XG10-0000-003_管道及设备涂漆设计统一规定Rev.0

XG10-0000-003_管道及设备涂漆设计统一规定Rev.0
XG10-0000-003_管道及设备涂漆设计统一规定Rev.0

XG10-0000-003

DATE

T H I S D O C U M E N T C O N T A I N S J I N G D I N G E N G I N E E R I N G & C O N S T R U C T I O N C O ., L T D . (J D E C ) C O N F I D E N T I A L I N F O R M A T I O N O F A P R O P R I E T A R Y N A T U R E . T H I S I N F O R M A T I O N M U S T N O T B E C O P I E D O R D I S C L O S E D I N W H O L E O R I N P A R T T O O U T S I D E P A R T I E S N O R U S E D F O R O T H E R T H A N T H E P U R P O S E F O R W H I C H P R O V I D E D W I T H O U T P E R M I S S I O N O F M A N A G E M E N T .

CONTENTS

PAGE

1.0

SCOPE ....................................................................................................... 3 . (3)

2.0

CODE AND STANDARD ............................................................................ 3 (3)

3.0 GENERAL .................................................................................................. 4 (4)

4.0 SURFACE PREPARATION ........................................................................ 5 (5)

5.0 APPLICATION OF PRIMERS AND PAINTS .............................................. 6 . (6)

6.0 SAFETY PRECAUTIONS ........................................................................... 7 (7)

7.0 SPECIAL REQUIREMENT ......................................................................... 7 (7)

8.0 PAINTING MATERIALS AND SELECTION OF PAINT ............................ 10 . (10)

9.0 INSPECTION ............................................................................................ 16 .. (16)

10.0 GUARANTEE ........................................................................................... 16 .. (16)

XG10-0000-003

DATE

T H I S D O C U M E N T C O N T A I N S J I N G D I N G E N G I N E E R I N G & C O N S T R U C T I O N C O ., L T D . (J D E C ) C O N F I D E N T I A L I N F O R M A T I O N O F A P R O P R I E T A R Y N A T U R E . T H I S I N F O R M A T I O N M U S T N O T B E C O P I E D O R D I S C L O S E D I N W H O L E O R I N P A R T T O O U T S I D E P A R T I E S N O R U S E D F O R O T H E R T H A N T H E P U R P O S E F O R W H I C H P R O V I D E D W I T H O U T P E R M I S S I O N O F M A N A G E M E N T .

1.0 SCOPE

1.1

This specification covers the requirements of painting application, paint materials and surface preparation for steel piping, equipment, and structural steel. Any proposed

variations from this specification must be approved by the authorized engineer of client. 1.2

Terms used in this specification are defined:

Painting system means associated with various paint coating to form a completed corrosion resistant or identification barrier.

The term (D.F.T.) stands for dry film thickness for painting, which is specified in micrometers (Microns).

D.F.T.

The maximum temperature, such as the high short term in operating,

regeneration and steam-out for start-up, shall be supplied a suitable and heat resistance painting system as anti-corrosive barrier or identification.

The term of shop means that the manufacturer's and vendor’s plant before transit to the construction site.

/

The term of field stands for this plant construction and erection site.

2.0

CODE AND STANDARD 2.1

GB 8923 (Rust grades and preparation grades of steel surfaces before application of paints and related products)

GB 8923

2.1.1 Sa 2.5 Very Thorough Blast Cleaning .

Sa 2.5

2.1.2 St 3 Very Thorough Hand Tool and Power Tool Cleaning .

St 3

2.2

SH/T 3022 (Design specification for anticorrosion coating of equipment and piping in petrochemical engineering)

SH/T 3022

XG10-0000-003

DATE

T H I S D O C U M E N T C O N T A I N S J I N G D I N G E N G I N E E R I N G & C O N S T R U C T I O N C O ., L T D . (J D E C ) C O N F I D E N T I A L I N F O R M A T I O N O F A P R O P R I E T A R Y N A T U R E . T H I S I N F O R M A T I O N M U S T N O T B E C O P I E D O R D I S C L O S E D I N W H O L E O R I N P A R T T O O U T S I D E P A R T I E S N O R U S E D F O R O T H E R T H A N T H E P U R P O S E F O R W H I C H P R O V I D E D W I T H O U T P E R M I S S I O N O F M A N A G E M E N T .

3.0 GENERAL

3.1

The following items shall normally not be painted:

Non-ferrous metal surfaces, such as brass, copper, aluminum, galvanized and stainless, except for the distinguished markings.

Concrete structures and foundations, unless otherwise specified. ,

Machined surfaces, valves, screw operators and other greased parts.

C.S. exterior surfaces for inner piping in jacket piping system.

Spring hanger scales and load set points.

Equipment nameplates and code inspection plates.

Internal surfaces of pipe, equipment and tanks, unless otherwise specified.

Certain equipment such as pumps, compressors, motors, packaged equipment, instruments, electrical items, etc. which shall be supplied with manufacturer's standard finish paint shall require no field painting, except for touched-up or specifically required to provide the desired finish color.

Aluminum jacket of insulation, except for the distinguish marking.

3.2

All buried ferrous metal piping shall be wrapped with anti-corrosive tapes and/or barrier and painted special primers.

/ 3.3

Contractor shall furnish all labor, supervision, quality control, inspection, tools, equipment and materials as required for blast cleaning.

3.4

All work shall be done with proper equipment in good condition and by skilled workman, according to recognized good painting practice except modifications made by this specification.

XG10-0000-003

DATE

T H I S D O C U M E N T C O N T A I N S J I N G D I N G E N G I N E E R I N G & C O N S T R U C T I O N C O ., L T D . (J D E C ) C O N F I D E N T I A L I N F O R M A T I O N O F A P R O P R I E T A R Y N A T U R E . T H I S I N F O R M A T I O N M U S T N O T B E C O P I E D O R D I S C L O S E D I N W H O L E O R I N P A R T T O O U T S I D E P A R T I E S N O R U S E D F O R O T H E R T H A N T H E P U R P O S E F O R W H I C H P R O V I D E D W I T H O U T P E R M I S S I O N O F M A N A G E M E N T .

3.5

As the inclement weather conditions occur or ambient air conditions become of the kind detrimental to the cleanliness of the prepared surface and the quality of the

applied coating, all surface preparation operations and coating applications shall cease. After the condition become proper, the surface shall be inspected and approved before coating application can be resumed.

3.6

Each coat of paint shall be in proper state of cure and dry before the application of the succeeding coat. Drying time shall be as recommended by the paint manufacturer.

4.0

SURFACE PREPARATION 4.1

All of the surfaces which need to be painted shall be cleaned and rust removal before painting. The rust removal grades shall be as per table 8.3-1. Blast cleaning shall be used if possible.

8.3-1

4.2

If in the interval between cleaning and painting, the surface is oxidized or becomes otherwise contaminated, those face so impaired shall be re-cleaned prior to painting.

4.3

Flame cleaning shall not be used unless otherwise specified.

4.4

All materials specified herein shall be applied in strict accordance with this specification and manufacturer's printed instructions and product literature which shall be considered part of this specification unless otherwise stated.

4.5

Surface preparation shall be done by one of the following methods in accordance with the latest revision of the GB 8923 Specification.

GB 8923

4.6

All of valves and flanges shall not be blasted but shall be cleaned with solvents and/or hand/power tool brush per GB 8923 St2/St3.

GB 8923 /

4.7 Repainting

The methods to be used for preparing the painted surface of repainting when specified shall be as follows:

XG10-0000-003

DATE

T H I S D O C U M E N T C O N T A I N S J I N G D I N G E N G I N E E R I N G & C O N S T R U C T I O N C O ., L T D . (J D E C ) C O N F I D E N T I A L I N F O R M A T I O N O F A P R O P R I E T A R Y N A T U R E . T H I S I N F O R M A T I O N M U S T N O T B E C O P I E D O R D I S C L O S E D I N W H O L E O R I N P A R T T O O U T S I D E P A R T I E S N O R U S E D F O R O T H E R T H A N T H E P U R P O S E F O R W H I C H P R O V I D E D W I T H O U T P E R M I S S I O N O F M A N A G E M E N T .

4.6.1 All loose or scaly paint, blisters, rust, etc., shall be removed before applying

fresh paint to the previously painted surfaces so that paint applied to be well bonded to these surfaces.

4.6.2 The edges of the old paint shall be scraped back to sound material and avoid

damaging sound paint as much as possible.

5.0

APPLICATION OF PRIMERS AND PAINTS

5.1

Paint and other coating materials shall be applied in accordance with manufacturer's instructions.

5.2

All painting shall be done carefully and the primer or paint shall be applied so as to prevent runs, drips or sagging.

