完整版)工程设计招标综合法评分标准Engineering XXX

1.XXX (40 points)

Score

points) Score

points) XXX XXX

If the bidder has obtained quality management system n。they will receive 1 point。if they have nal class A XXX)。they will receive 1 point。if their design has been rated as A in the "Suzhou Annual Engineering Survey and Design Enterprise Credit n" for three consecutive years。or as A for two consecutive years or B for three consecutive years。they will receive 5 points。3 points or 1 point respectively.

Enterprise

21 points)

If the bidder has undertaken a single contract for drainage engineering design with a contract amount of more than 2 n yuan and a performance record of 6 or above since January 1.2012.they

will receive 2 points for one item。up to 6 points。(The time is based on the contract XXX bid-winning notices and design contracts are required)。if the bidder has won awards or has a good n。they will receive 1 point for XXX design award and 2 points for XXX design award。with a limit of 4 items and a maximum of 8 points。(Based on the date of the award certificate) Project XXX

If the XXX in the water supply and drainage n。they will receive 1 point。if the project leader has XXX。they will receive 1 point for one item。up to 2 points.

Project Team

9 points)

XXX

For each XXX in the water supply and drainage n。they will receive 1 point。If they provide relevant materials。they will receive 2 points。up to 6 points.

Design XXX

10 points)

Price Criteria 10

The total cost of XXX quote according to the floating rate。and the floating rate of survey and design XXX Fee Standards" (2002 revised n) of the nal Development and Reform n and the Ministry of n。The invalid standard is a floating rate of -35% to 0% of the benchmark price。a floating rate of -35% or below receives full marks of 20 points。That is。the benchmark price for XXX 3. n yuan (survey fees are settled according to the actual n)。and bidders who quote within the range of 1.9864 n yuan or below will receive full XXX set at 5.406 n yuan (the final design fee is based

on the n standard baseline price)。and bidders who quote within

the range of 3.5139 n yuan or below will receive full marks。

Other quotes are XXX(The nal adjustment coefficient is 1.0.XXX 1.0.and the XXX 1.0)

Total Score

2.Technical XXX (60 points)

No.

XXX

n of XXX

XXX

Understanding of the project's geographic n。n and role。and a deep understanding (4 points)。XXX the tenderer

XXX (15 points) of the tender project

XXX and development of the project n

总体设计思路:

该项目的总体设计思路应当遵循适用、经济、安全、美观的原则,体现精细化、创新性,并融入节约、环保理念。设计人员应当根据项目实际特点,合理应用技术标准,尽量减少周边影响。

招标项目设计的特点、关键技术问题的认识及其对策措施:

该项目设计应当对排水工程方案的合理性、标准的选用、管材的选用等问题进行认真分析,制定相应的对策措施。同时,设计人员应当对各阶段的工作量进行充分的分析和预计,确保无遗漏,关键线路清晰、准确、完整,计划编制合理、可行。对可能出现的质量偏差和进度偏差也应当有相应的监控及应对措施。