builds until a fracture forms at adepth of a few kilometers and slip relieves the stress.Some earthquakes, however, take place where the earth cannot fracture.These earthquakes, calleddeep earthquakes, occur hundreds of kilometers down in the earth's mantle.At this depth, highpressure is thought to prevent the rock from cracking—even though stresses may be high enough to deform the rock like putty.Introduction Background Marx Generators Line Pulse Beam Generation Transporting BeamPellets Results ConclusionsNew Design for Particle Beam FusionA common weakness of middles is using headings that do not reveal the organizationSandia National LabsThe sections of scientific documents should reveal the document’s organizationNew Design forParticle Beam FusionIntroductionPast Designs for Particle Beam Fusion New Design for Particle Beam FusionCharging Marx Generators Forming Line PulseGenerating Particle Beam Transporting Particle BeamIrradiating Deuterium-Tritium Pellets Results of New DesignConclusions and RecommendationsSandia National LabsWhen you divide a section into subsections, the audience expects all to be of the same pie New Design for Particle Beam Fusion Charging Marx Generators Generating Particle BeamPelletsNew Design for Particle Beam Fusion Charging Marx Generators Generating Particle Beam Irradiating Deuterium-Tritium PelletsOrganization is hidden when headings occur in a long list without secondary headingsPerformance ofthe Solar One ReceiverIntroductionSteady State Efficiency Average Efficiency Start-Up Time Operation TimeOperation During Cloud Transients Panel Mechanical Supports Tube Leaks ConclusionPerformance ofthe Solar One ReceiverIntroductionReceiver’s EfficiencySteady State Efficiency Average Efficiency Receiver’s Operation CycleStart-Up Time Operation TimeOperation During Cloud Transients Receiver’s Mechanical WearPanel Mechanical Supports Tube Leaks ConclusionCalculation of Fan PerformanceCalculations of Volume Flow Rate.Here we used dynamic measurements. Each of the values for dynamic pressure used to find the flow rate was an average of five dynamic….....A common mistake with section transitions is to begin sections abruptly Calculation of Fan PerformanceThe performance characteristics calculated for the fan were volumetric flow rate, shaft power, and efficiency. A major assumption for these calculations was that….Calculation of the Volumetric Flow Rate .The volumetric flow rate through the fan’s duct was determined using dynamic measurements. Each of the values for dynamic pressure used to find the flow rate was an average of five dynamic…The position between a heading and a subheading is an opportunity for mapping and backgroundIn organizing a procedures section, consider beginning with the goals of the experimentThe goal of the experiment was to evaluate the effectiveness of inlet guide vanes at reducing the electrical power required by the fan. To evaluate the effectiveness of these vanes, we measured….Procedures for Experiment9What were goals?Power reduction Resulting flow rateWhat was measured?Atmospheric conditions Static pressure Dynamic pressureElectrical power In selecting the depth of a section, consider the purpose of that sectionPurpose of Procedures:(1)To establish credibility for yourresults (2)To allow others to repeat your workDepth of Procedures:Enough that others can repeatworkIn a strong ending, you analyze results and give a future perspectiveAnalyze results from overall perspectiveConclusionsAnalysis of ResultsSeveral options:Make recommendations Discuss future work Repeat limitationsFuture PerspectivePlacement of information into appendices allows you to emphasize key points in main textAppendix A Voltage ReadingsResultsUse appendices to supply secondary or tangential information to primary readersAppendix BProject StormfuryIn 1961, the United States Weather Bureau and theDepartment of Defense (Navy) began a project to reduce the strength of hurricanes. The project, called Project Stormfury, uses cloud seeding, a process used to produce rainfall and reduce hail in thunderstorms. In Project Stormfury, silver iodide crystals, similar in...Glossaryburst point: the exact point in space where anatomic bomb is detonated.clear visibility: a viewing range of twenty miles.fallout: the descent to the Earth's surface ofradioactive particles from a cloud contaminated with the fission products of a nuclear explosion.hypocenter:the point on the earth's surface directlybelow the burst point; also called ground zero.For secondary readers, use a glossary to define unfamiliar termsFailure to emphasize the contribution of others can cast a shadow on one’s career James Watson surreptitiouslylooked at Rosalind Franklin’s work [Franklin, 1952]Watson did not give enough credit to Franklin[Luzzati, 1950]Inherent complexity:Reynolds number turbulent eddies ρv 2One writing error of language is to make the writing needlessly complexContent:IdeasStyle and Form:WritingNeedless complexity:manufacturability, e.g., PORTA gate valve system test setup long and complex sentencesNeedlessly complex wording buries ideasR.I.P. The goal of this study is to develop a commerciali-zation strategy for solar energy systems by analyzing factors impeding early commercial projects (i.e.,SOLAR ONE) and by identifying the potential actionsthat can facilitate the viability of the projects.Needlessly complex wording buries ideasR.I.P. This study will consider why current solar energy systems, such as Solar One, have not reached the commercial stage and will find out what stepswe can take to make these systems commercial.The goal of this study is to develop a commerciali-zation strategy for solar energy systems by analyzing factors impeding early commercial projects (i.e.,SOLAR ONE) and by identifying the potential actionsthat can facilitate the viability of the projects.Stacking adjectives before nounsswallows the ideasSolar One is a solar-powered pilotplant located near Barstow, California. Solar Oneproduces 10 megawatts of electricity by capturingsolar energy in a central receiver design.Solar One is a 10 megawatt solarthermal electric central receiverBarstow power pilot plant.Needlessly complex sentences misdirect readersThe goal of the work was toconfirm the nature of electricalbreakdown of nitrogen in uniformfields at high pressures andelectrode gaps which approachthose obtained in engineeringpractice, prior to the deter-mination of the processes whichset the criterion for breakdownin the above-mentioned gas inuniform and non-uniform fieldsof engineering significance.At high pressures (760 torr)and typical electrode gapdistances (1 mm), theelectrical breakdown ofnitrogen was studied inuniform fields.The more muddled the original, the more revisions are needed to streamline it At high pressures (760 torr) and typical electrode gap distances (1 mm), the electrical breakdown of nitrogen was studied in uniform fields.This study examines the electrical breakdown of nitrogen in uniform fields. For these experiments, the electrode gap distanceswere typical (1 mm), whilethe pressures wererelatively high (760 torr).When you write longer sentences, give the readers a clueWe have found that these losses arisepredominantly from the flow control valve, so we have decided to alter the accumulator and piston actuator.Because these losses arise predominantly from the flow control valve, we recommend altering the accumulator and piston actuator.One measure for the complexity of the writing is the Gunning Fog IndexIn the index, the complexity of the writing depends on (1) the lengths of sentences (2) the lengths of wordsDesired index values for scientific writing are 10-12:New York Times (11)Scientific American (12)F i = 0.4 ((N w / N s )+ P lw )N w = number of words in a typical paragraph N s = number of sentences in the paragraphP lw = percentage of long words in the paragraphFor an educated audience, an index between 10 and 13 communicates the most efficientlyGunning IndexComprehension Efficiency (%)1015205ExerciseCalculate the fog indices of the Bohr paragraph andthe Einstein paragraph.F i = 0.4 ((N w / N s )+ P lw )N w = number of words in random paragraph N s = number of sentences in the paragraphP lw = percentage of long words in the paragraph (>3 syllables)not first word in sentence; no proper nouns;no verbs that acquire third syllable on endingA second error of language is to communicate the wrong messageJ. Edgar HooverDirector of FBI , 1924–1972An ambiguity is a group of words that can have more than one meaningThe proposed schedule is discussed below for the next four years.The proposed schedule for the next four years is discussed below.Syntax often causes ambiguities,especially with adverbsOnly I tested the Labrador for rabies yesterday.I only tested the Labrador for rabies yesterday.I tested the only Labrador for rabies yesterday.I tested the Labrador only for rabies yesterday.I tested the Labrador for rabies only yesterday.Word choice can also cause ambiguities We wanted to reduce thevibration of the fan at theexhaust as the exhaustducting was cracking.We wanted to reduce thevibration of the fan at theexhaust because the exhaustducting was cracking.Word choice can also cause ambiguities The solar receiver workedwell under passing clouds.The solar receiver workedwell, even when cloudspassed overhead.Words have both denotations and connotationsinexpensive unusual simple increase clear sufficient cost-effective novel streamlinedcheapstrangesimplisticNegative Neutral Positiveobvious adequate enhanceAlso causing ambiguities are pronouns,particularly the pronouns it and thisAlthough engineers realized the designflaws in the Titanic soon after its sinkingin 1912, the reasons for the severedamage inflicted by the iceberg remaineda mystery until its discovery in 1985.Although engineers realized the designflaws in the Titanic soon after its sinking in1912, the reasons for the severe damageinflicted by the iceberg remained a mysteryuntil the Titanic’s discovery in 1985.Also causing ambiguities are pronouns, particularly the pronouns it and thisIf you receive an e-mail titled "Win A Holiday," do not open it. It will erase everything on your hard drive. Forward this out to as many people as you can. This is a very malicious virus and not many people know about it.If you receive an e-mail titled "Win A Holiday," do not open it. The e-mail will erase everything on your hard drive. Forward this warning out to as many people as you can. The “Win a Holiday”virus is malicious and not many people know about it.Also causing ambiguities are pronouns, particularly the pronouns it and thisWe wanted to load Port B with a 1 ifthe switch was high and with a 0 ifthe switch was low, which waseasily done using a BRCLRstatement with a mask of 1. Thismeant that if the low bit of Port Awas clear, the code would output toPort B.Not having commas after introductory phrases or clauses often causes ambiguitiesAs light hydrocarbons evaporate the oilvapor pressure falls.As light hydrocarbons evaporate, the oilvapor pressure falls.When commas are missing within lists, ambiguities often occurWe examined neat methanol andethanol and methanol and ethanolwith 10% water.We examined four fuels: neatmethanol, neat ethanol,methanol with 10% water,and ethanol with 10% water.Ambiguities occur for many reasonsBreak ArrayOn the second day the knee was better and onthe third day it had completely disappeared.Patient has chest pain if she lies on her leftside for over a year.He slipped on the ice and apparentlyhis legs went in separate directions inearly December.Dr. Richard LedererJournal of Court Reporting。
cochrane纳入的RCT文献质量评价风险偏倚评价工具中英文对照版
![cochrane纳入的RCT文献质量评价风险偏倚评价工具中英文对照版](https://img.taocdn.com/s3/m/a64c78082a160b4e767f5acfa1c7aa00b52a9d08.png)
分配隐藏
分配前不充足的分配隐藏导致选择偏倚
低风险判断标准
参与者以及纳入参与者的研究者因以下掩盖分配的方法 或相当的方法,事先不了解分配情况
•中心分配(包括电话,网络,药房控制随机)
•相同外形的顺序编号的药物容器;
•顺序编号、不透明、密封的信封
高风险判断标准
参与者以及纳入参与者的研究者可能事先知道分配,因
而引入选择偏倚,譬如基于如下方法的分配:
•使用摊开的随机分配表(如随机序列清单)
•分发信封但没有合适的安全保障(如透明、非密 封、非顺序编号)
•交替或循环
•出生日期
•病历号
•其它明确的非隐藏过程
风险未知
没有足够信息判断为低风险或高风险。通常因分配隐藏 的方法未描述或描述不充分。例如描述为使用信封分配, 但为描述信封是否透明?密封?顺序编号?
outcome assessors.
Attrition bias.
Incomplete outcome dataAssessments should be made for each main outcome (or class of outcomes).?
Describe the completeness of outcome data for each main outcome, including attrition and exclusions from the analysis. State whether attrition and exclusions were reported, the numbers in each intervention group (compared with total randomized participants), reasons for attrition/exclusions where reported, and any re-inclusions in analyses performed by the review authors.