5.3

Primer coats shall be applied as soon as possible within 4 hours after surface

preparation and if there is evidence of rust before priming, then the surface must be re-cleaned.

4

5.4

Paint shall not be applied when ambient temperature is higher than 45 . Or when the outside temperature below 5 and in rain, mist, or if the relative air humidity is over 85%.

35 5 85

5.5

All surfaces shall be perfectly dry before and while being painted.

5.6

All ingredients in any container of paint shall be thoroughly mixed before use and shall be agitated frequently during application to keep the paint in suspension. Dry pigments which are separately packed shall be uniformly blended into paints.

5.7

Thinner shall not be added to the primer or paint, unless required by the

manufacturer's instructions, and then only of the type and quantity recommended. If required, thinner shall be added to the paint during the mixing process.

5.8

When succeeding coats of the same color are specified, acceptable tinting material shall be added to the undercoat to produce enough contrast to insure complete coverage by the succeeding coats.

XG10-0000-003

DATE

T H I S D O C U M E N T C O N T A I N S J I N G D I N G E N G I N E E R I N G & C O N S T R U C T I O N C O ., L T D . (J D E C ) C O N F I D E N T I A L I N F O R M A T I O N O F A P R O P R I E T A R Y N A T U R E . T H I S I N F O R M A T I O N M U S T N O T B E C O P I E D O R D I S C L O S E D I N W H O L E O R I N P A R T T O O U T S I D E P A R T I E S N O R U S E D F O R O T H E R T H A N T H E P U R P O S E F O R W H I C H P R O V I D E D W I T H O U T P E R M I S S I O N O F M A N A G E M E N T .

5.9

Unless particular method of application is specified, primers and finish coats may be applied by brushing, conventional spraying, airless spraying or roller coating.

5.10

Regardless of the method selected, the equipment or tools for application must be suitable, adequate, clean and in good workable condition.

5.11

Spray guns should be used, whenever practicable and in strict accordance with

manufacturer's recommendations, spray painting should not be used outside in windy weather or near surfaces of a contrasting color, unless the latter is properly protected from the spray.

6.0 SAFETY PRECAUTIONS

6.1

The necessary precautions shall be taken to protect personnel and property from hazards due to falls, injuries, toxic fumes, fires, or other harm.

6.2

Scaffolding shall be completely rigid and stable.

6.3

All rags soaked with coating materials shall be stored in closed containers.

6.4

Coating material shall be stored in a place where is free of fire.

6.5

Airless spray equipment shall be grounded to the hose couplings, if the length of hose exceeds 30.5 m.

30.5m

6.6

Solvent drums shall be grounded, and containers receiving solvents shall be electrically bonded to the drums by a suitable cable and clamp. ,

7.0

SPECIAL REQUIREMENT 7.1

Shop Painting

7.1.1 Structure Steel

7.1.2 All structural steel shall be painted in accordance with Section 8.0 with the

exceptions that the contact surface of shop bolted connections shall receive 2

XG10-0000-003

DATE

T H I S D O C U M E N T C O N T A I N S J I N G D I N G E N G I N E E R I N G & C O N S T R U C T I O N C O ., L T D . (J D E C ) C O N F I D E N T I A L I N F O R M A T I O N O F A P R O P R I E T A R Y N A T U R E . T H I S I N F O R M A T I O N M U S T N O T B E C O P I E D O R D I S C L O S E D I N W H O L E O R I N P A R T T O O U T S I D E P A R T I E S N O R U S E D F O R O T H E R T H A N T H E P U R P O S E F O R W H I C H P R O V I D E D W I T H O U T P E R M I S S I O N O F M A N A G E M E N T .

shop coats of primer.

8.0

7.1.3 Equipment

A. Shop fabricated and assembled vessels and exchangers shall not be

painted until completion of all heat treatment, pressure testing and inspection and shall receive full of painting system. Non-insulation equipment shall be painted surface paint which color shall be in accordance with Finish color spec table 1 before conveyance.

XG10-0000-004 2-1 B. Shop fabricated sections of field weldment assembled vessels and

exchangers for domestic contracts shall be left unpainted finish paints while such sections for foreign contracts shall not only receive shop coat of primer and intermediate painting, but also shall be protected with suitable covering to prevent salty contamination..

C. The manufacturer and brand of paint materials selected must be informed

to client by written form before officially painting. It shall not be applied painting until receive authorization from client.

7.1.4 Piping

Piping shall be primed in accordance with Section 8.0. 8.0

7.2

Field Painting

7.2.1 After receipt in the field, the surfaces of all items which have received only shop

painting shall be cleaned and all damage of the shop painting shall be touched-up with the same paint used for painting in the shop. The procedures are as follows:

A. For carbon steel, low alloy steel (1-1/4 to 9 of Cr)

1-1/4 9

Water wash or blast entire surface, spot clean rusty and damaged areas by solvent cleaning followed by hand and/or power tool cleaning

XG10-0000-003

DATE

T H I S D O C U M E N T C O N T A I N S J I N G D I N G E N G I N E E R I N G & C O N S T R U C T I O N C O ., L T D . (J D E C ) C O N F I D E N T I A L I N F O R M A T I O N O F A P R O P R I E T A R Y N A T U R E . T H I S I N F O R M A T I O N M U S T N O T B E C O P I E D O R D I S C L O S E D I N W H O L E O R I N P A R T T O O U T S I D E P A R T I E S N O R U S E D F O R O T H E R T H A N T H E P U R P O S E F O R W H I C H P R O V I D E D W I T H O U T P E R M I S S I O N O F M A N A G E M E N T .

per GB 8923 St3.

GB 8923 St3 /

Field welds shall receive needle gun chipping to remove weld slag and weld latents followed by hand and/or power tool cleaning per GB 8923 St3.

. GB 8923 St3

7.2.2 After receipt in the field, the surfaces of all items which have received final

finish coats of paint in the shop shall be checked and repaired where required. Any damaged areas where metal is not exposed shall be touched-up with an intermediate coat and a final coat. Where bare metal has been exposed, touch-up painting shall consist of entire coating system originally used on the item.

7.2.3 Brackets, clips, nozzles, manways and other attachments which protrude

through the insulation shall be painted with the appropriate uninsulated paint system.

7.2.4 Protection and clean up

A. Paint applicator shall fully protect all equipment, walls, floors, ceilings and

other surfaces from damage and shall provide the necessary drop cloths or other protection required to fully protect all surfaces from paint dropping, paint mist and all other conditions due to execution of his work.

B. Paint applicator shall exercise particular care to keep clean and unpainted

for all valve stems, motor shafts, and other such moving parts in order not to impair their free movement. Any paint deposited on these parts shall be carefully and completely removed.

C. Equipment nameplates, pressure gauges, instrument glasses, machined

surfaces, electrical indicating devices etc., shall be protected as approved or as directed and shall be cleaned so that they are clearly legible.

XG10-0000-003

DATE

T H I S D O C U M E N T C O N T A I N S J I N G D I N G E N G I N E E R I N G & C O N S T R U C T I O N C O ., L T D . (J D E C ) C O N F I D E N T I A L I N F O R M A T I O N O F A P R O P R I E T A R Y N A T U R E . T H I S I N F O R M A T I O N M U S T N O T B E C O P I E D O R D I S C L O S E D I N W H O L E O R I N P A R T T O O U T S I D E P A R T I E S N O R U S E D F O R O T H E R T H A N T H E P U R P O S E F O R W H I C H P R O V I D E D W I T H O U T P E R M I S S I O N O F M A N A G E M E N T .

D. Sufficient care shall be exercised by painter while painting around switches

and controls so as to avoid tripping of circuits. It is imperative that all switches shall remain unmoved and undisturbed by painters.

E. All shipping tags, wires, strings and all other means of temporary or

shipping identification on surfaces have to be painted shall be removed from such surface, but only after checking with and receiving authorization from Client.

7.2.5 Storage of paint and provision for fire fighting equipment

A. A temporary building shall be provided by the paint applicator for the bulk

storage of paint, paint material, and for the mixing of paint, thinner, etc., as those are used from day to day. The building shall be properly ventilated and shall be adequately protected with fire fighting equipment which is satisfactory to the construction superintendent. The floor of this building shall be kept clean at all times and oily rags, waste etc., shall be removed from this building at the end of each working day.

B. Adequate fire fighting equipment, satisfactory to the construction

superintendent shall also provided at all location where painting work is in progress.

8.0

PAINTING MATERIALS AND SELECTION OF PAINT 8.1

General Requirement

The coating materials shall be formulated and certified by manufacturer to meet all the following conditions which may be tested during the application of coating.

8.1.1 The material as received shall not show excessive settling in a freshly opened

full container, and shall mix readily to a smooth, homogeneous state. The material shall show no curdling, livering, caking and shall be free from lumps and skins.

