贯通地线、电缆槽及护肩施工方案
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
新建深圳至茂名铁路工程项目
(江门至茂名段)
贯通地线、电缆槽及护肩
施工方案
编制:
复核:
批准:
中铁二十局深茂铁路JMZQ-4标
工程指挥部
2016年5月1日
目录
1、编制依据·······················································错误!未定义书签。
2、编制原则·······················································错误!未定义书签。
3、编制范围·······················································错误!未定义书签。
4、工程概况·······················································错误!未定义书签。
5、贯通地线施工方案···········································错误!未定义书签。
路基综合接地主要技术要求 ·····························错误!未定义书签。
贯通地线敷设工艺 ······································错误!未定义书签。
贯通地线敷设 ············································错误!未定义书签。
分支引接线的埋设 ······································错误!未定义书签。
两侧贯通地线间的横向连接 ··························错误!未定义书签。
区间路基地段分支引接线、接地端子设置 ········错误!未定义书签。
接地端子材质及连接要求 ·····························错误!未定义书签。
贯通地线的压接工艺标准 ·····························错误!未定义书签。
质量控制 ·····················································错误!未定义书签。
其他注意事项 ···············································错误!未定义书签。
6、电缆槽施工方案··············································错误!未定义书签。
电缆槽施工工艺 ············································错误!未定义书签。
电缆槽施工流程图 ·········································错误!未定义书签。
电缆槽施工要点 ············································错误!未定义书签。
电缆槽质量控制要点 ······································错误!未定义书签。
7、护肩施工方案·················································错误!未定义书签。
护肩施工工艺 ···············································错误!未定义书签。
护肩施工流程要点 ·········································错误!未定义书签。
8、安全文明施工·················································错误!未定义书签。
安全施工 ·····················································错误!未定义书签。
控制扬尘 ·····················································错误!未定义书签。
减少噪声废气污染 ·········································错误!未定义书签。
贯通地线、电缆槽及护肩施工方案
1、编制依据
(1)新建铁路深圳至茂名铁路江门至茂名段《路基工点设计图》。
(2)新建铁路深茂铁路《路基工程设计大样图集》。
(3)《客货共线铁路路基工程施工技术指南》TZ202-2008;
(4)《铁路路基电缆槽》2010-8401;
(5)《铁路综合接地系统》2012-9301;
(6)《铁路路基工程施工质量验收标准》TB10414-2003;
(7)《铁路路基工程施工安全技术规程》TB10302-2009;
(8)新建铁路深圳至茂名段开平至恩平区间接触网基础预留接口设计图;
(9)建设单位、设计单位、监理单位的相关文件要求;
2、编制原则
(1)严格遵守有关部门颁布的相关法律法规、规范标准和设计文件等。
(2)坚持技术先进性、科学合理性、经济适用性、安全可靠性与工程施工环境相结合的原则。
(3)对施工现场坚持全员、全方位、全过程严密监控,动态控制,科学管理相结合的原则。
3、编制范围
适用于DK169+700-DK185+000段范围内路基贯通地线、电缆槽及护肩工程施工。
4、工程概况
中铁二十局深茂铁路JMZQ-4标一分部起讫里程DK169+700-DK185+000,管段全长公里,其中路基长度为公里。全线贯通地线、电缆槽及护肩各总长约18km。
综合接地系统是将沿着铁路线路两侧不同用途和不同电压的电气化、电力、通信、信号设备及其他金属构筑物的地线有机、合理的结合起来进入贯通地线,以保证铁路各系统、各设备之间实现等电位连接,减少不同设备、不同系统之间存在的电位差及可能造成的人身和设备的安全隐患(尤