ECE R114
![ECE R114](https://img.taocdn.com/s3/m/9e37da1d59eef8c75fbfb353.png)
E/ECE/324 Rev.2/Add.113E/ECE/TRANS/5052 July 2003AGREEMENTCONCERNING THE ADOPTION OF UNIFORM TECHNICAL PRESCRIPTIONS FOR WHEELED VEHICLES, EQUIPMENT AND PARTS WHICH CAN BE FITTED AND/OR BE USED ON WHEELED VEHICLES AND THE CONDITIONS FOR RECIPROCAL RECOGNITION OF APPROVALS GRANTED ON THE BASIS OFTHESE PRESCRIPTIONS ∗/(Revision 2, including the amendments which entered into force on 16 October 1995)_________Addendum 113: Regulation No. 114Date of entry into force: 1 February 2003UNIFORM PROVISIONS CONCERNING THE APPROVAL OF:I. AN AIRBAG MODULE FOR A REPLACEMENT AIRBAG SYSTEM;II. A REPLACEMENT STEERING WHEEL EQUIPPED WITH AN AIRBAG MODULE OF AN APPROVED TYPE;III. A REPLACEMENT AIRBAG SYSTEM OTHER THAN THAT INSTALLED IN A STEERING WHEEL_________UNITED NATIONS__________∗/Former title of the Agreement:Agreement Concerning the Adoption of Uniform Conditions of Approval and Reciprocal Recognition of Approval for Motor Vehicle Equipment and Parts, done at Geneva on 20 March 1958.E/ECE/324 Rev.2/Add.113E/ECE/TRANS/505Regulation No. 114page 3UNIFORM PROVISIONS CONCERNING THE APPROVAL OF:I. AN AIRBAG MODULE FOR A REPLACEMENT AIRBAG SYSTEM;II. A REPLACEMENT STEERING WHEEL EQUIPPED WITH AN AIRBAG MODULE OF AN APPROVED TYPE;III. A REPLACEMENT AIRBAG SYSTEM OTHER THAN THATINSTALLED IN A STEERING WHEELCONTENTSREGULATION Page1. Scope (5)2. Definitions (5)3. Application for approval (7)4. Approval (9)5. Requirements (12)6. Tests (15)7. Instructions for users (19)8. Conformity of production (21)9. Penalties for non-conformity of production (22)10. Modifications of the type of airbag module for a replacementairbag system or the type of replacement steering wheel withan airbag module of an approved Type or the type of replacementairbag system, other than that installed in a steering wheel (22)11. Production definitely discontinued (23)12. Names and addresses of technical services responsiblefor approval tests, and of administrative departments (23)E/ECE/324 Rev.2/Add.113E/ECE/TRANS/505Regulation No. 114page 4ANNEXESAnnex 1 - Communication concerning the approval or refusal or extension or withdrawal of approval or production definitely discontinued of a type of airbag module for areplacement airbag systemAnnex 2 - Communication concerning the approval or refusal or extension or withdrawal of approval or production definitely discontinued of a type of replacement steering wheelequipped with an airbag module of an approved typeAnnex 3 - Communication concerning the approval or refusal or extension or withdrawal of approval or production definitely discontinued of a type of replacement airbag systemother than that installed in a replacement steering wheelAnnex 4 - Example of an approval mark for an airbag module for a replacement airbag system Annex 5 - Example of an approval mark for a replacement steering wheel equipped with an airbag module of an approved typeAnnex 6 - Example of an approval mark for a replacement airbag system other than that installed ina steering wheelAnnex 7 - Fatigue test deviceAnnex 8 - Procedure for determining the "H" point and the actual torso angle for seating positions in motor vehicles1 - Description of the three-dimensional "H" point machineAppendix2 - Three-dimensional reference systemAppendix3 - Reference data concerning seating positionsAppendix* * *E/ECE/324 Rev.2/Add.113E/ECE/TRANS/505Regulation No. 114page 51. SCOPEThis Regulation applies to the following aftermarket equipment:1.1. to airbag modules for replacement airbag systems intended to be installed on motorvehicles;1.2. to replacement steering wheels for vehicles of categories M1 and N1, equipped with anairbag module of an approved type and intended to be installed as an additional restraintsystem beside safety-belts and other restraint systems in power-driven vehicles,i.e. a system which, in the event of a severe impact, automatically deploys a flexiblestructure intended to reduce the severity of injuries of the occupants;1.3. to replacement airbag systems other than those installed in steering wheels and equippedwith airbag modules of an approved type as an additional restraint system beside safety-belts and other restraint systems in power-driven vehicles of categories M1 and N1, i.e. asystem which, in the event of a severe impact, automatically deploys a flexible structureintended to reduce the severity of injuries of the occupants.2. DEFINITIONSsystem" means a group of components which, once installed in vehicle(s), 2.1. "Airbagperform all functions provided for by the manufacturer. This system comprises as aminimum a release unit activating one or more airbag modules and the electrical wiringharness, if present.2.2. "Airbag" means a flexible material, forming an enclosed volume that receives the gasfrom the inflator and restrains the occupant.2.3. "Airbagmodule" means the smallest sub-assembly comprising the energy source for its deployment and the airbag involved in the deployment.wheel" (equipped with an airbag module) means an aftermarketsteering2.4. "Replacementsteering wheel which is supplied to modify a motor vehicle and which may vary in itsfunctional dimensions, form and/or material from the original steering wheel provided bythe vehicle manufacturer.2.5. "Replacement airbag system" means an aftermarket airbag system which is supplied tomodify a motor vehicle, and which may vary in its functional dimensions, form, materialsor operation from any original airbag system provided by the vehicle manufacturer forthat motor vehicle.2.6. Categories of airbag modules for replacement airbag systems:E/ECE/324 Rev.2/Add.113E/ECE/TRANS/505Regulation No. 114page 6A: Device intended to protect the driver of a vehicle in the event of a frontal 2.6.1. Categorycollision.B: Device intended to protect front seat passenger(s) other than the driver in 2.6.2. Categorythe event of a frontal collision.C: Device intended to protect the passenger(s) in seats other than the front 2.6.3. Categoryseats in the event of a frontal collision.D: Device intended to protect the front seat occupant(s) in the event of a 2.6.4. Categorycollision.lateralofrelease" means the moment at which, in the event of an impact causing airbag 2.7. "Instantdeployment, the components producing that deployment are irreversibly actuated.2.8. "Control unit or release unit" means the sub-assembly comprising all componentspermitting the collision to be detected and producing release.harness" means all the electrical conductors and connections linking the various 2.9. "Wiringparts of the complete airbag system to each other and possibly to the vehicle.mass" means the mass of the vehicle in running order, unoccupied and 2.10. "Unladenkerbunladen but complete with fuel, coolant, lubricant, tools and spare wheel (if these areprovided as a standard equipment by the vehicle manufacturer).2.11. "Type of an airbag module for a replacement airbag system" comprises airbag moduleswhich do not differ in such essential aspects as:(a) the category of an airbag module,(b) the geometry of the airbag,(c) the material of the airbag,(d) the vents or equivalent devices,(e) the gas generator,principle,envelope(f) the(g) the material, structure and dimension of the cover,(h) the composition of the propellant,(i) the method of fixation of the module.2.12. "Type of a replacement steering wheel equipped with an airbag module" meansaftermarket steering wheels, which do not differ in such essential aspects as:(a) the presence of an airbag,(b) the dimension and diameter of the steering wheel,(c) the form, in so far as the safety performance and the strength performance isinfluenced,E/ECE/324 Rev.2/Add.113E/ECE/TRANS/505Regulation No. 114page 7(d) the material,(e) the type definition of an airbag module for a replacement airbag system accordingto paragraph 2.11. above.2.13. "Type of a replacement airbag system other than that installed in a steering wheel"comprises replacement airbag systems, which do not differ in such essential respects as:(a) the category of airbag module,(b) the geometry of the airbag,(c) the material of the airbag,(d) the vents or equivalent devices,(e) the gas generator,principle,envelope(f) the(g) the material, structure and dimension of the cover,(h) the composition of the propellant,(i) the method of fixation of the module.type" means a category of power-driven vehicles, which do not differ in such 2.14. "Vehicleessential respects in so far as they have an effect on the results of the impact testsprescribed in this Regulation for:(a) the structure, dimension, body version and materials of the vehicle,(b) the unladen kerb mass, as defined in paragraph 2.10. above,(c) the steering control, the seat and the safety-belt system and other restraint systems,(d) the siting and orientation of the engine,(e) the parts and optional arrangements or fittings of the vehicle which influence theperformance of the airbag.3. APPLICATION FOR APPROVAL3.1. Application for approval of an airbag module for a replacement airbag system3.1.1. The application for approval of an airbag module shall be submitted by the holder of thetrade mark of the airbag module manufacturer, the component manufacturer or by theirduly accredited representatives.3.1.2. For each category of an airbag module for a replacement airbag system, the applicationshall be accompanied by the following documents in triplicate and the followingparticulars:3.1.2.1. A technical description, including mounting instructions and specifying the type(s) ofvehicle for which the airbag module is intended,3.1.2.2. Sufficiently detailed drawings to permit the verification of the positions intended for theapproval mark as required under paragraph 4.1.4. below.E/ECE/324 Rev.2/Add.113E/ECE/TRANS/505Regulation No. 114page 83.1.2.3. A sufficient number of airbag modules shall be submitted to the technical serviceresponsible for the tests and verification of the conformity with the relevantparagraphs 5. and 6. of this Regulation.3.2. Application for approval of a replacement steering wheel equipped with an airbag moduleof an approved type3.2.1. The application for approval of a replacement steering wheel equipped with an airbagmodule shall be submitted by the holder of the trademark of the replacement steeringwheel or by the manufacturer, or by their duly accredited representative.3.2.2. For each type of a replacement steering wheel equipped with an airbag module, theapplication shall be accompanied by the following documents in triplicate and thefollowing particulars:3.2.2.1. a technical description, including mounting instructions,3.2.2.2. sufficiently detailed drawings,3.2.2.3. drawings showing the position of the airbag module(s) and its (their) attachment(s) on thesteering wheel,3.2.2.4. the position intended for the approval mark and required under paragraph 4.2.4. below, 3.2.2.5. a sufficient number of replacement steering wheels equipped with airbag modules andvehicles representative of the types for which the replacement steering wheel shall beapproved for shall be submitted to the technical service responsible for conducting theapproval tests so as to verify conformity with the relevant paragraphs 5. and 6. of thisRegulation.3.3. Application for approval of a replacement airbag system other than that installed in asteering wheel3.3.1. The application for approval of a replacement airbag system other than that installed in asteering wheel shall be submitted by the holder of the trade mark of the replacementairbag system or by the manufacturer, or by their duly accredited representatives.3.3.2. For each type of a replacement airbag system, the application shall be accompanied bythe following documents in triplicate and the following particulars:3.3.2.1. a technical description, including mounting instructions,3.3.2.2. sufficiently detailed drawings,E/ECE/324 Rev.2/Add.113E/ECE/TRANS/505Regulation No. 114page 93.3.2.3. drawings showing the position of the airbag system(s) and its (their) attachment(s) on thevehicle,3.3.2.4. the position intended for the approval mark and required under paragraph 4.3.4. below, 3.3.2.5. a sufficient number of replacement airbag systems and vehicles representative of thetypes for which the replacement system shall be approved for, shall be submitted to thetechnical service responsible for conducting the approval tests so as to verify conformitywith the relevant paragraphs 5. and 6. of this Regulation.4. APPROVAL4.1. Approval of an airbag module for a replacement airbag system4.1.1. If the samples of the airbag module submitted for approval meet the requirements of therelevant paragraphs 5. and 6. below, approval for this type of airbag module for areplacement airbag system shall be granted.4.1.2. An approval number shall be assigned to each type approved. Its first two digits(00 at present) shall indicate the series of amendments incorporating the most recentmajor technical amendments made to the Regulation at the time of issue of the approval.The same Contracting Party may not assign the same number to another type of airbagmodule for a replacement airbag system.4.1.3. Notice of approval or of refusal or extension or withdrawal of approval or of definitediscontinuation of production of a type of airbag module for a replacement airbag system,pursuant to this Regulation, shall be communicated to the Parties to the Agreementapplying this Regulation, by means of a form conforming to the model in annex 1 to thisRegulation.4.1.4. The samples of airbag modules for a replacement airbag system shall be clearly andindelibly marked with the manufacturer's trade name or mark and an approval markconsisting of:E/ECE/324 Rev.2/Add.113E/ECE/TRANS/505Regulation No. 114page 104.1.4.1. a circle surrounding the letter "E" followed by the distinguishing number of the countrywhich has granted approval, 1/4.1.4.2. an approval number,4.1.4.3. an additional symbol, indicating the airbag module category (see paragraph 2.6. above).4.1.5. The approval mark and the additional symbol shall be clearly legible and indelible. 4.1.6. Annex 4 to this Regulation gives an example of the approval mark and the additionalsymbol mentioned above.4.2. Approval of a replacement steering wheel equipped with an airbag module of anapproved type4.2.1. If a replacement steering wheel type equipped with an airbag module of an approved typesubmitted for approval meets the requirements of the relevant paragraphs 5. and 6. below,approval of that type of replacement steering wheel equipped with an airbag module of anapproved type shall be granted.4.2.2. An approval number shall be assigned to each type approved. Its first two digits (00 atpresent) shall indicate the series of amendments incorporating the most recent majortechnical amendments made to the Regulation at the time of issue of the approval. Thesame Contracting Party may not assign the same number to another type of replacementsteering wheel.