8.1.2 After the pigmented base and the curing agent are mixed, the coating shall be

used up within the specified time as recommended in approved manufacturer's

XG10-0000-003

DATE

T H I S D O C U M E N T C O N T A I N S J I N G D I N G E N G I N E E R I N G & C O N S T R U C T I O N C O ., L T D . (J D E C ) C O N F I D E N T I A L I N F O R M A T I O N O F A P R O P R I E T A R Y N A T U R E . T H I S I N F O R M A T I O N M U S T N O T B E C O P I E D O R D I S C L O S E D I N W H O L E O R I N P A R T T O O U T S I D E P A R T I E S N O R U S E D F O R O T H E R T H A N T H E P U R P O S E F O R W H I C H P R O V I D E D W I T H O U T P E R M I S S I O N O F M A N A G E M E N T .

instructions and certified by Client.

8.1.3 The technical data shall conform to SH/T3022

auticorrosion coating of equipment and piping in petrochemical engineering>.

SH/T3022

8.2

Steel surface painting materials.

8.2.1 The steel surface painting shall be applied to steel structure, equipment and

piping including carbon steel, low alloy steel.

8.2.2 Paint materials refer to table 8.3-1 as below

8.3-1

8.3

Painting application and coating procedure shall refer to Table 8.3-1 as below. 8.3-1

SPECIFICATION FOR PAINTING 12

OF 16 XG10-0000-003 REV. 0

DATE

07/17/’13

Table 8.3-1 Painting application

Paint

code

The max.

operate temp.

Paint type

D.F.T.

(min.)

Coat

No.

Total

D.F.T.

Surface prep. class A

T 120

Epoxy zinc primer.

Epoxy micaceous iron

intermediate paint.

Polyurethane finish.

50

150

50

1

1

1

250 Sa 2.5

Scope

Non-insulation C.S. , low alloy steel equipment and piping, construction steel structure, equipment

attached steel structure stairs, handrail and shell etc , pipe rack.

Repairing method the same as above

B

120 T 400

Inorganic zinc primer

Silicone resin for heat

resist

50

25

1

2

100 Sa 2.5

Scope

Non-insulation C.S. , low alloy steel equipment and piping.

Repairing method seeing B2.

B2

120 T 400

Silicone resin for heat

resist

25 3 75 St 3

Repairing method for B.

C

-40 T 120 Epoxy resin paint 100 2 200 Sa 2.5

Scope

Insulation C.S. , low alloy steel equipment and piping .

Repairing method the same as above.

D

120 T 400

Inorganic zinc primer

Silicone resin for heat

resist

50

25

1

1

75 Sa 2.5

Scope

Insulation C.S. , low alloy steel equipment and piping .

Repairing method seeing D2

D2

120 T 400

Silicone resin for heat

resist

25 3 75 St3

Scope Repairing method for D.

SPECIFICATION FOR PAINTING 13 OF 16

XG10-0000-003

REV.

DATE

07/17/’13

:

NOTE

(1) Steel structure attached to equipment including stairs, handrail and shell etc shall be painted as per code A. And other

accessory structure of equipment shall be painted the same as equipment.

(2) Piping supports which protrude through the insulation shall be painted as per code A. The piping supports welded with pipes

shall be painted the same as the pipes.

E 400 T 600

Silicone aluminium powder primer for heat resist

25 2 50 Sa 2.5

Scope

Non-insulation/insulation C.S. , low alloy steel equipment and piping. Repairing method the same as above. F -

Epoxy resin paint. Polyurethane finish.

130 50

1 1

180

Clean surface by blowing down or proper solvent, after 5-10min.,flush surface with fresh water

Scope

For surface of zinc coat(fire-fighting only) Repairing method seeing F2 F2 - Epoxy zinc primer(zinc coat damaged only). Epoxy micaceous iron intermediate paint. Polyurethane finish. 50 150 50

1 1 1

250

Sa2.5 or St3 per the type of damaged place.

Scope Repairing method for F F3

- Epoxy zinc primer. Epoxy resin paint.

50 50

1 1

100

Sa2.5 or St3 per the type of damaged place.

Scope Repairing for zinc coat (when the zinc coat damaged only). G

T 70 Modified epoxy

500

1

500

Sa2.5

Scope

Exterior bottom surface of C.S. and low alloy steel tank for non-insulation. Repairing method the same as above.

SPECIFICATION FOR PAINTING 14

OF 16 XG10-0000-003 REV. 0

DATE

07/17/’13

8.3-1

m/

m

A

T 120

50

150

50

1

1

1

250 Sa 2.5

B

120 T 400

50

25

1

2

100 Sa 2.5

B2

B2

120 T 400 25 3 75 St 3

B

C

-40 T 120 100 2 200 Sa 2.5

D

120 T 400

50

25

1

1

75 Sa 2.5

D2

D2

120 T 400 25 3 75 St3

D

SPECIFICATION FOR PAINTING 15

OF 16 XG10-0000-003 REV. 0

DATE

07/17/’13 : 1 A

2 A

E

400 T 600 25 2 50 Sa 2.5

/

F

-

130

50

1

1

180

5 10

F2

F2

-

50

150

50

1

1

1

250

Sa2.5

St3)

F

F3

-

50

50

1

1

100

Sa2.5

St3)

( )

H

T 70 500 1 500 Sa2.5

XG10-0000-003

T H I S D O C U M E N T C O N T A I N S J I N G D I N G E N G I N E E R I N G & C O N S T R U C T I O N C O ., L T D . (J D E C ) C O N F I D E N T I A L I N F O R M A T I O N O F A P R O P R I E T A R Y N A T U R E . T H I S I N F O R M A T I O N M U S T N O T B E C O P I E D O R D I S C L O S E D I N W H O L E O R I N P A R T T O O U T S I D E P A R T I E S N O R U S E D F O R O T H E R T H A N T H E P U R P O S E F O R W H I C H P R O V I D E D W I T H O U T P E R M I S S I O N O F M A N A G E M E N T .

9.0 INSPECTION

9.1

All work and materials supplied under this specification shall be subject to inspection by the Client or his representative. All parts of the work or materials that are found unsuitable under this specification shall be corrected and replaced.

9.2

All blast cleaned surfaces shall be inspected for proper cleaning and anchor pattern using equivalent visual profile comparators, prior to application of the primer. No coat of paint shall be applied until the prepared surface has been inspected and approved by Client.

9.3

Wet film thickness shall be checked during the application of each coat to assure the specified dry film thickness will be met.

9.4

The dry film thickness of each coat shall be checked by means of a microdot magnetic thickness gauge or approved equal. When film thickness measurements are in conflict, the readings taken by the Client representative shall prevail.

9.5

Coating material will be rejected if any indication of defective or contaminated material is found.

9.6

The completed paint job shall pass visual inspection by client. It is the responsibility of the coating applicator to correct any work found not to be in accordance with requirements specified herein.

10.0 GUARANTEE

The contractor shall guarantee that the whole painting system under contract is in conformity with this specification and shall be free from any defects in material and workmanship for a period of two (2) years from the day of acceptance. The contractor shall make all necessary or desirable repairs for defective painting work within the guarantee period.

2

热力管道设计技术规定

1 目的 为规范公司内部城市热力管网设计,特制定本规定。 2 范围 本规定适用于城市热力网设计。本次规定暂以蒸汽作为主要供热介质编制,今后将补充热水热力网设计的有关规定。 3 职责 由设计部负责组织实施本规定。 4 工程设计基础数据 基础数据应为项目所在地资料,以下为镇海炼化所在地资料。 自然条件 气温 年平均气温:℃ 极限最高气温:℃(1988年7月20日) 极端最低气温:-℃(1977年1月31日) 最热月平均气温:℃(7月) 最冷月平均气温:℃ 防冻温度:℃ 湿度 年平均相对湿度:79% 月平均最大相对湿度:89% (84年6月) 月平均最小相对湿度:60% (73年12月,80年12月,88年11月) 气压 年平均气压:百帕 年极端最高气压:百帕(81年12月2日) 年极端最低气压:百帕(81年9月1日) 夏季(7、8、9月)平均气压:百帕 夏季(7、8、9月)平均最低气压:百帕(72年7月)

