No ISB equipped
1.0Bar
Step number: 115 Condensate Drain 1 240Sec
Index
No ISB equipped
1.0Bar
A
Step number: 116 Condensate Drain 2 20Sec
Index
No ISB equipped
Index
No ISB equipped
100%
10sec delay activated 延时10秒动作
100%
A
Step:105 Pressurize 2. Pressurize tank to 1.5 Bar. PT130
Index
No ISB equipped
100%
100%
Step number: 106 Drain 2. 60Sec
Tetra Alsafe training 利乐无菌罐培训
TPKS:2003-01-15 ZSH
Tetra Pak (Kunshan) Co., Ltd. Tel (+86 757)3831626 Fax (+86 757)3831488
NO ISB EQUIPPED
No ISB equipped
Index
No ISB equipped
Step number: 602 Draining 1 LS102 + 5Sec Alsafe as Master or Internal PDA CIP unit
Index
No ISB equipped
Step number: 603 Circ. Tank External CIP unit as master
Index
No ISB equipped
100%
10sec delay activated 延时10秒动作
100%
A
Step:111 Heating Condition to Next Step TT140, TT160, TT170 > 1250C
Index
No ISB equipped
100%
Index
No ISB equipped
Step number: 604 - 701 Circ. V102, V112
Index
No ISB equipped
A
Step number: 604 - 702 Circ. Traps + V107
Index
No ISB equipped
A
Step number: 604 - 703 Circ. V107 + V125
No ISB equipped
Pre-sterilization101 预杀菌步骤101
Pre-sterilization112 预杀菌步骤112
Pre-sterilization113 预杀菌步骤113 Pre-sterilization114 预杀菌步骤114 Pre-sterilization115 预杀菌步骤115
100%
A
Step:112 Sterilizing 1800Sec AND TT140, TT160, TT170 > 1250C
Index
No ISB equipped
Every 15sec, activate d 10sec 每隔15 秒动作 10秒
V142 max. allowed open ramped from 0 –50% during appr. 2.5 min.
Index
No ISB equipped
1.0Bar
Step number: 302 (1001, 1004, 1101) Open to drain 3Sec
Index
No ISB equipped
1.0Bar
Step number: 303 (1001, 1004, 1101) Product line open to drain
2.6Bar
Step number: 113 Cooling 1 150Sec
If TT160<110 0C, Activated 如果TT160 <110 0C ,则动作
Index
No ISB equipped
1.3Bar
Step number: 114 Cooling 2 900Sec
Index
INDEX目录
Pre-sterilizing 预杀菌 101 - 116 CIP 清洗 601 - 632 Depress. After prod. 生产结束后卸压 501 - 502 Production 生产 1001 - 1101 Fil. tank from ster. 从消毒机至无菌罐 200 - 220 Filling/Empty line 填充/排空管道 301 - 305
Step number: 502 Depressuring.2 after production 300 Sec
Index
No ISB equipped
Filling/Emptying line 301 填充/排空管线 步骤 301
Filling/Emptying line 304 填充/排空管线 步骤 304
Pre-sterilization102 预杀菌步骤102
Pre-sterilization111 预杀菌步骤111 Pre-sterilization110 预杀菌步骤110 Pre-sterilization107 预杀菌步骤107
Pre-sterilization103 预杀菌步骤103 Pre-sterilization104 预杀菌步骤104 Pre-sterilization105 预杀菌步骤105
Sterilizer in CIP 消毒机正在CIP
Production Step 1004 生产步骤1004
Index
No ISB equipped
1.0Bar
Step number: 1001 Ready for filling
Index
No ISB equipped
V102, V103, V105, V107B, V112, V113 Condition See Sub-Step 201-207
Index
No ISB equipped
Step number: 631 Depressuring.1 PT130<0.2 Bar
Index
No ISB equipped
Step number: 632 Depressuring.2 120Sec
Index
No ISB equipped
Depressuring step 501 生产后卸压 步骤 501
Index
No ISB equipped
100%
10sec delay activated 延时10秒动作
100%
A
Step:107 Pressurize 3. Pressurize tank to 2.0 Bar. PT130
Index
No ISB equipped
100%
100%
Step number: 110 Drain 3. 60Sec
Index
No ISB equipped
1.0Bar
Step number: 304 (1001, 1004, 1101) Close to drain 3Sec
Production Step 1001 生产步骤1001
Production Step 1002 生产步骤1002 Production Step 1101 生产步骤1101 Production Step 1003 生产步骤1003
Sterilizer standby 消毒机待机
Sterilizer in Prod 消毒机正在生产
Step number: 1101 Ready for Emptying
Index
No ISB equipped
Sterilizer in CIP
Step number: 1101 Ready for Emptying, During sterilizer In CIP
Index
No ISB equipped
Filling/Emptying line 302 填充/排空管线 步骤 302
Filling/Emptying line 305 填充/排空管线 步骤 305
Filling/Emptying line 303 填充/排空管线 步骤 303
Filling/Emptying line 300 填充/排空管线 步骤 300
CIP step 606 CIP步骤606
CIP step 607 CIP步骤607
CIP step 602 CIP步骤602
CIP step 611 CIP步骤611
CIP step 610 CIP步骤610
CIP step 603 CIP步骤603
CIP step 613 CIP步骤613
CIP step 625 CIP步骤625
Index
No ISB equipped
100%
100%
A
Step:103 Pressurize 1. Pressurize tank to 1.0 Bar. PT130
Index
No ISB equipped
100%
100%
Step number: 104 Step timer: 300Sec Drain 1
Pre-sterilization116 预杀菌步骤116
Pre-sterilization106 预杀菌步骤106
Production 1001 生产步骤1001
Index
No ISB equipped
100%
Fully open From step 101-112 从步骤101-112全开
100%
Index
No ISB equipped
1.0Bar
Step number: 300 (1001, 1004, 1101) Start filling/emptying line
Index
No ISB equipped
1.0Bar
Step number: 301 (1001, 1004, 1101) Close Steam 2Sec
CIP step 626 CIP步骤626
CIP step 604 CIP步骤604
CIP step 630 CIP步骤630
CIP step 627 CIP步骤627 CIP step 632 CIP步骤632
CIP step 631 CIP步骤631
Index
No ISB equipped
Step number: 601 Pressurizing PT130>1.0bar
B
Step number: 1002 Sub-Step 207 Fill to Low level. LS10
Index
No ISB equipped
V102, V103, V105, V107B, V112, V113 Condition See Sub-Step 201-207
B
Step number: 1003 Sub-step 207 Filling> Low level. 90sec
Sterilizer Standby
Step number: 1101 Ready for Emptying, During sterilizer standby
Index
No ISB equipped
CIP step 601 CIP步骤601
CIP step 605 CIP步骤605 CIP step 612 CIP步骤612
Step number: 101 Step time: 30Sec Drain 1.0 Bar steam supply line
Index
No ISB equipped
100%
10Байду номын сангаас%
Step number: 102 Step time 30Sec Drain 2.7 Bar steam supply line
Index
No ISB equipped
V121, V123, V124, V125 Condition See Sub-Step 301-305
B
Step number: 1004 Sub-Step 303 Filling line 35Sec
Index
No ISB equipped
Sterilizer in Production
Depressuring step 502 生产后卸压 步骤 502
Step 500 步骤 500
Index
No ISB equipped
Step number: 501 Depressuring.1 after production PT130<0.2 Bar