__________1/ 1 for Germany, 2 for France, 3 for Italy, 4 for the Netherlands, 5 for Sweden, 6 for Belgium, 7 for Hungary, 8 for the Czech Republic, 9 for Spain, 10 for Serbia and Montenegro, 11 for the United Kingdom, 12 for Austria, 13 for Luxembourg, 14 for Switzerland, 15 (vacant), 16 for Norway, 17 for Finland, 18 for Denmark, 19 for Romania, 20 for Poland, 21 for Portugal, 22 for the Russian Federation, 23 for Greece, 24 for Ireland, 25 for Croatia, 26 for Slovenia, 27 for Slovakia, 28 for Belarus, 29 for Estonia, 30 (vacant), 31 for Bosnia and Herzegovina, 32 for Latvia, 33 (vacant), 34 for Bulgaria, 35 (vacant), 36 for Lithuania, 37 for Turkey, 38 (vacant), 39 for Azerbaijan, 40 for The former Yugoslav Republic of Macedonia, 41 (vacant), 42 for the European Community (Approvals are granted by its Member States using their respective ECE symbol), 43 for Japan, 44 (vacant), 45 for Australia, 46 for Ukraine, 47 for South Africa and 48 for New Zealand. Subsequent numbers shall be assigned to other countries in the chronological order in which they ratify or accede to the Agreement Concerning the Adoption of Uniform Technical Prescriptions for Wheeled Vehicles, Equipment and Parts which can be Fitted and/or be Used on Wheeled Vehicles and the Conditions for Reciprocal Recognition of Approvals Granted on the Basis of these Prescriptions, and the numbers thus assigned shall be communicated by the Secretary-General of the United Nations to the Contracting Parties to the Agreement.page 114.2.3. Notice of approval or refusal or extension or withdrawal of approval or of definitediscontinuation of production of a type of replacement steering wheel equipped with anairbag module of an approved type pursuant to this Regulation shall be communicated tothe Parties to the Agreement applying this Regulation, by means of a form conforming tothe model in annex 2 to this Regulation.4.2.4. The samples of the replacement airbag steering wheel and the hub (adapters) shall beclearly and indelibly marked with the manufacturer's trade name or mark and an approvalmark consisting of:4.2.4.1. a circle surrounding the letter "E" followed by the distinguishing number of the countrywhich has granted approval, 2/4.2.4.2. an approval number,4.2.4.3. an additional symbol, indicating the airbag module category (see paragraph. 2.6. above).4.2.5. The approval mark and the additional symbol shall be clearly legible and indelible. 4.2.6. The approval mark shall be placed on the replacement steering wheel and on the hub(adapter). If the replacement steering wheel and hub are in one piece, one approval markand one mark with the manufacturer's trade name or mark is sufficient.4.2.7. Annex 5 to this Regulation gives an example of the approval mark and the additionalsymbol mentioned above.4.3. Approval of a replacement airbag system other than that installed in a steering wheel 4.3.1. If a replacement airbag system other than that installed in a steering wheel submitted forapproval meets the requirements of the relevant paragraphs 5. and 6. below, approval ofthat type of replacement airbag system shall be granted.4.3.2. An approval number shall be assigned to each type approved. Its first two digits (00 atpresent) shall indicate the series of amendments incorporating the most recent majortechnical amendments made to the Regulation at the time of issue of the approval. Thesame Contracting Party may not assign the same number to another type of replacementairbag system.4.3.3. Notice of approval or refusal or extension or withdrawal of approval or of definitediscontinuation of production of a replacement airbag system pursuant to this Regulationshall be communicated to the Parties to the Agreement applying this Regulation, bymeans of a form conforming to the model in annex 3 to this Regulation.__________2/ See footnote No. 1/page 124.3.4. The samples of the replacement airbag system shall be clearly and indelibly marked withthe manufacturer's trade name or mark and an approval mark consisting of:4.3.4.1. a circle surrounding the letter "E" followed by the distinguishing number of the countrywhich has granted approval, 3/4.3.4.2. an approval number,4.3.4.3. an additional symbol, indicating the airbag module category (see paragraph. 2.6. above).4.3.5. The approval mark and the additional symbol shall be clearly legible and indelible.4.3.6. Annex 6 to this Regulation gives an example of the approval mark and the additionalsymbol mentioned above.5. REQUIREMENTS5.1. General requirements for the approval of an airbag module for a replacement airbagsystem, a replacement steering wheel equipped with an airbag module of an approvedtype, or a replacement airbag system other than that installed in a steering wheel.5.1.1. Before type approval is granted according to paragraphs 4.1., 4.2. and/or 4.3., thecompetent authority shall verify the existence of satisfactory arrangements for ensuring: 5.1.1.1. installation, maintenance, repair and dismantling of the system by trained techniciansonly according to a manual, which shall be prepared by the applicant of the approval. 5.1.1.2. substitution of a part or the complete system after guaranteed lifetime,5.1.1.3. labelling and notices for rescue persons, labelling and information for the use of childrestraint systems.5.1.2. Interference from magnetic fields shall not disrupt the operation of the airbag system.5.1.3. A complete system shall comprise a device alerting the user if the airbag system is not inworking order as designed.5.1.4. Airbag modules for replacement airbag system of category A shall be so designed that,when they are submitted to a test in accordance with the requirements ofparagraph 5.2.2.7., static deployment test, the airbag may be pushed aside manually afterfull deployment.5.1.5. Toxicity and burns__________3/ See footnote No. 1/page 13A certificate shall be presented stating that the nature, concentration and temperature ofthe gases and solid particles released on deployment of an airbag are not such as to beliable to injure seriously the occupants of the vehicle. The authorities responsible forissuing the approval shall reserve the right to verify the accuracy of the statement. 5.2. Requirements for the approval of an airbag module for a replacement airbag system 5.2.1. Each airbag module shall comply with the requirements of the "International StandardISO 12097-2 ROAD VEHICLES-AIRBAG COMPONENT TESTING-PART 2: Testingof Airbag Modules" version: 1996-08-00, to guarantee the operating safety of the airbagmodules.Airbag modules designed for front seats equipped with side airbag systems shall comply,as far as possible, with the requirements of the above-mentioned ISO Standard (forexample tests according to paragraph 5.2.2.).The module manufacturer shall state that the above-mentioned tests were carried out withpositive test results. In case of doubts the approval authority responsible for issuing theapproval shall reserve the right to verify the accuracy of this statement.5.2.2. Instead of paragraph 5.2.1., a reduced test programme is permitted which shows as aminimum the following test elements:test5.2.2.1. Drop5.2.2.2. Mechanical impact test5.2.2.3. Simultaneous vibration temperature test5.2.2.4. Thermal humidity cycling test5.2.2.5. Solar radiation simulation test5.2.2.6. Temperature shock test5.2.2.7. Static deployment test5.3. Requirements for the approval of a replacement steering wheel equipped with an airbagmodule of an approved type5.3.1. Before type approval is granted according to paragraph 4.2., the competent authority shallverify the existence of satisfactory arrangements for carrying out:5.3.1.1. a heat test of the replacement steering wheel (all parts except the airbag module), asdescribed in paragraph 6.2.1.1., to guarantee a cohesion of all materials.page 145.3.1.2. a bending test, as described in paragraph6.2.1.2., to guarantee a minimum deformationof the steering wheel rim,5.3.1.3. a torque test, as described in paragraph6.2.1.3., to guarantee a sufficient stiffness whenthe replacement steering wheel is loaded tangentially to the steering wheel rim,5.3.1.4. a fatigue test, as described in paragraph6.2.1.4., to guarantee a sufficient lifetime. 5.3.2. For the replacement steering wheel, it must be guaranteed that the effective diameter isnot substantially smaller than the effective diameter of the steering wheel installed by themanufacturer of the vehicle. This requirement is deemed fulfilled when the effectivediameter of the replacement steering wheel is not less than 0.9 times the effectivediameter of the steering wheel used by the vehicle manufacturer.5.3.3. The size and fitting of the replacement steering wheel to the steering column must bewithin the dimensions and tolerances specified by the vehicle manufacturer. Otherwisethe replacement manufacturer shall demonstrate to the Technical Service the properfunction of any other chosen fixing method.5.3.4. The replacement steering wheel shall allow the drivers a direct view to all importantinstruments and indicators such as(a) the speedometer and(b) the tell tale signs for:direction indicatormain beamrear fog lamphazard warning signalautomatic antilock systembrake system malfunctionsairbag function indicatorThe tests shall be carried out according to the prescription laid down in paragraph 6.2.2.5.3.5. Replacement steering wheels equipped with airbag modules of an approved type shall besuch that, when installed in a vehicle, this vehicle fulfils the requirements of paragraphs5.2.1.1., 5.2.1.2., 5.2.1.3., 5.2.1.4. and 5.2.1.5. of Regulation No. 94, 01 series ofamendments.In case of doubt, when verifying the conformity of the replacement steering wheelequipped with an airbag module of an approved type to the requirements of thisRegulation, account shall be taken of any data or test results provided by the applicant forapproval, and these can be taken into consideration in validating the approval test carriedout by the technical service.page 155.4. Requirements for the approval of a replacement airbag system other than that installed ina steering wheel5.4.1. Replacement airbag systems shall be equipped with an approved airbag module or it shallbe demonstrated to the satisfaction of the technical service, responsible for this test, thatthe system used complies with the requirements prescribed in paragraphs 5.1. and 5.2.above.5.4.2. Replacement airbag systems other than those installed in steering wheels shall be suchthat, when installed in a vehicle, this vehicle fulfils in case of an airbag system of:5.4.2.1. category B, the requirements of paragraphs 5.2.1.1., 5.2.1.2., 5.2.1.3., 5.2.1.4., and5.2.1.5. of Regulation No. 94, 01 series of amendments;5.4.2.2. category C, the requirements of paragraphs 5.2.1.1., 5.2.1.2., 5.2.1.3., 5.2.1.4., and5.2.1.5. of Regulation No. 94, 01 series of amendments; in addition instrumenteddummies shall be used for the verification of the performance of the airbag system; 5.4.2.3. category D, the requirements of paragraphs 5.2.1.1., 5.2.1.2., 5.2.1.3., 5.2.1.4., and5.2.1.5. of Regulation No. 95, 01 series of amendments; in this case the side impactdummy shall be used for the test.6. TESTS6.1. Tests of an airbag module for a replacement airbag systemThe tests shall be carried out according to ISO 12097-Part 2, version 1996-08-00.6.2. Tests of a replacement steering wheel equipped with an airbag module of an approvedtypetests:6.2.1. Strengthtest6.2.1.1. HeatThe replacement steering wheel (except the airbag module) is exposed to the followingtemperature carried out in one circle:- 16 hours at - 15°C ± 2°C- 30 minutes at + 22°C ± 2°C- 3 hours at + 80°C ± 2°C- 30 minutes at - 22°C ± 2°CThis test must leave no permanent deformation over and above the design tolerances, orany cracks or fractures.。
《信号与系统》信号术语中英文对照解析
![《信号与系统》信号术语中英文对照解析](https://img.taocdn.com/s3/m/4025a83458f5f61fb63666c7.png)
AAbsolutely integrable 绝对可积绝对可积冲激响应Absolutely integrable impulse response绝对可和Absolutely summable绝对可和冲激响应Absolutely summable impulse response累加器Accumulator声学Acoustic加法器Adder可加性Additivity property混叠现象Aliasing全通系统All-pass systems幅度调制AM (Amplitude modulation )放大器Amplifier幅度调制Amplitude modulation (AM)幅度放大因子Amplitude-scaling factor模数转换器Analog-to-digital (A-to-D) converter分析公式(方程)Analysis equation复数的角度(相位)Angel (phase) of complex number角判据Angle criterion角度调制Angle modulationAnticausality 反因果AperiodicAperiodic convolution Aperiodic signal AsynchronousAudio systems Autocorrelation functions Automobile suspension system Averaging systemBBand-limitedBand-limited input signals Band-limited interpolation Bandpass filtersBandpass signalBandpass-sampling techniques BandwidthBartlett (triangular) window Bilateral Laplace transform BilinearBilinear transformationBit 非周期非周期卷积非周期信号异步的音频(声音)系统自相关函数汽车减震系统平滑系统带(宽)限的带限输入信号带限内插带通滤波器带通信号带通采样技术带宽巴特利特(三角形)窗双边拉普拉斯变换双线性的双线性变换(二进制)位,比特Block diagramsBode plotsBoundedBreak frequencyButterworth filtersC“ Chirp ” transform algorithm CapacitorCarrierCarrier frequencyCarrier signalCartesian (rectangular) form Cascade (series) interconnection Cascade-formCausal LTI systemChannelChannel equalizationChopper amplifierClosed-loopClosed-loop polesClosed-loop system 方框图波特图有界限的折转频率巴特沃斯滤波器“鸟声”变换算法电容器载波载波频率载波信号直角坐标形式串联,级联串联形式因果的线性时不变系统信道,频道信道均衡斩波器放大器闭环闭环极点闭环系统Closed-loop system function 闭环系统函数系数乘法器Coefficient multiplier系数Coefficients通信系统Communications systems交换性(交换律)Commutative property非理想元件的补偿Compensation for nonideal elements复数共轭Complex conjugate复指数载波Complex exponential carrier复指数信号Complex exponential signals复指数Complex exponential(s)复数Complex numbers条件稳定系统Conditionally stable systems共轭对称Conjugate symmetry共轭性质Conjugation property连续时间延迟Continuous-time delay连续时间滤波器Continuous-time filter连续时间傅立叶级数Continuous-time Fourier series连续时间傅立叶变换Continuous-time Fourier transform连续时间信号Continuous-time signalsContinuous-time systems 连续时间系统Continuous-to-discrete-time conversion 连续时间到离散时间转换Convergence 收敛卷积Convolution卷积积分Convolution integral卷积性质Convolution property卷积和Convolution sum相关函数Correlation function临界阻尼系统Critically damped systems互相关函数Crosss-correlation functions截至频率Cutoff frequenciesD阻尼正弦振荡Damped sinusoids阻尼系数Damping ratio直流偏移Dc offset直流序列Dc sequence临界阻尼反馈系统Deadbeat feedback systems分贝Decibels (dB)抽取Decimation抽取和内插Decimation and interpolation负反馈Degenerative (negative) feedback延迟DelayDelay time 延迟时间DemodulationDifference equations Differencing property Differential equations Differentiating filters Differentiation property DifferentiatorDigital-to-analog (D-to-A) converter Direct Form I realization Direct form II realization Direct-form Dirichlet conditions Dirichlet, P.L. Discontinuities Discrete-time filtersDiscrete-time Fourier series Discrete-time Fourier series pair Discrete-time Fourier transform ( DFT) Discrete-time LTI filters Discrete-time modulationDiscrete-time nonrecursive filters 解调差分方程差分性质微分方程微分滤波器微分性质微分器数模转换器直接I 型实现直接II 型实现直接型狄里赫利条件狄里赫利间断点,不连续离散时间滤波器离散时间傅立叶级数离散时间傅立叶级数对离散时间傅立叶变换离散时间线性时不变滤波器离散时间调制离散时间非递归滤波器Discrete-time signals 