冬季(12、1、2月)平均气压:百帕 冬季(12、1、2月)平均最高气压:百帕(83年1月) 降雨量 多年平均降雨量:mm 年最大降雨量:mm(83年) 一小时最大降雨量:mm(81年7月30日6时44分开始) 十分钟最大降雨量:mm(81年7月30日7时22分开始) 一次最大暴雨量及持续时间:mm (出现在81年9月22日14时16分至23日18时16分) 雪 历年最大积雪深度:14 cm(77年1月30日) 风向 全年主导风向:东南偏东;西北;频率10% 夏季主导风向:以东南偏东为主 冬季主导风向:以西北为主 附风玫瑰图 风速、风压 风速 夏季风速(7、8、9月平均):m/s 冬季平均风速(12、1、2月平均):m/s 历年瞬间最大风速:>40m/s(1980年8月28日NNW、1988年8月7日N) 最大台风十分钟平均风速:m/s(1988年8月8日E) 30年1遇10分钟平均最大风速:~ m/s(十米高,省气象局) 基本风压 ~(按离海较远取小值,靠近海岸取大值) 最大冻土层深度及地温 冻土层深度: 最大冻土层深度:50mm 地温: m最低月平均地温(2月):℃

(空调)统一设计规范和要求

中央空调设计规范和要求
为了统一中央空调设计理念,规范空调设计要求,达到空调方案的可 行、可靠,满足客户对空调效果的需求,从以下几个方面进行空调设计规 范和要求。 一、设计的基本条件和要求 1、首先要了解工程概况,房间的功能,房间的面积, 各房间是否需要空调, 业主对空调的基本要求和意向,以便做方案比较与设计。 2、根据各房间的面积、功能、负荷大小来选择末端设备型号,负荷大小要 考虑房间的朝向,房间内设备散热、围护结构的隔热程度等。 3、设计时要从以下几个方面考虑:房间负荷配置、内外机配比、设备安装 位置、水泵、冷却塔等要符合规范要求及工程实际情况,新风量配置,风 管设计长度、风速、静压、室外机安装高度,噪音,气流组织形式等。 4、方案比较:根据工程的基本情况确定最经济适用的方案。基本情况有机 房位置、能源、空调使用情况等。根据各房间负荷的大小,对主机设备进 行选型设计。根据末端设备的流量配置水泵流量,计算水系统沿程阻力确 定水泵的扬程,再选水泵的型号。对方案要有个说明:包括工程概况、设 计参数,主机安装位置、冷却塔安装位置、空调方式等。
二、空调主机设计参数 序 号 1 2 房间名称 旅游旅馆、标准间 酒吧 冷负荷 序 指标 号 ( w/㎡ ) 100~130 320~350 19 20 房间名称 医 院 :一 般手 术室,超诊所 冷负荷 指标 ( w/m 2 ) 100~150 300~500

3 4 5 6 7 8 9
西餐厅、咖啡厅 中餐厅、宴会厅 商店、小卖部 中庭、接待
160~200 220~300 100~160 90~120
21
洁净手术室 X 光, CT,B
120~150 130~200 200~350 250~400 100~120 120~250 300~400 100~120 130~200 150~200 75~100 90~140 80~90 200~250 180~220
22 商场、百货大楼 23 影剧院:观众席 24 休息厅(允许吸烟) 化妆室 25 26 体育馆:比赛馆 27 观众休息厅 (允许吸烟) 28 贵宾室 29 展览厅、陈列室 30 会堂、报告厅 31 图书阅览 32 科研、办公 33 公寓、住宅 34 餐馆 35 足浴休闲
小会议室 (少量吸烟) 200~300 大会议室 (不许吸烟) 180~280 美容、美体 220~260 160~200 90~120 250~350 200~250 250~350 100~120 100~120 140~160 170~230
10 健身房、保龄球 11 弹子房 12 室内游泳池 13 舞厅(交谊舞) 14 舞厅(迪斯科) 15 办公 16 医院、高级病房 17 家用户式空调 18 KTV
三、空调末端设计参数 序 号 1 2 3 4 5 房间名称 旅游旅馆、标准间 酒吧 西餐厅、咖啡厅 中餐厅、宴会厅 商店、小卖部 冷负荷 序 指标 号 ( w/㎡ ) 180-200 320-350 200-230 260-320 200 19 20 21 房间名称 医 院 :一 般手 术室,超诊所 洁净手术室 X 光, CT,B 冷负荷 指标 ( w/m 2 ) 200 300~500 200 130~200 200~350
22 商场、百货大楼 23 影剧院:观众席

氢气管道设计规定

一、设计依据 二、设计范围 XXXXX项目之4500Nm3/h输配送项目管道施工图设计。 三、项目统一规定 (1)生产装置主项编号为:XX,分项编号为XX,工艺编号XXX。 (2)本次设计中,管道规格选用HG20553-93标准中的Ⅱ系列管道,法兰选用PN系列(HG20592~20635-2009)。 (3)装置的标高均为相对标高。 四、设计采用标准 (1)《化工装置工艺系统工程设计规定》HG/T20557~20559-93 (2)《化工工艺设计施工图内容和深度统一规定》HG/T20519-92 (3)《化工企业安全卫生设计规定》HG20571-95 (4)《建筑设计防火规范》GB50016-2006 (5)《石油化工企业设计防火规范》GB50160-2008 (6)《化工配管用无缝及焊接钢管尺寸选用系列》HG20553-93 Ⅱ系列 (7)《流体输送用无缝钢管》GB/T8163-2008 (8)《石油裂化用无缝钢管》GB9948-2006

(9)《钢制对焊无缝管件》GB12459-2005 (10)《钢制管法兰、垫片、紧固件》HG20592~20635-2009 (11)《管架标准图》(1~5册)HG/T21629-1999 (12)《化工装置管道布置设计规定》HG/T 20549-1998 (13)《化工装置设备布置设计规定》HG/T20546-92 (14)《石油化工管道设计器材选用通则》SH3059-2001 (15)《化工设备、管道外防腐设计规定》HG/T20679-1990 (16)《工业设备及管道绝热工程设计规范》GB50264-97 (17)《工业金属管道工程施工及验收规范》GB50235-97 (18)《现场设备、工业管道焊接工程施工及验收规范》GB 50236-98 (19)《化工金属管道工程施工及验收规范》HG20225-95 (20)《氢气站设计规范》GB 50177-2005 (21)《氢气使用安全技术规程》GB 4962-2008 (22)《工业管路的基本识别色、识别符号和安全标识》GB7231-2003 注:本设计中所采用公开发行的标准规范由施工单位自备。 五、设备安装 1.本工程设备安装需执行《机械设备安装工程施工及验收通用规范》(GB50231-98)规定,特殊设备的安装需执行有关设备供应商的施工及检验验收标准。

设备管道等表面色及标志色管理规定

万华烟台工业园氯碱热电工程建设指挥部 设备、管道等表面色及标志色管理规定 WHLD/M-P17-001-2015

1、总则 为了规范万华烟台工业园氯碱装置设备、管道等表面色及标志色的设置,促进安全生产和现场规范化,特制定本规定。 2、一般规定 2.1 本规定适用于万华烟台工业园氯碱工程设备及管道等表面色和标识的管理。 2.2 安全标志、安全色执行相关国家标准规定。 2.3 执行本规定时,所使用的颜色应与附录《色卡》一致。 2.4 除表面采用搪瓷、陶瓷、塑料(含玻璃钢)、橡胶、有色金属、不锈钢、镀锌钢管、铝合金板等材料的设备和管道宜保持制造厂出厂色或材料本色,不再刷表面色(但应刷标志)外,其它设备和管道应刷表面色和标志。 2.5 表面是指不隔热的设备和管道的外表面,或者隔热的设备和管道的保护层外表面,以及钢结构的表面。 2.6 有隔热层的设备和管道的保护层外表面颜色为交通白(RAL 9016),须在规定部位涂刷标志色并用箭头和字母作出标志。

2.7 在外径或保护层外径小于等于50mm 的管道上刷涂标志有困难时,可采用标志牌。 2.8标志是指在外表面局部范围涂刷明显的标识符,包括字样、代号、位号、色环和箭头等。标志可在表面色的基础上再刷色,也可直接在本色或出厂色上刷色。 2.9 起重运输机械和机修、电修、仪修中的设备宜保持出厂色(淡黄色RAL1018),在设备的醒目位置标明设备位号。 2.10 对火炬、烟囱等高耸设备,根据《中华人民共和国民用航空法》和《航空障碍灯(MH/T6012)-1999》设置飞行障碍标志;对码头、航标等按照《中华人民共和国航标条例》的要求进行。. 3、设备、机械颜色规定 3.1生产装置中的设备、机械表面色和标志色应符合表1的规定。 表1 设备、机械表面色和标志色 序号设备机械类别表面色标志色备注 灰蓝色((RAL 9016) 1 RAL 5008)交通白储罐灰蓝色(塔类交通白(RAL 9016) RAL 50082 ) 灰蓝色((RAL 9016) RAL 5008)3 冷换设备交通白灰蓝色(交通白RAL 5008 反应器)(RAL 9016) 4 灰蓝色(RAL 5008其他容器)5 交通白(RAL 9016) 灰蓝色(RAL 50086 )(RAL 9016) 交通白工业炉 灰蓝色(RAL 5008)交通白锅炉7 (RAL 9016)