离散时间信号Discrete-time systems 离散时间系统Discrete-time to con ti nu ous-time conv ersion离散时间至U连续时间转换Dispersion 弥撒(现象)Distortion 扭曲,失真Distribution theory(property)分配律Dominant time constant 主时间常数Double-sideband modulation (DSB) 双边带调制Downsampling 减采样Duality 对偶性EEcho 回波Eigenfunctions 特征函数Eigenvalue 特征值Elliptic filters 椭圆滤波器Encirclement property 围线性质End points 终点—、八、、Energy of signals 信号的能量Energy-density spectrum 能量密度谱Envelope detector 包络检波器Envelope function 包络函数EqualizationEqualizer circuitsEquation for closed-loop poles Euler, L.Euler ' s relationEven signalsExponential signalsExponentialsFFast Fourier transform (FFT) FeedbackFeedback interconnection Feedback pathFilter(s)Final-value theoremFinite impulse response (FIR) Finite impulse response (FIR) filters Finite sum formulaFinite-duration signalsFirst differenceFirst harmonic components 均衡化均衡器电路闭环极点方程欧拉欧拉关系(公式)偶信号指数信号指数快速傅立叶变换反馈反馈联结反馈路径滤波器终值定理有限长脉冲响应有限长脉冲响应滤波器有限项和公式有限长信号一阶差分基波分量(一次谐波分量)First-order continuous-time systems 一阶连续时间系统一阶离散时间系统First-order discrete-time systems一阶递归离散时间滤波器First-order recursive discrete-time filters一阶系统First-order systems受迫响应Forced response正向通路Forward path傅立叶级数Fourier series傅立叶变换Fourier transform傅立叶变换对Fourier transform pairsFourier, Jean Baptiste Joseph 傅立叶(法国数学家,物理学家)频率响应Frequency response线性时不变系统的频率响应Frequency response of LTI systemsFreque ncy scali ng of contin uous-time连续时间傅立叶变化的频率尺度Fourier transform (变换性质)Frequency shift keying (FSK) 频移键控Frequency shifting property 频移性质Frequency-division multiplexing (FDM) 频分多路复用Frequency-domain characterization 频域特征Frequency-selective filter 频率选择滤波器Frequency-shaping filters 频率成型滤波器Fundamental components 基波分量Fundamental periodGGainGain and phase margin General complex exponentials Generalized functions Gibbs phenomenon Group delayHHalf-sample delay Hanning window Harmonic analyzerHarmonic components Harmonically relatedHeat propagation and diffusion Higher order holds Highpass filterHighpass-to-lowpass transformations Hilbert transformHomogeneity (scaling) propertyFundamental frequency 基波频率 基波周期增益 增益和相位裕度 一般复指数信号 广义函数 吉伯斯现象 群延迟半采样间隔时延 汉宁窗 谐波分析议 谐波分量 谐波关系 热传播和扩散现象 高阶保持 高通滤波器 高通到低通变换 希尔波特滤波器 齐次性(比例性)IIdeal 理想的理想带阻特征Ideal bandstop characteristic理想频率选择滤波器Ideal frequency-selective filter理想化Idealization恒等系统Identity system虚部Imaginary part冲激响应Impulse response冲激串Impulse train增量线性系统Incrementally linear systems独立变量Independent variable无限长脉冲响应Infinite impulse response (IIR)无限长脉冲响应滤波器Infinite impulse response (IIR) filters无限项和公式Infinite sum formula无限项泰勒级数Infinite taylor series初值定理Initial-value theorem冲激串采样Inpulse-train sampling瞬时的Instantaneous瞬时频率Instantaneous frequency时域积分Integration in time-domainIntegration property 积分性质Integrator 积分器Linear 线性InterconnectionIntermediate-frequency (IF) stage Intersymbol interference (ISI) Inverse Fourier transform Inverse Laplace transform Inverse LTI system Inverse system design Inverse z-transformInverted pendulum Invertibility of LTI systems Invertible systemsLLag network Lagrange, J.L.Laplace transform Laplace, P.S. de lead network互联 中频级 码间干扰 傅立叶反变换 拉普拉斯反变换 逆线性时不变系统 逆系统设计 z 反变换 倒立摆 线性时不变系统的可逆性 逆系统滞后网络 拉格朗日(法国数学家,力学家) 拉普拉斯变换 拉普拉斯(法国天文学家, 数学家) 超前网络left-half plane 左半平面 left-sided signal左边信号Linear constant-coefficient difference 线性常系数差分方程equationsLinear constant-coefficient differential线性常系数微分方程equations线性反馈系统Linear feedback systems线性插值Linear interpolation线性性Linearity对数幅-相图Log magnitude-phase diagram对数模图Log-magnitude plots无损失码Lossless coding低通滤波器Lowpass filters低通到高通的转换Lowpass-to-highpass transformation线性时不变系统响应LTI system response线性时不变系统分析LTI systems analysisM幅度和相位Magnitude and phase匹配滤波器Matched filter测量仪器Measuring devices记忆Memory无记忆系统Memoryless systemsModulating signal 调制信号Modulation 调制Modulation index 调制指数Modulation property 调制性质Moving-average filters移动平均滤波器Multiplexing 多路技术Multiplication property 相乘性质Multiplicities 多样性NNarrowband 窄带Narrowband frequency modulation 窄带频率调制Natural frequency 自然响应频率Natural response 自然响应Negative (degenerative) feedback 负反馈Nonanticipatibe system 不超前系统Noncausal averaging system非因果平滑系统Nonideal 非理想的Nonideal filters 非理想滤波器Nonmalized functions 归一化函数Nonrecursive 非递归Nonrecursive filters 非递归滤波器Non recursive lin ear con sta nt-coefficie nt 非递归线性常系数差分方程difference equationsNyquist frequency 奈奎斯特频率奈奎斯特率Nyquist rate奈奎斯特稳定性判据Nyquist stability criterionO奇次谐波Odd harmonic奇信号Odd signal开环Open-loop开环频率响应Open-loop frequency response开环系统Open-loop system运算放大器Operational amplifier正交函数Orthogonal functions正交信号Orthogonal signals示波器Oscilloscope过阻尼系统Overdamped system过采样Oversampling超量OvershootP并联Parallel interconnection并联型框图Parallel-form block diagramsParity check 奇偶校验检查Parseval ' s renlatioPartial-fraction expansionParticular and homogeneous solution PassbandPassband edgePassband frequencyPassband ripplePendulumPercent modulationPeriodicPeriodic complex exponentials Periodic convolutionPeriodic signalsPeriodic square wavePeriodic square-wave modulating signal Periodic train of impulsesPhase (angle) of complex number Phase lagPhase leadPhase marginPhase shift 帕斯伐尔关系(定理)部分分式展开特解和齐次解通频带通带边缘通带频率通带起伏(或波纹)钟摆调制百分数周期的周期复指数周期卷积周期信号周期方波周期方波调制信号周期冲激串复数相位(角度)相位滞后相位超前相位裕度相移Phase-reversal Phase modulation Plant Polar form PolesPole-zero plot(s) PolynomialsPositive (regenerative) feedback Power of signalsPower-series expansion method Principal-phase function Proportional (P) control Proportional feedback system Proportional-plus-derivative(PID) controlPulse-amplitude modulation Pulse-code modulation Pulse-train carrierProportional-plus-derivative feedback Proportional-plus-integral-plus-differential 相位倒置 相位调制 工厂 极坐标形式 极点 零极点图 多项式 正(再生)反馈 信号功率 幂级数展开的方法 主值相位函数 比例控制 比例反馈系统 比例加积分 比例加积分反馈比例-积分-微分控制脉冲幅度调制 脉冲编码调制 冲激串载波QQuadrature distortion Quadrature multiplexing Quality of circuitRRaised consine frequency responseRational frequency responses Rational transform RC highpass filter RC lowpass filter RealReal exponential signals Real partRectangular (Cartesian) form Rectangular pulse Rectangular pulse signal Rectangular windowRecursive (infinite impulse response) filters递归(无时限脉冲响应)滤波器Recursive linear constant-coefficient 递归的线性常系数差分方程 difference equationsRegenerative (positive) feedback正交失真 正交多路复用 电路品质(因数)升余弦频率响应 有理型频率响应 有理变换RC 高阶滤波器RC 低阶滤波器 实数 实指数信号 实部 直角(卡笛儿)坐标形式 矩形脉冲 矩形脉冲信号 矩形窗口再生(正)反馈Region of comvergence 收敛域right-sided signal 右边信号上升时间Rise time根轨迹分析(方法)Root-locus analysis动求和Running sumSS域S domain采样数据反馈系统Sampled-data feedback systems采样数据系统Sampled-data systems采样Sampling采样频率Sampling frequency采样函数Sampling function采样示波器Sampling oscilloscope采样周期Sampling period采样定理Sampling theorem比例性(齐次性)性质Scaling (homogeneity) propertyScaling in z domain z 域尺度变换扰频器Scrambler二次谐波分量Second harmonic components二阶Second-orderSecond-order continuous-time system 二阶连续时间系统Second-order discrete-time system 二阶离散时间系统Second-order systems 二阶系统序列sequenceSeries (cascade)级联(串联)interconnection筛选性质Sifting propertySinc functions sinc 函数单边带Single-sidebandSingle-sideband sinusoidal amplitude单边带正弦幅度调制modulation奇异函数Singularity functions正弦(信号)SinusoidalSinusoidal amplitude正弦幅度调制modulation正弦载波Sinusoidal carrierSinusoidal frequency正弦频率调制modulation滑动Sliding频谱系数Spectral coefficient频谱Spectrum语音加密器Speech scramblerS-plane S 平面方波Square waveStability 稳定性Step responseStep-invariant transformation StopbandStopband edgeStopband frequency Stopband ripple Stroboscopic effect SummerSuperposition integral Superposition property Superposition sum Suspension system Symmetric periodic SymmetrySynchronousSynthesis equationSystem function(s)T Table of propertiesTaylor series不稳定系统的稳定性(度)阶跃响应阶跃响应不定的变换阻带阻带边缘阻带频率阻带起伏(或波纹)频闪响应加法器叠加积分叠加性质叠加和减震系统周期对称对称性同步的综合方程系统方程性质列表泰勒级数Stabilization of unstable systemsTime advance property of unilateralz-transform单边z 变换的时间超前性质Time constants时间常数Time delay property z-transform ofunilateral单边z 变换的时间延迟性质Time expansion property时间扩展性质Time invariance时间变量Time reversal property时间反转(反褶)性Time scaling property时间尺度变换性Time shifting property时移性质Time window时间窗口Time-division multiplexing(TDM)时分复用Time-domain时域Time-domain properties时域性质Tracking system (s)跟踪系统Transfer function转移函数transform pairs变换对Transformation变换(变形)Transition band 过渡带Time 时间,时域Transmodulation (transmultiplexing) 交叉调制Triangular (Barlett) windowTrigonometric seriesTwo-sided signalType l feedback systemUUint impulse responseUint ramp function Undamped natural frequency Undamped system Underdamped systems UndersamplingUnilateralUnilateral Laplace transform Unilateral z-transformUnit circleUnit delayUnit doubletsUnit impulseUnit step functionsUnit step response Unstable systems 三角型(巴特利特)窗口三角级数双边信号l 型反馈系统单位冲激响应单位斜坡函数无阻尼自然相应无阻尼系统欠阻尼系统欠采样单边的单边拉普拉斯变换单边z 变换单位圆单位延迟单位冲激偶单位冲激单位阶跃函数单位阶跃响应不稳定系统VUnwrapped phaseUpsamplingVariableWWalsh functions Wave Wavelengths Weighted average WidebandWideband frequency modulation WindowingzZ domainZero force equalizer Zero-Input response Zero-Order holdZeros of Laplace transform Zero-state response z-transform z-transform pairs展开的相位特性增采样变量沃尔什函数 波形 波长 加权平均 宽带 宽带频率调制 加窗z 域置零均衡器 零输入响应零阶保持 拉普拉斯变换的零点 零状态响应 z 变换 z 变换对。
IEEE参考文献格式
![IEEE参考文献格式](https://img.taocdn.com/s3/m/e4979f05bed5b9f3f90f1c97.png)
•Creating a reference list or bibliographyA numbered list of references must be provided at the end of thepaper. The list should be arranged in the order of citation in the text of the assignment or essay, not in alphabetical order. List only one reference per reference number. Footnotes or otherinformation that are not part of the referencing format should not be included in the reference list.The following examples demonstrate the format for a variety of types of references. Included are some examples of citing electronic documents. Such items come in many forms, so only some examples have been listed here.Print DocumentsBooksNote: Every (important) word in the title of a book or conference must be capitalised. Only the first word of a subtitle should be capitalised. Capitalise the "v" in Volume for a book title.Punctuation goes inside the quotation marks.Standard formatSingle author[1] W.-K. Chen, Linear Networks and Systems. Belmont, CA: Wadsworth,1993, pp. 123-135.[2] S. M. Hemmington, Soft Science. Saskatoon: University ofSaskatchewan Press, 1997.Edited work[3] D. Sarunyagate, Ed., Lasers. New York: McGraw-Hill, 1996.Later edition[4] K. Schwalbe, Information Technology Project Management, 3rd ed.Boston: Course Technology, 2004.[5] M. N. DeMers, Fundamentals of Geographic Information Systems,3rd ed. New York : John Wiley, 2005.More than one author[6] T. Jordan and P. A. Taylor, Hacktivism and Cyberwars: Rebelswith a cause? London: Routledge, 2004.[7] U. J. Gelinas, Jr., S. G. Sutton, and J. Fedorowicz, Businessprocesses and information technology. Cincinnati:South-Western/Thomson Learning, 2004.Three or more authorsNote: The names of all authors should be given in the references unless the number of authors is greater than six. If there are more than six authors, you may use et al. after the name of the first author.[8] R. Hayes, G. Pisano, D. Upton, and S. Wheelwright, Operations,Strategy, and Technology: Pursuing the competitive edge.Hoboken, NJ : Wiley, 2005.Series[9] M. Bell, et al., Universities Online: A survey of onlineeducation and services in Australia, Occasional Paper Series 02-A. Canberra: Department of Education, Science andTraining, 2002.Corporate author (ie: a company or organisation)[10] World Bank, Information and Communication Technologies: AWorld Bank group strategy. Washington, DC : World Bank, 2002.Conference (complete conference proceedings)[11] T. J. van Weert and R. K. Munro, Eds., Informatics and theDigital Society: Social, ethical and cognitive issues: IFIP TC3/WG3.1&3.2 Open Conference on Social, Ethical andCognitive Issues of Informatics and ICT, July 22-26, 2002, Dortmund, Germany. Boston: Kluwer Academic, 2003.Government publication[12] Australia. Attorney-Generals Department. Digital AgendaReview, 4 Vols. Canberra: Attorney- General's Department,2003.Manual[13] Bell Telephone Laboratories Technical Staff, TransmissionSystem for Communications, Bell Telephone Laboratories,1995.Catalogue[14] Catalog No. MWM-1, Microwave Components, M. W. Microwave Corp.,Brooklyn, NY.Application notes[15] Hewlett-Packard, Appl. Note 935, pp. 25-29.Note:Titles of unpublished works are not italicised or capitalised. Capitalise only the first word of a paper or thesis.Technical report[16] K. E. Elliott and C.M. Greene, "A local adaptive protocol,"Argonne National Laboratory, Argonne, France, Tech. Rep.916-1010-BB, 1997.Patent / Standard[17] K. Kimura and A. Lipeles, "Fuzzy controller component, " U.S. Patent 14,860,040, December 14, 1996.Papers presented at conferences (unpublished)[18] H. A. Nimr, "Defuzzification of the outputs of fuzzycontrollers," presented at 5th International Conference onFuzzy Systems, Cairo, Egypt, 1996.Thesis or dissertation[19] H. Zhang, "Delay-insensitive networks," M.S. thesis,University of Waterloo, Waterloo, ON, Canada, 1997.[20] M. W. Dixon, "Application of neural networks to solve therouting problem in communication networks," Ph.D.dissertation, Murdoch University, Murdoch, WA, Australia, 1999.Parts of a BookNote: These examples are for chapters or parts of edited works in which the chapters or parts have individual title and author/s, but are included in collections or textbooks edited by others. If the editors of a work are also the authors of all of the included chapters then it should be cited as a whole book using the examples given above (Books).Capitalise only the first word of a paper or book chapter.Single chapter from an edited work[1] A. Rezi and M. Allam, "Techniques in array processing by meansof transformations, " in Control and Dynamic Systems, Vol.69, Multidemsional Systems, C. T. Leondes, Ed. San Diego: Academic Press, 1995, pp. 133-180.[2] G. O. Young, "Synthetic structure of industrial plastics," inPlastics, 2nd ed., vol. 3, J. Peters, Ed. New York:McGraw-Hill, 1964, pp. 15-64.Conference or seminar paper (one paper from a published conference proceedings)[3] N. Osifchin and G. Vau, "Power considerations for themodernization of telecommunications in Central and Eastern European and former Soviet Union (CEE/FSU) countries," in Second International Telecommunications Energy SpecialConference, 1997, pp. 9-16.[4] S. Al Kuran, "The prospects for GaAs MESFET technology in dc-acvoltage conversion," in Proceedings of the Fourth AnnualPortable Design Conference, 1997, pp. 137-142.Article in an encyclopaedia, signed[5] O. B. R. Strimpel, "Computer graphics," in McGraw-HillEncyclopedia of Science and Technology, 8th ed., Vol. 4. New York: McGraw-Hill, 1997, pp. 279-283.Study Guides and Unit ReadersNote: You should not cite from Unit Readers, Study Guides, or lecture notes, but where possible you should go to the original source of the information. If you do need to cite articles from the Unit Reader, treat the Reader articles as if they were book or journal articles. In the reference list or bibliography use the bibliographical details as quoted in the Reader and refer to the page numbers from the Reader, not the original page numbers (unless you have independently consulted the original).[6] L. Vertelney, M. Arent, and H. Lieberman, "Two disciplines insearch of an interface: Reflections on a design problem," in The Art of Human-Computer Interface Design, B. Laurel, Ed.Reading, MA: Addison-Wesley, 1990. Reprinted inHuman-Computer Interaction (ICT 235) Readings and Lecture Notes, Vol. 1. Murdoch: Murdoch University, 2005, pp. 32-37. Journal ArticlesNote: Capitalise only the first word of an article title, except for proper nouns or acronyms. Every (important) word in the title of a journal must be capitalised. Do not capitalise the "v" in volume for a journal article.You must either spell out the entire name of each journal that you reference or use accepted abbreviations. You must consistently do one or the other. Staff at the Reference Desk can suggest sources of accepted journal abbreviations.You may spell out words such as volume or December, but you must either spell out all such occurrences or abbreviate all. You do not need to abbreviate March, April, May, June or July.To indicate a page range use pp. 111-222. If you refer to only one page, use only p. 111.Standard formatJournal articles[1] E. P. Wigner, "Theory of traveling wave optical laser," Phys.Rev., vol. 134, pp. A635-A646, Dec. 1965.[2] J. U. Duncombe, "Infrared navigation - Part I: An assessmentof feasability," IEEE Trans. Electron. Devices, vol. ED-11, pp. 34-39, Jan. 1959.[3] G. Liu, K. Y. Lee, and H. F. Jordan, "TDM and TWDM de Bruijnnetworks and shufflenets for optical communications," IEEE Trans. Comp., vol. 46, pp. 695-701, June 1997.OR[4] J. R. Beveridge and E. M. Riseman, "How easy is matching 2D linemodels using local search?" IEEE Transactions on PatternAnalysis and Machine Intelligence, vol. 19, pp. 564-579, June 1997.[5] I. S. Qamber, "Flow graph development method," MicroelectronicsReliability, vol. 33, no. 9, pp. 1387-1395, Dec. 1993.[6] E. H. Miller, "A note on reflector arrays," IEEE Transactionson Antennas and Propagation, to be published.Electronic documentsNote:When you cite an electronic source try to describe it in the same way you would describe a similar printed publication. If possible, give sufficient information for your readers to retrieve the source themselves.If only the first page number is given, a plus sign indicates following pages, eg. 26+. If page numbers are not given, use paragraph or other section numbers if you need to be specific. An electronic source may not always contain clear author or publisher details.The access information will usually be just the URL of the source. As well as a publication/revision date (if there is one), the date of access is included since an electronic source may change between the time you cite it and the time it is accessed by a reader.E-BooksStandard format[1] L. Bass, P. Clements, and R. Kazman. Software Architecture inPractice, 2nd ed. Reading, MA: Addison Wesley, 2003. [E-book] Available: Safari e-book.[2] T. Eckes, The Developmental Social Psychology of Gender. MahwahNJ: Lawrence Erlbaum, 2000. [E-book] Available: netLibrary e-book.Article in online encyclopaedia[3] D. Ince, "Acoustic coupler," in A Dictionary of the Internet.Oxford: Oxford University Press, 2001. [Online]. Available: Oxford Reference Online, .[Accessed: May 24, 2005].[4] W. D. Nance, "Management information system," in The BlackwellEncyclopedic Dictionary of Management Information Systems,G.B. Davis, Ed. Malden MA: Blackwell, 1999, pp. 138-144.[E-book]. Available: NetLibrary e-book.E-JournalsStandard formatJournal article abstract accessed from online database[1] M. T. Kimour and D. Meslati, "Deriving objects from use casesin real-time embedded systems," Information and SoftwareTechnology, vol. 47, no. 8, p. 533, June 2005. [Abstract].Available: ProQuest, /proquest/.[Accessed May 12, 2005].Note: Abstract citations are only included in a reference list if the abstract is substantial or if the full-text of the article could not be accessed.Journal article from online full-text databaseNote: When including the internet address of articles retrieved from searches in full-text databases, please use the Recommended URLs for Full-text Databases, which are the URLs for the main entrance to the service and are easier to reproduce.[2] H. K. Edwards and V. Sridhar, "Analysis of software requirementsengineering exercises in a global virtual team setup,"Journal of Global Information Management, vol. 13, no. 2, p.21+, April-June 2005. [Online]. Available: Academic OneFile, . [Accessed May 31, 2005].[3] A. Holub, "Is software engineering an oxymoron?" SoftwareDevelopment Times, p. 28+, March 2005. [Online]. Available: ProQuest, . [Accessed May 23, 2005].Journal article in a scholarly journal (published free of charge on the internet)[4] A. Altun, "Understanding hypertext in the context of readingon the web: Language learners' experience," Current Issues in Education, vol. 6, no. 12, July 2003. [Online]. Available: /volume6/number12/. [Accessed Dec. 2, 2004].Journal article in electronic journal subscription[5] P. H. C. Eilers and J. J. Goeman, "Enhancing scatterplots withsmoothed densities," Bioinformatics, vol. 20, no. 5, pp.623-628, March 2004. [Online]. Available:. [Accessed Sept. 18, 2004].Newspaper article from online database[6] J. Riley, "Call for new look at skilled migrants," TheAustralian, p. 35, May 31, 2005. Available: Factiva,. [Accessed May 31, 2005].Newspaper article from the Internet[7] C. Wilson-Clark, "Computers ranked as key literacy," The WestAustralian, para. 3, March 29, 2004. [Online]. Available:.au. [Accessed Sept. 18, 2004].Internet DocumentsStandard formatProfessional Internet site[1] European Telecommunications Standards Institute, 揇igitalVideo Broadcasting (DVB): Implementation guidelines for DVBterrestrial services; transmission aspects,?EuropeanTelecommunications Standards Institute, ETSI TR-101-190,1997. [Online]. Available: . [Accessed:Aug. 17, 1998].Personal Internet site[2] G. Sussman, "Home page - Dr. Gerald Sussman," July 2002.[Online]. Available:/faculty/Sussman/sussmanpage.htm[Accessed: Sept. 12, 2004].General Internet site[3] J. Geralds, "Sega Ends Production of Dreamcast," ,para. 2, Jan. 31, 2001. [Online]. Available:/news/1116995. [Accessed: Sept. 12,2004].Internet document, no author given[4] 揂憀ayman抯?explanation of Ultra Narrow Band technology,?Oct.3, 2003. [Online]. Available:/Layman.pdf. [Accessed: Dec. 3, 2003].Non-Book FormatsPodcasts[1] W. Brown and K. Brodie, Presenters, and P. George, Producer, 揊rom Lake Baikal to the Halfway Mark, Yekaterinburg? Peking to Paris: Episode 3, Jun. 4, 2007. [Podcast television programme]. Sydney: ABC Television. Available:.au/tv/pekingtoparis/podcast/pekingtoparis.xm l. [Accessed Feb. 4, 2008].[2] S. Gary, Presenter, 揃lack Hole Death Ray? StarStuff, Dec. 23, 2007. [Podcast radio programme]. Sydney: ABC News Radio. Available: .au/newsradio/podcast/STARSTUFF.xml. [Accessed Feb. 4, 2008].Other FormatsMicroform[3] W. D. Scott & Co, Information Technology in Australia:Capacities and opportunities: A report to the Department ofScience and Technology. [Microform]. W. D. Scott & CompanyPty. Ltd. in association with Arthur D. Little Inc. Canberra:Department of Science and Technology, 1984.Computer game[4] The Hobbit: The prelude to the Lord of the Rings. [CD-ROM].United Kingdom: Vivendi Universal Games, 2003.Software[5] Thomson ISI, EndNote 7. [CD-ROM]. Berkeley, Ca.: ISIResearchSoft, 2003.Video recording[6] C. Rogers, Writer and Director, Grrls in IT. [Videorecording].Bendigo, Vic. : Video Education Australasia, 1999.A reference list: what should it look like?The reference list should appear at the end of your paper. Begin the list on a new page. The title References should be either left justified or centered on the page. The entries should appear as one numerical sequence in the order that the material is cited in the text of your assignment.Note: The hanging indent for each reference makes the numerical sequence more obvious.[1] A. Rezi and M. Allam, "Techniques in array processing by meansof transformations, " in Control and Dynamic Systems, Vol.69, Multidemsional Systems, C. T. Leondes, Ed. San Diego: Academic Press, 1995, pp. 133-180.[2] G. O. Young, "Synthetic structure of industrial plastics," inPlastics, 2nd ed., vol. 3, J. Peters, Ed. New York:McGraw-Hill, 1964, pp. 15-64.[3] S. M. Hemmington, Soft Science. Saskatoon: University ofSaskatchewan Press, 1997.[4] N. Osifchin and G. Vau, "Power considerations for themodernization of telecommunications in Central and Eastern European and former Soviet Union (CEE/FSU) countries," in Second International Telecommunications Energy SpecialConference, 1997, pp. 9-16.[5] D. Sarunyagate, Ed., Lasers. New York: McGraw-Hill, 1996.[8] O. B. R. Strimpel, "Computer graphics," in McGraw-HillEncyclopedia of Science and Technology, 8th ed., Vol. 4. New York: McGraw-Hill, 1997, pp. 279-283.[9] K. Schwalbe, Information Technology Project Management, 3rd ed.Boston: Course Technology, 2004.[10] M. N. DeMers, Fundamentals of Geographic Information Systems,3rd ed. New York: John Wiley, 2005.[11] L. Vertelney, M. Arent, and H. Lieberman, "Two disciplines insearch of an interface: Reflections on a design problem," in The Art of Human-Computer Interface Design, B. Laurel, Ed.Reading, MA: Addison-Wesley, 1990. Reprinted inHuman-Computer Interaction (ICT 235) Readings and Lecture Notes, Vol. 1. Murdoch: Murdoch University, 2005, pp. 32-37.[12] E. P. Wigner, "Theory of traveling wave optical laser,"Physical Review, vol.134, pp. A635-A646, Dec. 1965.[13] J. U. Duncombe, "Infrared navigation - Part I: An assessmentof feasibility," IEEE Transactions on Electron Devices, vol.ED-11, pp. 34-39, Jan. 1959.[14] M. Bell, et al., Universities Online: A survey of onlineeducation and services in Australia, Occasional Paper Series 02-A. Canberra: Department of Education, Science andTraining, 2002.[15] T. J. van Weert and R. K. Munro, Eds., Informatics and theDigital Society: Social, ethical and cognitive issues: IFIP TC3/WG3.1&3.2 Open Conference on Social, Ethical andCognitive Issues of Informatics and ICT, July 22-26, 2002, Dortmund, Germany. Boston: Kluwer Academic, 2003.[16] I. S. Qamber, "Flow graph development method,"Microelectronics Reliability, vol. 33, no. 9, pp. 1387-1395, Dec. 1993.[17] Australia. Attorney-Generals Department. Digital AgendaReview, 4 Vols. Canberra: Attorney- General's Department, 2003.[18] C. Rogers, Writer and Director, Grrls in IT. [Videorecording].Bendigo, Vic.: Video Education Australasia, 1999.[19] L. Bass, P. Clements, and R. Kazman. Software Architecture inPractice, 2nd ed. Reading, MA: Addison Wesley, 2003. [E-book] Available: Safari e-book.[20] D. Ince, "Acoustic coupler," in A Dictionary of the Internet.Oxford: Oxford University Press, 2001. [Online]. Available: Oxford Reference Online, .[Accessed: May 24, 2005].[21] H. K. Edwards and V. Sridhar, "Analysis of softwarerequirements engineering exercises in a global virtual team setup," Journal of Global Information Management, vol. 13, no. 2, p. 21+, April-June 2005. [Online]. Available: AcademicOneFile, . [Accessed May 31,2005].[22] A. Holub, "Is software engineering an oxymoron?" SoftwareDevelopment Times, p. 28+, March 2005. [Online]. Available: ProQuest, . [Accessed May 23, 2005].[23] H. Zhang, "Delay-insensitive networks," M.S. thesis,University of Waterloo, Waterloo, ON, Canada, 1997.[24] P. H. C. Eilers and J. J. Goeman, "Enhancing scatterplots withsmoothed densities," Bioinformatics, vol. 20, no. 5, pp.623-628, March 2004. [Online]. Available:. [Accessed Sept. 18, 2004].[25] J. Riley, "Call for new look at skilled migrants," TheAustralian, p. 35, May 31, 2005. Available: Factiva,. [Accessed May 31, 2005].[26] European Telecommunications Standards Institute, 揇igitalVideo Broadcasting (DVB): Implementation guidelines for DVB terrestrial services; transmission aspects,?EuropeanTelecommunications Standards Institute, ETSI TR-101-190,1997. [Online]. Available: . [Accessed: Aug. 17, 1998].[27] J. Geralds, "Sega Ends Production of Dreamcast," ,para. 2, Jan. 31, 2001. [Online]. Available:/news/1116995. [Accessed Sept. 12,2004].[28] W. D. Scott & Co, Information Technology in Australia:Capacities and opportunities: A report to the Department of Science and Technology. [Microform]. W. D. Scott & Company Pty. Ltd. in association with Arthur D. Little Inc. Canberra: Department of Science and Technology, 1984.AbbreviationsStandard abbreviations may be used in your citations. A list of appropriate abbreviations can be found below:。
自动化专业英语课后单词及课后句子总结
![自动化专业英语课后单词及课后句子总结](https://img.taocdn.com/s3/m/ddd37148f7ec4afe04a1df19.png)
P3U1architecture n. 体系结构instruction set 指令集binary-coded adj. 二进制编码的central processing unit (CPU) 中央处理器processor n. 处理器location n. (存储)单元word length 字长access v. 存取,接近fetch v., n. 取来field n. 域,字段opcode n. 操作码operand n. 操作数address n. 寻址single-precision adj. 单精度的floating-point adj. 浮点的terminal n. 终端complement v. 补充,求补decode v. 解码,译码request n. 请求inactive n. 不活动,停止I/O-mapped adj. 输入/输出映射的(单独编址)memory-mapped adj. 存储器映射的(统一编址)难句翻译[1] …how the instruction execution cycle is broken down into its various components.……指令执行周期怎样分解成不同的部分。
[2] One way to achieve meaningful patterns is to divide up the bits into fields…一种得到(指令)有效形式的方法是将(这些)位分成段……[3] The majority of computer tasks involve the ALU, but a great amount of data movement is required in order to make use of the ALU instructions.计算机的大多数工作涉及到ALU(逻辑运算单元),但为了使用ALU指令,需要传送大量的数据。
FedEx Dangerous Goods Checklist说明书
![FedEx Dangerous Goods Checklist说明书](https://img.taocdn.com/s3/m/613884267f21af45b307e87101f69e314332fa9f.png)