1331001B0000-EQ-SPC-001-0 静设备设计统一规定

中国石油克拉玛依石化分公司 超稠油加工技术改造及油品质量升级项目 静设备设计统一规定 编制江 涛 校对张新国 审核吴致莹 审定韩玉梅 0 供使用江涛张新国吴致莹韩玉梅 2013-1-31 版次 目的 编 制 校 对 审 核 审 定 日 期

目录 1 总则 (3) 1.1 目的 (3) 1.2 范围 (3) 2 主要标准规范 (3) 2.1 设备设计标准与规范 (3) 2.2 材料标准 (4) 2.3 焊接标准 (5) 2.4 附件标准 (5) 2.5 施工验收规范 (6) 2.6 其它标准 (6) 2.7 标准的执行 (6) 3 设计基础数据 (7) 4 材料 (7) 4.1 压力容器设计使用年限 (7) 4.2 腐蚀裕量 (7) 4.3 压力容器选材 (7) 5 设计 (9) 5.1 设计方法 (9) 5.2 设计参数 (10) 5.3 结构设计与零部件 (10) 6 隔热、防腐与防火层 (13) 6.1 设备的隔热设计 (13) 6.2 设备的防腐 (13) 6.3 防火层设置 (13) 6.4 梯子平台 (13) 7 制造、检验和验收 (13) 8 文件要求 (13) 9 运输包装和标记 (14) 9.1 运输包装 (14) 9.2 保护措施 (14)

1 总则 1.1 目的 1) 本规定的目的是为了确保设计进度,提高设计质量,统一工程设计原则和规定,统一设计文件编制内容和深度。 2) 本规定可作为详细工程设计的依据。 3) 有关设计单位的设计人员应严格遵守此规定,如有偏离应事先征得总体院和业主的书面批准。 1.2 范围 本规定适用于中国石油克拉玛依石化分公司超稠油加工技术改造及油品质量升级项目静设备设计部分,包括塔器、反应器、容器、换热器、储罐等的设计、制造、检验、验收和安装。 2 主要标准规范 2.1 设备设计标准与规范 TSG R0004-2009 固定式压力容器安全技术监察规程 GB150-2011 压力容器 JB4732-1995 钢制压力容器-分析设计标准(2005年确认) GB151-1999 管壳式换热器 GB12337-1998 钢制球形储罐 GB16749-1997 压力容器波形膨胀节 GB50341-2003 立式圆筒形钢制焊接油罐设计规范 NB/T 47003.1-2009 钢制焊接常压容器 JB/T4710-2005 钢制塔式容器 JB/T4731-2005 钢制卧式容器 JB/T 4751-2003 螺旋板式换热器 NB/T47007-2010 空冷式热交换器 SH/T3074-2007 石油化工钢制压力容器 SH/T3075-2009 石油化工钢制压力容器材料选用规范 SH/T3096-2012 高硫原油加工装置设备和管道设计选材导则 SH/T3119-2000 石油化工钢制套管换热器设计规范

管道设计技术规定

管道设计技术规定 TYYGROUP system office room 【TYYUA16H-TYY-TYYYUA8Q8-

SH/P20-2005 管道设计技术规定SH/P21-2005 装置布置设计技术规定SH/P22-2005 管道布置设计技术规定 上海化工设计院有限公司 二OO五年三月

管道设计技术规定 SH/P20-2005 上海化工设计院有限公司 二OO五年三月 管道设计技术规定 1 总则 本规定包括:管道设计、材料、制造、安装、检验和试验的要求。 本规定为管道布置、管件材料和管道机械的设计原则,各项目的管道设计应符合本规定的要求。 2 设计 概述 为经济地、合理地选择材料,管道应按其使用要求各自分类,任何一类管道使用的范围应考虑:腐蚀性、介质温度和压力等因素。 设计条件和准则 在设计中应考虑正常操作时,可能出现的温度和压力的最严重情况,并在管道一览表或流程图上加以说明。 操作介质温度<38℃不保温的金属管道的设计温度同介质温度,内部或外部保温的管道应依据传热计算或试验确定。 在调节阀前的管道(包括调节阀)压力应按最小流量下(关闭或节流时)来设计。而在调节阀后的管道,应按阀后终了的压力加上摩擦和压头损失来设计。 对于按照正常操作条件下,不同的温度和压力(短时的)进行设计时,不应包括风载和地震载荷。 非受压部件包括管架及其配件或管道支撑构件的基本许用应力应与受压部件相同。 管道的腐蚀度,应按具体介质来确定。通常对碳钢和铁素体合金钢的工艺管道应至少有1mm的腐蚀度,对于奥氏体合金钢和有色金属材料一般不加腐蚀余量。

管道尺寸确定 管子的尺寸依据操作条件而确定。必要时,考虑按正常控制条件下计算的管道和设备的摩擦和25%流量的余量,但下列情况除外: (1)泵、压缩机、风机的管道尺寸,按其相应的能力确定(在设计转速下能适应流量的变化要求)同时要估计到流量到0的情况。当机器的最大能力超过工艺要求的最大能力时,管道的设置不能按机器最大能力计算。 (2)循环燃油系统,应按设备设计要求的125%流量考虑,以使其有25%的循环量。 (3)间断操作的管道(如开车和旁路管道)的尺寸,应按可利用的压力降来设计。 一般不采用特殊尺寸的管道如:DN32(1″)、DN125(5″)、DN175(7″)等。对于这种尺寸的设备接管口,应由一个适合的管件把标准管和设备接管口连起来。 管道的布置 管道的布置要有一定的绕性,以降低管道的应力和推力。 一般管道均沿管架水平敷设,有坡度要求的管道,根据坡度要求单独支承。 输送无腐蚀性介质的管道一般配置在有腐蚀性介质管道的上面;有保温的管道一般配置在无保温的管道的上面。 安全阀(驰放阀)和放空管的配置应符合下述要求: (1)安全阀(驰放阀)和放空阀应选择在管道的最高位置处。 (2 )排放有毒性气体或可燃气体的放空管的排出高度,应符合相应的设计规定。 管道的方向改变、相交及变径 管道的方向改变、相交及变径应优先采用对焊管件(弯头、三通、异径管),带法兰的管件用于需要经常检修、拆卸的地方。 管道方向的改变通常采用弯头、弯管、焊制管弯头(虾米腰)。 (1)对焊弯头的弯曲半径一般采用倍公称直径。 (2)弯管的最小弯曲半径通常按~4倍公称直径计。

输油管道工程设计规范版

1总则 1. 0. 1为在输油管道工程设计中贯彻执行国家现行的有关方针政策,保证设计质量,提高设计水平,以使工程达到技术先进、经济合理、安全可靠及运行、管理、维护方便,制定本规范。 1.0.2本规范适用于陆上新建、扩建或改建的输送原油、成品油、液态液化石油气管道工程的设计。 1. 0. 3输油管道工程设计应在管道建设、营运经验和吸取国内外先进科技成果的基础上合理选择设计参数,优化设计。 1. 0. 4输油管道工程设计除应符合本规范外,尚应符合国家现行的有关强制性标准的规定。 2术语 2. 0. 1输油管道工程oil pipeline project 用管道输送原油、成品油及液态液化石油气的建设工程。一 般包括输油管线、输油站及辅助设施等。 2.0.2管道系统pipeline system 各类型输油站、管线及输送烃类液体有关设施的统称。 2.0.3输油站oil transport station 输油管道工程中各类工艺站场的统称。 2.0. 4首站initial station 输油管道的起点站。 2. 0. 5末站terminal 输油管道的终点站。 2. 4. 6中间站intermediate station 在输油首站、末站之间设有各类站场的统称。 2. 0. 7中间热泵站intermediate heating and pumping station 在输油首站、末站之间设有加热、加压设施的输油站。 2. 0. 8中间泵站intermediate pumping station 在输油首站、末站之间只设有加压设施的输油站。