DIRECTIONS:Mark the appropriate box for each item to indicate if the shipment complies with the requirement. Check all sides of the package, as applicable.1.Shipment is prepared per IATA, does not have only the Surface (ground) Limited Quantity mark or marked as ORM-D/ORM-D-AIR. [7.1.D]NY2.Shipment acceptable by both origin and destination locations. If A130, ensure radioactives accepted by origin and destination. [eSRG]NY3. Package in good condition and free of leakage , odor , or external damage . [5.0.2.4.1; 9.1.3.1 (i)]NY4. Shipper’s Declaration included. [8.0.1.1] Typewritten or computer-generated per FX-07.NY 5. Shipment not forbidden. [4.2]N Y6.A20 in blue pages column M: Keep Away From Heat label, declaration statement, and technical name when required per NYN/A7.Shipper’s Declaration prepared per FX-18 (does not apply to 023 shipments or shipments originating in U.S. territories or non-U.S. locations).N Y N/A8.Shipper and Consignee name and full address . For 023 shipments, shipper’s address includes country name. [8.1.6.1; 8.1.6.2]NY9.Page of Pages . [8.1.6.4]N Y 10. Passenger and Cargo Aircraft or Cargo Aircraft Onlylimitations correctly indicated. [8.1.6.5]NY11. Non-radioactive correctly indicated (except A130). [8.1.6.8]N Y 12. UN or ID number preceded by prefix “UN” or “ID”.[8.1.6.9.1, Step 1]NY13. Proper Shipping Name , including technical name inparentheses ( ) or “SAMPLE” forentries. UN2814 or UN2900: Technical name in parentheses or “suspected category A infectious substance” in parentheses. [3.11.2; 4.1.2.1 (d); 8.1.6.9.1, Step 2; A140]NY14. Class or Division number(s), and when 1.4 indicated,Compatibility Group letter included, matching Column C of 4.2. [8.1.6.9.1, Step 3]NY15. Subsidiary hazard(s) in parentheses immediately followingclass or division, matching Column C of 4.2. [8.1.6.9.1, Step 4]N Y N/A 16. Packing Group (e.g., I, II, or III), matching column E. IfSAMPLE used as technical name, shipper selects most restrictive packing group for Proper Shipping Name. [3.11.1; 8.1.6.9.1, Step 5]NYN/A 17. Number of packages and type of packaging (e.g., 1fibreboard box, 1 box fibreboard, or 1 4G fibreboard box). [8.1.6.9.2, Step 6]NY18. Net quantity (e.g., g, kg, L, mL) or gross weight (kg G) perpackage in metric units, not exceeding Packing Instruction maximum per package. If “sample ” is included in proper shipping name, the net quantity does not exceed 2.5 kg. [3.11.3; 8.1.6.9.2, Step 6 (a); Appendix B.1.1]NY19. Packing Instruction number indicated (e.g., 361, or Y441with Y prefix for limited quantity). [8.1.6.9.3]NY20. Shipment complies with special provisions. [4.2, column M]N Y N/A 21. 24-hour emergency response telephone number, includinginternational prefix, if required by State or Operator variation. [2.8]N Y N/A22. Name , date , and shipper’s signature (signature may betypewritten for U.S. domestic shipments, including U.S. territories). [8.1.4.1; 8.1.6.13-15]NY23. Shipper’s same signature next to amendments andalterations (changes). [8.1.2.6]NOTE: An insertion in different handwriting or printing is notNY N/A 25. Package large enough to support all markings, labels,documentation and none are placed on the bottom of the package. FedEx branded packaging (including brown boxes) not used. [FX-06]NY26. Shipper and Consignee name and full address marked onpackage. [7.1.4.1 (b)]NY 27. UN or ID number preceded by prefix “UN ” or “ID ”, meets size requirements and corresponds to declaration. [7.1.4.1 (a); 7.1.4.4]N Y 28. Proper Shipping Name, including technical name inparentheses ( ) or “SAMPLE” for entries, andcorresponds to declaration.UN2814 or UN2900: Technical name not required. [7.1.4.1 (a); A140]NY29. Package permitted by Packing Instruction and inspecification packaging , if required. [5.0.1.2 (b)]NYN/A30.Specification Packaging : Performance rating (X, Y , Z) corresponds with Packing Group (I, II or III) unless further limited by Packing Instruction, Special Permit, or Special Provision (not required on outermost package for Overpack). Handwritten specification markings unacceptable. [6.0.4.2.1 (c)]NY N/A 31.Specification Packaging with S:.4G/x35/S /22/C222.Enter UN Specification weight limit: ________________ kg (Max weight as listed within the UN Specification marking; e.g. 4G/x 35/S/22/C222)Enter actual package gross weight:________________ kg (T otal weight of the package from airbill or package label)Actual package gross weight DOES NOT EXCEED UN specification weight limit (not required for 6.2 packages or Overpack). [6.0.4.2.1 (d)]N/ANY 32. More than one outer package , net quantity or gross weight(in metric units) marked on package. Not applicable to ID 8000 or when contents are same UN #, PSN, packing group, and quantity. [7.1.4.1 (c)]NYN/A 33. Dry Ice : Net weight marked on package in kilograms. [7.1.4.1 (d)]N Y N/A 34. UN3356: Package marked with DOT31FP specificationmarking unless overpacked. [FX-02 (e); USG-18]NYN/A35. UN3077 or UN3082: the Environmentally HazardousSubstance Mark is required. [7.1.5.3]N Y N/A36. Primary hazard label(s), matching column D. Hazard labelon same surface and in diamond shape near Proper Shipping Name marking when package dimensions are adequate . [7.2.3; 7.2.6.2.1; 7.2.6.2.5]N Y N/A37. Subsidiary hazard label(s), matching column D or requiredby Special Provision, affixed on same surface near hazard label(s) when required and in diamond shape, unlesspackage dimensions inadequate. [7.2.3; 7.2.6.2.3; 7.2.6.2.5]NY N/A 38. Cargo Aircraft Only label, when required, must be affixedon same surface of package near hazard label(s). [7.2.4.2; 7.2.6.3]NY N/Ac. “KEEP UPRIGHT” at 120-degree intervals aroundpackage OR on each side. [7.1.4.1 (f);]N Yd. Two Package Orientation labels (Up Arrows). [7.1.4.1 (f)]NYe. Instructions to be followed in event of emergency, delay, orif shipment is unclaimed. [7.1.4.1 (f)]NY(package type code) Class 6.2. (Not required on65. When different DG are packed in same Overpack andrequire multiple hazard labels, labels adjacent to each other(not opposite side). [7.2.6.2.4]NY N/A66. More than one Overpack used, unique identification mark(tracking number may be used) and total quantity of DG byUN number (including unit of measure) on both declarationand package. [7.1.7.3; Figure 8.1.L and 8.1.M]NY N/A67. Overpacks containing UN1070, UN1072, UN2451, UN3156,UN3157, or UN3356:• The shipper’s declaration has the statement: “This shipment is prepared in accordance with USG-18 and FX-02 (e)”:OR• The overpack packaging is marked “DOT-31FP compliant”N Y N/A69. If required, Competent Authority (CA) or DOT-SP approvalnumber indicated in the Authorization field on declaration and approval document attached when needed and complies with special permit/CA requirements. [8.1.6.9.4]N Y N/A70. Complies with all other applicable State and Operatorvariations . [2.8] NY 71. If USG-04, “RQ” is indicated before or after basic descriptionon declaration when marked on the package. “RQ” is marked on package when on declaration. N Y N/A72. US domestic shipment marked with “This packageconforms to 49CFR173.13”. Complies with 49CFR173.13 requirements for hazard class, labeling, transport type and packaging. [FX-02 (a) and (d); 49CFR: 173.13]N Y N/AIf there are any discrepancies indicated, your shipment cannot be transported by FedEx Express. In the U.S., this shipment is returned to the Shipper using DOT-SP 14691. In the U.S., call 1.800.GoFedEx and press “81” then “4” for assistance. For non-U.S. locations, please contact your local Customer Service representative.ACCEPTED REJECTEDInspected By _______________________________ Employee # ______________Shipper Contact Name __________________________________________________Shipper Contact Phone # _________________________________________________Printed or other static representations of this document are considered uncontrolled and for reference only.。
自动化专业专业外语单词
![自动化专业专业外语单词](https://img.taocdn.com/s3/m/ffb73d45a8956bec0975e353.png)
abound v. 大量存在accelerate v. 加速active network 有源网络ad hoc 尤其,特定地admissible adj. 允许的advent n. 出现aforementioned adj. 上述的airgap = air gap 气隙algebraic equation 代数方程alignment n. 组合alleviate v. 减轻,缓和altitude n. 海拔amortisseur n. 阻尼器amplifier n. 放大器amplify v. 放大amplitude n. 振幅apparatus n. 装置approach n. 途径方法研究aptness n. 恰当arbitrary adj. 任意的argument n. 辐角,相位armature n. 电枢,衔铁,加固arrival angle 入射角arrival point 汇合点assembly n. 装置,构件assumption n. 假设asymmetric adj. 不对称的asymptote n. 渐进线asymptotically stable渐近稳定at rest 处于平衡状态attain v. 达到,实现autonomous adj.自激的bandwidth n. 带宽become adept in 熟练binary adj. 二进制的bipolar adj. 双向的Boolean algebra 布尔代数bound v. 限制break frequency 转折频率breakdown n. 击穿,雪崩breakover n. 导通brush n. 电刷building blocks 积木cage n. 笼子,笼形capacitor n. 电容器carrier n. 载波,载体cascade n., v. 串联characteristic adj. 特性(的)n. 特性曲线characteristicequation特方程circuitry n. 电路closed-loop n. 闭环coefficient n. 系数coil n. 绕组,线圈;v. 盘绕coincide v. 一致common logarithm 常对数complex adj. 复数的n.复数comprise v. 包含conduction n. 导电,传导configuration n. 构造,结构confine v. 限制…范围内conjugate adj. 共轭的constant matrix 常数矩阵constitute v. 构造,组织constraint n. 强迫,约束constraint n. 约束条件continuum n. 连续controllabillity n. 能控性converge v. 集中,汇聚,收敛core n. 铁心corresponding adj. 相应的criteria n. 判据critically damped 临界阻尼crystal n. 晶体cumulative adj. 累积的damp v. 阻尼,减幅,衰减damping n. 阻尼;adj. 阻尼的decay v. 衰减decibel n. 分贝decouple v. 解耦,退耦deduce v. 演绎demagnetization 去磁,退磁denominator n. 分母dependent variable 应变量depict v. 描述derivation n. 导数deteriorate v. 恶化,变坏deterministic adj. 确定的develop v. 导出,引入difference equation 差分方程differential 差别的,微分的differentiate v. 微分diode n. 二极管discrete adj. 离散的distributed 分散的分布的disturbance n. 扰动,干扰domain n. 域,领域dominate v. 支配,使服从dominating pole 主极点dual adj. 双的,对偶的dutyratio 占空比,功率比dynamic response 动态响应eigenvalue n. 特征根elastic adj. 有弹性的electric charge 电荷eliminate v. 消除,对消elongate v. 延长,拉长emf(electromotive force )电动势emitter n. 发射极encircle v. 环绕enclose v. 围绕encompass v. 包含entail v., n. 负担,需要equation 方程even adj. 偶数的excitation n. 激励exponential adj. 指数的extreme adj. 极端的facilitatev. 使容易,促进factor n. 因子;v. 分解因式factored adj. 可分解的feedback n. 反馈fictitious adj. 假想的field winding n. 励磁绕组field-weakening n. 弱磁filter n. 滤波器,滤波final value 终值firing angle 触发角flip-flop n. 触发器force commutated 强制换向forcing frequency 强制频率formulation n. 公式化forward biased 正向偏置fractional adj. 分数的fractional adj. 小数的fundamental n. 基本原理gate n. 门,门电路general form 一般形式generalize v. 一般化,普及generator n. 发生器,发电机geometry 几何学几何形状globally stable 全局稳定gouge v. 挖gross national product 国民生产总值GTO 门极可关断晶闸管guarantee v., n. 保证,担保hardware n. 硬件harmonics n. 谐波holding current 保持电流homogeneous solution 通解horizontally adv. 水平地horsepower n. 功率horsepower n. 马力,功率Hurwitz criterion 赫尔维茨据hybrid n. 混合identify v. 确认,识别,辨识identity n. 一致性,等式igit n. 位数imaginary axis 虚轴implement v. 实现implementation 实现履行impulse v. 冲激in series 串联incidentally adv. 偶然地increment n. 增量indentation n. 缺口independent variable 自变量inductor n. 电感器infinitesimal adj. 无限小的inhibit v. 抑制initial condition 初始条件initial value 初值insofar as 到这样的程度在……范围内integer n. 整数integral / integrate 积分integrated circuit 集成电路intersect v. 相交interval n. 间隔intrinsic adj. 固有的,本征intrinsic adj. 内在的intuition n. 直觉intuitively adv. 直观地inverse transform 反(逆)变换Kirchhoff’s first law 基尔霍夫第一定律lag v., n. 延迟lagging n. 滞后Laplace transformation拉变换lead n. 导线leading adj. 超前的leakage current 漏电流linearazation n. 线性化locally stable 局域稳定loop current 回路电流lumped adj. 集中的magnitude n. 幅值manipulate v. 处理matrix n. 模型,矩阵matrix algebra 矩阵代数mechanize v. 使机械化merit n. 优点;指标,准则mesh n. 网孔minimize v. (使)最小化minimum phase 最小相位misinterpretation 曲解误译model n. 模型v. 建模modification n. 修正,修改multiplication n. 复合性multiply v. 加倍,倍增multivariable adj. 多变量的multivariable n. 多变量n-dimensional n维的net n. 净值;adj. 净值的network n. 网络,电路neutral adj. 中性的;n. 中性线nonlinear adj. 非线性的notch n. 换相点,换级点numerator n. 分子numerical adj. 数字的observability n. 能观性observable adj. 可观测的odd multiple 奇数倍omit v. 省略on the order of 约为open-loop n. 开环optimal control 最优控制order n. 阶origin n. 原点oscillation n. 振荡outline n. 轮廓;v. 提出……的要点overdamped adj. 过阻尼的overshoot n. 超调量,超调package n. 包parallel n. 类似parameter n. 参数partial fraction expansion 部分分式展开式particular solution 特解passive adj. 被动的,无源的passive network 无源网络peak time 峰值时间performance criteria 性能指标performance index 性能指标periodic adj. 周期性的phase n. 状态,相位phase sequence 相序phase-lag n. 相位滞后phase-plane equation相平面方程pilot n. 飞行员plant n. 机器,设备被控对象plot v. 绘图n. 曲线图polar plot 极坐标图polarity n. 极性polynomial n. 多项式portrait n. 描述positive definite 正定potential n. (电)势power factor 功率因数predictable adj. 可断定的predominance n. 优势prevalent adj. 流行的prevent…from doing 使……不……principal adj. 主要的probability theory 概率论procedure n. 程序,过程product n. 乘积property n. 性质proportional to 与…成正比Pulsate v. 脉动,跳动,振动quadrant n. 象限quadratic adj. 二次的;n. 二次方程qualitatively adv. 定性地quasi adj. 近似的radically adv. 完全地radius n. 半径radix n. 权random adj. 随机的rated adj. 额定的,设计的,适用的rationale n. 理论real axis 实轴recovery n. 恢复rectification n. 整流rectifier n. 整流器regulate v. 调整relay n. 继电器relevance n. 关联remainder n. 余数represent v. 代表,表示resistance n. 阻抗resistor n. 电阻器reveal v. 显现,揭示reverse 反转变换极性的reverse biased 反向偏置rheostat n. 变阻器ripple n. 波纹,波动rise time 上升时间rms = root-mean-square 有效值,方均根rotor n. 转子Routh criterion 劳斯判据rugged adj. 结实的,耐用的sampled-data n. 采样数据saturation n. 饱和scalar adj. 数量的,标量的;n.数量,标量scheme n. 方法,形式,示意图schottky diode 肖基特二极管semicircle n. 半圆形semiconductor n. 半导体sensor n. 传感器settling time 调节时间shaft n. 转轴shifting theorem 平移定理shutdown v. 关闭sign n. 符号significance n. 意义simplicity n. 简单simultaneously adv. 同时地sketch v., n. (绘)草图,素描slip n. 转差(率)slop n. 斜率slot n. 槽SMPS 开关电源snubber n. 缓冲器,减震器spatial adj. 空间的spring n. 弹簧square-wave n. 方波stability n. 稳定性startup n. 启动state variable 状态变量state-controllable 状态可控的stationary adj. 静态的stator n. 定子steady-state n. 稳态step n. 阶跃(信号)stepper motor 步进电动机stimulus n. 刺激,鼓励stochastic adj. 随机的straight-forward 直截了当的,简单的strategy n. 方法superposition n. 叠加supersede v. 取代suppress v. 抑制symbolic 符号的,记号的symmetrical adj. 对称的terminology n. 术语threshold n. 门限,阈限,极限thyratron n. 闸流管thyristor n. 晶闸管time-invariant adj. 时不变的tip n. 顶端tolerant adj. 容许的,容忍的trade deficit 贸易赤字trade off 换取trail-and-error n. 试凑法trajectories n. 轨迹,弹道transient adj. 暂态的,瞬态的,过渡的transient response 暂态响应transistor n. 晶体管triangular adj. 三角的turn n. 匝数tutorial adj. 指导性的underdampted 欠阻尼的undergo v. 经历uniform adj. 一致的variable n. 变量vector n. 矢量vertically adv. 垂直地violently adv. 激烈地voltage drop 电压降winding 缠绕的,线圈,绕组with respect to 相对于workhorse n. 重载,重负荷wound-rotor n. 绕线转子yield v. 推导出,得出。
Alphacool Core W
![Alphacool Core W](https://img.taocdn.com/s3/m/f481b0643868011ca300a6c30c2259010302f356.png)
Alphacool Core Wärmeleitpad Soft 6.2W/mk1.1. Product identifier1.2. Relevant identified uses of the substance or mixture and uses advised againstHeat transferring agentUse of the substance/mixture1.3. Details of the supplier of the safety data sheetAlphacool International GmbHCompany name:TochtergesellschaftStreet:Marienberger Str. 1Place:D-38122 BraunschweigTelephone:Telefax:0531 28874-00531 28874-22e-mail:Ronald WillmsContact person:05207 95846-205Telephone:e-mail: Internet:+49 (0) 6131 192401.4. Emergency telephone number:2.1. Classification of the substance or mixtureGB CLP RegulationThis mixture is not classified as hazardous in accordance with GB CLP Regulation.2.2. Label elementsNo information available.2.3. Other hazards3.2. MixturesHazardous componentsFull text of H and EUH statements: see section 16.4.1. Description of first aid measuresProvide fresh air. If experiencing respiratory symptoms: Get emergency medical help immediately.After inhalationAfter contact with skin, wash immediately with plenty of water and soap.After contact with skinRinse immediately carefully and thoroughly with eye-bath or water. If skin irritation occurs: Get medical help.After contact with eyesRinse mouth thoroughly with water. Get medical advice/attention if you feel unwell.After ingestion4.2. Most important symptoms and effects, both acute and delayedThis article contains hazardous substances or mixtures intended to be released under normal or reasonably foreseeable conditions of use.4.3. Indication of any immediate medical attention and special treatment neededTreat symptomatically.5.1. Extinguishing mediaCo-ordinate fire-fighting measures to the fire surroundings.Suitable extinguishing media5.2. Special hazards arising from the substance or mixtureNon-flammable.5.3. Advice for firefightersIn case of fire: Wear self-contained breathing apparatus.Collect contaminated fire extinguishing water separately. Do not allow entering drains or surface water.Additional information6.1. Personal precautions, protective equipment and emergency proceduresAvoid dust formation. Do not breathe dust. Avoid contact with eyes and skin.General adviceDo not allow to enter into surface water or drains.6.2. Environmental precautions6.3. Methods and material for containment and cleaning upTake up mechanically. Treat the recovered material as prescribed in the section on waste disposal.For cleaning upSafe handling: see section 7Personal protection equipment: see section 8Disposal: see section 136.4. Reference to other sections7.1. Precautions for safe handlingProvide adequate ventilation. Avoid breathing dust/mist. Wear personal protection equipment (refer to section 8).Advice on safe handlingNo special fire protection measures are necessary.Advice on protection against fire and explosionWash hands before breaks and after work. When using do not eat, drink, smoke, sniff.Advice on general occupational hygiene7.2. Conditions for safe storage, including any incompatibilitiesKeep container tightly closed.Requirements for storage rooms and vesselsNo special measures are necessary.Hints on joint storage7.3. Specific end use(s)Heat transferring agent8.1. Control parameters Exposure limits (EH40)Category fibres/mlmg/m³ppmSubstanceCAS No Origin TWA (8 h)-Aluminium oxides, inhalable dust1344-28-110WEL8.2. Exposure controlsIndividual protection measures, such as personal protective equipmentWear eye/face protection.Eye/face protectionWear suitable gloves.Hand protectionUse of protective clothing.Skin protectionIn case of inadequate ventilation wear respiratory protection.Respiratory protectionsolid Physical state:9.1. Information on basic physical and chemical propertiesColour:blue neutralOdour:Changes in the physical state not determined Melting point/freezing point:not determined Boiling point or initial boiling point and boiling range:not applicable Flash point:Flammabilitynot determined Solid/liquid:not applicableGas:The product is not: Explosive.Explosive propertiesnot determinedLower explosion limits:not determinednot determined Auto-ignition temperature:not determined Decomposition temperature:pH-Value:not determined Water solubility:The study does not need to be conductedbecause the substance is known to beinsoluble in water.Solubility in other solventsnot determinedPartition coefficient n-octanol/water:not determined Vapour pressure:not determined Density:not determined Relative density:3,1 Relative vapour density:not determined 9.2. Other informationInformation with regard to physical hazard classesOxidizing propertiesThe product is not: oxidising.Other safety characteristicsSolid content:not determined Evaporation rate:not determinedFurther Information10.1. ReactivityNo hazardous reaction when handled and stored according to provisions.10.2. Chemical stabilityThe product is stable under storage at normal ambient temperatures.10.3. Possibility of hazardous reactionsNo known hazardous reactions.10.4. Conditions to avoidnone10.5. Incompatible materialsOxidising agent, strong10.6. Hazardous decomposition productsNo known hazardous decomposition products.Acute toxicityBased on available data, the classification criteria are not met.Based on available data, the classification criteria are not met.Irritation and corrosivitySensitising effectsBased on available data, the classification criteria are not met.Carcinogenic/mutagenic/toxic effects for reproductionBased on available data, the classification criteria are not met.STOT-single exposureBased on available data, the classification criteria are not met.Based on available data, the classification criteria are not met.STOT-repeated exposureAspiration hazardBased on available data, the classification criteria are not met.Further informationThe mixture is classified as not hazardous according to regulation (EC) No 1272/2008 [CLP].12.1. ToxicityThe product is not: Ecotoxic.12.2. Persistence and degradabilityThe product has not been tested.12.3. Bioaccumulative potentialThe product has not been tested.BCFSourceSpeciesBCF Chemical name CAS No 1344-28-1Aluminium Oxide100-11000The product has not been tested. The study does not need to be conducted because the substance is known to be insoluble in water.12.4. Mobility in soil12.5. Results of PBT and vPvB assessmentThe substances in the mixture do not meet the PBT/vPvB criteria according to UK REACH.The product has not been tested.This product does not contain a substance that has endocrine disrupting properties with respect to non-target organisms as no components meets the criteria.12.6. Endocrine disrupting propertiesNo information available.12.7. Other adverse effectsDo not allow to enter into surface water or drains. Do not allow to enter into soil/subsoil.Further information13.1. Waste treatment methodsDo not allow to enter into surface water or drains. Do not allow to enter into soil/subsoil. Dispose of wasteaccording to applicable legislation.Land transport (ADR/RID)14.1. UN number or ID number:No dangerous good in sense of this transport regulation.14.2. UN proper shipping name:No dangerous good in sense of this transport regulation.14.3. Transport hazard class(es):No dangerous good in sense of this transport regulation.14.4. Packing group:No dangerous good in sense of this transport regulation.14.6. Special precautions for userNo dangerous good in sense of this transport regulation.14.7. Maritime transport in bulk according to IMO instrumentsNo dangerous good in sense of this transport regulation.EU regulatory informationInformation according to 2012/18/EUNot subject to 2012/18/EU (SEVESO III) (SEVESO III):National regulatory informationWater hazard class (D):1 - slightly hazardous to water15.2. Chemical safety assessmentChemical safety assessments for substances in this mixture were not carried out.Abbreviations and acronymsCLP: Classification, labelling and PackagingREACH: Registration, Evaluation and Authorization of ChemicalsGHS: Globally Harmonised System of Classification, Labelling and Packaging of ChemicalsUN: United NationsCAS: Chemical Abstracts ServiceDNEL: Derived No Effect LevelDMEL: Derived Minimal Effect LevelPNEC: Predicted No Effect ConcentrationATE: Acute toxicity estimateLC50: Lethal concentration, 50%LD50: Lethal dose, 50%LL50: Lethal loading, 50%EL50: Effect loading, 50%EC50: Effective Concentration 50%ErC50: Effective Concentration 50%, growth rateNOEC: No Observed Effect ConcentrationBCF: Bio-concentration factorPBT: persistent, bioaccumulative, toxicvPvB: very persistent, very bioaccumulativeADR: Accord européen sur le transport des marchandises dangereuses par Route(European Agreement concerning the International Carriage of Dangerous Goods by Road)RID: Regulations concerning the international carriage of dangerous goods by railMARPOL: International Convention for the Prevention of Marine Pollution from ShipsIBC: Intermediate Bulk ContainerSVHC: Substance of Very High ConcernFor abbreviations and acronyms, see: ECHA Guidance on information requirements and chemical safetyassessment, chapter R.20 (Table of terms and abbreviations).Further InformationThe information is based on the present level of our knowledge. It does not, however, give assurance ofproduct properties and establishes no contract legal rights. The receiver of our product is singularly responsible for adhering to existing laws and regulations.(The data for the hazardous ingredients were taken respectively from the last version of the sub-contractor's safetydata sheet.)。
大学中印象深刻的英语作文
![大学中印象深刻的英语作文](https://img.taocdn.com/s3/m/2c26505ff68a6529647d27284b73f242326c3160.png)
大学中印象深刻的英语作文全文共3篇示例,供读者参考篇1An Unforgettable Experience in CollegeCollege life is a time of growth, exploration, and new experiences. It is a time when bonds are formed, challenges are faced, and memories are made. There have been many moments in my college experience that have left a lasting impression on me, but one in particular stands out as truly unforgettable.It was during my sophomore year, when I decided to participate in a study abroad program in London. I had never been outside of my home country before, and the thought of living in a foreign country for an entire semester was both exhilarating and nerve-wracking. But I was determined to step out of my comfort zone and embrace this opportunity for personal and academic growth.From the moment I arrived in London, I was captivated by the city's rich history, vibrant culture, and diverse population. I was living in a bustling neighborhood near the Thames River, surrounded by iconic landmarks such as Big Ben, the Tower ofLondon, and Buckingham Palace. Every day was a new adventure, as I navigated the city's public transportation system, explored its museums and galleries, and sampled its famous fish and chips.But it wasn't just the city itself that made my time in London so unforgettable. It was the people I met and the connections I formed that truly enriched my experience. I lived in a dormitory with students from all over the world, each with their own unique backgrounds and perspectives. We bonded over late-night study sessions, weekend trips to the countryside, and shared meals in the university cafeteria.One of the most impactful moments of my time in London came when I volunteered at a local community center for refugees and immigrants. I helped teach English classes, organize cultural events, and provide support to those in need. It was a humbling experience that reminded me of the power of empathy, compassion, and human connection.As the semester drew to a close, I found myself reluctant to leave London and return home. I had grown accustomed to the daily rhythms of life in the city, the friends I had made, and the sense of independence and adventure that had come to define my college experience. But I also knew that the lessons I hadlearned and the memories I had created would stay with me forever.Looking back on my time in London, I am grateful for the opportunity to have lived and studied in such a dynamic and diverse city. It was a time of personal growth, cultural immersion, and self-discovery that I will always cherish. And as I move forward in my college journey and beyond, I will carry with me the lessons and experiences that have shaped me into the person I am today.篇2An Unforgettable Impression in UniversityAs I reflect on my time in university, there is one particular experience that stands out as truly unforgettable. It was during my second year when I had the opportunity to participate in a study abroad program in Spain. This experience not only broadened my horizons but also gave me a new perspective on life.The decision to study abroad was not an easy one. I had never been away from home for such an extended period of time, and the thought of living in a foreign country where I didn't speak the language was daunting. However, I knew that thisexperience would be a once-in-a-lifetime opportunity to immerse myself in a new culture and challenge myself in ways that I had never done before.Upon my arrival in Spain, I was immediately struck by the beauty of the country and the warmth of its people. The vibrant streets, delicious food, and rich history all combined to create a truly magical experience. However, it was the people I met during my time in Spain that truly left a lasting impression on me.I was fortunate enough to make friends with both locals and other international students, each of whom had their own unique stories and perspectives to share. Through conversations with them, I learned about different cultures, customs, and ways of thinking that I had never been exposed to before. It waseye-opening to see the world through their eyes and to realize that despite our differences, we were all united by our shared humanity.One particular moment that stands out in my memory was when I volunteered at a local orphanage. The children there had faced hardships that I could never imagine, yet they greeted me with smiles and open hearts. Spending time with them taught me the true meaning of resilience, kindness, and gratitude. It wasa humbling experience that made me appreciate all the privileges I had taken for granted in my own life.As my time in Spain came to an end, I felt a mix of sadness and gratitude. I was sad to leave behind the friends and memories I had made, but grateful for the lessons I had learned and the personal growth I had experienced. This experience in Spain had not only enriched my academic knowledge but also my understanding of the world and myself.Looking back on this unforgettable experience, I am reminded of the transformative power of stepping outside of one's comfort zone and embracing new challenges. It is through these moments of discomfort and uncertainty that we truly learn and grow. I will always cherish my time in Spain and the impact it had on me, and I am grateful for the opportunity to have had such a life-changing experience during my university years.篇3One of the most unforgettable experiences I had in college was during my sophomore year when I participated in a study abroad program in London. The opportunity to live and study in a different country for a semester not only broadened myperspective but also deepened my understanding of different cultures.Upon arriving in London, I was immediately struck by the bustling city life and rich history that surrounded me. From the historic landmarks like the Tower of London and Buckingham Palace to the vibrant street markets and diverse cuisine, every corner of the city seemed to offer something new and exciting to discover.One of the highlights of my time in London was attending classes at a prestigious university and engaging with students from all over the world. The diversity of perspectives and backgrounds in my classes challenged me to think critically and creatively, and I found myself learning as much from my peers as I did from my professors.Outside of the classroom, I had the opportunity to explore different neighborhoods, museums, and parks in London. Whether it was taking a leisurely stroll along the River Thames, visiting the world-renowned British Museum, or enjoying a traditional English afternoon tea, each experience left a lasting impression on me.One of the most memorable moments of my study abroad experience was traveling to Edinburgh, Scotland for a weekendtrip with my classmates. Exploring the charming cobblestone streets, visiting the majestic Edinburgh Castle, and hiking up Arthur's Seat to take in the breathtaking views of the city below are memories that I will always treasure.Overall, my time in London was a transformative experience that not only enhanced my academic and professional growth but also enriched my personal life. The friendships I formed, the lessons I learned, and the memories I made during my study abroad program will forever hold a special place in my heart and continue to influence me in profound ways. I am grateful for the opportunity to have had such a meaningful and unforgettable experience during my college years.。