2.0.9中间加热站intermediate heating station 在输油首站、末站之间只设有加热设施的输油站。 2. 0. 10输人站input station 向管道输入油品的站。 2. 0. 11分输站off-take station 在输油管道沿线,为分输油品至用户而设置的站。 2. 0. 12减压站pressure reducing station 由于位差形成的管内压力大于管道设计压力或由于动压过大,超过下一站的允许进口压力而设置减压装置的站。 2. 0.13弹性弯曲elastic bending 管道在外力或自重作用下产生的弹性限度范围内的弯曲变形。 顺序输送hatch transportation 多种油品用同一管道依次输送的方式。 2. 0.15翻越点turnatrer point 输油管道线路上可能导致后面管段内不满流(slack f low)的某高点。 一站控制系统,ration control system 对全站工艺设备及辅助设施实行自动控制的系统。 2. 0. 17管件pipe fittings 弯头、弯管、三通、异径接头和管封头等管道上各种异形连接件的统称。 2. 0. 18管道附件pipe accessories 管件、法兰、阀门及其组合件,绝缘法兰、绝缘接头、清管器收发筒等管道专用部件的统称。 2. 0. 19最大许用操作压力maximum allowable operating pressure(MADP) 管道内的油品处于稳态(非瞬态)时的最大允许操作压力。其值应等于站间的位差、摩阻损失以及所需进站剩余压力之和。 2. 0. 20 U管道设计内压力pipeline internal design pressure 在相应的设计温度下,管道或管段的设计内压力不应小于管道在操作过程中管内流体可能产生的最大内压力。 2. 0. 21线路截断阀line block valve 为防止管道事故扩大、减少环境污染与管内油品损失及维修方便在管道沿线安装

工艺设计统一规定

潍坊科达化工工程有限公司 工艺专业设计统一规定 (以纯碱工程为例) 施工图设计 工程代号:K10000

前言 本规定以纯碱工程施工图设计为例的工艺专业统一规定,本规定以化工部颁布的“化工工艺设计施工图内容深度统一规定”为依据,并参照其它有关规定,在执行过程中如有不妥或错漏请及时联系。 所有的施工图图纸成品一律应用AutoCAD2004绘制。表格成品一律应用Word 或Excel表编制。 所有成品文件均为电子文档,根据需要再制成纸质文件。 所有的同各专业往返条件关系都应执行科达公司管理体系文件中“施工图设计的基本程序”文件。

目录 一、设计标准及规定 二、设计原则 三、工艺流程图的内容及深度 四、设备一览表的内容及要求 五、工艺设备位号的编法 六、管道一览表的内容及要求 七、管道标注的规定 八、工艺说明的内容及要求 九、首页图

一、设计标准及规定 1 设计标准 设计标准采用现行国家标准和行业标准。 2 本工程设计规定 2.1 工程名称 纯碱工程, 工程代号:K1000 2.3 主项名称及代号 盐水工段501 石灰工段502 蒸吸工段503 碳化工段504 轻灰工段505 重灰工段506 压缩工段507 全厂外管083 2.4 年操作时间:8000小时 2.5 设计系数: 1.15 2.4 设计质量执行专业有关规定。 2.5 设计进度控制执行项目进度计划和项目设计调度有关计划进度要求。 2.6 专业设计计算书,执行各专业各类计算规定。 2.7 设计过程中专业之间设计条件的内容深度与格式,执行《设计条件内容深度与格式的规定》 2.8 设计成品文件编号,执行《项目文件格式与编号规定》。 2.9 设计过程中应建立的质量记录和实施记录。 2.10 施工图图纸成品一律应用AutoCAD2004绘制,表格成品一律应用Word或Excel 表编制。

压力管道设计规范标准

压力管道设计规范 上海化工设计院有限公司 二OO五年三月

目录 1.管道设计技术规定SH/P20-2005 2.装置布置设计技术规定SH/P21-2005 3.管道布置设计技术规定SH/P22-2005 4.管道材料设计技术规定SH/P23-2005 5.保温、防腐及涂色设计技术规定SH/P24-2005 6.管道应力分析设计技术规定SH/P25-2005 7.管道支吊架设计技术规定SH/P26-2005

管道设计技术规定 SH/P20-2005 上海化工设计院有限公司 二OO五年三月

管道设计技术规定 1 总则 1.1 本规定包括:管道设计、材料、制造、安装、检验和试验的要求。 1.2 本规定为管道布置、管件材料和管道机械的设计原则,各项目的管道设计应符合本规定的要求。 2 设计 2.1 概述 为经济地、合理地选择材料,管道应按其使用要求各自分类,任何一类管道使用的范围应考虑:腐蚀性、介质温度和压力等因素。 2.2 设计条件和准则 2.2.1 在设计中应考虑正常操作时,可能出现的温度和压力的最严重情况,并在管道一览表或流程图上加以说明。 2.2.2 操作介质温度<38℃不保温的金属管道的设计温度同介质温度,内部或外部保温的管道应依据传热计算或试验确定。 2.2.3 在调节阀前的管道(包括调节阀)压力应按最小流量下(关闭或节流时)来设计。而在调节阀后的管道,应按阀后终了的压力加上摩擦和压头损失来设计。 2.2.4 对于按照正常操作条件下,不同的温度和压力(短时的)进行设计时,不应包括风载和地震载荷。 2.2.5 非受压部件包括管架及其配件或管道支撑构件的基本许用应力应与受压部件相同。 2.2.6 管道的腐蚀度,应按具体介质来确定。通常对碳钢和铁素体合金钢的工艺管道应至少有1mm的腐蚀度,对于奥氏体合金钢和有色金属材料一般不加腐蚀余量。 2.3 管道尺寸确定 2.3.1 管子的尺寸依据操作条件而确定。必要时,考虑按正常控制条件下计算的管道和设备的摩擦和25%流量的余量,但下列情况除外: (1)泵、压缩机、风机的管道尺寸,按其相应的能力确定(在设计转速下能适应流量的变化要求)同时要估计到流量到0的情况。当机器的最大能力超过工艺要求的最大能力时,管道的

装置设备布置专业设计技术统一规定

中国石化集团兰州设计院标准 SLDI 323C05-1996 中国石化集团兰州设计院

目录 1.前言 (1) 2.设备地脚螺栓 (1) 3.设备运输和吊装 (1) 4.空冷器的布置 (1) 5.换热器的布置 (1) 6.泵的布置 (2) 7.卧式容器的布置 (2) 8.立式容器和反应器的布置 (2) 9.塔的布置 (2) 10.加热炉的布置 (2) 11.离心式压缩机的布置 (2) 12.往复式压缩机的布置 (3) 13.装置内管廊的布置 (3) 14.外管架的布置 (3) 15.回转窑的布置 (3) 16.汽车槽车和铁路槽车装卸站的布置 (3) 17.罐区的布置 (4) 18.建筑物、构筑物及通道的布置 (4)

中国石化集团兰州设计院 1. 前言 石油化工企业装置设备布置设计包括建筑物、构筑物和通道等的布置设计,所以可通称为装置的布置设计。 装置的布置设计合理与否影响到整个装置能否安全生产、操作维修是否方便、投资能否节约等,因此,为了统一装置布置设计文件的内容和深度,提高设计质量和设计效率,特制定本规定。 2、设备地脚螺栓 与设备类专业共同商定固定设备的地脚螺栓是预埋或是预留,并由设备专业向结构专业提出设备地脚螺栓条件。 3、设备运输和吊装(根据需要) 3.1为便于考虑吊装要求 , 按设备重量或按尺寸分为三个等级: 类型按重量分按直径x长度分 大型 80t以上 3500x30000及以上或任意x40000及以上 中型40~80t 1800x10000及以上或任意x20000及以上 小型 40t以下小于上述尺寸 3.2 编制设备吊装方案,应符合《大型设备吊装工程施工工艺标准》(SH3515-1990)的规定,通常由施工单位编制。但对主要设备吊装方案的技术条件如吊耳及吊装方位等要求,应与施工单位共同商定。3.3 对于某些可能更换的设备,在设备布置设计时应考虑留有足够的空间和通道,便于安装拆卸设备的机具作业以及运输。 4 、空冷器的布置 4.1 空冷器宜布置在管廊上方或框架顶层。 4.2 布置空冷器的框架或管廊的一侧地面上应留有必要的检修空地和通道,以便吊车通行和吊装设备。 4.3 空冷器不宜布置在下列设备的上方: 4.3.1 操作温度高于介质自然点或高于340℃的液体输送泵。 4.3.2 易燃液体泄漏时将产生闪蒸气体的液体输送泵。 4.3.3 电气传动设备或其它放热设备。 4.3.4 空冷器的布置应避免自身或相互间的热风循环,可采取下列措施: 4.3.4.1 同类型的空冷器应布置在同一高度。 4.3.4.2 相邻的两空冷器应靠紧布置,不应留有间距。 4.3.4.3 多组空冷器应相互靠近,否则易造成热风循环。 4.3.4.4 空冷器应布置在装置的上风侧,以免腐蚀性气体或热风进入管束,从而影响空冷器的冷却效果。 4.3.4.5 引风式空冷器与鼓风式空冷器布置在一起时,应将引风式空冷器布置在鼓风式空冷器的上风侧 , 且其管束的安装高度应比鼓风式空冷器低。 4.3.5 干式鼓风式空冷器应与引风式空冷器分开布置,且引风式空冷器应布置在鼓风式空冷器的常年最大频率风向的上风侧。 4.3.6 在空冷器的上风侧不应有锅炉等高温设备,下风侧20~25m范围内不应有高于空冷器的建筑物、构筑物或大型设备,如不可避免则应提高空冷器的设计温度1.5~2℃。 4.3.7 空冷器与加热炉之间的距离不应小于15m。 4.3.8 空冷器管束两端管箱和传动机械处应设置平台。 4.3.9 空冷器布置时要考虑空冷器运行时产生的噪音对操作人员的影响,噪音应限制在90分贝以下。 5. 换热器的布置 5.1 布置时要考虑换热器抽管束或检修所需的场地(包括空间)和设施。当检修时,汽车吊不能接近换热器时,应设吊车梁、地面轨道或其它检修用设施。 1