英语作文印象最深刻的校园
![英语作文印象最深刻的校园](https://img.taocdn.com/s3/m/1d742cedfc0a79563c1ec5da50e2524de418d05f.png)
英语作文印象最深刻的校园The campus of my university is a place that has left a lasting impression on me. From the moment I first stepped onto the grounds, I was captivated by the vibrant energy and rich history that permeated every corner. As I navigated the winding pathways and explored the various buildings, I couldn't help but feel a sense of wonder and curiosity about the experiences that had unfolded here before me.One of the most striking features of the campus is its architectural diversity. The campus is a harmonious blend of old and new, with historic buildings standing alongside modern structures. The grand, stately edifices of the main administrative buildings exude a sense of tradition and academic excellence, while the sleek, contemporary design of the newer academic and research facilities reflect the university's commitment to innovation and progress.As I wandered through the campus, I was struck by the attention to detail that had gone into the design of the various spaces. The well-manicured gardens and lush greenery provided a serene oasisamidst the bustling activity, and the thoughtfully placed benches and seating areas encouraged students to pause, reflect, and connect with one another. The campus was not merely a functional space, but a place that had been carefully crafted to foster a sense of community and well-being.One of the most memorable experiences I had on campus was attending a lecture in the university's historic lecture hall. As I stepped through the ornate wooden doors and into the grand, tiered auditorium, I was immediately struck by the sense of history and tradition that permeated the space. The high ceilings, intricate woodwork, and stained-glass windows created an atmosphere of intellectual gravity, and I couldn't help but feel a sense of reverence for the generations of scholars who had sat in these very seats before me.The lecture itself was a thought-provoking and engaging exploration of a complex topic, and the professor's passion and expertise were evident in every word. As I listened, I found myself transported, my mind expanding to grapple with the intricacies of the subject matter. The experience was not merely an academic exercise, but a profound and transformative journey of the mind.Another aspect of the campus that left a lasting impression on me was the vibrant student life. From the bustling student union to thecountless clubs and organizations, the campus was a hub of activity and engagement. I was particularly struck by the diversity of the student body, with individuals from all walks of life coming together to share their unique perspectives and experiences.One event that particularly stood out to me was the annual cultural festival, where students from various backgrounds showcased their traditions, customs, and cuisines. As I wandered through the colorful displays and sampled the mouthwatering dishes, I was struck by the richness and complexity of the human experience. The event was not merely a celebration of diversity, but a testament to the power of community and the shared humanity that binds us all together.Throughout my time on campus, I was also inspired by the university's commitment to sustainability and environmental stewardship. The campus boasted numerous initiatives aimed at reducing its carbon footprint, from solar panels and energy-efficient buildings to comprehensive recycling programs. These efforts not only reflected the institution's values but also served as a powerful example of the positive impact that individuals and organizations can have on the world around them.As I reflect on my time on campus, I am struck by the profound impact that this place has had on my personal and intellectual growth. The campus has been a crucible of learning, a hub ofcreativity and innovation, and a sanctuary of community and belonging. It has challenged me to think critically, to engage with diverse perspectives, and to strive for a more just and sustainable future.In many ways, the campus has become a second home to me, a place where I have forged lifelong friendships, discovered new passions, and pushed the boundaries of my own understanding. It is a place that has left an indelible mark on my soul, a place that will continue to shape and inspire me long after I have left its hallowed halls.As I prepare to embark on the next chapter of my life, I know that the lessons and experiences I have gained on this campus will continue to guide and sustain me. The memories I have made here will forever be a part of who I am, a testament to the transformative power of education and the enduring spirit of the human experience.。
uncovered lines on new code -回复
![uncovered lines on new code -回复](https://img.taocdn.com/s3/m/f21afac3bdeb19e8b8f67c1cfad6195f302be843.png)
uncovered lines on new code -回复Uncovered Lines on New Code: The Importance of Thorough Testing and Code CoverageIntroduction:In the fast-paced world of software development, writing new code is an integral part of the process. However, it is equally important to ensure that this newly written code is thoroughly tested before it is deployed. Uncovered lines on new code, which refers to the portions of code that remain untested, can have serious implications for the overall quality and reliability of the software. In this article, we will discuss the importance of thorough testing and code coverage, the potential consequences of leaving uncovered lines, and step-by-step measures to address and rectify this issue.Importance of Thorough Testing:Thorough testing is crucial for several reasons. First and foremost, it helps to identify and fix any bugs or errors in the code. By running a variety of test cases, developers can determine whether the code performs as expected in different scenarios. It ensures that all features and functionalities are working correctly and optimally, providing a seamless user experience.Furthermore, thorough testing helps to enhance the stability and reliability of the software. By identifying and fixing potential issues early on, developers can prevent unexpected crashes or system failures. This not only saves time and effort in the long run but also fosters user trust and satisfaction.Code Coverage and Uncovered Lines:Code coverage refers to the extent to which the code is tested. It measures the percentage of lines of code that have been executed during testing. When there are uncovered lines on new code, it means that certain parts of the code have not been tested, potentially leaving room for undetected bugs and errors.Uncovered lines on new code can occur due to various reasons, including tight project deadlines, inadequate testing resources, or an incomplete test suite. Ignoring code coverage can lead to a false sense of security, whereby developers assume that their code is error-free simply because it has not been flagged during the limited testing that has been conducted.Consequences of Uncovered Lines:The consequences of leaving uncovered lines on new code can range from minor inconveniences to major system failures. Even a small undetected bug or a single untested condition can result in unexpected behavior, leading to operational inefficiencies or compromising data integrity.Furthermore, uncovered lines can become breeding grounds for larger issues. As the code evolves over time, untested sections may interact with new features or undergo changes that introduce dependencies. The lack of adequate testing can then make it challenging to isolate and fix problems, potentially escalating the impact on the software.Addressing Uncovered Lines on New Code:To address and rectify the issue of uncovered lines on new code, a systematic approach is essential. Below, we outline a step-by-step process for achieving comprehensive code coverage:1. Test Planning: Create a well-defined testing plan that includes clear objectives, test cases, and expected outcomes. This plan will provide a roadmap for testing and ensure that all critical areas of the code are covered.2. Test Automation: Utilize automated testing tools and frameworks to streamline the testing process. Automation helps to reduce human error and allows for efficient and repeatable testing, especially for large codebases.3. Test Coverage Analysis: Use code coverage tools to assess the extent of code coverage achieved during testing. These tools identify the specific lines of code that remain untested, enabling developers to prioritize their testing efforts.4. Test Suite Enhancement: Based on the code coverage analysis, update and expand the test suite to include additional test cases that target the uncovered lines. This ensures that all code paths are tested thoroughly and minimizes the risk of leaving any untested sections.5. Regression Testing: Perform regression testing after implementing code changes or bug fixes. This ensures that the existing functionality remains intact and that the newly added code does not introduce any unintended consequences.6. Continuous Integration and Delivery: Incorporate testing into the continuous integration and delivery (CI/CD) pipeline to automate and ensure regular testing during the development process. This helps to catch any regressions or issues early on, promoting continuous improvement and reducing the number of uncovered lines on new code.Conclusion:Thorough testing and achieving comprehensive code coverage are critical for the successful development and deployment of software. Uncovered lines on new code can have serious consequences, including bugs, system failures, and compromised user experience. By following a systematic approach that includes test planning, automation, coverage analysis, and regression testing, developers can significantly reduce the number of uncovered lines on new code, ensuring a more robust and reliable software product.。
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
Ho(z) =
Ho(Z)Ho(z'),
0-7803-7041-4/01/$10.00 02001 IEEE
3713
using the noble identity [8],we obtain the simplified structures of Fig. 4 for the three bands of the non-unifoim critically sampled subband filter. The delays A I , A2 and A3 in Fig. 4 are needed in
where H o ( z ) and H ' ( z ) represent the analysis filters of a twochannel perfect reconstruction filterbank. The delay A0 in the third band is included to compensate for the smaller delay intoduced in this band by the filterbank. The generalization of the structure of Fig. 2 results in adaptive subfilters with different spar. length of such subfilters should sity factors, that is, G i ( z M i ) The be at least [7] K; = N/M;
The non-uniform subband adaptive filter with critical sampling proposed in this paper is derived from an adaptive subband structure which employs an analysis filterbank to decompose the input signal and sparse adaptive filters in the subbands [3]. It is illusis )the input signal, H k ( z ) are the trated in Fig. I , where ~ ( n analysis filters of an M-channel filterbank, G k ( z M )are the sparse adaptive subfilters, d ( n ) is the desired signal, e ( n ) is the error signal used in the adaptation algorithm, and A is the delay introduced in the input signal by the filterbank. It has been shown in [3] that the structure of Fig. 1 is able of modeling an arbitrary FIR system, with the introduction of a delay A, by properly choosing the filterbank (perfect or near-perfect reconstruction bank) and the number of adaptive coefficients.
I
I
I
Figure 1: Adaptive structure using an analysis filterbank and sparse subfilters. Recently, in [7], the subband adaptive filter of Fig. 1 was generalized, such that a non-uniform analysis filterbank (or a discrete wavelet) was used to decompose the input signal, resulting in a structure which employs sparse adaptive subfilters with different lengths and sparsity factors. This non-uniform subband filter is illustrated in Fig. 2, where we consider, for simplicity, a threechannel filterbank implemented by a two-level tree structure. The equivalent analysis filters of the three-channel filterbank o f Fig. 2 are
1. INTRODUCTION
Adaptive filtering in subbands has been extensively investigated in order to reduce the computational complexity and increase the convergence rate of high-order adaptive FIR filters. It has been mostly applied to echo cancellers for audio teleconferencing, where adaptive FIR filters of very large lengths (1 000-4000 coefficients) are used. Subband adaptive structures with critical sampling [I][3] and with noncritical sampling [4]-[6] have been proposed in the literature. In order to avoid aliasing problems, the sampling rate of the decomposed signals is reduced by a factor smaller than the number of subbands in the oversampled approach [4], while adaptive cross-filters between adjacent subbands are needed in the critical sampled approach [ 11. In a recently proposed critically sampled subband structure [2], the cross-filters are identical to the direct-path adaptive filters and, therefore, do not need to be adapted separately, resulting in an improved adaptation convergence and a reduced computational complexity when compared to other critically sampled subband structures [3]. Most of the subband adaptive filters employ uniform filterbanks. A recent work [6], however, has shown that non-uniform subband adaptive filters might outperform the uniform ones. The non-uniform subband filter presented in [6] used oversampled subband signals. In this paper, we develop a non-uniform subband structure with critical sampling of the subband signals. Such adaptive subband structure is a generalization of the uniform subband filter presented in [2],[3]. Due to the non-uniform frequency decomposition of the input signal, the distinct adaptive subfilters work at different rates, which leads to some particularities in the adaptation algorithm.
2. THE CRITICALLY SAMPLED NON-UNIFORM SUBBAND ADAPTIVE STRUCTURE
ABSTRACT
In this paper, a non-uniform subband adaptive structure with critical sampling of the subband signals is derived. With the assumption of non-overlapping between non-adjacent analysis filters, the resulting structure yields exact modeling of an arbitrary FIR system. An LMS-type adaptation algorithm, which minimizes the sum of the subband squared-errors, is obtained for updating the coefficients of the proposed structure, resulting in significant convergence rate improvement for colored input signals when compared to the fullband LMS algorithm. Computer simulations illustrate the convergence behavior of the proposed non-uniform subband adaptive filter in the applications of system identification and acoustic echo cancellation.