压力管道涂漆防腐工艺导则

压力管道涂漆防腐工艺导则 1范围 本标准适用于各种工业管道、各种公用管道的涂漆防腐工程2管道涂色分类表 见表1 表1管道涂色分类表 注:表道,又能做到统一。 3 一般油漆 3.1作业条件 3.1.1 管道试压合格,未经试压的大口径钢板卷管如需涂漆,应留出焊缝部位及有关标记 3.1.2 被涂表面的铁锈、焊渣、毛刺、油脂、泥砂、水分等污物均已清除干净。 3.1.3 环境温度宜在15—35C之间,相对湿度在70%以下,并有防火、防冻、防雨措施c 涂漆的环境空气必须清洁,无煤烟、灰尘及水汽。室外涂漆遇雨、降雾时应停止施工。 3.1.4 管道安装后不易涂漆的部位,应预先涂漆。 3.2 表面处理涂料施工前,应将管道表面的油垢及氧化物等消除。焊缝处不得有焊渣、毛刺。表面个别部分凹凸不平的长度不得超过5mm。 1欢迎下载

管材表面的锈层可用下列方法消除: 3.2.1 手工处理用锤、刮刀、挫刀、钢丝刷或砂纸等将金属表面的锈层、氧化皮、铸砂等除掉。金属表面浮锈较厚时,先用锤等敲掉锈层,但不得损伤金属表面;锈蚀不厚时,直接用钢丝刷、砂纸擦拭表面,直至露出金属本色,再用棉纱擦干净。 3.2.2 机械处理 采用金钢砂轮打磨或同压缩空气喷石英砂(喷砂法)吹打金届表面,将金属表面的锈层、氧化皮、铸砂等污物除净。 喷砂除锈: 3.2.2.1 喷砂除锈工作应在专设的砂场内进行。 3.222 喷砂所用砂子必须坚硬、带棱、粒径在1—3mm之间;用前应经水洗、筛选、烘干,使其不合泥土杂物,含水率v 1 %。 3.223 操作程序:合格砂装入砂罐内(到容积2/3为限)T砂罐和贮气罐的出口阀及管路上的阀门全部关闭十开动空压机(使表压保持在0. 49MPa左右)-打开各个阀门及喷嘴(迅速将风压调至0. 4Mpa)-喷砂(喷嘴与被喷砂表面呈50°—70°夹角,并尽可能保持100 —200mn间距)一均匀移动喷嘴一被喷砂表面出现银灰色金属光泽即达到喷砂合格。 3.2.2.4 对管子内壁喷砂所用的喷嘴应为铸铁浇注的或用45号钢制作的锥形喷嘴,嘴端呈椭圆形(长轴10mm短轴5mm) 3.2.2.5 如喷嘴喷不出砂,应立即关闭空气阀,并从以下三方面找原因:出砂阀门开启度不够;出砂阀门受堵:砂罐内无砂。 3.2.3 化学处理 用酸洗的方法清除金属表面的锈层、氧化皮。采用浓度10—20%、温度18—60C的 稀硫酸溶液,浸泡被涂物件15—60 分钟;也可用10—15%的盐酸在室温下进行酸洗。为使酸洗时不损伤金属,在酸溶液中加入缓蚀剂。酸洗后要用清水洗涤,并用50%浓度的碳酸钠溶液中和,最后用热水冲洗2—3次,用热空气干燥。 3.2.4 旧涂料的处理在旧涂料上重新涂漆时,可根据旧漆膜的附着情况,确定是否全部清除或部分清 除。 如旧漆膜附着良好,铲刮不掉可不必清除;如旧漆膜附着不好,则必须清除重新涂刷。 2

非标设备结构设计规范

非标准设备制造和管理规程 1定义 非标准设备(工装、治具、设备、仪器等)是指生产需要而又不能直接采购的专用设备,本规程的原则是保证能够经济有效地获得和使用非标准设备。对于加工和装配过程(包含自制及外购外协)的非标准设备,由使用部门提出申请,直接按本管理规程执行。 2目的 为了方便对非标准设备的申请、设计、制作、验收、移交及使用的标准化管理 3 立项流程 3.1立项依据 3.1.1根据自身生产实际并经使用部门评审需要改进和增添的非标准设备项目。 3.1.2公司发展规划或技改技措计划中规定的非标准设备等项目。 3.2 立项顺序 3.2.1由使用部门提出申请并填制及申报《工装治具仪器 设备需求单》,设备制造部门凭申请单同使用部门(有需要时, 同外购外协供应商)进行方案设计《设计方案书》并提出预算, 财务部门、设备制造部门和使用部门对预算进行审核,通过后由 使用部门提出申请《设备固定资产购入申请决裁书》的审批,然 后按申请审批流程,设备制造部门收到《设备固定资产购入申请 决裁书》后根据《设计方案书》进行审核并下达工作令。 3.2.2 非标设备须考虑设备的后期维护和可能的修改。委外须考虑外购外协供应商持久、可信,且在设备出现故障或提出修改时随叫随到等因素。 3.2.3《设计方案书》的内容要求详细、明确,使用部门应提供使用的产品或需加工产品的尺寸及要求图,尺寸及要求图必须和产品实物一致。 2.3非标准设计人员对所承接的《设计方案书》,要编写可行性分析报告,并按规定履行各栏签字手续。如有分歧意见,最终以设备制造部门主管或使用部门主管的意见为准。 4 预算审核 4.1 设备制造部门或外购外协供应商负责对预算审核过程中的所有问题做出解答,所有单件预算的零部件必须注明品牌和型号。设备制造部门的预算(对预算由采购部门协助报价)作为最终预算承接此项目。 4.2 设备制造部门前期工作进行后,因制造费用大于预算费用,则超出部分设备制造部门需按实列支,并由设备制造部门重新提出申请及说明。

压力管道设计技术规定

压力管道设计技术规定 上海化工设计院有限公司 二OO五年三月

目录 1.管道设计技术规定SH/P20-2005 2.装置布置设计技术规定SH/P21-2005 3.管道布置设计技术规定SH/P22-2005 4.管道材料设计技术规定SH/P23-2005 5.保温、防腐及涂色设计技术规定SH/P24-2005 6.管道应力分析设计技术规定SH/P25-2005 7.管道支吊架设计技术规定SH/P26-2005

管道设计技术规定SH/P20-2005 上海化工设计院有限公司 二OO五年三月

管道设计技术规定 1 总则 1.1 本规定包括:管道设计、材料、制造、安装、检验和试验的要求。 1.2 本规定为管道布置、管件材料和管道机械的设计原则,各项目的管道设计应符合本规定的要求。 2 设计 2.1 概述 为经济地、合理地选择材料,管道应按其使用要求各自分类,任何一类管道使用的范围应考虑:腐蚀性、介质温度和压力等因素。 2.2 设计条件和准则 2.2.1 在设计中应考虑正常操作时,可能出现的温度和压力的最严重情况,并在管道一览表或流程图上加以说明。 2.2.2 操作介质温度<38℃不保温的金属管道的设计温度同介质温度,内部或外部保温的管道应依据传热计算或试验确定。 2.2.3 在调节阀前的管道(包括调节阀)压力应按最小流量下(关闭或节流时)来设计。而在调节阀后的管道,应按阀后终了的压力加上摩擦和压头损失来设计。 2.2.4 对于按照正常操作条件下,不同的温度和压力(短时的)进行设计时,不应包括风载和地震载荷。 2.2.5 非受压部件包括管架及其配件或管道支撑构件的基本许用应力应与受压部件相同。 2.2.6 管道的腐蚀度,应按具体介质来确定。通常对碳钢和铁素体合金钢的工艺管道应至少有1mm的腐蚀度,对于奥氏体合金钢和有色金属材料一般不加腐蚀余量。 2.3 管道尺寸确定 2.3.1 管子的尺寸依据操作条件而确定。必要时,考虑按正常控制条件下计算的管道和设备的摩擦和25%流量的余量,但下列情况除外: (1)泵、压缩机、风机的管道尺寸,按其相应的能力确定(在设计转速下能适应流量的变化要求)同时要估计到流量到0的情况。当机器的最大能力超过工艺要求的最大能力时,管道

涂漆及表面色工程统一规定.

*********项目 工程统一规定 涂漆及表面色工程统一规定 文件编号:

目录 1目的 (1) 2适用范围 (1) 3标准规范 (1) 4设计 (2) 4.1一般规定 (2) 4.2设计原则 (4) 4.3表面色和标志色规定 (5) 5涂漆施工方提交的文件 (9) 6材料 (9) 6.1材料制造厂商 (9) 6.2涂漆材料 (10) 7运输、操作和贮藏 (10) 7.1交货和贮藏 (10) 7.2材料的使用和期限 (10) 7.3涂漆部件的搬运 (10) 8涂敷前的要求 (11) 8.1一般要求 (11) 8.2涂漆前的表面处理 (11) 8.3工厂刷漆的表面 (13) 8.4镀锌表面 (13) 9涂漆规定 (13) 10检查和试验 (15) 10.1涂装前表面处理与检查 (15) 10.2地上设备和管道防腐蚀工程检查与验收 (16)

10.3引进设备的检查 (17) 10.4修补 (19) 附录A 涂漆材料 (20) 附录B 设备、管道和管道组成件涂漆表 (21)

1 目的 为统一XX项目EPC阶段涂漆和表面色要求,指导EPC承包商的工程技术工作,特编制本规定。 2 适用范围 2.1本规定对塔、容器、换热器、加热炉、机械和包装机械、仪表、钢结构、管道等其他部件的表面处理和涂层保护系统提出了要求。如相关专业有各自的涂漆规定,各自的涂漆规定与本规定有矛盾时以各自涂漆规定为准。 2.2涂漆和镀锌材料,以及与各种涂层系统相关的表面处理均包括在涂漆材料中。 2.3工厂制造的容器、换热器、设备和包装单元及其相关管道应在发运前由供应商在车间内按照附录A,B,完成全部表面处理,底漆和面漆的涂覆工作。 2.4按照采购文件的规定,在车间预制的管道元件和管子应在车间现场按照附录A、B完成全部表面处理,底漆和面漆的涂覆工作。 2.5本规定适用于XX项目中钢制设备、管道及其附属钢结构的外表面涂料防腐蚀工程的设计。 2.6本规定不包括要求已经有外涂层和保护层的地下管道。 3 标准规范 下列文件中条款通过本规定的引用而成为本规定的条款。凡注日期的引用文件,其随后所有的修改单或修改版均不适用本规定。凡是不注日期或修改号(版次)的引用文件,其最新版本适用于本规定。 GB/T 1720- 《漆膜附着力测定方法》

管道跨距设计技术规定

1 范围 本标准规定了管道允许跨距和导向间距的确定原则和方法,并给出了十六种典型管段的管架配置方案。 本标准适用于一般石油化装置内外输送介质温度不超过400℃的液体的气体管道。 本标准主要根据管系静态一次应力条件制定,对需考虑热应力和振动间题的管道,应按设计标准另作相应的热应力和动态分析核算,并根据分析结果调整管架位置。 2 管道跨距和支吊架的设置 2.1 配管设计中,可先根据管道的设计条件按本标准的计算方法或图表,求出基本跨距,然后按各管段的配置形式和载荷条件确定其相应的允许跨导向间距,以虎作为配置管架的基本条件。 2.2 配置管架除应满足本标准允许距距和导向间距外,还需注意以下问题: 2.2.1 管架应尽量设置在直管段部分,避免在小半径弯头、支管连接点等局部应力较高的部位设置支承点,以防管系中局部应力过载; 2.2.2 刚性支吊架应设在沿支承方向上管道位移为零的位置上; 2.2.3 支吊架应尽可靠近阀门、法兰及重管件,但不应以它们作直接支承,以免因局部荷载作用引起连接面泄漏,或阀体因受力变形导致阀瓣卡住、关闭不严等不良后果; 2.2.4 导向架不宜过份靠近弯头和支管连接部位,否则可能额外地增加管系应力和支承统的荷载; 2.2.5 对因清理、维修等要求而需经常拆卸的管段,不宜设置永久性管架。 3 管道基本跨距的确定 基本跨距是用以确定管段允许跨距的基准数据。本规定根据三跨简支梁承受均布荷载时的强度条件和刚度条件别以计算法和图表法规定如下: 3.1 计算法 3.1.1 刚度条件 根据管段不应在轻微外界扰力作用下发生明显振动的要求,规定装置内管段的自振频率不低

L 01=0.2124 qo I E t (1-a) L 01*=0.2654 qo I E t (1-b) 式中: L 01一装置内管道由刚度条件决定的跨距,m; L 01*一装置外管道由刚度要件决定的跨距, m; I 一管子扣除腐蚀裕量后的惯性矩(见表1), cm 4 ; E t 一管材在设计温度下的弹模量(见40B201-1997《工艺管道应力分析技术规定》附录二),MPa ; qo 一每米管道的质量(包括管子 、隔热层、物料质量及其他垂直均布持续荷载),kg/m 。 3.1.2 强度条件 根据不降低管道承受内压能力的原则,规定装置内外的管道一律取由管道质量荷载(包括其他垂直持续荷载)在管壁中引起的一次轴向应力不起过额定许用应力的二分之一。 L 02=(L 02*)=0.626 []qo t W σ (2) 式中:L 02 L 02*一由强度条件决定的装置内及装置外的管道跨距,m; W 一管子扣除腐蚀裕量后的断面模量(见表1),cm 3; [σ]t 一管材在设计温度下的的许用应力(按40B201一1997《工艺管道应力分析技术规定》附录六取值),MPa ; qo 一每米管道的质量(包括管子、隔热层、物料质量及其他垂直均布持续荷载),kg/m 。 3.1.3 在刚度和强度条件计算的跨距值中,取较小者为该管道之基本跨距(Lo 或LO*)。 3.2 图表法 根据本标准基本跨距所需要满足的最低刚度条件和强度条件,对计算公式作必要的工程简化处理,绘制成用于各种隔热和不隔热管道的基本跨距曲线。这些曲线对常用管道规格(t/D ≤0.1)的基本跨距值,误差不超过±10%。

某企业设备更新计划制度

某企业设备更新计划制度 篇一:设备改造更新管理制度 设备改造更新管理制度 发放部门:□管理者代表□文控□业务部□采购部□工程部 □工模部□生产部□品管部□仓库□行政部 设备改造更新管理制度 1.目的作用 企业的设备改造和更新,是提高企业素质、促进企业技术进步、增强企业内在的发展能力和对外界环境变化的适应能力的需要。通过设备改造更新,必然会为企业的产品生产不断增加品种、提高质量、增加产量、降低消耗、节约能源、提高效率等方面带来极大的收益。为了使该项工作能够得到规范运作,避免管理失误,特制定本制度。 2.管理职责企业的技术改造更新(含设备),是企业经营计划中的一个重要方面工作,它同时也是一项综合性、全局性、科学性很强的工作,既需要有一个强有力的统一指挥,还需要相关各部门的协作配合。因此,企业应成立由总经理(或主管生产技术副总)为主负责的技改领导小组,以

加强对工作的协调和技改统一的指挥领导。其主要成员应包括:总师办主任、技术研发部长、生产作业部长、财会部长等人。技改领导小组的工作职能中关于设备改造更新方面应包括以下内容: a.负责设备改造更新的计划管理。 b.组织对项目的技术经济论证。 c.对项目方案进行决策。 d.批准项目费用的预算,审查资金使用情况。 e.督察项目实施情况,协调部门间工作配合事项。 f.对已完成交付使用的项目进行效益考核。 3.设备改造更新的项目决策企业的设备改造更新,应有步骤地进行,即要有长期的总体规划,又要有各年需要进行的具体项目实施计划。对选定的更新改造项目,必须经过可行性研究,进行技术经济论证,对多种备选方案进行比较,选择投资少、工期短、收效快、效益高、能适宜企业长期发展需要的项目。 设备技术改造的项目决策企业的设备技术改造,不要追求形式,要讲求实效,对需要改造的陈旧落后设备,在具体方案制定时,应从企业发展的需要考虑,同时还要从设备本身的投资改造价值考虑,即通过改造后能给企业带来哪些方面的收益。一般来说应从以下几方面来考虑: 节约能源,节约原材料,降低消耗,降低成本。 提高设备的加工精度,提高产品的质量。适应新产品开发,适应产品升级换代。提高和改善工艺性能。

相关文档
最新文档